অ্যাওয়ার্ড (NOA) · 175651
a) Construction of RCC drain (RCC/Brick/Pipe) Starting from Godnail Lal Building to Anayetnagar Lacky Bazar.Ch.0+000-2+505. b) Construction of drain (RCC/Brick/Pipe) starting from Tatkhana more upto WAPDA canal via Sayedpara wooden bridge Sayedpare Kafil uddin garments & the H/O Mr. Shamim at ward no-08.Ch.0+000-0+670. (Total Length with 7 link drain =1616.0m) c)Construction of drain (RCC/Brick/Pipe) starting fromTatkhana Government Primary School to Chowdhuribari road via Dr.kuddus house at ward no-08 Ch.0+000-0+292 & Link Ch.0+000-0+100.0 d) Construction of drain (RCC/Brick/Pipe) starting from Dhanakunda Saudbari to Rail Line & Barepara Aklim Mia House at ward no-08 Ch.0+000-0+170. e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08.Ch.0+000-0+356. Total Length(including 8 nos.Link Drain)=1840m. f) Construction of drain(RCC/Brick/Pipe) at Jalkuri starting from Amtala more to Wapda Cannal via east side & Jalkuri Khola Market at ward no-9.Ch.00+000-0+735Ch.0+000-0+493 (Link-1)Ch.0+000-0+288(Link-2). g)Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Naintarpar to Karoitola via Firoz Master House at ward no-9.Ch.0+000-0+650 Ch.0+000-0+599(Link-1)Ch.0+000-0+100(Link-2)Ch.0+000-0+118(Link-3). h) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapda acanal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9. Ch.0+000-0+225 Total Length (including Link drain)=837m. i) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Transmeter to Shikderbari pool via Taher Ali House & Jalkuri Graveyared at ward no-9.Ch.0+000-0+580. Ch.0+000-0+580(Link-1) Ch.0+000-0+190(Link-2) j) Construction of drain (RCC/Brick/Pipe) at jalkuri Starting from Modogar Mojibor poulty firm to Wapda canal near Ali Hossain House via Dewan Jame Mosque at ward no-9. Ch.0+000-0+400 Ch.0+000-0+370(Link-1) Ch.0+000-0+580(Link-2).
৳১৯.১৭ কোটি
এক নজরে
- কাজ পেয়েছে
- Mir Habibul Alam-Udayan Builders JV
- টেন্ডারার আইডি
- -
- জেলা
- নারায়ণগঞ্জ
- পদ্ধতি
- OTM
- NOA-এর তারিখ
- -
- চুক্তির তারিখ
- ৮ অক্টো ২০১৭
- কাজ শেষের তারিখ
- -