Sales and Distribution Division, BPDB, Chowmuhani's office building repairs and preserves ancillary works, including painting the interior, installing the falls sealing and enhancing the beautification.
CM - 2 /e-GP/20220922/700487/0039989
|
Sales and Distribution Division, Chowmuhoni |
৳২.৭৫ লাখ |
২২ মে ২০২২ |
Completed |
|
Ancillary emergency repair and maintenance work including replacement of HT and LT loop, change of DOFC and LA, replacement of faulty transformers at various distribution substations of 11 KV Amanotpur and Medical feeders under BBB, BPDB, Chowmuhani.
LM-12-21-22/e-GP/20220922/636518/0039974
|
Sales and Distribution Division, Chowmuhoni |
৳৩.০০ লাখ |
১৪ ডিসে ২০২১ |
Completed |
|
Repair of 11 KV and 11 / 0.4 KV distribution lines, installation of new transformers at load centers for low-voltage removal and ancillary emergency maintenance including replacement of transformers in different areas under 11 KV Hajipur feeder under BBB, BPDB, Chowmuhani.
LM-13-21-22/e-GP/20220922/636522/0039978
|
Sales and Distribution Division, Chowmuhoni |
৳৩.০০ লাখ |
১৪ ডিসে ২০২১ |
Completed |
|
Renovation of derelict Khal/canal with leveling, dressing and compaction of excavated soil to embankment and pumping & bailing out water from khal and construction of water passing structure on the both side of embankment of khal etc. (6000 cum/KM avg.).
PD/NFLMIDP/EGP/2021-22/WD-08/Lot-15/e-GP/20220921/602152/0039467
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳১৩.১৫ লাখ |
৯ সেপ ২০২১ |
Completed |
|
Construction of Medium size Hydraulic Structure Cross dam/Sluice Gate/ Culvert.
PD/NFLMIDP/EGP/2020-21/WD-15/Lot-12/e-GP/20220921/491443/0039952
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২৮.১১ লাখ |
৯ মে ২০২১ |
Completed |
|
Construction of Medium size Hydraulic Structure Cross dam/Sluice Gate/ Culvert.
PD/NFLMIDP/EGP/2020-21/WD-15/Lot-19/e-GP/20220921/491450/0039949
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২৩.৯২ লাখ |
৯ মে ২০২১ |
Completed |
|
Rain water harvester installation..
WD6/SACP-BADC/20-21/RWHI-7/e-GP/20220921/503496/0039954
|
Office of Component Director, Smallholder Agricultural Competitiveness Project (SACP)-BADC Part |
৳২৮.০৪ লাখ |
১৭ ডিসে ২০২০ |
Completed |
|
Line maintenance & repair works of 11 kV & 11/0.4 kV lines installing new transformers at load center to reduce low voltage problem transformer replacement and with other necessary works at several areas in 11 kV Eklaspur Feeder under Sales & Distribution Division BPDB Chowmuhoni.
LM - 12/e-GP/20220921/498600/0039973
|
Sales and Distribution Division, Chowmuhoni |
৳২.৯৯ লাখ |
৩০ সেপ ২০২০ |
Completed |
|
Re-Excavation of Khal/canal with leveling dressing and compaction of excavated soil to embankment including pumping & bailing out water from khal and construction of water passing structure on the both side of embankment of khal etc. 10000 cum/KM avg..
PD/NFLMIDP/EGP/2020-21/WD-04/Lot-08/e-GP/20220921/491357/0039465
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২০.৩০ লাখ |
২১ সেপ ২০২০ |
Completed |
|
Renovation of derelict Khal/canal with leveling dressing and compaction of excavated soil to embankment and pumping & bailing out water from khal and construction of water passing structure on the both side of embankment of khal etc. 6000 cum/KM avg..
PD/NFLMIDP/EGP/2019-20/WD-05/Lot-01/e-GP/20220921/351967/0039964
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২০.৭০ লাখ |
২৮ নভে ২০১৯ |
Completed |
|
Renovation of derelict Khal/canal with leveling dressing and compaction of excavated soil to embankment and pumping & bailing out water from khal and construction of water passing structure on the both side of embankment of khal etc. 6000 cum/KM avg..
PD/NFLMIDP/EGP/2019-20/WD-05/Lot-06/e-GP/20220921/351972/0039968
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২০.৭০ লাখ |
২৮ নভে ২০১৯ |
Completed |
|
Construction of buried pipeline 1000meter each for 2-cusec electric operated LLP.
PD/NFLMIDP/EGP/2019-20/WD-09/Lot-01/e-GP/20220921/352000/0039459
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳১২.০০ লাখ |
৩ সেপ ২০১৯ |
Completed |
|
Construction of Medium size Hydraulic Structure Cross dam/Sluice Gate/ Culvert.
PD/NFLMIDP/EGP/2019-20/WD-15/Lot-13/e-GP/20220921/352032/0039970
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳৩০.০০ লাখ |
৩ সেপ ২০১৯ |
Completed |
|
Renovation of derelict Khal/canal with leveling dressing and compaction of excavated soil to embankment and pumping & bailing out water from khal and construction of water passing structure on the both side of embankment of khal etc. 6000 cum/KM avg..
PD/NFLMIDP/EGP/2019-20/WD-05/Lot-13/e-GP/20220921/351979/0039967
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳১৩.০০ লাখ |
৩ সেপ ২০১৯ |
Completed |
|
Construction of Small size Hydraulic Structure Cross dam/ Foot Bridge.
PD/NFLMIDP/EGP/2019-20/WD-16/Lot-04/e-GP/20220921/352038/0039466
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳১৫.০০ লাখ |
৩ সেপ ২০১৯ |
Completed |
|
Construction of Medium Size Hydraulic Structure for water retention/conservation or water control at any upazila of Project Area.
NFLMIDP/2018-19/Medium size Hydraulic Structure/02/e-GP/20220921/226998/0039959
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২৫.০০ লাখ |
২৬ সেপ ২০১৮ |
Completed |
|
Renovation of derelict Khal/Nala through re-excavation by using excavator according to approve pre work drawing and design maintaining proper slope with leveling dressing and compaction of excavated soil to embankment providing cross dam if necessary and pumping & bailing out water from khal/Nala at any upazila of the project area.
NFLMIDP/2018-19/Renovation of Khal/01/e-GP/20220921/226982/0039957
|
Office of the Project Director, Noakhali, Feni and Laxmipur District MID Project |
৳২৪.৫০ লাখ |
২৬ সেপ ২০১৮ |
Completed |
|
Re-excavation of Khal / Canal by using excavator according to approved drawing-design maintaining proper slope with Leveling dressing and compaction of excavated soil in embankment providing cross dam if necessary and pumping & bailing out water from khal at any place of Subornachar Upazilla Under Noakhali District.
WR-SUWLAR&MIDP/NOAKHALI-05/e-GP/20220921/224994/0039962
|
Executive Engineer (MI) Office, Noakhali Region |
৳১২.৭৫ লাখ |
২০ সেপ ২০১৮ |
Completed |