|
Construction of 22.00m Long RCC Girder Bridge on Nalchity Bazar-Matibhanga via ferry ghat road at ch. 1870.00m under Nalchity Upazila District:Jhalokathi (ID No-542734053)
IBRP/Jha/Nalchity/Brg-13./e-GP/20241020/844840/00199035
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৩.১৯ কোটি |
১৩ জুন ২০২৩ |
Completed |
|
Construction of 18.00m Long RCC Girder Bridge on Pathikhalghata bazar-BaroiZore pull Rd. at ch.0.00m (ID No- 542434022)
IBRP/Jhalo/Kathalia/Brg-32/e-GP/20241023/829905/00202618
|
Office of the Executive Engineer, LGED, Jhalokati |
৳২.২০ কোটি |
২১ মে ২০২৩ |
Completed |
|
a) Rehabilitation of 12.00m x 3.70m Long Iron Bridge on Kanchabalia-Narerkati Border at ch.536.00m. (Road ID- 542404005) b) Rehabilitation of 12.00m x 3.70m Long Iron Bridge on Kaliargop DC Rd.-Gogon River Rd. at ch.0.00m. (Roal ID- 542404024) c) Rehabilitation of 13.00m x 3.70m Long Iron Bridge on Charbhatarakanda-South kistakati at ch.6500.00m. (Road ID- 542404039) d) Rehabilitation of 7.00m x 3.70m Long Iron Bridge on H/O Somed Ali-South Kistakati at Ch.1200. 00m (ID No- 542405016) e) Rehabilitation of 12.0m x 3.70m Long Iron Bridge on Berkati Sikder Bari-Gani Sarder Bari via Pr. School. at ch.450.00m (ID No-542404043) f) Rehabilitation of 13.0m x 3.70m Long Iron Bridge on Bariara Mirabari Rd. at ch.30.00m (ID No-542405054)
IBRP/Jha/Sad/Brg-62/e-GP/20241021/829907/00201164
|
Office of the Executive Engineer, LGED, Jhalokati |
৳২.১৮ কোটি |
২১ মে ২০২৩ |
Completed |
|
Periodic Maintenance of Angulkata Hat(R&H)-Pachkhola UP-Arial Kha Ghat Road from Ch.00m-3500m [Sadar], Madaripur, Road Code: 354543008
e-APP/LGED/MAD/GOBM/22-23/W-13/e-GP/20230727/725069/0076277
|
Office of the Executive Engineer, LGED, Madaripur |
৳১.৩৬ কোটি |
২২ আগ ২০২২ |
Completed |
|
Improvement of BC road from Tulatala GCCR to Hosnabad Lanch ghat road from Ch. 1000m - 1750m under Muladi Upazila, District : Barishal. [Road ID No: 506694020].
BJP/BAR/MUL/DW-232/e-GP/20241017/593276/00198128
|
Office of the Executive Engineer, LGED, Barisal |
৳৫৯.৩৩ লাখ |
১৭ নভে ২০২১ |
Completed |
|
Construction of 16.00m Long RCC Girder Bridge on Wilkingson Khal-Burirhat Road at Ch.920m under Nalchity upazila District-Jhalakathi Road ID No 542734032
BJP/JHA/NOL/DW-71/e-GP/20241125/562238/00223165
|
Office of the Executive Engineer, LGED, Jhalokati |
৳১.৩৯ কোটি |
১৮ এপ্রিল ২০২১ |
Completed |
|
Improvement of BC road from Galua UP Office-Katakhali Bazar via Galua-D Islamic Mad road at Ch. 0.00-915m including 03 Nos 1.50mX1.50m RCC Box Culvet at Ch. 313m 625m & 820m and 01 No 2.00mX2.00m RCC Box Culvert at Ch. 581m and 01 Nos double vent 4.00mX4.00m RCC Box Culvet at Ch. 411m RAJAPUR Road ID 542843012 Salvage Materials Cost 143272 Taka
BJP/JHA/RAJ/DW-59/e-GP/20241125/546304/00223202
|
Office of the Executive Engineer, LGED, Jhalokati |
৳১.৩৬ কোটি |
২ মার্চ ২০২১ |
Completed |
|
Improvement of BC road from Ameana Khatun Reg P.S via Imam uddin Baitul Jame Mosque- Galua Charakhali LGED Road at Ch. 0 - 1000m including 02 Nos 1.50mX1.50m RCC Box Culvet at Ch. 17m & 922m and 02 Nos 1m X 1m RCC Box Culvet at Ch. 360m & 408m RAJAPUR Road ID 542844096 Salvage Materials Cost 1513863 Taka
BJP/JHA/RAJ/DW-60/e-GP/20241023/546305/00202572
|
Office of the Executive Engineer, LGED, Jhalokati |
৳১.১৫ কোটি |
২ মার্চ ২০২১ |
Completed |
|
Part A Construction of WMCA Office12m x 6m Part B Electrification Works for WMCA Office Part C Supply of Office Furniture WMCA Office Sadar
LGED/SSSWRDP/WD-83/20-21./e-GP/20241025/544985/00203779
|
Office of the Executive Engineer, LGED, Jhalokati |
৳২০.৫৫ লাখ |
২৮ ফেব ২০২১ |
Completed |
|
Installation of 130 nos 38mm dia deep tube well with No.6 Hand Pump at Shibchar Upazia in Madaripur District under Safe Water Supply throughout the Country PSWSC.
000/e-GP/DPHE/2023-07-11/00532165
|
Office of the Executive Engineer DPHE, Madaripur |
৳৮৩.৩১ লাখ |
৩ জানু ২০২১ |
Completed |
|
Installation of 130 nos 38mm dia deep tube well with No.6 Hand Pump at Rajoir Upazia in Madaripur District under Safe Water Supply throughout the Country PSWSC.
000/e-GP/DPHE/2023-07-11/00532168
|
Office of the Executive Engineer DPHE, Madaripur |
৳৭৭.৫৪ লাখ |
৩ জানু ২০২১ |
Completed |
|
a Rehabilitation of 9.00m Long Iron Bridge on Silkingson Khal-Burirhat at ch.3380m Road ID-542734032 b Rehabilitation of 9.00m Long Iron Bridge on Barisal-Patuakhali RHD S/S of Dapdapia union college to Wilskingson Khal at ch.1000m Road ID-542734103
IBRP/Jha/Nolcity/Rehab/Brg-19/e-GP/20241022/489076/00201792
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৩৮.৩১ লাখ |
৪ অক্টো ২০২০ |
Completed |
|
a Rehabilitation of 6.00m Long Iron Bridge on Siddhakati UP-Kumarkhali Bazar via Kaliarjhor Bazar Road at ch.6107m Road ID-542733016 b Rehabilitation of 18.00m Long Iron Bridge on Dopdopia Lanch ghat to Dopdopia UP old bridge at ch.715m Road ID-542734111 c Rehabilitation of 6.00m Long Iron Bridge on Nalchity Dopdopia RHD Kumarkhali Bridge to Jaguya Border of City Corporationat ch.200m Road ID-542734155
IBRP/Jha/Nolcity/Rehab/Brg-17/e-GP/20241022/489074/00201685
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৬০.৬৪ লাখ |
৪ অক্টো ২০২০ |
Completed |
|
Construction of WMCA Building Semi pacca Saturia FCD Sub Project under Rajapur Upazila District Jhalakathi.
LGED/SSSWRDP/WD-129/2019-20/e-GP/20241024/489080/00203464
|
Office of the Executive Engineer, LGED, Jhalokati |
৳১৮.৬৬ লাখ |
৪ অক্টো ২০২০ |
Completed |
|
a Rehabilitation of 9.00m Long Iron Bridge on Siddhakati UP-Kumarkhali Bazar via Kaliarjhor Bazar Road at ch.5519m Road ID-542733016 b Rehabilitation of 9.00m Long Iron Bridge on Siddhakati UP-Kumarkhali Bazar via Kaliarjhor Bazar Road at ch.4200m Road ID-542733016 c Rehabilitation of 9.00m Long Iron Bridge on East Dapdhapia-UP office Nikhoa at ch.300m Road ID-542734029
IBRP/Jha/Nolcity/Rehab/Brg-18/e-GP/20241020/489075/00199013
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৫৭.৪৬ লাখ |
৪ অক্টো ২০২০ |
Completed |
|
Construction of 22.06m Long RCC Slab Bridge on Sher-e-Bangla Bazar Mollar hat up via Amtali GPS at Ch.3550m under Nalchity Upazila Road ID No.542403008
IBRP/Jhalo/Nalchity/Brg-11/e-GP/20241023/489067/00202892
|
Office of the Executive Engineer, LGED, Jhalokati |
৳১.৯৪ কোটি |
১৫ সেপ ২০২০ |
Completed |
|
Periodic Maintenance of Arachandi RHD to Lawkhola RHD Road from Ch. 720m-1426m Janjira Road Code 386944044 Overlay.
e-Tender/LGED/Shari/GOBM /20-21/W-05/e-GP/20230923/490819/0087209
|
Office of the Executive Engineer, LGED, Shariatpur |
৳৪০.৬৬ লাখ |
৮ সেপ ২০২০ |
Completed |
|
Construction of Laboratory BuildingTwo Storid With four Storied Foundation DPHEMadaripur District under the Water Quality Testing management Strengthing Project FY-2019-20
000/e-GP/DPHE/2023-07-11/00478688
|
Office of the Executive Engineer DPHE, Madaripur |
৳৫৩.৮৪ লাখ |
১৪ জুলাই ২০২০ |
Completed |
|
a Rehabilitation of 11.00m Long Iron Bridge on Latimshed Gharami Bai Shabangol Hazi Bari via Abul Kasem Howlader Bari at Ch. 660m Sadar Road ID 542404046b Rehabilitation of 7.00m Long Iron Bridge on Latimshed Gharami Bai Shabangol Hazi Bari via Abul Kasem Howlader Bari at Ch. 579m Sadar Road ID 542404046c Rehabilitation of 12.00m Long Iron Bridge on Latimshed Gharami Bai Shabangol Hazi Bari via Abul Kasem Howlader Bari at Ch. 541m Sadar Road ID 542404046d Rehabilitation of 11.00m Long Iron Bridge on Latimshed Gharami Bai Shabangol Hazi Bari via Abul Kasem Howlader Bari at Ch. 120m Sadar Road ID 542404046e Rehabilitation of 15.00m Long Iron Bridge on Kandergati GPS Manpasha GPS via Chowdhury Bari Easat side of Kandergati GPS at Ch. 10m Sadar Road ID 542404100
IBRP/Jhalo/Sadar/Rehab/Brg-05/e-GP/20241022/445927/00202022
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৯৯.০১ লাখ |
২১ জুন ২০২০ |
Completed |
|
Installation of 130 nos 6 no. Hand pump Deep Tube well at Vedorgonj Upazila Char BhagaKanchikataSakhipurTarabunia-DTarabunia-U Union of Shariatpur District FY19-20. Under the Project for Safe Water Supply Through Out The Country PSWSC.
000/e-GP/DPHE/2023-07-11/00452428
|
Office of the Executive Engineer , DPHE, Sariatpur |
৳৯৩.৮৩ লাখ |
১৫ এপ্রিল ২০২০ |
Completed |
|
Construction of 24.00m Long RCC Girder Bridge on Aurabunia UP office-Munsirabad-Soyghar Madrasha Moller hat-Binapani bazar Road at ch.6835m under Kathalia Upazila Road ID No.542433007
IBRP/Jhalo/Kathalia/Brg-14/e-GP/20241021/445920/00199454
|
Office of the Executive Engineer, LGED, Jhalokati |
৳২.৫০ কোটি |
২৫ মার্চ ২০২০ |
Completed |
|
Construction of 10 nos 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Sadar Upazilla Gopalganj District under DPHE.
000/e-GP/DPHE/2023-07-11/00447242
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳১.৯৭ কোটি |
১৯ মার্চ ২০২০ |
Completed |
|
Repair and renovation of Goshairhat UEOs Office bhaban under PEDP4.
e-Tender/PEDP4/SRT/GOS/2019-20/W9.112/e-GP/20231106/433923/00122800
|
Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur |
৳৪.৩৩ লাখ |
২৭ ফেব ২০২০ |
Completed |
|
Repair and renovation of Goshairhat URC bhaban under PEDP4.
e-Tender/PEDP4/SRT/GOS/2019-20/W10.028/e-GP/20231106/433924/00122589
|
Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur |
৳৪.৩৩ লাখ |
২৭ ফেব ২০২০ |
Completed |
|
Construction of 18.00m Long RCC Girder Bridge on Mollar hat RHD-Sreemontokathi-n-Pingri via Balarjore hat GC Road at ch.4203m Rajapur Road ID No.542842004
IBRP/Jha/Raja/Brg-09/e-GP/20241021/421342/00199381
|
Office of the Executive Engineer, LGED, Jhalokati |
৳২.৩৪ কোটি |
১৭ ফেব ২০২০ |
Completed |
|
a Construction of class room of Baitara Primary School. b Construction of class room of Purbo Ranapasa Primary School under Nalchity Upazila District Jhalakathi
e-Tender/NBIDNNGPS/JHA/NAL/2018-2019/W1..01467/e-GP/20241106/377713/00213426
|
Office of the Upazila Engineer, LGED, Nalchity, Jhalakathi |
৳১.৯১ কোটি |
১ ডিসে ২০১৯ |
Completed |
|
a Construction of Khirakati Jalsota Government Primary School. b Construction of Nalchity Puran Bazar Government Primary School under Nalchity Upazila District Jhalakathi
e-Tender/NBIDGPS/JHA/NAL/2018-19/W1..03823/e-GP/20241106/377710/00213336
|
Office of the Upazila Engineer, LGED, Nalchity, Jhalakathi |
৳১.৯২ কোটি |
১ ডিসে ২০১৯ |
Completed |
|
Installation of 357 nos Deep Tube well with 6 no.Hand pump under Arsenic Risk Reduction Project on Water Supply in Sadar Upazila at Madaripur District.
000/e-GP/DPHE/2023-07-11/00383302
|
Office of the Executive Engineer DPHE, Madaripur |
৳২.২১ কোটি |
১৪ নভে ২০১৯ |
Completed |
|
Installation of 178 Nos DTW with 6 no. hand pump under Preferential Rural Water Supply Project at Sadar Upazila in Madaripur District.FY-2018-19
000/e-GP/DPHE/2023-07-11/00308689
|
Office of the Executive Engineer DPHE, Madaripur |
৳১.২৯ কোটি |
১২ মে ২০১৯ |
Completed |
|
Construction of 6 nos. RCC Wash block MTBoys & FT Girls at Damudya & Bhedorgonj including 2 nos. inspection pit 1 nos. Soak Well & 1 nos Septic tank with all Sanitary & Electrical Works etc. during the FY-2018-19
000/e-GP/DPHE/2023-07-11/00293933
|
Office of the Executive Engineer , DPHE, Sariatpur |
৳৮৭.৬৩ লাখ |
১১ মার্চ ২০১৯ |
Completed |
|
Construction of 10 nos. RCC WASH BlockMTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. under Need Based Infrastructure Development of Government Primary Schools Project FY 2017-2018
000/e-GP/DPHE/2023-07-11/00181629
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳১.৫৫ কোটি |
১ এপ্রিল ২০১৮ |
Completed |
|
Improvement of Mohohar BazarCattle Hat UNR-Char Chatang Tulatala UNR road Ch. 00m-2280m under Sadar Upazila District Shariatpur Road ID No. 386695102.
IRIDP-2/SRT/DW-93/e-GP/20231024/170361/00114654
|
Office of the Executive Engineer, LGED, Shariatpur |
৳১.৬৭ কোটি |
৬ মার্চ ২০১৮ |
Completed |
|
Construction of 16.0m Girder bridge on Kaichkury H/O Sukur Sikary-Danay road at ch. 1500m under Bhedargonj Upazila District Shariatpur Road ID No. 386145128.
IRIDP-2/SRT/DW-108/e-GP/20231023/170376/00114237
|
Office of the Executive Engineer, LGED, Shariatpur |
৳৯২.৯৯ লাখ |
৬ মার্চ ২০১৮ |
Completed |
|
Estimate for Construction of 10 nos. Combined Wash Block with Common WallBuilding - Single storied 2 Inspection Pit 1 Rectangular Leach Pit 2 Soak Well Sanitary & Electrical works Running water supply etc. Size of WASH Block 26ft-1inch x 12ft-1inch-10ft-1inch 290 Sq.ft
000/e-GP/DPHE/2023-07-11/0091893
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳৯৫.১৩ লাখ |
১৫ মার্চ ২০১৭ |
Completed |
|
Installation of 2.00km pipe lines in Gopalganj pourashava under 37 District Town Water Supply ProjectFY20162017
000/e-GP/DPHE/2023-07-11/0083987
|
Office of the Executive Engineer,DPHE,Gopalganj |
৳২৩.০২ লাখ |
২৩ জানু ২০১৭ |
Completed |
|
Improvement of Chailarchar UP-Farazir Hat via Khejurtala Hat Road by BC, from Ch. 4700-5900.00m Under Sadar Upazila, Dist: Madaripur. [ID No- 354543004].
GFRIDP/M/16-17/UN-BR/167/e-GP/20230930/76347/0092640
|
Office of the Executive Engineer, LGED, Madaripur |
৳৭০.০৫ লাখ |
১৫ ডিসে ২০১৬ |
Completed |
|
(a) Improvement of Nathullabad UP Haripasha Sikder Bari-RHD via GPS (Chachor GPS-Horipasha GPS) . road ( Ch.00-1010m). (b) Construction of 01no 4.75m OFculvert at ch.842.0m on the same road. (c) Construction of 01no 1.22m*1.22m culvert at ch.200m on the same road. Road ID-542404056 Salvage cost-7,02,736.00 BDT
IRIDP-2/JLK/DW-32/e-GP/20241031/62856/00209873
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৬৮.৮৮ লাখ |
৭ আগ ২০১৬ |
Completed |
|
a) Improvement of Agor bari-Less Protab (Jhalokathi Chowpala Road Less Protab Satoraj via Monirer bari) Road (Ch. 00m-700m) Road ID - 542404073 (b) Construction of 01 no 2.5m x 2.5m culvert at ch. 810m on the same road. (c) Construction of 03 nos 2.0m x 2.0m Culvert at ch. 105m, 300m & 390m on the same road
IRIDP-2/JLK/DW-12/e-GP/20241027/60829/00204776
|
Office of the Executive Engineer, LGED, Jhalokati |
৳৫৭.৯৭ লাখ |
২৬ জুন ২০১৬ |
Completed |
|
Improvement by BC on Chairman Bazar to Farajir Hat road at ch. 0.00-2000.00m under Madaripur Sadar Upazila, Dist: Madaripur. (Road ID No. 354545264)
GFRIDP/M/15-16/VR-BR/205/e-GP/20231001/40749/0094128
|
Office of the Executive Engineer, LGED, Madaripur |
৳১.৩২ কোটি |
১৪ ডিসে ২০১৫ |
Completed |
|
Construction of 13 Nos. Combined WASH Block for MT and Boys & FT and Girls with Common Wall in Primary Schools at Gopalganj Sador Upazilla In Gopalganj District under Primary Education Development Program-3 Project.
000/e-GP/DPHE/2023-07-11/0022965
|
Office of the Executive Engineer,Gopalganj |
৳৭৯.৯৫ লাখ |
৮ এপ্রিল ২০১৫ |
Completed |