Improvement of Keaju Headman Para Church Under Soroi Union. Latitude: 21.93153 Longitude: 92.19848]
GSID-2/BAN/DW-42/e-GP/20240725/910281/00166682
|
Office of the Executive Engineer, LGED, Bandarban |
৳৪.৭৫ লাখ |
২৮ নভে ২০২৩ |
Completed |
|
Improvement of Raicha Tholi Buddha Bihar Under Bandarban Sadar Union. [Latitude: 22.163783 Longitude: 92.175782]
GSID-2/BAN/DW-32/e-GP/20240728/909962/00166804
|
Office of the Executive Engineer, LGED, Bandarban |
৳৭.৫১ লাখ |
২৭ নভে ২০২৩ |
Completed |
|
Construction of Irrigation Canal (A-A1=600m & B-B1= 250m. Total Length= 850m) & Repair and Maintenance of Rubber Dam (Silt removal, block setting etc) Under Shilak khal Rubber dam SP (SP No: 99005), Upazila: Sadar, District: Bandarban.
SSSWRDP/Ban/WD-296/2023-24/e-GP/20240725/907981/00166681
|
Office of the Executive Engineer, LGED, Bandarban |
৳৫৮.৯৩ লাখ |
২২ নভে ২০২৩ |
Completed |
|
Construction of Drain Beside the Road Thanchi-Thanchi College - Sadar UP Office Via Amtolipara Road from Ch. 515.m-900m. under Thanchi Upazila, Dist: Bandarban. (L-Drain, X-Drain & Brick Protection wall) (Effictive Length=489m)
UTMIDP-BAND/THAN/WD-183/e-GP/20240728/871393/00166777
|
Office of the Executive Engineer, LGED, Bandarban |
৳৩৩.৪৮ লাখ |
১২ সেপ ২০২৩ |
Completed |
|
A) Improvement of Bowghat-Borichar Road From Ch.00-1500m. [ID- 403734089] B) Construction of 11 Nos 0.600x0.600m Cross Drain at ch. 150m, 320m, 350m, 420m, 505m, 600m, 840m, 960m, 1050m, 1200m & 1290m on the same road.
IRIDP-3/BAN/DW-13/e-GP/20250723/865047/00247511
|
Office of the Executive Engineer, LGED, Bandarban |
৳২.২২ কোটি |
৪ সেপ ২০২৩ |
Completed |
|
Supplying & Installation of Agriculture Equipment at 5 (Five) Upazila (Sadar, Kawkhali, Kaptai, Naniarchar, Bilaichari) under RHDC.
SID-CHT Agri-01/e-GP/20250616/855651/00246097
|
Rangamati Hill District Council |
৳২.০০ কোটি |
২৪ জুলাই ২০২৩ |
Completed |
|
Construction of Mechanical works for Surface Water Treatment Plant at Alikadam Upazilla in Bandarban District.
000/e-GP/DPHE/2023-07-11/00727683
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৬৯.২০ লাখ |
২৫ আগ ২০২২ |
Completed |
|
Construction of 160 mm dia 2000 meter HDPE Pipe line at Different Important places of Naikkhongchari Upazilla of Bandarban District.
000/e-GP/DPHE/2023-07-11/00671781
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৬২.৪৪ লাখ |
৮ মার্চ ২০২২ |
Completed |
|
Installation of 100 Nos Deep Tube Well (100x38)mm with DSP (no 6 Hand Pump) at Different Upazilla of Bandarban Districts Under Safe Water Supply of Ashrayan Project
000/e-GP/DPHE/2023-07-11/00651885
|
Office of the Executive Engineer , Bandarban, DPHE |
৳১.৪০ কোটি |
৩০ জানু ২০২২ |
Completed |
|
Installation of 50 Nos Deep Tube Well (100x38)mm with DSP (no 6 Hand Pump) at Different Upazilla of Bandarban Districts Under Safe Water Supply of Ashrayan Project.
000/e-GP/DPHE/2023-07-11/00647275
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৬৯.৮৫ লাখ |
২৭ জানু ২০২২ |
Completed |
|
Construction of Community Based Water Supply scheme by Installing 100mm dia Tube well with 1.5 HP Submersible Pump at Thanchi Upazilla under PSWSC project in Bandarban district. FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642943
|
Office of the Executive Engineer , Bandarban, DPHE |
৳১.১৮ কোটি |
২৩ জানু ২০২২ |
Completed |
|
Construction of Public Toilet with water connection in Dighinala Upazilla & Guimara Upazilla under Safe water supply and sanitation management project in different villages of Khagrachari district 2021-2022.
000/e-GP/DPHE/2023-07-11/00646698
|
Office of the Executive Engineer,DPHE,Khagrachari Division,Khagrachari |
৳৭৩.৩৪ লাখ |
১২ জানু ২০২২ |
Completed |
|
Rehabilitation of Chairy Bazar R& H - Shantir Hat GC (Rangunia) Road from ch. 00-3070 m & 1x2.50x2.50 m RCC Box Culvertat Ch. 379m & 1x1.50x1.50m Box culvert at ch. 1224 m under Upazila: Kawkhali , District: Rangamati. Road ID No: 484252007
FDR/Ran/21-22/UZR/W-07/e-GP/20231014/636831/00107566
|
Office of the Executive Engineer, LGED, Rangamati |
৳২.৪১ কোটি |
১২ ডিসে ২০২১ |
Completed |
|
Ashrayan-2 Installation of 25Nos Deep Tube Well (100x38)mm with DSP (no 6 Hand Pump) at Different Upazilla of Bandarban Districts Under Safe Water Supply of Ashran Project
000/e-GP/DPHE/2023-07-11/00596160
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৩৪.৮৫ লাখ |
৮ আগ ২০২১ |
Completed |
|
Ashrayan-1 Installation of 25Nos Deep Tube Well (100x38)mm with DSP (no 6 Hand Pump) at Different Upazilla of Bandarban Districts Under Safe Water Supply of Ashran Project
000/e-GP/DPHE/2023-07-11/00596159
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৩৪.৮৫ লাখ |
৮ আগ ২০২১ |
Completed |
|
Constraction of Safe Water Supply System at Shalbon Village in Khagrachari Pourasava of Khagrachari Sadar Upazilla under the Project for Safe water supply and sanitation management project in different villages of Khagrachhari district (2020-2021).
000/e-GP/DPHE/2023-07-11/00594091
|
Office of the Executive Engineer,DPHE,Khagrachari Division,Khagrachari |
৳২৫.২০ লাখ |
২৫ জুলাই ২০২১ |
Completed |
|
a Improvement of Paindu UP- Paindu Headmen Para Road at Ch 00-1000m. ID-403914002b Construction of 02 nos 0.900x1.350m culvert at ch. 523m & 626m on the same road. Salvage material value 2501458.00
IRIDP-3/BAN/DW-03/e-GP/20240725/559538/00166683
|
Office of the Executive Engineer, LGED, Bandarban |
৳৯৮.৩১ লাখ |
২ মে ২০২১ |
Completed |
|
Rehabilitation of Khabukpara RHD Road-Rajvila Chakmapara Road from Ch 00m-3200m ID 403144050
LGED/Ban/VRRP/Re-hab/20-21W-1595/e-GP/20230927/562107/0086993
|
Office of the Executive Engineer, LGED, Bandarban |
৳১.৬৭ কোটি |
৩১ মার্চ ২০২১ |
Completed |
|
Installation of 104 Nos Deep Tube well 100x38mm with submersible pump at Sadar Upazila in Sylhet District Under Project for Safe Water Supply Through Out The Country PSWSC
000/e-GP/DPHE/2023-07-11/00524296
|
Office of the Executive Engineer DPHE, Sylhet |
৳১.৫০ কোটি |
২১ ডিসে ২০২০ |
Completed |
|
Rehabilitation of Naikhongchari UZ HQ - Alikadam UZ HQ Road via Dochari UP Office Road at Ch. 5670 - 7570m Effective length 1900m ID No. 403732007
WD/DDRRIP-3HD/BAN/ALIKADAM/UZR/W41/e-GP/20240726/526156/00166693
|
Office of the Executive Engineer, LGED, Bandarban |
৳৬.৩৭ কোটি |
১৪ ডিসে ২০২০ |
Completed |
|
Construction of Public Toilet with water connection in Panchari Upazilla Matiranga Upazilla & Guimara Upazilla under Safe water supply and sanitation management project in different villages of Khagrachari district 2020-2021.
000/e-GP/DPHE/2023-07-11/00515435
|
Office of the Executive Engineer,DPHE,Khagrachari Division,Khagrachari |
৳১.০২ কোটি |
৯ ডিসে ২০২০ |
Completed |
|
Installation of Deep Tube Well 100x38mm with Submersible Pump & Deep Tube Well 100x38mm with DSP 6 no Pump at Jurachari Upazila in Rangamati District. Lot-7 89 nos TW
000/e-GP/DPHE/2023-07-11/00507557
|
Office of the Executive Engineer , Rangamati, DPHE |
৳১.২১ কোটি |
১ নভে ২০২০ |
Completed |
|
Installation of Deep Tube Well 100x38 mm with Submersible Pump at Langadu Upazila in Rangamati District. Lot-8 93 nos TW
000/e-GP/DPHE/2023-07-11/00507563
|
Office of the Executive Engineer , Rangamati, DPHE |
৳১.৩৬ কোটি |
২৮ অক্টো ২০২০ |
Completed |
|
Installation of Deep Tube Well 100x38mm with DSP 6 no Pump at Rangamati Sadar Upazila in Rangamati District. Lot-13 61nos TW
000/e-GP/DPHE/2023-07-11/00507569
|
Office of the Executive Engineer , Rangamati, DPHE |
৳৮৪.৯৩ লাখ |
২৮ অক্টো ২০২০ |
Completed |
|
Installation of 60 Nos 75mm X 38mm dia Deep Tara Tube well and 63 Nos 38mm dia Deep Tubewell with No.6 Hand Pump at Chakaria Upazila in Coxsbazar District Under Project for Safe Water Supply Through Out The Country of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00507360
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳৯১.৪০ লাখ |
২২ অক্টো ২০২০ |
Completed |
|
Installation of 120 Nos 75mm X 38mm dia Deep Tara Tube well and 13 Nos 75mm X 38mm dia Tara Shallow Tube well with No.6 Hand Pump at Ramu Upazila in Coxsbazar District Under Project for Safe Water Supply Through Out The Country of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00507402
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳১.১১ কোটি |
২২ অক্টো ২০২০ |
Completed |
|
Installation of 143 Nos 38mm dia Deep Tubewell 39 Nos 75mm X 38mm dia Tara Deep Tubewell and 26 Nos 38mm dia Shallow Tubewell with No.6 Hand Pump at Moheshkhali Upazila in Coxsbazar District Under Project for Safe Water Supply Through Out the Country of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00507385
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳১.২৮ কোটি |
২২ অক্টো ২০২০ |
Completed |
|
Installation of 182 Nos 38mm dia Deep Tube well with No.6 Hand Pump at Pekua Upazila in Coxsbazar District Under Project for Safe Water Supply Throughout The Country of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00507374
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳১.২৯ কোটি |
২২ অক্টো ২০২০ |
Completed |
|
Installation of 52 Nos 38mm dia Deep Tubewell with No 6 Hand Pump and 52 Nos Deep Tubewell 100mm 38mm with Submersible Pump at Sadar Upazila in Coxsbazar District Under Project for Safe Water Supply Through Out the Country of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00507403
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳১.০৬ কোটি |
২২ অক্টো ২০২০ |
Completed |
|
Installation of 182 Nos Deep Tube well with No.6 Hand Pump at Pekua Upazila in Coxsbazar District Under Project for Safe Water Supply Throughout The Country of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00504748
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳১.২৮ কোটি |
১৩ অক্টো ২০২০ |
Completed |
|
Installation of 80 Nos Deep Tube Well 100x38mm with Submersible Pump at LamaUpazilla of Bandarban Districts Under Safe Water Supply Through Out The CountrySWSC Project FY-2019-2020.
000/e-GP/DPHE/2023-07-11/00488171
|
Office of the Executive Engineer , Bandarban, DPHE |
৳১.৩০ কোটি |
১ সেপ ২০২০ |
Completed |
|
Installation of 100 Nos Deep Tube Well 100x38mm with DSP no 6 Hand Pump at Different Upazilla of Bandarban Districts Under Safe Water Supply Through Out The CountrySWSC Project FY-2019-2020.
000/e-GP/DPHE/2023-07-11/00488110
|
Office of the Executive Engineer , Bandarban, DPHE |
৳১.৩৯ কোটি |
১ সেপ ২০২০ |
Completed |
|
Estimate for installation of 100 x 50mm dia shrouded Tube Well with 1.0 HP capacity submersible pump under Village Water Supply ProjectVWSP of Department of Public Health Engneering DPHE
000/e-GP/DPHE/2023-07-11/00485584
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৩১.৪১ লাখ |
৩১ আগ ২০২০ |
Completed |
|
Rehabilitation of Chimbuk R & H Road to Hativanga Tripura Para Road Ch. 0.00-755 m ID No. 403144055
WD/DDRRIP-3HD/BAN/SADAR/VILL/W31/e-GP/2023924/471416/0087924
|
Office of the Executive Engineer, LGED, Bandarban |
৳১.৩৪ কোটি |
১২ জুলাই ২০২০ |
Completed |
|
Rehabilitation of Marishya Bazar GC-Durachari Bazar GC road. Ch. 4500m-10230m Effective length 5623m ID No 484072003 Salvage Materials Tk. 15717977.00
WD/DDRRIP-3HD/RANG/BAGHAI/UZR/W15/e-GP/20231015/460839/00108010
|
Office of the Executive Engineer, LGED, Rangamati |
৳১০.৪৮ কোটি |
২১ মে ২০২০ |
Completed |
|
Construction of additional class room BARA PARA GPS under PEDP4
e-Tender/PEDP4/KHG/SAD/2019-2020/W1.00170/e-GP/20231204/459204/00147541
|
Office of the Upazila Engineer, LGED, Khagrachari Sadar, Khagrachari |
৳১৩.০৫ লাখ |
১১ মে ২০২০ |
Completed |
|
Installation of DSP Deep Tube Well 100mm X 50mm Dia at Lama & Sadar Upazilla under Bandarban districts
000/e-GP/DPHE/2023-07-11/00457753
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৭৫.৬৯ লাখ |
৪ মে ২০২০ |
Completed |
|
Major maintenance of Taludar Para Chara Tarabon Chara & Kalanal GPS Under PEDP4
eTender/PEDP4/KHG/PAN/2019-2020/W17.00877/e-GP/20231207/446072/00149244
|
Office of the Upazila Engineer, LGED, Panchari, Khagrachari |
৳৮.০৮ লাখ |
১৯ মার্চ ২০২০ |
Completed |
|
Rehabilitation of Lama - Suwalac Road from Ch 9100 - 12350m 12350 - 12950m & 12950 - 14500m under Upazila Lama District Bandarban. Road ID No. 403512001
FDR/Ban/19-20/UNR/W-14/e-GP/202397/435820/0081069
|
Office of the Executive Engineer, LGED, Bandarban |
৳২.৪০ কোটি |
৯ মার্চ ২০২০ |
Completed |
|
Major Maintenance of Hila Gazi Para & Majumder Khill Govt. Primary School Under PEDP4
e-tender/PEDP4/CTG/RAN/2019-20/W17.00978/e-GP/202397/436039/0081051
|
Office of the Upazila Engineer, LGED, Rangunia, Chittagong |
৳১০.৩২ লাখ |
৮ মার্চ ২০২০ |
Completed |
|
Rehabilitation of Ruma Battali Bazar R & H Road - Galanga UP Office Road. at Ch. 0.00m - 6055.00m Effective Length 6055.00m. ID No 403913004
WD/DDRRIP-3HD/BAN/RUMA/UNR/W26/e-GP/20240726/427030/00166696
|
Office of the Executive Engineer, LGED, Bandarban |
৳১০.৮৫ কোটি |
১৮ ফেব ২০২০ |
Completed |
|
Improvement of Chemedolu para- Kuhalong UP Road Ch. 5000-10000m Effective length 5000m ID No. 403143004
WD/DDRRIP-3HD/BAN/SADAR/UNR/W21/e-GP/2023925/417192/0089596
|
Office of the Executive Engineer, LGED, Bandarban |
৳৭.১৬ কোটি |
২ ফেব ২০২০ |
Completed |
|
1 Improvement of Thanchi-Thanchi- Shajahanpara- Zinnapara BC road at Ch. 00- 1183m. Effective Length 1041m Under Thanchi Upazila Dist. Bandarban2 Improvement of Thanchi-Thanchi Sadar UP office via Thanchi College BC road at Ch. 00- 530m. Effective Length 515m Under Thanchi Upazila Dist. Bandarban
UTMIDPTHAN/BANDA/WR-177/e-GP/2023922/416544/0086990
|
Office of the Executive Engineer, LGED, Bandarban |
৳১.৮৮ কোটি |
২ ফেব ২০২০ |
Completed |
|
Improvement of Road from Upaban Lake- Naikhyongchari HQ Bazar GC by 25mm thik Bitumininus Carpeting with 7mm Seal Coat from Ch. 0.0m- 1000m Under Naikhyongchari Upazila. Dist Bandarban. Road ID No. 403733075
UTMIDPNAIK/BANDA/WR-167/e-GP/2023923/416488/0087464
|
Office of the Executive Engineer, LGED, Bandarban |
৳১.৭১ কোটি |
২ ফেব ২০২০ |
Completed |
|
Construction of 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works.-Naikhongchari-07
000/e-GP/DPHE/2023-07-11/00405683
|
Office of the Executive Engineer , Bandarban, DPHE |
৳১.৩৬ কোটি |
৯ জানু ২০২০ |
Completed |
|
Rehabilitation of Chairy Bazar R&H -Laxmichari HQ via Barmachari kawkhali Part Road. Ch.00m-3600 Effective Length 3600m. ID No 484252005
WD/DDRRIP-3HD/RANG/KAWKHA/UZR/W07/e-GP/20231014/385727/00107567
|
Office of the Executive Engineer, LGED, Rangamati |
৳৪.৮৮ কোটি |
২১ নভে ২০১৯ |
Completed |
|
Construction of 57.00M RCC Girder Bridge on Bangchari R&H road-Awlad Bazar GC road at ch.1.20km ID No 484364020 Under Kaptai Upazila Dist. Rangamati.
WD/DDRRIP-3HD/RANG/KAPTAI/BRIDGE/W06/e-GP/20231016/378478/00109419
|
Office of the Executive Engineer, LGED, Rangamati |
৳২.৪৬ কোটি |
৭ নভে ২০১৯ |
Completed |
|
SANCOM-341Construction of 6 Nos Community Toilet with 3 Cubicalesone urinals 2 wash basins 1 septic tank and 3 soak well with Sanitary and electrical works at different upazila in Bandarban District under National Sanitation Project Phase- FY -2019-20
000/e-GP/DPHE/2023-07-11/00370826
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৪১.৯৭ লাখ |
৪ নভে ২০১৯ |
Completed |
|
Improvement of Kharikhong to Zamchup via Kuramara Road Ch.1200.00-3040m Effective Length1795.00m ID No 484875022
WD/RIDPCHT-2/RANG/SADAR/VILL/W63/e-GP/20231015/371887/00108295
|
Office of the Executive Engineer, LGED, Rangamati |
৳৩.৮২ কোটি |
৩০ অক্টো ২০১৯ |
Completed |
|
B-DTW-45Installation of DSP Deep Tube Well 100mm X 50mm Dia at Bandarban Sadar Upazilla under Bandarban districts. FY-2019-20
000/e-GP/DPHE/2023-07-11/00357590
|
Office of the Executive Engineer , Bandarban, DPHE |
৳৪৬.২৫ লাখ |
১৭ সেপ ২০১৯ |
Completed |