অ্যাওয়ার্ড (NOA) · 2020929
(1) Construction work of Boundary wall & Road at Atmul Up Betgari Mirbari Eatimkhana (Part : 01) (2) Construction work of Boundary wall & Road at Atmul Up Betgari Mirbari Eatimkhana (Part : 02) (3) Development work of dewanttala Majar Mosjid Complex (Part : 01) (4) Development work of dewanttala Majar Mosjid Complex (Part : 02) (5) Development work of Grammer School & College at Shibganj Sadar (6) Construction of Boundary & Guide wall at Betgaria Mir Mahatab Shah Alam Dakhil Madrasha (7) Development of Bogura Mahastan Mazar Mosque Perject (Women's Shed). Under Zila Parishad Bogura (8) Construction of Protective/Guide wall/ Surface drain at Nine site of Maidanhata UP (9) Construction of Protective/Guide wall/ Surface drain at Four site of Kichok UP (10)Construction of Protective/Guide wall/ Surface drain at Seven site of Atmul UP (11) Construction of Protective/Guide wall/ Surface drain at Seven site of Pirob UP (12) Construction of Protective/Guide wall/ Surface drain at Eleven site of Majhihotto UP (13) Construction of Protective/Guide wall/ Surface drain at Seven site of Buriganj UP (14) Construction of Protective/Guide wall/ Surface drain at Four site of Bihar UP (15) Construction of Protective/Guide wall/ Surface drain at Five site of Shibganj Sadar UP (16) Construction of Protective/Guide wall/ Surface drain at Eleven site of Deuli UP (17) Construction of Protective/Guide wall/ Surface drainof Seven site of Saidpur UP (18) Construction of Protective/Guide wall/ Surface drain at Ten site of Mokamtola UP (19) Construction of Protective/Guide wall/ Surface drain at Four site of Raynagar UP (20) Construction of Surface drain at betgari mirbari Family Grave Yard – Bashi & Betgari Girls School – Bashi Undar Atmul UP (Part : 01) (21) Construction of Installation in Position Brick Palisading at Upazila Parishad Pond North & East Side (Part : 02) Undar Shibganj Bogura
৳৫.০১ কোটি
এক নজরে
- কাজ পেয়েছে
- M/S JOY TRADERS
- টেন্ডারার আইডি
- 1001705
- অফিস (PE)
- Office Of the Zilla Parishad Bogura
- জেলা
- বগুড়া
- পদ্ধতি
- OTM
- NOA-এর তারিখ
- -
- চুক্তির তারিখ
- ২৮ জুন ২০২৬
- কাজ শেষের তারিখ
- -
- ঠিকানা
- PATULIPARA,TANGAIL SADAR,TANGAIL