Installation of 260 (Two Hundred Sixty) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District Under Safe Water Supply Through Out the Country (PSWSC) of Department of Public Health Engineering. FY: 2022-2023.
000/e-GP/DPHE/2023-07-11/00748185
|
Office of the Executive Engineer DPHE, Khulna |
৳১.১৭ কোটি |
১৩ নভে ২০২২ |
Completed |
|
Installation of 38 (Thirty Eight) nos. Rain Water Harvesting (RWH) at Rupsha Upazila in Khulna District under Revenue Budget. FY: 2022-2023.
000/e-GP/DPHE/2023-07-11/00743794
|
Office of the Executive Engineer DPHE, Khulna |
৳১৭.০৭ লাখ |
৬ নভে ২০২২ |
Completed |
|
Installation of 240 (Two Hundred Forty) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District Under Arsenic Risk Reduction Project on Water Supply (ARRP) of Department of Public Health Engineering. FY: 2022-2023.
000/e-GP/DPHE/2023-07-11/00737440
|
Office of the Executive Engineer DPHE, Khulna |
৳৯৬.৬৯ লাখ |
২৯ সেপ ২০২২ |
Completed |
|
Installation of 12 (Twelve) Nos. 10000 Liter P/d Capacity Solar Operated Pond Sand Filter PSF in Different Upazila at Khulna District Under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads FY 2021-2022.
000/e-GP/DPHE/2023-07-11/00696484
|
Office of the Executive Engineer DPHE, Khulna |
৳৭৭.৪১ লাখ |
১১ মে ২০২২ |
Completed |
|
Construction of Boundary Wall around the Koyra Office Building Area in Khulna District Under Revenue Budget of DPHE.FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00682434
|
Office of the Executive Engineer DPHE, Khulna |
৳৭.৯০ লাখ |
৫ এপ্রিল ২০২২ |
Completed |
|
Construction of Public Sanitation and Hygiene Facilities (02 nos) with running Water and Response to COVID-19 Hand Washing Station (09 nos) with running Water by Installing Tube-well with Overhead Tank and associated Facilities .
000/e-GP/DPHE/2023-07-11/00640190
|
Office of the Executive Engineer DPHE, Khulna |
৳৪৯.১৪ লাখ |
২৩ ডিসে ২০২১ |
Completed |
|
Repair & Maintenance work at Toilets & Sinking of a Deep Tubewell with Submersible Pump of DPEO Office (Sanitary, Fixture & Fittings Electrical works & Running water supply etc.), Khulna under PEDP-4 ( FY 2021-2022.)
000/e-GP/DPHE/2023-07-11/00638876
|
Office of the Executive Engineer DPHE, Khulna |
৳২.৬৯ লাখ |
২০ ডিসে ২০২১ |
Completed |
|
Running Repair & Maintenance work of SD Mohananda-18" & work Boat No-11 such as Side Pully Repair,Hydrolic Pipe & nipple, Gear Box of Work Boat, Dredger Body & Delevery Pipe, Electric Switch, Sensor Limite Swtich etc at Borni Baor Dredging Work at Tungipara Gopalgong Under Khulna Dredger Opration Division BWDB, Lobonchora, Khulna During Year 2020-21.
XEN/KDD/OTM-20/2020-21/e-GP/20220929/585520/0047152
|
Khulna Dredger Division |
৳২.৯৬ লাখ |
৬ জুন ২০২১ |
Completed |
|
Repair & Maintenance Toilet and Other Work at Koyra URC in Khulna District under Fourth Primary Education Development Program PEDP-4 of Department of Public Health Engineering DPHE. FY 2020-2021.
000/e-GP/DPHE/2023-07-11/00572192
|
Office of the Executive Engineer DPHE, Khulna |
৳১.২৮ লাখ |
২২ এপ্রিল ২০২১ |
Completed |
|
Re-Sectioning of Embankment from Km. 29.000 to Km. 29.750 total 0.750 Km. at Baniakhali in Polder No-10/12 under Non-Development Revenue Budget Code no-3258137 under Khulna O&M Division-2 BWDB Khulna during the year 2020-2021.
13/NDR/K-2/2020-21/e-GP/20220929/547471/0047610
|
Khulna O&M Division-2 |
৳২৮.৪৯ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Re-excavation of 06 Nos. Pond at Paikgacha Upazila-01 No. Paikgacha Batikhali Pond Koyra-01 No. Koyra Pond Dumuria Upazila-02 Nos. Chuknagar Pond & Sarafpur Acra Pond & Batiaghata Upazila-02 Nos. Batiaghata Hetalbunia Pond & Batiaghata Vandercot Pond Under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads at Khulna District. FY 2020-2021.
KHU-156/e-GP/20220929/480509/0047118
|
Office of the Executive Engineer DPHE, Khulna |
৳২.২৪ কোটি |
২২ জুলাই ২০২০ |
Completed |
|
Re-excavation of 06 Nos. Pond at Rupsha Upazila-04 Nos. Noihati Sreerampur Pond Sreefaltala Pond Aijgathi Deyara Pond & Aijgathi Durjanimahal Pond Khulna Sodor-01 No. Moheshwerpasha Pond & Fultala Upazila-01 No. Fultala Pond Under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads at Khulna District. FY 2020-2021.
KHU-157/e-GP/20220929/480512/0047091
|
Office of the Executive Engineer DPHE, Khulna |
৳২.১৩ কোটি |
২২ জুলাই ২০২০ |
Completed |
|
Supplying Geo-bag 100 percent Ployester to protect vulnerable locations in different polders from emergency early flood under khulna O&M Division-2 BWDB Khulna during the financial year 2019-2020.
32/NDR/2019-20/Supply/e-GP/20220926/456915/0043143
|
Khulna O&M Division-2 |
৳২১.৯৮ লাখ |
৩ মে ২০২০ |
Completed |
|
Repair Work of Mollahat Sub-Division Office and its Rest house under Bagerhat O&M Division BWDB Bagerhat under NDR Budget BAG/NDR/OTM/Package-15/2019-2020.
BAG/NDR/OTM/Package-15/2019-2020/e-GP/20220926/456082/0043176
|
Bagerhat O&M Division |
৳৮.৯৭ লাখ |
২৭ এপ্রিল ২০২০ |
Completed |
|
Construction of 7 Nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Dacope & Koyra Upazila of Khulna District Under Fourth Primary Education Development Program PEDP-4. FY 2019-2020
000/e-GP/DPHE/2023-07-11/00454287
|
Office of the Executive Engineer DPHE, Khulna |
৳১.৩৮ কোটি |
১৪ এপ্রিল ২০২০ |
Completed |
|
Construction of 10 Nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Dumuria Upazila of Khulna District Under Fourth Primary Education Development Program PEDP-4. FY 2019-2020
000/e-GP/DPHE/2023-07-11/00454206
|
Office of the Executive Engineer DPHE, Khulna |
৳১.৭৯ কোটি |
১৪ এপ্রিল ২০২০ |
Completed |
|
Construction of 8 Nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Dacope Upazila of Khulna District Under Fourth Primary Education Development Program PEDP-4. FY 2019-2020
000/e-GP/DPHE/2023-07-11/00454277
|
Office of the Executive Engineer DPHE, Khulna |
৳১.৫৮ কোটি |
১৪ এপ্রিল ২০২০ |
Completed |
|
Construction of 10 Nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Dumuria Upazila of Khulna District Under Fourth Primary Education Development Program PEDP-4. FY 2019-2020
000/e-GP/DPHE/2023-07-11/00454174
|
Office of the Executive Engineer DPHE, Khulna |
৳১.৭৯ কোটি |
১৪ এপ্রিল ২০২০ |
Completed |
|
Construction of Retired Embankment Marginal Dyke from Km. 16.580/0.000 to Km. 16.760/0.200 total 0.200 Km. in polder no. 34/2 part Amirpur-Bhandarkot-Baliadanga Sub-Project under BlueGold Program at Shealidanga under Khulna O&M Division-2 BWDB Khulna During the year 2019-2020.
15//BGP/2019-20/K-2/e-GP/20220926/451141/0043165
|
Khulna O&M Division-2 |
৳৮.৪৮ লাখ |
২৫ মার্চ ২০২০ |
Completed |
|
Construction of Retired Embankment Marginal Dyke from Km. 2.350/0.000 to Km. 2.850/0.550 total 0.550 Km. at Kalinagar in polder no. 22 under Khulna O&M Division-2 BWDB Khulna under BlueGold Program During the year 2019-2020.
16//BGP/2019-20/K-2/e-GP/20220926/451150/0043115
|
Khulna O&M Division-2 |
৳১৯.৭৩ লাখ |
২৫ মার্চ ২০২০ |
Completed |
|
Precautionary protective work along the R/B of Kazibacha river from Km. 12.830 to Km. 12.890 total 0.060 Km. in polder no-30 at Baronpara Gangarampur Batiaghata Khulna under Non-Development revenue Budget during the year 2019-2020.
31/NDR/2019-20/e-GP/20220926/441783/0043096
|
Khulna O&M Division-2 |
৳২৬.১১ লাখ |
১১ মার্চ ২০২০ |
Completed |
|
Precautionary protective work along the R/B of Kapotakho river from Km. 73.600 to Km. 73.670 total 0.070 Km. at Malopara Raruli Paikgacha Khulna under Non-Development revenue Budget during the year 2019-2020.
30/NDR/2019-20/e-GP/20220926/441795/0043105
|
Khulna O&M Division-2 |
৳২১.৪৬ লাখ |
১১ মার্চ ২০২০ |
Completed |
|
Re-excavation of Sapa khal from Km. 0.000 to Km. 1.924 total 1.924 Km. in polder no. 31 Part at Batiaghata Khulna in C/W Bluegold Program during the year 2019-2020.
13/BGP/2019-20/K-2/e-GP/20220926/416537/0043146
|
Khulna O&M Division-2 |
৳২৩.৯৩ লাখ |
২৯ জানু ২০২০ |
Completed |
|
Construction of Retired Embankment Marginal Dyke from Km. 2.050/0.000 to Km. 2.220/0.170 total 0.170 km at Kalinagor in Polder no-22 in C/W Bluegold Program during the year 2019-2020.
10/BGP/2019-20/K-2/e-GP/20220924/416533/0041627
|
Khulna O&M Division-2 |
৳১৩.৬৭ লাখ |
২৯ জানু ২০২০ |
Completed |
|
Repair Maintenance & Re-Construction of Pump House & Installation of New Submersible Pump Boundary Wall at Batiaghata UZHC under Khulna District.
HED/KD/GOBRev-H/19-20/16/e-GP/20220924/390146/0041561
|
HED, Khulna Division, Khulna |
৳১৪.৭২ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
DOKKHIN KHAZA DANGA GOVERNMENT PRIMARY SCHOOL UNDER RUPSA UPAZILA DISTRICT KHULNA.
e-Tender/NBIDGPS/KHU/RUP/2019-20W1.04303/e-GP/20241127/377277/00224185
|
Office of the Upazila Engineer, LGED, Rupsha, Khulna |
৳১.০৪ কোটি |
১৩ নভে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 15.000 to km. 15.560 total 0.560 km. at Jhalbunia in Polder no. 31 under Non-Development Revenue Budget during the year 2019-2020.
09/NDR/2019-20/e-GP/20220924/380846/0041356
|
Khulna O&M Division-2 |
৳১২.৪৩ লাখ |
১২ নভে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 28.000 to km. 28.600 total 0.600 km. at Laxmikhola in Polder no. 31 under Non-Development Revenue Budget during the year 2019-2020.
03/NDR/2019-20/e-GP/20220924/380826/0041351
|
Khulna O&M Division-2 |
৳১২.৭৬ লাখ |
১২ নভে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 12.626 to km. 13.500 total 0.874 km. at Narkeltola in Polder no. 23 under Non-Development Revenue Budget during the year 2019-2020.
16/NDR/2019-20/e-GP/20220924/380878/0041541
|
Khulna O&M Division-2 |
৳১৮.৪৯ লাখ |
১২ নভে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 1.100 to km. 1.550 total 0.450 km. at Khona in Polder no. 31 under Non-Development Revenue Budget during the year 2019-2020.
04/NDR/2019-20/e-GP/20220924/380827/0041533
|
Khulna O&M Division-2 |
৳১২.৭৭ লাখ |
১২ নভে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 22.125 to km. 23.295 total 1.170 km. at Sonakhali in Polder no. 23 under Non-Development Revenue Budget during the year 2019-2020.
19/NDR/2019-20/e-GP/20220924/380881/0041492
|
Khulna O&M Division-2 |
৳২৪.০৯ লাখ |
১২ নভে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 25.000 to km. 25.250 total 0.250 km. at Andharmanik in Polder no. 31 under Non-Development Revenue Budget during the year 2019-2020.
02/NDR/2019-20/e-GP/20220924/380823/0041359
|
Khulna O&M Division-2 |
৳৯.৯১ লাখ |
১২ নভে ২০১৯ |
Completed |
|
Resectioning of Embankment from Km. 25.400 to Km. 26.440 total 1.040 km. in polder no. 34/2 partAmirpur-Bhandarkot-Baliadanga sub project under Bluegold Program under Khulna O&M Division-2 BWDB Khulna during the year 2019-20.
05/BGP/2019-20/K-2/e-GP/20220926/370944/0043033
|
Khulna O&M Division-2 |
৳১৩.৯৫ লাখ |
২২ অক্টো ২০১৯ |
Completed |
|
247695116 Improvement of Uttar Dihi Faragi Bari-JJI Mill Road at ch 00-624m by BC under Phultala Upazila District Khulna. Salvage Cost of this package is Tk 561840.00 fixed which will be paid by contractor
KBSRIDP/KHUL/VR-35.2/18/e-GP/20241111/355840/00217048
|
Office of the Executive Engineer, LGED, Khulna |
৳৪৫.৭৫ লাখ |
১২ সেপ ২০১৯ |
Completed |
|
Construction of 05 Five Nos. Community Toilet with 3 Cubicales one urinals 2 wash basins 1 septic tank and 3 soak well with Sanitary and electrical works of Khulna District under National sanitation Project Phase-III DPHE. FY 2019-2020.
SANCOM-301/e-GP/20220927/352257/0044610
|
Office of the Executive Engineer DPHE, Khulna |
৳৩৬.২৭ লাখ |
১ সেপ ২০১৯ |
Completed |
|
Installation for 10000 L/day Capacity Solar Operated Pond Sand Filter PSF at Koyra Upazila-09 Nos. Under Khulna District Under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads.
SPSF_10_KHU/e-GP/20220924/346784/0041753
|
Office of the Executive Engineer DPHE, Khulna |
৳৬৭.৯৩ লাখ |
২২ আগ ২০১৯ |
Completed |
|
Repair and Protection of embankment from km. 18.050 to km. 18.140 total 0.090 km at Telikhali in Polder No. 22 under Khulna O&M Division-2 BWDB Khulna in c/w Blue Gold Program during the year 2018-2019.
13/K-2/BGP/2018-19/e-GP/20220923/316264/0040642
|
Khulna O&M Division-2 |
৳১৫.২৬ লাখ |
৭ মে ২০১৯ |
Completed |
|
re-sectioning of embankment from km. 12.350 to km. 12.500 Total 0.150 km. with 0.050 km. temporary slope protection at Boroitola in Polder no. 23 under Non-Development Revenue Budget during the year 2018-2019.
NDR/K-10/2018-19/e-GP/20220923/301354/0040608
|
Khulna O&M Division-2 |
৳৩.৯১ লাখ |
২৮ মার্চ ২০১৯ |
Completed |
|
construction of retired embankment Marginal Dyke from km. 1.700/0.000 to km. 1.960/0.255 Total 0.255 km. at Khona in Polder No. 31 under Non-Development Revenue Budget during the year 2018-2019.
NDR/K-8/2018-19/e-GP/20220922/301346/0040413
|
Khulna O&M Division-2 |
৳৯.৭১ লাখ |
২৮ মার্চ ২০১৯ |
Completed |
|
Re-sectioning of embankment from from km. 29.490 to km. 30.023 total 0.533 km. at Laskor in Polder no. 23 under Non-Development Revenue Budget during the year 2018-2019.
NDR/K-5/2018-19/e-GP/20220922/283198/0040150
|
Khulna O&M Division-2 |
৳৮.৪১ লাখ |
১০ ফেব ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 11.200 to km. 11.258 & from Km. 11.800 to Km. 11.900 total 0.158 km. at Boyar Jhapa in Polder no. 23 under Non-Development Revenue Budget during the year 2018-2019.
NDR/K-4/2018-19/e-GP/20220923/283155/0040634
|
Khulna O&M Division-2 |
৳৫.৩০ লাখ |
১০ ফেব ২০১৯ |
Completed |
|
Construction of retired embankment Marginal Dyke from km. 25.880/0.000 to km. 26.300/0.430 total 0.430 km. at Andharmanik in Polder No. 31 under Non-Development Revenue Budget during the year 2018-2019.
NDR/K-7/2018-19/e-GP/20220922/273114/0040406
|
Khulna O&M Division-2 |
৳১৯.৬১ লাখ |
১৫ জানু ২০১৯ |
Completed |
|
Re-sectioning of embankment from km. 1.400 to km. 2.400 total1.000 km. at Bainchapra in Polder no. 20 under Non-Development Revenue Budget during the year 2018-2019.
NDR/K-6/2018-19/e-GP/20220923/273089/0040603
|
Khulna O&M Division-2 |
৳১২.০৪ লাখ |
১৫ জানু ২০১৯ |
Completed |
|
Re-Sectioning of Embankment from Km. 14.750 to Km. 15.100 total 0.350 Km. and Km. 16.100 to Km. 16.800 total 0.700 Km. grand total 1.050 Km. in Polder no. 31part under Blue Gold Program at khulna O&M Division-2 BWDB Khulna during the year 2018-19.
01/K-2/BGP/2018-19/e-GP/20220923/236019/0040626
|
Khulna O&M Division-2 |
৳১৫.২২ লাখ |
১৫ অক্টো ২০১৮ |
Completed |
|
Construction of Retired embankment from Km. 26.100/0.000 to KM. 26.450/0.400 Total 0.400 Km. at Keshorabad in polder no. 31 part under Khulna O&M Division-2 BWDB Khulna in C/W Blue Gold Program during the year 2018-19 & 2019-20.
02/K-2/BGP/2018-19/e-GP/20220922/236021/0040161
|
Khulna O&M Division-2 |
৳১৭.২০ লাখ |
১৫ অক্টো ২০১৮ |
Completed |
|
Construction of Upazila Office Boundary Wall at Extension at Paikgacha Upazila
REV-KHU-03/e-GP/20220921/180930/0039642
|
Office of the Executive Engineer DPHE, Khulna |
৳২.৭০ লাখ |
১ এপ্রিল ২০১৮ |
Completed |
|
Repair of Upazila Office at Fultala Upazila under Khulna District.
REV-KHU-02/e-GP/20220921/180929/0039633
|
Office of the Executive Engineer DPHE, Khulna |
৳২.২১ লাখ |
১ এপ্রিল ২০১৮ |
Completed |
|
Improvement of M.T. Road By Lane. Near of Baki Shahebs House
KCC/ADP/XEN-3/2017-18/W-176/e-GP/20220921/174316/0039822
|
Executive Engineer Civil-3 |
৳৭.৩৮ লাখ |
১২ মার্চ ২০১৮ |
Completed |
|
SUPPLYING OF MATERIALS FOR CONSTRUCTION OF LOW COST LATRINE SET RCC SLAB WITH PLASTIC PAN AND 5 NOS RCC RING 900 SETS AT DIFFERENT UPAZILA IN KHULNA DIVISION UNDER NATIONAL SANITATION PROJECT PHASE III DPHE FY 2017-2018
SANGD-120 /e-GP/20220921/142767/0039638
|
Office of the Executive Engineer DPHE, Khulna |
৳১০.৭৮ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Repair/Re-sectioning of embankment from km. 2.900 to km. 3.255 at Kalinagor km. 10.800 to km. 10.900 at Durgapur Total 0.455 km. in Polder No. 22 under Blue Gold Program during the year 2016-17 & 2017-18. Package No. e-T/26/KHU2/BLUE GOLD/P-22/2016-17
e-T/26/KHU2/BLUE GOLD/P-22/2016-17/e-GP/20220920/110206/0039309
|
Khulna O&M Division-2 |
৳১৮.০৭ লাখ |
৪ জুলাই ২০১৭ |
Completed |