(1) Re-Construction of RCC Open Irrigation Canal A-B Ch.0+ 00km to 0+400km 2 Nos SP Identification Sign board & 2 Nos SP Indication Post. (2) Re-Construction of RCC Open Irrigation Canal B-D Ch.0+ 00km to 0+750km (3) Re-Construction of RCC Open Irrigation Canal B-C Ch.0+ 00km to 1+050km (4) Construction of RCC Irrigation Canal F-F1 Ch.0+ 00Km to 0+900km (5) Construction of RCC Open Irrigation Canal A1-A2 Ch.0+ 00km to 0+250km (6) Construction of RCC Open Irrigation Canal E-E1 Ch.0+ 00km to 0+500km (7) Construction of Extension of Existing RCC Sumps (3.05mx2.30m) and (3.95mx1.90m) Mohammad Khani CAD (SP No. 22021) under Sadar Upazila, Dist: Chapainawabganj.
SSSWRDP/Cha/WD-250/2022-23/e-GP/20241005/781730/00191209
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳২.৭১ কোটি |
২৬ জানু ২০২৩ |
Ongoing |
|
Construction of Drain to Remove Waterlogging in Bhandamozlishpur Government Primary School
INF-2020-21-304806-01/e-GP/20231217/764486/00154985
|
Office of the Upazila Engineer, Bajitpur, Kishoreganj |
৳১৬.০৯ লাখ |
১১ ডিসে ২০২২ |
Completed |
|
Resectioning of right embankment in between 15.00 km to 21.00 km = 4650m & 22.00 km to 30.00 km = 6900m with 60 nos. ramp in c/w "Protection Project at Moulvibazar Sadar, Rajnagar & Kulaura Upazila from erosion of Manu River" under Moulvibazar O&M Division during the FY of 2021-22 & 2022-23.
RRE-02/e-GP/20231221/655166/00156585
|
Moulvibazar O&M Division |
৳১০.৮৫ কোটি |
৬ ফেব ২০২২ |
Ongoing |
|
1. Improvement of Hatubhanga bazar to Charsubuddi Uttarpara via Mezerkandi road by BC (ch. 00-1100m) under Raipura Upazila, District: Narsingdi. Road ID No: 368644087. Salvage cost Tk. 498768.62 2. Improvement of Monoharabad-Radhanagar Kalibari road via Pir Fate Ali Shah Mazar road by BC (ch. 00-415m) under Raipura Upazila, District: Narsingdi. Road ID No: 368644081. Salvage cost Tk. 702537.04 3. Improvement of Adiabad Moddyapara Uttom's bari pucca road-Moddyapara Aftab Mia's bari pucca road via Malek Mia's bari road by BC (ch. 00-466m) under Raipura Upazila, District: Narsingdi. Road ID No: 368645238. Salvage cost Tk. 143260.63 4. Improvement of Morjal High School-Lucky Madam's house road (Improvement of Kazi Bashir Uddin High School to Jashore bazar road) by BC (ch. 00-150m) under Raipura Upazila, District: Narsingdi. Road ID No: 368645207.
NAR/VR/NEW/BC/W-24/e-GP/20231129/635683/00144071
|
Office of the Executive Engineer, LGED, Narshingdi |
৳২.৩৭ কোটি |
১৩ ডিসে ২০২১ |
Completed |
|
Remaining work for Rehabilitation of Ruderpudda GC - Bajitpur Road (Nikli Part) Road from Ch. 00-7450m , Road ID. 348762001 under Upazila: Nikli, Dist. Kishoreganj.
FDR/Kis/21-22/UZR/W-03 Adl/e-GP/20231122/626446/00134734
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳৩.৭৭ কোটি |
১৪ নভে ২০২১ |
Completed |
|
Rehabilitation of Bajitpur-Agorpur (Bajitpur Part) Road from Ch. 00 m-5950 m, Road ID: 348062004, under Upazila: [Bajitpur] , Dist.: Kishoreganj.
e-Tender/KIS/GOBM/2021-2022/ W-29/e-GP/20231007/601454/0098380
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৮৭ কোটি |
২ সেপ ২০২১ |
Completed |
|
Installation Of Central Oxygen System Supply of austagram upazila Health Complex Under Austagram Upazila Dist: Kishoreganj
e-Tender/ AUS/JICA/2020-2021/01/e-GP/20231210/600136/00150246
|
Office Of The Upazila Engineer, Austagram, Kishoreganj |
৳১৩.৮৯ লাখ |
৩১ আগ ২০২১ |
Completed |
|
Bank Revetment work along the left bank at melaghar from km 28.750 to 29.250= 500m with 1no. R/S stair in C/W Protection Project at Moulvibazar Sadar Rajnagor & Kulaura Upazilla from erosion of Manu river under Moulvibazar O & M Division BWDB Moulvibazar during the FY 2020-21 , 2021-22 & 2022-2023
ML-PW-29/e-GP/20231221/592775/00156583
|
Moulvibazar O&M Division |
৳৯.৭২ কোটি |
৭ জুলাই ২০২১ |
Ongoing |
|
Bank Revetment work along the right bank at miyarpara from km 19.350 to 19.950 600m & 20.500 to 20.750 250m in C/W Protection Project at Moulvibazar Sadar Rajnagor & Kulaura Upazilla from erosion of Manu river under Moulvibazar O & M Division BWDB Moulvibazar during the FY 2020-21 & 2021-22
MR-PW-46/e-GP/20231221/543523/00156580
|
Moulvibazar O&M Division |
৳১৮.৬৫ কোটি |
১৬ জুন ২০২১ |
Ongoing |
|
Re-Construction of 45.00m Long PSC Girder Bridge on Subidpur UP Office-Balikhal (Nagura) Road ( Shahid Mhanmahon Road) under Replacement category at Chainage: 282m Road ID: 636113004 Baniachong Upazila Habiganj District.
SupRB/Habi/Replace/20-21/W-15/e-GP/20231224/580101/00157257
|
Office of the Executive Engineer, LGED, Habiganj |
৳৪.৩৮ কোটি |
৩ জুন ২০২১ |
Ongoing |
|
Construction of 51.0m Long RCC Girder Bridge over Bodgoni Khal under Sadar Upazila Poirtola R&H - Gosaipur Bazar (Sadar Part) Road. Ch. 5772m [Road ID : 412132004] [Sadar] [Brahmanbaria]
CBU-100/Purto-438/e-GP/20231218/572845/00155357
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳৫.০৩ কোটি |
৫ মে ২০২১ |
Completed |
|
Construction Of Breast Feeding Corner on Different Important Office under Austagram Upazila District Kishoreganj
e-Tender/AUS/JICA/2019-2020/01/e-GP/20231210/552336/00150256
|
Office Of The Upazila Engineer, Austagram, Kishoreganj |
৳৯.৯৪ লাখ |
৪ মে ২০২১ |
Completed |
|
Improvement of Badhunagar-Meghna River by RCC from Ch. 00-1000m Road ID. 348115006 under Upazila Bhairab Dist.Kishoreganj.
MRRIDP/21/KISH/BHAI/VR/RCC/122/e-GP/20230930/556853/0092621
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১.২৬ কোটি |
৩১ মার্চ ২০২১ |
Completed |
|
Construction of Upazila Muktijoddah Complex under Upazila Bajitpur Dist. Kishoreganj
CUMCP/KIS/BAJ/20/C-442/e-GP/20231122/541531/00134647
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৪৯ কোটি |
২ ফেব ২০২১ |
Ongoing |
|
Improvement of Bajitpur GC to Chatirchar UP Road via Kailag UP Kukrari Bazar Nunur Haor Bajitpur Part Road at Ch. 2600-6000m Road ID No. 348063010 by1. Earth Works2. Pavement Works RCC Road3. Structure Work Different size 10 nos. Box Culvert4. Protective Worksunder Upazila Bajitpur District Kishoreganj.
HFMLIP/Kishore/18-19/W-273/e-GP/20231007/490813/0098323
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳৫.৭৭ কোটি |
৯ সেপ ২০২০ |
Completed |
|
Periodic Maintenance of Battali bazar R&H-Talshahar bazar Road Sadar portion from Ch. 00m-200m 550m-700m & 3000m-4500m Brahmanbaria-S Road ID 412132003
e-Tender/LGED/BBR/GOBM/20-21/W-39/e-GP/20230920/488663/0085933
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳১.৬০ কোটি |
২ সেপ ২০২০ |
Completed |
|
Re-construction of Itna - Azmiriganj GC Road at Ch. 00m - 5550m Submergible Under Itna Upazila District Kishoreganj. Road ID No. 348332002
HFMLIP/Kishore/17-18/W-307/e-GP/20231122/480795/00135316
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১৮.৭৩ কোটি |
২৩ আগ ২০২০ |
Completed |
|
Maintenance of Dilalpur UP-Gazirchar UP via Noapara Bazar Road ID 348063005 with Widening Ch 2700-5300m under Bajitpur Upazila Dist.-Kishoreganj.
MRRIDP/20/KISH/BAJI/MAINT/UNR/105/e-GP/20231003/433606/0095882
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৯২ কোটি |
৯ মার্চ ২০২০ |
Completed |
|
Construction of Primary Drain at Raypura PourashavaNarshingdi under Water Supply & Environmental Sanitation including Fecal sludge Management Project in 32 Pourashavas.
000/e-GP/DPHE/2023-07-11/00425621
|
Office of the Executive Engineer, DPHE,Narsingdi |
৳৬.১৮ কোটি |
১৩ ফেব ২০২০ |
Completed |
|
Rehabilitation of- a Sararchar GC - Pirijpur Bazar RHD ID-348062012 Ch. 0000 - 4850 km b Bajitpur-Kuliarchar Road Bajitpur part ID-348062003 Ch. 0000-4004 km c Dilalpur GC - Kuliarchar UZ HQ via Nazirdighi Road Bajitpur part ID-348062010 Ch. 0000-2730 km d Bajitpur- Ruderpudda via Sharishapur Bajitpur part ID-348062006 Ch. 0000-6220 km Upazila Bajitpur.
KIS/AF- 51 /e-GP/20231014/368120/00107292
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১৪.২৪ কোটি |
১৬ অক্টো ২০১৯ |
Completed |
|
Rehabilitation ofa Tarail HQ - Cherang GCC Road ID-348922002 Ch. 0000-6318 km Upazila Tarailb Tarail HQ-Chowganga GC via Damiha UP Tarail Part ID-348922008 Ch. 0000-5876 km Upazila Tarail.
KIS/AF-55/e-GP/20231128/349280/00140651
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১২.৪৮ কোটি |
১৫ সেপ ২০১৯ |
Completed |
|
1 Improvement of Jahurul Islam Road Mostu Mia House to Medical College by RCC Ch 00-560m and Construction of Surface Drain.2 Improvement of Jahurul Islam Medical College front to Bhagalpur Rail Crossing and Link Road by RCC Ch. 00-560m ID No 348064020 under Bajitpur Upazila Dist Kishoreganj.
KIRIDP/Bajitpur/W-96/e-GP/20231128/350543/00140656
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৪২ কোটি |
২৮ আগ ২০১৯ |
Completed |
|
Construction of 20.00m Long RCC Girder Bridge on Juluhar bazaar-Laxankati RHD via Mirzapur Durgakathi at Ch 4376m Road ID 579872003
IBRP/Piroj/Nesar/Brg-01/e-GP/20241207/328019/00229567
|
Office of the Executive Engineer, LGED, Pirojpur |
৳১.৪৬ কোটি |
৪ আগ ২০১৯ |
Completed |
|
Construction of 24.00m Long RCC Girder Bridge on Chandkathi GC - Bharatkathi RHD Road at Ch 2010m Road ID 579872008
IBRP/Piroj/Nesar/Brg-05/e-GP/20241207/328023/00229831
|
Office of the Executive Engineer, LGED, Pirojpur |
৳২.৪৫ কোটি |
৪ আগ ২০১৯ |
Completed |
|
Construction of RCC Box Culvert at Nazirpur Bridge to Nazirpur H/Q Chotto Buichakati Humayun Hazra House Road at Chowthaimahal Bus Bay at Ch. 110m220m975m1302m413m1375m & 1138m Under Nazirpur Upazila Dist Pirojpur. Road ID 579765043
UTMIDP-NAZI/PIRO/WB-01/e-GP/20241202/338742/00226586
|
Office of the Executive Engineer, LGED, Pirojpur |
৳১.৩১ কোটি |
৪ আগ ২০১৯ |
Completed |
|
Village Protection work on Chachua Fenani under Itna Upazila Dist.-Kishoreganj. EL1050m
HILIP/18/WD14/VP-KIS/Itn-06/e-GP/20231001/339307/0093994
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳৯৫.৭৪ লাখ |
২৪ জুলাই ২০১৯ |
Completed |
|
Construction of 4-storied academic building with 4-storied foundation in/c sanitary water supply & electrification works at Manullarchar hazi bari model high school Pakundia Kishoreganj
WD-NGSS-53/e-GP/20221016/335885/0051095
|
Office of the Executive Engineer, EED,Kishoreganj Zone. |
৳২.৮৮ কোটি |
২৬ জুন ২০১৯ |
Completed |
|
Construction of 30.00m PC Girder Bridge on Sreerampur GC-Narayanpur GC Road via Sapmara Bazar & Nilkuthi R&H Road at ch. 5273m under Raipura Upazila Dist-Narsingdi.
PD/CLBUURP/W-310/e-GP/20231023/336598/00114569
|
Office of the Executive Engineer, LGED, Narshingdi |
৳২.৭১ কোটি |
২৪ জুন ২০১৯ |
Completed |
|
Construction of 30.00m PC Girder Bridge on Sreerampur GC-Narayanpur GC Road via Sapmara Bazar & Nilkuthi R&H Road at ch. 5891m under Raipura Upazila Dist-Narsingdi.
PD/CLBUURP/W-311/e-GP/20231023/337600/00114510
|
Office of the Executive Engineer, LGED, Narshingdi |
৳২.৯৪ কোটি |
২৪ জুন ২০১৯ |
Completed |
|
Rehabilitation of a Mithamoin GC Sadar-Nikli Chuntikhali Ghat Road Mithamoin Part ID-348592008 Ch. 0000-3500Km. Upazila Mithamoin Dist. Kishoreganj.b Austagram- Lakhai road via Ekurdia Dalarkandi Road ID-348022011 Ch. 0513-6120 Km. Upazila Austagram Dist. Kishoreganj.
KIS/AF-84/e-GP/20231025/329379/00115556
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১০.৪২ কোটি |
১৩ জুন ২০১৯ |
Completed |
|
Construction of Bangalpara UP complex building.
e-Tender/UCCP-2/KIS/AUS/2018-19/W-645/e-GP/20231210/292095/00150243
|
Office of the Upazila Engineer, LGED, Austagram, Kishoreganj |
৳১.৫৮ কোটি |
৮ এপ্রিল ২০১৯ |
Completed |
|
Construction of 60.00m RCC Girder Bridge on Lochonpur R&H-Brahmanbadhua Bazar Olipura Bazar Road at ch. 400m under Raipura Upazila Dist-Narsingdi.
PD/CLBUURP/W-312/e-GP/20231019/301205/00111920
|
Office of the Executive Engineer, LGED, Narshingdi |
৳৩.১৬ কোটি |
১ এপ্রিল ২০১৯ |
Completed |
|
Rehabilitation of Barkuma-Barma Hat Road via Darilla from Ch 1170m-4720m Trishal Road ID 361944094
MYM/VRRP/18-19/W-18/e-GP/20230913/294748/0082663
|
Office of the Executive Engineer, LGED, Mymensingh |
৳১.০৩ কোটি |
১৩ মার্চ ২০১৯ |
Completed |
|
Rehabilitation ofa Katiadi-Manikkhali GC Rd. ID-348452002 Ch. 0000-7695 Km. Upazila Katiadib Dhuldia GC-Manikkhali GC via Gachihata Rd. ID-348452005 Ch. 0000-5910 Km. Upazila KatiadiUnder Kishoreganj District.
KIS/AF-53/e-GP/20231025/283320/00115095
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১৪.৬৩ কোটি |
২৬ ফেব ২০১৯ |
Completed |
|
Improvement of Chanpur U.P Office-Baluakandi Bazar via Sadagorkandi Bazar Road at Ch 1.040 km -3.650 km under Raipura Upazila District Narsingdi. Road ID No. 368643011
GDP-3/NA-28/e-GP/20231012/276716/00106423
|
Office of the Executive Engineer, LGED, Narshingdi |
৳৩.২৯ কোটি |
২৩ জানু ২০১৯ |
Completed |
|
Construction of class room of Duljan Government Primary School under NBIDGPS Project-1 & Construction of class room of Dulir Char Government Primary School under NBIDGPS Project-1.
e-Tender/NBIDGPS/KIS/BAJ/2018-19/W1.03528/e-GP/20231206/268755/00148517
|
Office of the Upazila Engineer, LGED, Bajitpur, Kishoreganj |
৳১.৬২ কোটি |
১৪ জানু ২০১৯ |
Completed |
|
a Improvement of Sararchar-Kuliarchar-Kamalpur Rail Crossing to Mirapur via Balla-Kamalpur Govt. Primary School Road Ch00-430m 348064090 under Bajitpur Upazila Dist. Kishoreganj.b Improvement of Sararchar-Mirapur to Bhagalpur Bustand via Robir Bazar Road Ch00-3190m 348064091 & Construction of 4 nos U-Drain under Bajitpur Upazila Dist. Kishoreganj.
KIRIDP/Bajitpur/W-95/e-GP/20231029/251207/00118432
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৪৭ কোটি |
২৬ নভে ২০১৮ |
Completed |
|
a Maintenance of Kalikaprashad UP-Siddirchar Bazar Road with Protective Works Ch00-4040m Road ID No 348113002.b Maintenance of Shimulkandi UP-Ananda Bazar Road with Protective Works Ch00-4100m Road ID No348113003.c Maintenance of Bhairab UPZ HQ Chandiber Mor- Aganagar UP via Kalipur & Chanpur Bazar Road with Protective Works Ch1460-4257m Road ID No348113005.d Maintenance of Akbarnagar RHD- Tearirchar RHD via Gazaria GC Road with Protective Works Ch3000-4025m Road ID No 348112003 under Bhairab Upazila District Kishoreganj.
MRRIDP/18/KISH/BHAI/MAINT/UZR-UNR/33/e-GP/20230930/231079/0092497
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳৩.৩৪ কোটি |
৪ অক্টো ২০১৮ |
Completed |
|
Construction of BORDDAY CHANDIPUR KHERIPARA Non Government Primary School under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/CNG/NAC/2017-18/W1.00259/e-GP/20241029/159197/00206861
|
Office of the Upazila Engineer, LGED, Nachole, Chapai Nawbaganj |
৳৬২.২৭ লাখ |
১৯ ফেব ২০১৮ |
Completed |
|
Construction of class room of kaloir primary school..
e-Tender/NBIDGPS/CNG/NAC/2017-18/W1.00551/e-GP/20241029/167463/00206787
|
Office of the Upazila Engineer, LGED, Nachole, Chapai Nawbaganj |
৳৪৯.৮২ লাখ |
১৯ ফেব ২০১৮ |
Completed |
|
Construction of BAUL Non Government Primary school under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/CNG/NAC/2017-2018/W1.00125/e-GP/20241104/166302/00211465
|
Office of the Upazila Engineer, LGED, Nachole, Chapai Nawbaganj |
৳৫৮.৮২ লাখ |
১৯ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Bangabari UP Office Brozonathpur Hat & Ghat via H/O Lokman Hakim Road from Ch. 00m- 2425m under Gomostapur Upazila Dist Chapainawabganj.Salvage Tk.0.00. Road ID No. 170373021
e-Tender/LGED/CNG/GOBM/17-18/W-41/e-GP/20240919/165747/00178659
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳৪৫.৭১ লাখ |
১৪ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Kasba UP Kalhairbottola Mollikpur GC Chalk Rustam RHD Road Nachole Portion upto Bisnupur Road from Ch. 00m- 3900m under Nachole Upazila Dist Chapainawabganj.Salvage Tk.0.00 .Road ID No. 170563013
e-Tender/LGED/CNG/GOBM/17-18/W-43/e-GP/20240921/165750/00179317
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳৬৭.৩৯ লাখ |
১৪ ফেব ২০১৮ |
Completed |
|
a Improvement of Lundia Mokbul Membar House - Lundia Eadgh Field Road Ch. 00-1160m 348115034 under Bhairab Upazila Dist Kishoreganj.b Construction of 02 no 0.625mx0.600m culvert at ch. 300m 425m on the same road.c Construction of 01 no 2x4.50mx4.00m RCC box culvert at ch. 540m on the same road.
IRIDP-2/KISH./DW-114/e-GP/20231107/153536/00123051
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৩৬ কোটি |
১৮ জানু ২০১৮ |
Completed |
|
Improvement of Khashawla rail line-Khashawla purbapara Road Ch.00-1150m 348114013 under Bhairab Upazila Dist Kishoreganj.
IRIDP-2/KISH./DW-116/e-GP/20231017/153566/00109834
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১.৪৬ কোটি |
১৮ জানু ২০১৮ |
Completed |
|
Construction of Class room of DHONKI PARA Government Primary school under NBIDGPS Project-1
e-Tender/NBIDGPS/KSG/KAT/2017-2018/W1.00022/e-GP/20231115/151120/00127552
|
Office of the Upazila Engineer, LGED, Katiadi, Kishoreganj |
৳৩৫.১৩ লাখ |
১৫ জানু ২০১৮ |
Completed |
|
Construction of class room of khoskandi government primary school under NBIDGPS Project-1
e-Tender/NBIDGPS/BRB/2017-18/W1.00125/e-GP/20231121/146309/00132879
|
Office of the Upazila Engineer, LGED, Bancharampur, Brahmanbaria |
৳৬১.০২ লাখ |
২০ ডিসে ২০১৭ |
Completed |
|
Construction of Class room of Nogor Bhanda GPA under NBIDGPS Project-1.
e-Tender/NBIDGPS/KSG/BAJ/2017-18/W1.00023/e-GP/20231206/145922/00148429
|
Office of the Upazila Engineer, LGED, Bajitpur, Kishoreganj |
৳৩২.৮০ লাখ |
১৭ ডিসে ২০১৭ |
Completed |
|
Development of Shimulkandi Growth Center Market Upazila Bhairab District Kishoreganj
WNOBI/Kis/GC/108 A/e-GP/20231220/135628/00156235
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১.০৫ কোটি |
১৬ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Rasulpur-Moutupi road from Ch. 00-1280mBhairab ID no-348114002
e-Tender/LGED/KISH/GOBM/17-18/W-40/e-GP/20231022/134932/00113349
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২৭.৯২ লাখ |
১৪ নভে ২০১৭ |
Completed |