(a) Maintenance of Kazibari Moor at ( khajura- Punihar battala road)- Silimpur Bazar Road. (Ch.00-900m) Road ID- 241094030 Under Bagherpara Upazila District-Jashore. (b) Construction of 02nos 0.375mx0.450m dia U-Drain culvert at Ch.774m & 885m on the same road. Salvage Cost Tk. 3,98,822.00
IRIDP-3/JSR/MW-62/e-GP/20240916/703190/00176306
|
Office of the Executive Engineer, LGED, Jessore |
৳৪২.০৪ লাখ |
২৬ মে ২০২২ |
Completed |
|
(a) Improvement of House of Ator (of Azampur) - Sekendarpur Road. (Ch.00-500m) Road ID- 241095226 Under Bagherpara Upazila District-Jashore. (b) Construction of 01no 0.375mx0.450m dia U-Drain culvert at Ch.449m on the same road.
IRIDP-3/JSR/DW-60/e-GP/20240911/703188/00174648
|
Office of the Executive Engineer, LGED, Jessore |
৳৪০.৮২ লাখ |
২৬ মে ২০২২ |
Completed |
|
Improvement of R&H to Katchpur UP Office road Via Padma Metal and Katchpur Uttarpara road by RCC at Ch. 00-738m under Upazila: Sonargaon, District: Narayanganj Road ID No.367044049 Salvage Cost TK.2,11,319.00
GDP-3/NA- 86/e-GP/20230930/691262/0092934
|
Office of the Executive Engineer, LGED, Narayanganj |
৳১.৩৭ কোটি |
২৮ এপ্রিল ২০২২ |
Completed |
|
Approach road development works at Ilisha #1 well drilling project, West Ilisha, Bhola.
bpx.28.09.0000.086.38.009.21/e-GP/20220627/598717/0015833
|
Construction Division |
৳৮৪.৭৯ লাখ |
১ সেপ ২০২১ |
Ongoing |
|
Improvement of Nowgaon UP office (Matiamalipara)- Boalia Hat Via Bashbaria - Sreekrisnapura, Sastan road (ch. 00-615m), Road ID-188893023, Upazila: Tarash, Dist: Sirajganj.
IRIDP-3/SRJ/DW-38/e-GP/20240815/599739/00167954
|
Office of the Executive Engineer, LGED, Sirajganj |
৳৪৬.২৬ লাখ |
২৫ আগ ২০২১ |
Completed |
|
Periodic Maintenance of Uttar Chalk Jalaler Dhal RHD - Goruri GC Road from Ch. 4050m - 6015m ATGHORIA Road ID176052002
e-Tender/LGED/Pab/GOBM/20-21/W-38/e-GP/20240709/492734/00165403
|
Office of the Executive Engineer, LGED, Pabna |
৳৭৮.৮৬ লাখ |
১৪ সেপ ২০২০ |
Completed |
|
Construction of 50.00m Long RCC Girder Bridge on Talimpur RHD-Azimganj GC via Talimpur UP Office Road at Ch. 4700m Road ID 658142007 Upazila Barlekha District Moulvibazar.
SDIRIIP/MOUL/BR UZR/W-002/e-GP/20220627/473266/0015804
|
Office of the Executive Engineer, LGED, Moulvibazar |
৳৩.২৯ কোটি |
২ জুলাই ২০২০ |
Ongoing |
|
Construction of 60.00m Long RCC Girder Bridge over Juri River on Kapnapahar Cha Bagan To Commissionnagar Govt. Primary School Road at Brindarghat at Ch. 1000m Road ID 658844083 Upazila Juri District. Moulvibazar.
CBU-100/Purto-118/e-GP/20220627/454641/0015809
|
Office of the Executive Engineer, LGED, Moulvibazar |
৳৪.৩১ কোটি |
২ জুন ২০২০ |
Ongoing |
|
Laying of distribution pipe line supply and installation of water meter & house connection in bagerhat pauroshava under gopalgonj and bagerhat pauroshava water supply and system improvement project
000/e-GP/DPHE/2023-07-11/00436129
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৬.৮৯ কোটি |
২ মার্চ ২০২০ |
Completed |
|
Installation of 10 Main Distribution Pipe Line at Jamalpur Pouroshava Treatement Plant
000/e-GP/DPHE/2023-07-11/00390284
|
DPHE,Jamalpur Division |
৳৪৬.৪৪ লাখ |
২৬ নভে ২০১৯ |
Completed |
|
Installation of PTW01-05 Interconnection of 6 Pipe Line at Jamalpur Pouroshava Treatment Plant
000/e-GP/DPHE/2023-07-11/00390283
|
DPHE,Jamalpur Division |
৳৩৭.৬১ লাখ |
২৬ নভে ২০১৯ |
Completed |
|
Construction of Primary Drain RCC at Dewanganj Pourashava under Water Supply and Environmental Sanitation including Faecal Sludge Management Project in 32 Pourashavas
000/e-GP/DPHE/2023-07-11/00387350
|
DPHE,Jamalpur Division |
৳১.০৪ কোটি |
২৬ নভে ২০১৯ |
Completed |
|
Installation of 234 nos Deep Tube well with 6 no.Hand pump under Arsenic Risk Reduction Project on Water Supply in Kalkini Upazila at Madaripur District.
000/e-GP/DPHE/2023-07-11/00383327
|
Office of the Executive Engineer DPHE, Madaripur |
৳১.৩৬ কোটি |
১৪ নভে ২০১৯ |
Completed |
|
construction of transmission pipe lineHDPE in bagerhat pourashava underGopalganj and Bagerhat Pourashava Water Supply & Environmental Sanitation System Improvement Project.
000/e-GP/DPHE/2023-07-11/00378652
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৩.৫৫ কোটি |
৬ নভে ২০১৯ |
Completed |
|
Installation of 18.345 Km pipeline of different diameter in Sunamganj Pourashava.
000/e-GP/DPHE/2023-07-11/00372083
|
Office of the Executive Engineer DPHE, Sunamganj |
৳৩.২৫ কোটি |
২৭ অক্টো ২০১৯ |
Completed |
|
Installation of 200mm150mm&100mm dia PVC 12k.m. Pipe line in Munshiganj Pourashava .
000/e-GP/DPHE/2023-07-11/00367559
|
Office of the Executive Engineer,DPHE,Munshiganj |
৳১.৫৩ কোটি |
৭ অক্টো ২০১৯ |
Completed |
|
Construction of Rural piped-water Supply scheme at Vukshimul school & college under Arsenic Risk Reduction Project.
000/e-GP/DPHE/2023-07-11/00365095
|
Office of the Executive Engineer,DPHE,Moulvibazar |
৳১.৭১ কোটি |
৩০ সেপ ২০১৯ |
Completed |
|
Construction and Installation of Rain Water Harvesting RWH under Arsenic Risk Reduction Project of Department of Public Health Engineering DPHE on Water Supply at Paikgacha Upazila for FY 2019-2020
000/e-GP/DPHE/2023-07-11/00364924
|
Office of the Executive Engineer DPHE, Khulna |
৳৩৯.৯৭ লাখ |
২৯ সেপ ২০১৯ |
Completed |
|
Installation of 9 nos 6 DTW 12 nos Shallow Tara TW and 56 nos Deep Tara TW under PRWSP of DPHE at Alamdanga Upazilla Chuadanga
000/e-GP/DPHE/2023-07-11/00364194
|
Office of the Executive Engineer ,DPHE,Chuadanga |
৳৪৩.৩৪ লাখ |
২৯ সেপ ২০১৯ |
Completed |
|
Installation of 488 nos. 6 no. Deep Tube well DTW at Dumuria-274 Rupsha-110 & Terokhada-104 nos. of Khulna District under Arsenic Risk Reduction Project on Water Supply Department of Public Health Engineering. FY 2019-2020
000/e-GP/DPHE/2023-07-11/00360568
|
Office of the Executive Engineer DPHE, Khulna |
৳৩.৪৩ কোটি |
২৯ সেপ ২০১৯ |
Completed |
|
Construction of Rural Piped Water Supply scheme at Vukshimul school & college under Arsenic Risk Reduction Project.
000/e-GP/DPHE/2023-07-11/00365092
|
Office of the Executive Engineer,DPHE,Moulvibazar |
৳১.৭২ কোটি |
২৯ সেপ ২০১৯ |
Completed |
|
100 mm dia & 63 mm dia new pipe line with HDPE Pipe at khurushkul Asrayan Project-02 in Coxs Bazar District
000/e-GP/DPHE/2023-07-11/00356195
|
Office of the Executive Engineer,DPHE,coxsbazar |
৳৪২.২২ লাখ |
১১ সেপ ২০১৯ |
Completed |
|
Supply of Furniture at kotalipara & tungipara upazilla office Gopalganj under Revenue Budget FY-2019-2020
000/e-GP/DPHE/2023-07-11/00354791
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳১.৭৪ লাখ |
৫ সেপ ২০১৯ |
Completed |
|
2 Nos Rural Piped Water Supply Scheme Kashiani & Muksudpur Upazilla at Gopalganj District.FY 2019-2020
000/e-GP/DPHE/2023-07-11/00349663
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳৪.৫৯ কোটি |
২৫ আগ ২০১৯ |
Completed |
|
Installation of 10000 Liter P/d Capacity 12 Nos Solar Operated Pond Sand Filter PSFDifferent Upazilla at Gopalganj District FY 2019-2020 under village water supply project of DPHE.
000/e-GP/DPHE/2023-07-11/00350517
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳৮১.৯৮ লাখ |
২৫ আগ ২০১৯ |
Completed |
|
Pipe line construction different dia at shibpur pouroshova in Narshingdi District under 40 pouroshova and Growth centre water supply & Environmental Sanitation Projectphase-ii during the FY-2019-2020
000/e-GP/DPHE/2023-07-11/00348304
|
Office of the Executive Engineer, DPHE,Narsingdi |
৳৮০.৩৩ লাখ |
৭ আগ ২০১৯ |
Completed |
|
Construction of Pipe line at Manikgonj under the 37 Dist.Town Water Supply Project
000/e-GP/DPHE/2023-07-11/00344484
|
Office of the Executive Engineer,DPHE, Manikgonj |
৳১.৭০ কোটি |
৩০ জুলাই ২০১৯ |
Completed |
|
Installation of 110 mm dia HDPE Pipe Line 8.45 k.m with Road Restoration under Expansion and Development of Water Supply and Sanitation System in Ishwargonj Pourashava Mymensingh FY 2019-20.
000/e-GP/DPHE/2023-07-11/00346151
|
Office of the Executive Engineer, DPHE,Mymensingh |
৳১.৪৬ কোটি |
৩০ জুলাই ২০১৯ |
Completed |
|
Pipeline with road repaire & street hydrant at Kuksha Pourashava Kushtia District under Water Supply & Environmental Sanitation including Faecal Sludge Management Project in 32 Pourasavas . Package No Kustia/purta-38
000/e-GP/DPHE/2023-07-11/00344451
|
Office of the Executive Engineer,DPHE,Kushtia |
৳২.০৪ কোটি |
৩০ জুলাই ২০১৯ |
Completed |
|
nstallation of 1073 nos. Deep Tube Well with 6 no.hand pump at Kotalipara partly Muksudpur & Tungipara Upazila in Gopalganj District under Arsenic Risk Reduction Project on Water Supply DPHE. FY 2019-2020
000/e-GP/DPHE/2023-07-11/00346273
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳৮.৫৩ কোটি |
২৯ জুলাই ২০১৯ |
Completed |
|
Laying of Pipe Line of different dia of Shailkupa pourashva in Jhenaidah district Under Environmental Sanitation and Water Supply with Piped Network on Thana Sadar & Growth Centre Pourashavas 2nd Phase
000/e-GP/DPHE/2023-07-11/00342805
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳৭৬.৬১ লাখ |
১৪ জুলাই ২০১৯ |
Completed |
|
Laying of Pipe Line of different dia of Kotchandpur pourashva in Jhenaidah district Under Environmental Sanitation and Water Supply with Piped Network on Thana Sadar & Growth Centre Pourashavas 2nd Phase FY 2018-2019.
000/e-GP/DPHE/2023-07-11/00342814
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳৫৮.৯৩ লাখ |
১৪ জুলাই ২০১৯ |
Completed |
|
Laying of Pipe Line of different dia of Kaligonj pourashva in Jhenaidah district Under Environmental Sanitation and Water Supply with Piped Network on Thana Sadar & Growth Centre Pourashavas 2nd Phase FY 2018-2019.
000/e-GP/DPHE/2023-07-11/00342817
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳৭৪.৩৮ লাখ |
১৪ জুলাই ২০১৯ |
Completed |
|
Laying of Pipe Line of different dia of Moheshpur pourashva in Jhenaidah district Under Environmental Sanitation and Water Supply with Piped Network on Thana Sadar & Growth Centre Pourashavas 2nd Phase FY 2018-2019
000/e-GP/DPHE/2023-07-11/00342819
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳৭১.৩১ লাখ |
১৪ জুলাই ২০১৯ |
Completed |
|
Pipeline with road repaire & street hydrant at Hakimpur Pourashava Dinajpur District under Water Supply & Environmental Sanitation including Faecal Sludge Management Project in 32 Paurashavas during the FY 2018-2019 .
000/e-GP/DPHE/2023-07-11/00335863
|
Office of the Executive Engineer ,DPHE, Dinajpur |
৳২.৬২ কোটি |
২০ জুন ২০১৯ |
Completed |
|
Supplying of Tube-well materials for emergency Sinking 6 no.Hand Tube-well for FY2018-2019at Gopalganj District under revenue Budget.
000/e-GP/DPHE/2023-07-11/00331606
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳৬৭.৪৮ লাখ |
১২ জুন ২০১৯ |
Completed |
|
Pipeline & street hydrant at Dewanganj Pourashava Jamalpur District under Water Supply & Environmental Sanitation including Faecal Sludge Management Project in 32 Pourasavas
000/e-GP/DPHE/2023-07-11/00321304
|
DPHE,Jamalpur Division |
৳৩.৭৮ কোটি |
২৭ মে ২০১৯ |
Completed |
|
Installation of different dia water supply upvc pipe line 31 km in pirgonj pourashava area Rangpur under Improvement of water supply and invironmental sanitation project DPHE Rangpur Division during the year of 2018-2019
000/e-GP/DPHE/2023-07-11/00321574
|
Office of the Executive Engineer,DPHE,Rangpur |
৳৩.১৩ কোটি |
২১ মে ২০১৯ |
Completed |
|
Different Diameter Distribution Pipelines with Road Repair & Street Hydrant at Sundarganj Pourashava under Water Supply & Environmental Sanitation including FaecalSludge Management Project in 32 PourasavasFY-2018-2019.
000/e-GP/DPHE/2023-07-11/00316977
|
Office of the Executive Engineer ,DPHE, Gaibandha |
৳১.৫৬ কোটি |
২০ মে ২০১৯ |
Completed |
|
Construction of 10 nos RCC WASH Block MTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. at Jibonnagar upazila of Chuadanga dist. under Need Based Infrastructure Development of Government Primary Schools Project.
000/e-GP/DPHE/2023-07-11/00317433
|
Office of the Executive Engineer ,DPHE,Chuadanga |
৳১.২৪ কোটি |
১৩ মে ২০১৯ |
Completed |
|
Construction of 10 nos RCC WASH Block MTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. at Damurhuda upazila of Chuadanga dist. under Need Based Infrastructure Development of Government Primary Schools Project
000/e-GP/DPHE/2023-07-11/00317517
|
Office of the Executive Engineer ,DPHE,Chuadanga |
৳১.২৪ কোটি |
১৩ মে ২০১৯ |
Completed |
|
Construction of 3 nos RCC WASH Block MTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. at Alamdanga upazila of Chuadanga dist. under Need Based Infrastructure Development of Newly Nationalized Government Primary Schools Project
000/e-GP/DPHE/2023-07-11/00317118
|
Office of the Executive Engineer ,DPHE,Chuadanga |
৳৩৭.১৬ লাখ |
১৩ মে ২০১৯ |
Completed |
|
Interconnection Between Production Tube Wells Khanka Sharif Master Para IRP Matrisadon and 275.00mPipe Line Net Work in Gaibandha Pourashava under 37PWSP.
000/e-GP/DPHE/2023-07-11/00315868
|
Office of the Executive Engineer ,DPHE, Gaibandha |
৳৬.৬৫ লাখ |
১২ মে ২০১৯ |
Completed |
|
a. Improvement of Narikelbaria GC-Agra Bazar Road from Ch 1200-1308m & 1667-1857m by BC Road ID 241093002 b. Improvement of Uttarsalua Bazer-Chaturbaria bazer Road from Ch 1470-2842m by BC Road ID 241094016 c. Improvement of Bhodrodanga House of Hossain Fakir Bagherpara-Kaligonj RHD Krishno Nogor Bazar via Durgapur Bazar Road from Ch 00-1005m by BC Road ID 241094022d. Improvement of Dohakula UP Office-Bahrampur Bazar Road from Ch 1187-2312m by BC Road ID 241093001 under Upazila Bagherpara District Jashore. Salvage Cost of this package is Tk. 8454007.00 which is fixed amount and it will be paid by contractor.
JRRIDP/18/JSR/W-10/e-GP/20241017/301690/00197455
|
Office of the Executive Engineer, LGED, Jessore |
৳২.৯৪ কোটি |
১৮ এপ্রিল ২০১৯ |
Completed |
|
17.73 Km Pipe line different dia construction under Water Supply and Environmental Sanitation System Improvement Project for Three Pourashavas of Jamalpur District at Maderganj Pouroshava Jamalpur
000/e-GP/DPHE/2023-07-11/00307380
|
DPHE,Jamalpur Division |
৳১.৮৫ কোটি |
১৫ এপ্রিল ২০১৯ |
Completed |
|
4.58 Km Pipe line different dia construction under Water Supply and Environmental Sanitation System Improvement Project for Three Pourashavas of Jamalpur District at Melandah Pouroshava Jamalpur
000/e-GP/DPHE/2023-07-11/00307379
|
DPHE,Jamalpur Division |
৳৮৩.৫৩ লাখ |
১৫ এপ্রিল ২০১৯ |
Completed |
|
18.88 Km Pipe line different dia construction under Water Supply and Environmental Sanitation System Improvement Project for Three Pourashavas of Jamalpur District at Jamalpur Pouroshava Jamalpur
000/e-GP/DPHE/2023-07-11/00307381
|
DPHE,Jamalpur Division |
৳১.৭৮ কোটি |
১৫ এপ্রিল ২০১৯ |
Completed |
|
Construction of 10 Nos RCC WASH Block MTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. Under Need Based Insfrastructure Development of Newly Nationalized Government Primary Schools Project at Different Upazila in Gopalganj District Fy2018-2019 Special Allotment.
000/e-GP/DPHE/2023-07-11/00302923
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳১.৫৫ কোটি |
৯ এপ্রিল ২০১৯ |
Completed |
|
Construction of 10 Nos RCC WASH Block MTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. Under Need Based Insfrastructure Development of Government Primary Schools Project at Different Upazila in Gopalganj District Fy2018-2019 Special Allotment.
000/e-GP/DPHE/2023-07-11/00302928
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳১.৫৫ কোটি |
৮ এপ্রিল ২০১৯ |
Completed |
|
Construction of 10 Nos RCC WASH Block MTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. Under Need Based Insfrastructure Development of Government Primary Schools Project at Different Upazila in Gopalganj District Fy2018-2019 Special Allotment.
000/e-GP/DPHE/2023-07-11/00302930
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳১.৫৫ কোটি |
৮ এপ্রিল ২০১৯ |
Completed |