Widening of Dhalvanga G.C-Jawlir bazar Kishamat Durgapur Eidgah Maidan Road from Ch. 00m-3200m under Sadullapur Upazila, District: Gaibandha, Road ID: 132823003
e-Tender/LGED/Gai/GOBM/22-23/W-.23/e-GP/20241002/746845/00189085
|
Office of the Executive Engineer, LGED, Gaibandha |
৳৩.২১ কোটি |
৬ নভে ২০২২ |
Completed |
|
Periodic Maintenance of Gharua UP-Dignagar Bazar via Sharifabad Bazar road from Ch. 1000m-7160m [BHANGA],Road ID-329103010
e-Tender/LGED/Farid/GOBM/22-23/W-11/e-GP/2023102/733343/0094811
|
Office of the Executive Engineer, LGED, Faridpur |
৳২.৬৪ কোটি |
১৮ সেপ ২০২২ |
Completed |
|
Periodic Maintenance of Dhaewkhali UP office -Baliahati via Chandrapara high School road from Ch. 00m-2800m & 3350m-7030m [SADARPUR],Road ID-329843001
e-Tender/LGED/Farid/GOBM/22-23/W-16/e-GP/2023102/733345/0094847
|
Office of the Executive Engineer, LGED, Faridpur |
৳২.৬০ কোটি |
১৮ সেপ ২০২২ |
Completed |
|
Construction of 50.00m Long RCC Girder Bridge on Mohespur Chaklapara to Khair Shibnagar Road at Ch. 2105m. RID No. 127385040. Upazila. Fulbari. Dist. Dinajpur.
RDRIIP-2/W-BRI-035/e-GP/20240929/551700/00186986
|
Office of the Executive Engineer, LGED, Dinajpur |
৳২.৯৮ কোটি |
১ মার্চ ২০২১ |
Ongoing |
|
Construction of additional class room Mohakali-1 GPS under PEDP4.
e-Tender/PEDP4/MUN/SAD/2020-2021/W1-01532/e-GP/20231026/534003/00115675
|
Office of the Upazila Engineer, LGED, Munshiganj Sadar, Munshiganj |
৳১.২৫ কোটি |
১৮ জানু ২০২১ |
Completed |
|
Construction of additional class room of uttar dogorbari Gps PEDP4 under chirirbandar dinajpur
e-Tender/PEDP4/DIN/CHI/2020-21/W1.01462/e-GP/20241016/522346/00195958
|
Office of the Upazila Engineer, LGED, Chirirbandar, Dinajpur |
৳৭৪.৩৩ লাখ |
২ ডিসে ২০২০ |
Completed |
|
Improvement of Khagbari Kheyaghat-Ramshil Bazar-Johorerkandi Road by BC from Ch. 00-1180m under Kotwalipara Upazila District Gopalganj Road ID No 335514057 Salvage Materials Cost Tk. 1226460.00.
GDIRIIP/Gopal/Kotali/VR-BC/20-21/140/e-GP/20231102/515772/00120996
|
Office of the Executive Engineer, LGED, Gopalganj |
৳১.০৯ কোটি |
২৫ নভে ২০২০ |
Completed |
|
Construction of Additional Classroom of Dipnagar under PEDP4. Upazila Kaharol. Dist. Dinajpur.
e-Tender/PEDP4/DIN/KAH/2019-20/W1.00108/e-GP/20241030/493312/00209291
|
Office of the Upazila Engineer, LGED, Kaharol, Dinajpur |
৳৬৮.৭১ লাখ |
২৪ সেপ ২০২০ |
Completed |
|
Construction of additional class room of Kabilar Bazar school under PEDP4
e-Tender/PEDP4/GBD/SAD/2020-21/W2.02336/e-GP/20241208/494291/00230933
|
Office of the Upazila Engineer, LGED, Gaibandha Sadar, Gaibandha |
৳৯৭.১৪ লাখ |
১৪ সেপ ২০২০ |
Completed |
|
Construction of additional class room of DAKKHIN JOYDEBPUR GPS under Nawabganj upazilaDist-Dinajpur
e-Tender/PEDP4/DIN/NAW/2019-20/W2.01862/e-GP/20241103/487360/00210640
|
Office of the Upazila Engineer, LGED, Nawabganj, Dinajpur |
৳৫৭.৬১ লাখ |
২ সেপ ২০২০ |
Ongoing |
|
Construction of additional class room of Nawpara primary school room under PEDP4
e-Tender/PEDP4/DIN/BRL/2019-20/W2.01440/e-GP/20241015/479521/00195164
|
Office of the Upazila Engineer, LGED, Birol, Dinajpur |
৳৭১.৪৩ লাখ |
২৬ জুলাই ২০২০ |
Completed |
|
An Estimate for installation of Tube Well 100x38mm with Submersible Pump under Safe Water Supply Through Out The Country
000/e-GP/DPHE/2023-07-11/00479225
|
Office of the Executive Engineer,DPHE,Munshiganj |
৳৯৩.৮২ লাখ |
১৪ জুলাই ২০২০ |
Completed |
|
An Estimate for installation of Tube Well 100x38mm with Submersible Pump under Safe Water Supply Through Out The Country
000/e-GP/DPHE/2023-07-11/00479232
|
Office of the Executive Engineer,DPHE,Munshiganj |
৳৯৩.৮২ লাখ |
১৪ জুলাই ২০২০ |
Completed |
|
An Estimate for installation of Tube Well 100x38mm with Submersible Pump under Safe Water Supply Through Out The Country
000/e-GP/DPHE/2023-07-11/00479243
|
Office of the Executive Engineer,DPHE,Munshiganj |
৳৯৩.৮২ লাখ |
১৪ জুলাই ২০২০ |
Completed |
|
An Estimate for installation of Tube Well 100x38mm with Submersible Pump under Safe Water Supply Through Out The Country
000/e-GP/DPHE/2023-07-11/00479238
|
Office of the Executive Engineer,DPHE,Munshiganj |
৳৯৩.৮২ লাখ |
১৪ জুলাই ২০২০ |
Completed |
|
Construction of Upazila Parishad Administrative extension Complex Building & Hall Room under Nawabganj UpazilaDist-Dinajpur.
EUCPW-57/e-GP/20241103/476013/00210569
|
Office of the Upazila Engineer, LGED, Nawabganj, Dinajpur |
৳৪.৫৫ কোটি |
৩০ জুন ২০২০ |
Completed |
|
Construction of Chapa Daha-1 Kabiler Bazar and Kisamat Baluya Boundary Wall including Gate of Primary School under PEDP4
e-Tender/PEDP4/GBD/SAD/2019-2020/W14.0748/e-GP/20241208/436802/00230842
|
Office of the Upazila Engineer, LGED, Gaibandha Sadar, Gaibandha |
৳৪৪.৯৯ লাখ |
৮ মার্চ ২০২০ |
Completed |
|
Construction of Laboratory BuildingTwo Storey with four Storey Foundation of Existing Office Building Extension for Laboratory Works Purpose at Kishoreganj District of Department of Public Health EngineeringDPHE under the Water Quality Testing Management Strengthing Project during the Financial Year 2019-20.
000/e-GP/DPHE/2023-07-11/00415708
|
Office of the Executive Engineer DPHE, Kishoreganj |
৳৫৩.৮২ লাখ |
২৬ জানু ২০২০ |
Completed |
|
Construction of Dhaka Central Jail Keraniganj Sub -head Construction of RCC Approach Road in Connection of Different Bldg. During the year.2019-2020
DD-3/Development /01/2019-20/e-GP/20220924/390090/0041587
|
Dhaka PWD Division-3, Dhaka |
৳১.০৩ কোটি |
২৬ নভে ২০১৯ |
Completed |
|
A Improvement of Tojam brick field Bhotharam house via Nadabari Dr. para Road at ch 500-1000m ID No. 194865120. B Improvement of Amjuan Chowrasta more Madhabpur Sankor Ray Road at ch 830-1835m ID No. 194865152. C Improvement of Ghoghodara R&H Choto rani kone via khudra Bashbari GPS Road at ch 00-1044m ID No. 194865092. under Ranisankail Upazila Dist-Thakurgaon.
RDRIIP-2/W-VRB 195/e-GP/20240912/305536/00174999
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳২.০০ কোটি |
১৬ এপ্রিল ২০১৯ |
Completed |
|
Rehabilitation of Bhedargonj -Shakhipur_Kasempur Road from Ch. 00m-16900m under Upazila Bhedargonj District Shariatpur. Road ID 386142001
FDR/Sha/18-19/UZR/W-07/e-GP/20231005/292328/0097963
|
Office of the Executive Engineer, LGED, Shariatpur |
৳১৭.৮৪ কোটি |
২৮ মার্চ ২০১৯ |
Completed |
|
A Improvement of Joy Kristopur Govt Primary School Connecting Road. School Code-10202070601Ch. 00-800m B Improvement of Bridhigaon Govt Primary School Connecting Road. School Code-10202910202Ch. 500-1200m C Improvement of Inuya Govt Primary School Connecting Road. School Code-10202070602Ch. 00-1250m D Improvement of Saynua Busbari Govt Primary School Connecting Road. School Code-10202041002Ch. 00-1000m.E Improvement of Senua Dangipara Govt Primary School Connecting Road. School Code-10202040902Ch. 00-1000m Under Pirganj Upozila Thakurgaon.Salvage Amount-422009.00
RDRIIP-2/W-SCH-22/e-GP/20240903/283385/00171441
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳৩.৫২ কোটি |
১০ ফেব ২০১৯ |
Completed |
|
A Improvement of Shabdal hat - Sukanpukuri UP Office Road ch. 3000-5180m ID. No. 194943023 B Improvement of Rajagaon UP Office -Atowari Road ch. 1000-2795m ID. No. 194943037 Under Sadar Upazila Dist- Thakurgaon
RDRIIP-2/W-UNR-130/e-GP/20240710/238416/00165479
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳৩.৪৫ কোটি |
২৮ অক্টো ২০১৮ |
Completed |
|
Periodic Maintenance of Birganj to Kanshama RHD Khanshama Bridge to Fulbari GC via Jharbari GC Road Birgonj part Road from Ch. 5500m to 10535m Road ID No 127122001 Birganj
e-Tender/LGED/Dina/18-19/W-94/e-GP/20241002/232551/00189190
|
Office of the Executive Engineer, LGED, Dinajpur |
৳২.২০ কোটি |
২৩ অক্টো ২০১৮ |
Completed |
|
Periodic Maintenance of Birganj to Kanshama RHD Khanshama Bridge to Fulbari GC via Jharbari GC Road Birgonj part Road from Ch. 000m to 5500m Road ID No 127122001 Birganj
e-Tender/LGED/Dina/18-19/W-93/e-GP/20241002/232550/00189150
|
Office of the Executive Engineer, LGED, Dinajpur |
৳২.৬৩ কোটি |
২৩ অক্টো ২০১৮ |
Completed |
|
a Improvement of Bhully hat-Kachuban Road Ch 00-1000m ID No.194945041. b Improvement of Bokesh hat-Bakpur Road Ch 00-1000m ID No.194945061. c Improvement of Karticlola Morh BDR Camp road Balapara School Road ID No.194945200 d Improvement of Bhully-Panchir UZR Mutkir Morh-Turuk Pathar H/Q Joinal Road 00-1000m ID No.194945302 e Improvement of Farabari UZR-Bonkantapur Road Ch 00-1000m ID No.194945116 f Improvement of Eakubpur-Barunagaon Road ch 3056-4056 ID No.194945190 under Sadar Upazila Dist- Thakurgaon
RDRIIP-2/W-VRB-109/e-GP/20240820/213899/00168406
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳৪.১৫ কোটি |
৩০ জুলাই ২০১৮ |
Completed |
|
A Improvement of Parkhupia Govt. Primary School Connecting Road. School code-10201061001 B Improvement of Boro Balia Govt. Primary School Connecting Road.School code-10201050601 C Improvement of Boguladangi Govt. Primary School Connecting Road. School code-10201050301 D Improvement of Moroldoba Govt. Primary School Connecting Road.School code-10201080702.Under Sadar Upazila Dist Thakurgaon.
RDRIIP-2/W-SCH-04/e-GP/20240911/213897/00174538
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳১.৯৫ কোটি |
২৫ জুলাই ২০১৮ |
Completed |
|
Wooden ballah supplyingstaging hoisting carrying etc. all complete at working of mat foundation of TDS Building Dhaka Mill Barrack Police line
DD-3/01/2018-2019 /e-GP/20220928/210713/0046490
|
Dhaka PWD Division-3, Dhaka |
৳৪.৯১ লাখ |
৩ জুলাই ২০১৮ |
Completed |
|
Construction works of Deep Tube well 50 mm 125 mm dia u pvc pipepump house underground water reservoir and establishment of distribution pipe line at BRTA Dhaka Metro Circle-02 Equria keraniganj Dhaka.
DD-3/161/2017-2018 /e-GP/20220928/200730/0046481
|
Dhaka PWD Division-3, Dhaka |
৳১৬.৯৬ লাখ |
২৯ মে ২০১৮ |
Completed |
|
Supplying fitting & fixing Mirror polish Tiles in floor Aluminium sliding window Vertical Blind Curtain in window sanitary fittings and Painting at 3rd Floor of Dudok Head Quarter Segunbagicha Dhaka.
e-Tender/Dudok/D-1/2017-2018/e-GP/20220924/186147/0041692
|
PWD Maintenance Division, Dhaka |
৳৪৯.৯৯ লাখ |
১২ এপ্রিল ২০১৮ |
Completed |
|
Supplying fitting & fixing Mirror polish Tiles in floor Aluminium sliding window Vertical Blind Curtain in window sanitary fittings and Painting at 2nd Floor of Dudok Head Quarter Segunbagicha Dhaka.
e-Tender/Dudok/C-1/2017-2018/e-GP/20220924/186067/0041689
|
PWD Maintenance Division, Dhaka |
৳৫০.০০ লাখ |
১২ এপ্রিল ২০১৮ |
Completed |
|
Special repair work of drain apron along with tiles and sanitary fittings at kitchen of Bangladesh stationary office staff quarter No 2 & 3 Tejgaon Dhaka.
DD-3/114/2017-2018 /e-GP/20220928/180984/0046474
|
Dhaka PWD Division-3, Dhaka |
৳১৩.৪০ লাখ |
৫ এপ্রিল ২০১৮ |
Completed |
|
Construction SAAO Office cum Service Center in Suagram Union under Kotwalipara Upazila District Gopalganj.
FSCTT/WD-19/e-GP/20231127/178991/00140613
|
Office of the Executive Engineer, LGED, Gopalganj |
৳১.৫৮ কোটি |
২৮ মার্চ ২০১৮ |
Completed |
|
Construction SAAO Office cum Service Center in Kushli Union under Tungipara Upazila District Gopalganj.
FSCTT/ WD-17/e-GP/20231127/178990/00140606
|
Office of the Executive Engineer, LGED, Gopalganj |
৳১.৬৫ কোটি |
২৮ মার্চ ২০১৮ |
Completed |
|
Rehabilitation of BWDBs Office and Colony under Rajshahi O&M Division BWDB Rajshahi during the FY 2017-18 and 2018-19.
RSOCTP-1/e-GP/20241205/178246/00229212
|
Rajshahi O&M Division |
৳১.৮০ কোটি |
২১ মার্চ ২০১৮ |
Completed |
|
Construction of 6 Nos 2 Storied RCC WASH BlockMTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. at different Primary School of Pakundia Upazila under Kishoreganj District During 2017-2018 Financial Year.
000/e-GP/DPHE/2023-07-11/00178366
|
Office of the Executive Engineer DPHE, Kishoreganj |
৳৭৬.৪১ লাখ |
২০ মার্চ ২০১৮ |
Completed |
|
Construction Work of Broken Boundary Wall One storey Substation Building with One storey foundation and One Storey Ansar Camp with One storey foundation of BRTA Office Dhaka Metro Circle-2 Equira Keranigonj Dhaka.
DD-3/79/2017-2018/e-GP/20220928/176169/0046463
|
Dhaka PWD Division-3, Dhaka |
৳১.১৫ কোটি |
১৯ মার্চ ২০১৮ |
Completed |
|
Repair and Renovation of Railway quarter boddobhumi under Sadar Upazila of Rajbari District.
PRMMP/Raj/M-24/Sa/G-01/2017-18/e-GP/20231017/172610/00110570
|
Office of the Executive Engineer, LGED, Rajbari |
৳১৩.৫০ লাখ |
৬ মার্চ ২০১৮ |
Completed |
|
Construction of Shikarmongol Union Parishad Complex Bhaban Under Kalkini UpazilaMadaripur.
W- 572/e-GP/20231218/167896/00155260
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳১.২৮ কোটি |
২৬ ফেব ২০১৮ |
Completed |
|
Renovation & Maintenance work of Drain of approach road sewerage line & pit of Vehicle shed cum Barack cum Office Building of Dudok Head Quarter Segunbagicha Dhaka.
e-Tender/Dudok/I/2017-2018/e-GP/20220924/167974/0041687
|
PWD Maintenance Division, Dhaka |
৳৩৯.৭৫ লাখ |
১৮ ফেব ২০১৮ |
Completed |
|
Construction of Mithapur primary schoolEMIS Code no.31503130202 under Madaripur Sadar
e-Tender/NBIDNNGPS/MDR/SAD/2017-18/W1.00390/e-GP/20231031/160276/00119916
|
Office of the Upazila Engineer, LGED, Madaripur Sadar, Madaripur |
৳৬৫.৬৪ লাখ |
১৪ ফেব ২০১৮ |
Completed |
|
Construction of Fathpur Primary School
e-Tender/NBIDNNGPS/DIN/BRL/2017-18/W1.00225/e-GP/20241014/158942/00194944
|
Office of the Upazila Engineer, LGED, Birol, Dinajpur |
৳৬২.০৩ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of JOPSHA MIRKANDA PARA Primary School H-3 V-2.
e-Tender/NBIDNNGPS/SRT/NAR/2017-18/W1.00070/e-GP/2023910/160443/0081352
|
Office of the Upazila Engineer, LGED, Naria, Shariatpur |
৳৬৫.৩৩ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of MOHISH KHOLA Primary School under NBIDGPS Project-1H-5 Room
e-Tender/NBIDGPS/SRT/NAR/2017-18/W1.00329/e-GP/202395/155831/0080812
|
Office of the Upazila Engineer, LGED, Naria, Shariatpur |
৳৬২.৬৪ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of EKADAL Primary School under NBIDGPS Project-1. H-3V-2Room
e-Tender/NBIDGPS/SRT/NAR/2017-18/W 1.00307 /e-GP/2023910/155837/0081562
|
Office of the Upazila Engineer, LGED, Naria, Shariatpur |
৳৬৫.৭৬ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of SOUTH BHUMKHARA Primary School under NBIDGPS Project-1 H-3 V-2
e-Tender/NBIDNNGPS/SRT/NAR/2017-18/W1.00068/e-GP/2023910/160452/0081503
|
Office of the Upazila Engineer, LGED, Naria, Shariatpur |
৳৬৩.৫৭ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of PREMTOLA Primary School under NBIDGPS Project-1 H-3 V-2
e-Tender/NBIDNNGPS/SRT/NAR/2017-18/W1.00069/e-GP/2023917/160451/0083709
|
Office of the Upazila Engineer, LGED, Naria, Shariatpur |
৳৬২.১২ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of 18.00m Long RCC Girder Bridge on Udakhali UP-Singria Bazar Road over Singria Bill at ch.3610m. Road ID 132213001
PD/CLBUURP/W-341/e-GP/20241006/161970/00191586
|
Office of the Executive Engineer, LGED, Gaibandha |
৳১.২৬ কোটি |
৬ ফেব ২০১৮ |
Completed |
|
Supply & Installation of Security Light in the Boundary Wall of Kuril Flyover site Office
rajuk/electrical-1/18/3/e-GP/20220928/154882/0046327
|
office of the Chief Engineer ( Project & Design) |
৳৬.৬৯ লাখ |
৩০ জানু ২০১৮ |
Completed |
|
Periodic Maintenance of Akhanagar Rail Station Bazar-Ruhia Paachim UP office Road at ch. 5040m-10103m under Sadar Upazila Dist- Thakurgaon ID No.194943039.
e-Tender/LGED/Thak/GOBM/17-18/W-56/e-GP/20240917/151205/00176593
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳৪৩.৬৭ লাখ |
৪ জানু ২০১৮ |
Completed |