M/S. Iqbal & Brothers
Ownership
- Iqbal Ahmed · Proprietor 100.00%
Top offices
Top districts
- Chattogram206
- Chattogram49
- Cox's Bazar33
- Dhaka21
- Faridpur21
Get new tenders for Chattogram every morning and afternoon, free
Enter your mobile number, or start it on Telegram in one tap. No login.
Biggest competitors
| Companies | Shared offices | Total wins |
|---|---|---|
| M/S. S R ENTERPRISE | 24 | 79 |
| M/S Chowdhury Enterprise | 23 | 132 |
| M/S HASAN ENTERPRISE | 21 | 117 |
| M/S. Maa Enterprise | 21 | 113 |
| M/s Nissan Traders | 21 | 112 |
| M/S Khan Enterprise | 21 | 91 |
| M/S S.A. Enterprise | 18 | 79 |
| M/S. Nahar Enterprise | 18 | 79 |
| Mohammed Eunus & Brothers (Pvt.) Ltd. | 17 | 187 |
| M/S. Shah Jabbaria Construction & Co. | 17 | 116 |
Awards
361 resultsContract progress
68 results| Description | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
|
Grass Cutting of Power House Area(60 M.W, 150M.W),Rest House,132 KV Sub-station etc.(FY-2023-24)
W R-01/e-GP/20240713/874949/00165847 |
Deputy Manager, 150MW Sikalbaha Peaking Power Plant | BDT 9.00 lakh | 17 Sep 2023 | Completed |
|
Removal of Mud from River Intake Channel (For FY 2023-2024)
WR...23/e-GP/20240713/845926/00165863 |
Executive Engineer Mechanical Division Shikalbaha 225 MW Dual Fuel CCPP BPDB, Chittagong. | BDT 6.20 lakh | 13 Jun 2023 | Completed |
|
Improvement of Mira Bari Jam-E-Mosque under Tiakhali Union (Latitude: 22.00979, Longitude: 90.25075) under Kalapara, Patuakhali.
GSID-2/PTK/DW-27/e-GP/20241216/813580/00236142 |
Office of the Executive Engineer, LGED, Patuakhali | BDT 4.75 lakh | 12 Apr 2023 | Completed |
|
Rehabilitation by BC Road of Chandhat GC - Gajaria Village Road from Ch.00-1560m. under Nagarkanda Upazila, District-Faridpur. (Road ID No. 329624129).
CAFDRIRP/Faridpur/VR/W-10/2022-23/e-GP/20231025/790732/00115196 |
Office of the Executive Engineer, LGED, Faridpur | BDT 1.13 crore | 1 Mar 2023 | Ongoing |
|
(1) Improvement of Rojai Baper Bari Road by RCC Casting under Gumanmardan union ward no. 09 (2) Improvement of Chomod Ali Talukder Road by RCC Casting under Nangolmora union ward no. 09 (3) Construction of guide wall on Daim Uddin Sarang Bari Graveyard under Garduara union ward no. 01 (4) Improvement of Shahabuddin Bari Road by RCC Casting under Garduara union ward no. 02 (5) Improvement of Najir Fakir Bari Road by RCC Casting under Shikerpur union ward no. 02
ADP/HAT/2022-23/W-04/e-GP/20231225/787704/00157601 |
Office of the Upazila Engineer, Hathazari, Chattogram | BDT 9.63 lakh | 15 Feb 2023 | Completed |
|
Periodic Maintenance of Bittidanga Hat - Kasbamajail UP road from Ch. 00m-2000m [Pangsha] [Road ID: 382733031]
e-Tender/LGED/Rjb/GOBM/22-23/W-13/e-GP/20231026/724011/00117104 |
Office of the Executive Engineer, LGED, Rajbari | BDT 1.31 crore | 16 Aug 2022 | Completed |
|
Development of Paschim Gujra Ramkrishna GPS Road by HBB at Ch: 00-650m; Upazila: Raozan, District: Chattogram (EMIS Code-441021106).
GCP-3/ctg/WDS-271/e-GP/2023916/626664/0083496 |
Office of the Executive Engineer, LGED, Chittagong | BDT 42.05 lakh | 24 Nov 2021 | Completed |
|
Periodic Maintenance of Baniabaha GC-Mulghar UP Office via Nizpara Road from Ch. 00m-6945m [Rajbari Sadar] [Road ID: 382763004]
e-Tender/LGED/Rajb/GOBM/21-22/W-19/e-GP/20231026/607875/00117151 |
Office of the Executive Engineer, LGED, Rajbari | BDT 1.19 crore | 19 Sep 2021 | Completed |
|
Construction of Additional Class Room at Purbo Shamir GPS Under PEDP4
e-Tender/PEDP4/CHA/KAR/2020-21/W2-03172/e-GP/20230724/599160/0076210 |
Office of the Upazila Engineer, LGED, karnafuli, Chattogram. | BDT 61.10 lakh | 23 Aug 2021 | Completed |
|
Improvement of Ramjan Ali Hat GC to Chittagong-Rangamati (R & H) Road (Ramjan Ali Hat Kawtia Chan Mia Road) Road at Ch: 00-320m; Upazila: Raozan, District: Chattogram (Salvage Materials Cost Tk. 138968.00) (ID No-415744073).
IRIDP-3/CTG/DW-57/e-GP/2023915/593420/0083300 |
Office of the Executive Engineer, LGED, Chittagong | BDT 25.37 lakh | 1 Aug 2021 | Completed |
|
(1) Development of Purbo Saddar Para Road By BFS at Karaldanga Up, Upazila- Boalkhali, District- Chattogram. (2) Development of Ahalla Karaldanga Ludir Par Late Sayed Ahamed Bari Road By HBB at Karaldanga Up, Upazila- Boalkhali, District- Chattogram.
Ue/Boal/Ctg/Revenue-04/e-GP/20231227/590978/00157796 |
Office of the Upazila Engineer, Boalkhali, Chattogram | BDT 3.33 lakh | 30 Jun 2021 | Completed |
|
Development of Janar Keochia Salimer Para Road by RCC at Ch: 00-122m; Upazila: Satkania, District: Chattogram (ID No-415825059).
GCHDP-WD-VZR-CHT-SATK-21/13/e-GP/2023916/585782/0083456 |
Office of the Executive Engineer, LGED, Chittagong | BDT 11.86 lakh | 22 Jun 2021 | Completed |
|
Grass cutting of 132Kv substation (in the 2021 - 2022 FY)
WR 15 2020-2021/e-GP/20220929/587057/0047070 |
Executive Engineer ( Electrical , I & C ), 150MW Shikalbaha PPP | BDT 3.59 lakh | 9 Jun 2021 | Completed |
|
Grass Cutting of Power House Area (60 MW & 150 MW ) & Rest House for Financial Year 2021-2022
DM W 18/e-GP/20220923/585799/0040904 |
Deputy Manager, 150MW Sikalbaha Peaking Power Plant | BDT 4.50 lakh | 7 Jun 2021 | Completed |
|
Periodic Maintenance of Gunbaha UP office to Modhumati river via Chandani bazar Road from Ch. 1295m- 2310m BOALMARI Road ID 329183017
e-Tender/LGED/Farid/GOBM/20-21/W-02/e-GP/2023911/494618/0081659 |
Office of the Executive Engineer, LGED, Faridpur | BDT 14.95 lakh | 20 Sep 2020 | Completed |
|
Cleaning of open drain and septic tank in the plant and residential area on an annual basis
WR-17-20-21/e-GP/20220625/494421/0013993 |
Deputy Manager (Maintenance), Shikalbaha 225 MW CCPP | BDT 1.80 lakh | 16 Sep 2020 | Completed |
|
Cleaning of main drinking water tank and tanks on eich building & Change of broken glass of residential area on each building on an annual basis
WR-14-20-21/e-GP/20220617/494419/007792 |
Deputy Manager (Maintenance), Shikalbaha 225 MW CCPP | BDT 2.65 lakh | 16 Sep 2020 | Completed |
|
Sweeping cleaning woks in the residetial area BOP area3rd angleAdminstration buildingDormitoryRoadetc on an annual basis
WR-15-20-21/e-GP/20220617/494416/007798 |
Deputy Manager (Maintenance), Shikalbaha 225 MW CCPP | BDT 4.48 lakh | 16 Sep 2020 | Completed |
|
Grass Cutting of Power House Area 60 MW & 150 MW & Rest House.
SB WR07/e-GP/20220623/489583/0012409 |
Deputy Manager, 150MW Sikalbaha Peaking Power Plant | BDT 4.50 lakh | 8 Sep 2020 | Completed |
|
Works Procurement For Grass Cutting of Pant area BOP Dormitory Store Fuel Handling Plant etc annual basis for next financial year 2020-2021
DWR-11/e-GP/20220625/473194/0014023 |
Deputy Manager (Maintenance), Shikalbaha 225 MW CCPP | BDT 4.37 lakh | 22 Jun 2020 | Completed |
|
Grass Jangle and Bushes Cutting of Hathazari 100MW PPS.
WR-0000000017/e-GP/20220623/457843/0012416 |
Hathazari 100MW Peaking Power Station | BDT 4.19 lakh | 27 May 2020 | Completed |
|
Engine Hot Box cleaning Works from July/20 to June/21
WR-00000006/e-GP/20220626/456684/0014503 |
Hathazari 100MW Peaking Power Station | BDT 2.74 lakh | 10 May 2020 | Completed |
|
Refilling of Fire extinguisher with related supply of materials. And new extinguisher Installation.
WR-000000009/e-GP/20220626/456682/0014507 |
Hathazari 100MW Peaking Power Station | BDT 2.56 lakh | 10 May 2020 | Completed |
|
Unloading of Furnace Oil from Railway Wagon July 19 to June 20.
WR-00000005/e-GP/20220626/456694/0014511 |
Hathazari 100MW Peaking Power Station | BDT 15.90 lakh | 10 May 2020 | Completed |
|
Improvement by BC on Gopalpur Molikpara UNR Poltry Farm to Mongli bazar road from at Ch 0.00-765.00m under Sadar Upazila Dist- Faridpur Road ID No 329475272
FDIRIDP/F/19-20/VR-BC/601/e-GP/2023911/430602/0081651 |
Office of the Executive Engineer, LGED, Faridpur | BDT 59.25 lakh | 3 May 2020 | Completed |
|
CONSTRUCTION OF 5 NOS 2-STORIED RCC WASH BLOCK AT FATIKCHARI OR ANY OTHER UPAZILA IN CHATTOGRAM UNDER PEDP-4 BY DPHE CHATTOGRAM.
000/e-GP/DPHE/2023-07-11/00390613 |
Office of the Executive Engineer, DPHE,Chittagong | BDT 70.07 lakh | 2 Dec 2019 | Completed |
|
CONSTRUCTION OF 5 NOS 2-STORIED RCC WASH BLOCK AT CHANDANISH OR ANY OTHER UPAZILA IN CHATTOGRAM UNDER PEDP-4 BY DPHE CHATTOGRAM.
000/e-GP/DPHE/2023-07-11/00390611 |
Office of the Executive Engineer, DPHE,Chittagong | BDT 69.16 lakh | 2 Dec 2019 | Completed |
|
CONSTRUCTION OF 5 NOS 2-STORIED RCC WASH BLOCK AT BOALKHALI OR ANY OTHER UPAZILA IN CHATTOGRAM UNDER PEDP-4 BY DPHE CHATTOGRAM.
000/e-GP/DPHE/2023-07-11/00390610 |
Office of the Executive Engineer, DPHE,Chittagong | BDT 69.17 lakh | 2 Dec 2019 | Completed |
|
Periodic Maintenance of Dhulia UPC- Kalamiar Bazar via Rabair Bazar UPC Road from Ch. 3000m 4780m BAUPHAL Road ID 578383006
e-Tender LGED/PTK/GOBM/19-20/W-28/e-GP/20241215/380261/00235510 |
Office of the Executive Engineer, LGED, Patuakhali | BDT 68.19 lakh | 11 Nov 2019 | Completed |
|
Periodic Maintenance of Dhewkhali UP Office- Baliahati via Chandrapara high school Road form Ch 1000m- 2800m Sadarpur Road ID No. 329843001
e-Tender/LGED/Farid/GOBM/19-20/W-22/e-GP/2023101/376215/0093448 |
Office of the Executive Engineer, LGED, Faridpur | BDT 36.76 lakh | 11 Nov 2019 | Completed |
|
Zil Bunia Government Primary School under NBIDGPS Project-1 at Patuakhali Sadar Upazila.
e-Tender/NBIDGPS/PAT/PAT/2019-20/W1.04844/e-GP/20241119/347294/00219922 |
Office of the Upazila Engineer, LGED, Patuakhali Sadar, Patuakhali | BDT 89.97 lakh | 5 Aug 2019 | Completed |
|
Construction of Class Room of West Raozan Government Primary School Under NBIDGPS-1.
e-Tender/NBIDGPS/CHA/RAO/2018-2019/W1.04186/e-GP/20231219/339283/00155960 |
Office of the Upazila Engineer, LGED, Raojan, Chittagong | BDT 84.35 lakh | 8 Jul 2019 | Completed |
|
Grass Jangle and Bushes Cutting of Hathazari 100MW PPS.
WR-000000024/e-GP/20220625/335031/0013965 |
Hathazari 100MW Peaking Power Station | BDT 4.26 lakh | 19 Jun 2019 | Completed |
|
Cleaning of sludge pond Oily Water Treatment Plant Drain Oil pump house from July/19 to June/20
WR-000000010/e-GP/20220626/328700/0014528 |
Hathazari 100MW Peaking Power Station | BDT 6.43 lakh | 3 Jun 2019 | Completed |
|
Engine Hot Box cleaning Works from July/19 to June/20
WR-00000008/e-GP/20220626/328701/0014532 |
Hathazari 100MW Peaking Power Station | BDT 2.74 lakh | 3 Jun 2019 | Completed |
|
Unloading of Furnace Oil from Railway Wagon from July/19 to June/20
WR-0000006/e-GP/20220626/328652/0015161 |
Hathazari 100MW Peaking Power Station | BDT 15.90 lakh | 3 Jun 2019 | Completed |
|
Repair maintenance and painting of side walls and roof of firefighting tank cooling tower & storage tanks aluminum cover.
WR 20/e-GP/20220626/313304/0015203 |
Deputy Manager, 150MW Sikalbaha Peaking Power Plant | BDT 2.48 lakh | 5 May 2019 | Completed |
|
a Improvement of road by HBB started from Azahars house Jame Mosque road to Nazirs Hossain road at 04no word Zilongja union under Sadar Upazilla b Improvement of road by HBB started from sutarchar Culvert to Shahidul Islams house road at 09no word Zilongja union under Sadar Upazilla c Improvement of road by HBB & Construction of Culvert started from South Mohuripara jame mosque backside road to kudarat Ullah Sikders farm road at Zilongja union under Sadar Upazilla
egp/zpcox/2018-19/adp 05/e-GP/20231118/308231/00129711 |
Zila Parishad, Cox's Bazar | BDT 14.01 lakh | 21 Apr 2019 | Completed |
|
Mobilization/De-mobilization of shore pipes materials & supply of engine boat for carrying goods or people around the work site for maintenance dredging of Kalni-Kushiyara river management project 2nd revised under Chittagong dredger operation division BWDB Chittagong during the Fy 2018-19.
CDD-kk/ LTM- 07/2018-19/e-GP/20220723/293859/0027101 |
Chittagong Dredger Division | BDT 16.60 lakh | 10 Mar 2019 | Completed |
|
Construction & dismantling of shore pipe dia 20 of Uper Dhaleswari river 53.00 to 56.75 & 58.50 to 60.50km around the work site for maintenance dredging of Kalni-Kushiyara river management project 2nd revised under Chittagong dredger operation division BWDB Chittagong during the Fy 2018-19.
CDD-kk/ LTM- 11/2018-19/e-GP/20220723/293929/0027100 |
Chittagong Dredger Division | BDT 45.45 lakh | 10 Mar 2019 | Completed |
|
A Development of Barbakia Bodamazir Ghona Road by HBB at Ch.00-1000m Upazila Pekua District Coxs Bazar. Road ID-422954010 Salvage Amount in BDT 55523.00B Development of Taitong Barbakia Rajakhali Darbar Ghat Road by BC at Ch. 00-1000m Upazila Pekua District Coxs Bazar. Road ID-422953008 Salvage Amount in BDT 1910551.00.
GCP-3/Cox/WD-22/e-GP/20230828/246556/0078712 |
Office of the Executive Engineer, LGED, Cox'sbazar | BDT 1.47 crore | 15 Nov 2018 | Completed |
|
Wages of hired labour outsourcing manpower
GR-00000008/e-GP/20220628/245957/0018799 |
Hathazari 100MW Peaking Power Station | BDT 34.99 lakh | 8 Nov 2018 | Completed |
|
Improvement of Graveyard of Paschim uzantia Mia Para Jame Mosque Under Uzantia Union. Latitude 21.770236 Longitude 91.907027.
GSIDP/COX/DW- 40/e-GP/20231214/235277/00153988 |
Office of the Executive Engineer, LGED, Cox'sbazar | BDT 5.26 lakh | 22 Oct 2018 | Completed |
|
aSupply & Installation of Deep tube-well in Front the house of Salem Master Word no-1 champapur Up Kalapara Patuakhali b Supply & Installation of Deep tube-well in Front the house of Tanu madbar Londa Dankhali Up Kalapara Patuakhali.c Supply & Installation of Deep tube-well in Front the house of Al-amin talukder village of Posarbunia Banite Bazar Word no-2 Lalua Up Kalapara Patuakhali d Supply & Installation of Deep tube-well in Front the house of Rahaman sakder Madania bug kalapara pouroshava Word no-1 kalapara Patuakhali e Supply & Installation of Deep tube-well in Front house of Abul Hashem Howlader village of Safakhali Word no-6 methaGong Up Kalapara Patuakhali f Supply & Installation of Deep tube-well in Front the house of younus mazi village of Golbunia MethiaGong Up Kalapara Patuakhali
ZP_Pat/2017-18/Rev/028/e-GP/20241223/221454/00238485 |
Zila Parishad, Patuakhali | BDT 4.56 lakh | 19 Sep 2018 | Completed |
|
a Improvment of muradieah karemia karatul qurine madrasa Dumki patuakhali.b Supply & Installation of Deep tube-well in Front the house of Abdur Razzak sakder Village of Rajakhali Word No-6 Seri-Rampur Up Dumki Patuakhali.c Supply & Installation of Deep tube-well in Front the house of Profullo Chandro Sile Dumki Patuakhali.d Improvement of Eid-Ga Math Dakhin Muridia Haji bari Dumki Patuakhali.
ZP_Pat/2017-18/Rev/017/e-GP/20241223/219722/00238847 |
Zila Parishad, Patuakhali | BDT 3.33 lakh | 5 Sep 2018 | Completed |
|
Works Procurement For Grass cutting of Pant area BOP Store Fuel Handling Plant etc. at annual basis for next financial year
PWR-7/e-GP/20220628/209356/0017513 |
Deputy Manager (Maintenance), Shikalbaha 225 MW CCPP | BDT 4.37 lakh | 24 Jun 2018 | Completed |
|
Re-habilitation of Joynagar Vomrapara Road Link of Kadalpur Kala Kator Para Jugi Para Road from Ch 00-850m Raozan 415745598
e-tender/LGED/CTG/GOBM/17-18/W-140/e-GP/20231015/184478/00108421 |
Office of the Executive Engineer, LGED, Chittagong | BDT 1.05 crore | 18 Apr 2018 | Completed |
|
Improvement by HBB on Ghoradha H/O Lotif BC road to Mongolkot road from Ch 00.00- 1380.00m under Sadar Upazila Dist. Faridpur Road ID No. 329474093
FDIRIDP/F/17-18/VR-HBB/292/e-GP/20231017/171730/00110470 |
Office of the Executive Engineer, LGED, Faridpur | BDT 64.15 lakh | 18 Mar 2018 | Completed |
|
Construction & dismantling of 20 dia shore pipe line on normal ground & staging in connection with Dhaleswari river dredging Aushtogram Kishorgonj under Chittagong dredger Division BWDB Chittagong. Chain age 48.000 km to 47.000 km.
CDD-KK/LTM-16/2017-18/e-GP/20220723/173248/0027103 |
Chittagong Dredger Division | BDT 41.96 lakh | 6 Mar 2018 | Completed |
|
Supplying Engine boat with Majhee for river crossing dredger staff work boat staff labour & to carry repair materials from stores etc. in-connection with the dredging works at Hatoria river Patarkhandi Mitamouin Kishorgonj under chittagong dredger division BWDB Chittagong during the year 2017-18.
CDD-H/LTM-13/2017-18/e-GP/20220723/154202/0027104 |
Chittagong Dredger Division | BDT 3.86 lakh | 14 Jan 2018 | Completed |