M/S. Hoque Traders
Top offices
Top districts
- Feni232
- Chattogram33
- Chattogram28
- Bogura25
- Noakhali20
Get new tenders for Feni every morning and afternoon, free
Enter your mobile number, or start it on Telegram in one tap. No login.
Biggest competitors
| Companies | Shared offices | Total wins |
|---|---|---|
| M/S. Maa Enterprise | 20 | 207 |
| M/S Chowdhury Enterprise | 18 | 166 |
| Mohammed Eunus & Brothers (Pvt.) Ltd. | 17 | 180 |
| M/S. Nahar Enterprise | 16 | 97 |
| M/S Khan Enterprise | 16 | 89 |
| M/S S.A. Enterprise | 14 | 77 |
| M M ENTERPRISE | 14 | 49 |
| M/S Sadia Enterprise | 14 | 29 |
| M/S. Rahman Traders | 13 | 152 |
| MS SHIMUL ENTERPRISE | 13 | 109 |
Awards
375 resultsContract progress
98 results| Description | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
|
Periodic Maintenance of Badapara-Mirpur Road from Ch. 00m-1010m under Gabtali Upazila, District: Bogura [Road ID # 110405010].
e-Tender/LGED/Bogu/GOBM/23-24/RW-20/e-GP/20240919/873727/00178441 |
Office of the Executive Engineer, LGED, Bogura | BDT 25.55 lakh | 14 Sep 2023 | Completed |
|
(i) Maintenance of Sufi Ahmad Karim road (Charcandia UP[Old]-Jabed Ali Tendol Mosque) Ch 480-2380m. Road ID No-430945121. (ii) Providing Protective work160.00m. (iii) Construction of 4 Nos U-Drain culvert at Ch.1346m, 1544m, 2074m & 2265m. under Sonagazi Upazila, Feni Value of Recovered Material Tk=418990.00
GNP-3/FENI/SON/22-23/W-348/e-GP/20231210/853605/00149983 |
Office of the Executive Engineer, LGED, Feni | BDT 1.25 crore | 13 Jul 2023 | Completed |
|
Rehabilitation work of Shahid Momin road-Asrafunnesa women Madrasha road Road from Ch. 00m-525m [CHAGALNAIYA] (ID No. 430145185) , Feni
e-Tender/LGED/FENI/GOBM/22-23/W-069/e-GP/20231120/809502/00132430 |
Office of the Executive Engineer, LGED, Feni | BDT 37.07 lakh | 4 Apr 2023 | Completed |
|
i) Improvement of Takiabazar (UP HQ- Banglabazar Road Ch. 260-1180m (Road ID No. 430943010) (ii) Providing Protective Work 62m (iii) Construction of 4 Nos U-drain culvert at Ch. 270m, 380m, 690m and 780m on the same road under Sonagazi Upazila, Feni.
GNP-3/FENI/SON/22-23/W-291/e-GP/20231210/793714/00149939 |
Office of the Executive Engineer, LGED, Feni | BDT 89.66 lakh | 12 Mar 2023 | Completed |
|
i. Improvement of Charlaxmigonj Eidgah- Fazilerghat Connecting Road via Dasani & Chayani Bazar Ch. 2170-2870m [ID No. 430945075] ii. Providing 20.00m Palisading Work iii. Construction of 2 Nos U-drain Culvert at Ch. 2210m & 2722m on the same road under Sonagazi Upazila, Feni (Salvage Material Cost Tk. 1,08,555.00)
GNP-3/FENI/SON/22-23/W-280/e-GP/20231210/751100/00149931 |
Office of the Executive Engineer, LGED, Feni | BDT 65.54 lakh | 5 Dec 2022 | Completed |
|
(a) Improvement of Katakhila- Alampur (Alauddin Babul Chairman) Road at Ch. 00-700m and Mosque Connecting link 100m (ID No. 430945258) (b) Construction of 02 Nos 0.600mx1.125m on the same Road at Ch. 225m & 432m (Salvage Cost. 24395.00) under Sonagazi, Feni.
IRIDP-3/FNI/DW-32/e-GP/20231122/739783/00135153 |
Office of the Executive Engineer, LGED, Feni | BDT 83.78 lakh | 11 Oct 2022 | Ongoing |
|
(a) Improvement of Laxmipur School Road (Five Star- Laxmipur GPS) at Ch. 00-750m (ID No. 430945086) (b) Construction of 03 Nos 0.600mx1.125m culvert at Ch. 110m, 155m & 580m on the same Road (Salvage Cost Tk. 1,28,757.00) under Sonagazi, Feni
IRIDP-3/FNI/DW-31/e-GP/20231130/739782/00145924 |
Office of the Executive Engineer, LGED, Feni | BDT 88.95 lakh | 11 Oct 2022 | Ongoing |
|
Improvement of Tarail Karimgonj FRB-Kaikorhati bazar via Pangpachia road (ch.00m-288m) [ID No-348924033) under Tarail Upazila, Dist-Kishoreganj.
IRIDP-3/KISH/DW-72/e-GP/20231122/733900/00134712 |
Office of the Executive Engineer, LGED, Kishoreganj | BDT 28.50 lakh | 20 Sep 2022 | Completed |
|
Periodc Maintenance of Karamotia(UP HQ)-Olemabazar viaCharsha bikhari School&Jamaderbazar Road from Ch. 3320-4930m [SONAGAZI] (Road ID. 430943008), Feni
e-Tender/LGED/FENI/GOBM/22-23/W-019/e-GP/20231002/733647/0094567 |
Office of the Executive Engineer, LGED, Feni | BDT 62.51 lakh | 18 Sep 2022 | Completed |
|
Periodc Maintenance of Amiruddinmunshirhat-Haludvita-1no Sluice-Nobabpur UP Road from Ch. 4270-6920m [SONAGAZI] (Road ID. 430943009), Feni
e-Tender/LGED/FENI/GOBM/22-23/W-020/e-GP/20231002/733648/0094594 |
Office of the Executive Engineer, LGED, Feni | BDT 76.01 lakh | 18 Sep 2022 | Completed |
|
Periodc Maintenance of Karamatia-Kazir hat Road from Ch. 00-1295m [SONAGAZI] (Road ID. 430943007), Feni
e-Tender/LGED/FENI/GOBM/22-23/W-008/e-GP/20231002/732790/0094548 |
Office of the Executive Engineer, LGED, Feni | BDT 33.70 lakh | 14 Sep 2022 | Completed |
|
Periodc Maintenance of Jagathpur-Manipur Road from Ch. 00-1700m [FULGAZI] (Road ID. 430952001), Feni
e-Tender/LGED/FENI/GOBM/22-23/W-013/e-GP/20231002/732792/0094711 |
Office of the Executive Engineer, LGED, Feni | BDT 1.48 crore | 14 Sep 2022 | Completed |
|
(i) Improvement of Purbo Safarpur- School Road from Ch. 500-1200m (ID No. 430945003) (Salvage material Cost Tk. 132101.00) (ii) Protective Work 20.00m (iii) Construction of U-drain at Ch. 590m & 756m under Sonagazi upazila, Feni.
GNP-3/FENI/SON/21-22/W-249/e-GP/20231222/701064/00156628 |
Office of the Executive Engineer, LGED, Feni | BDT 61.92 lakh | 5 Jun 2022 | Completed |
|
Supply and Installation of Digital Vernier Caliper under Revenue Budget of Department of Public Health Engineering (DPHE) at Feni District, in the Financial Year of 2020-2021.
000/e-GP/DPHE/2023-07-11/00690026 |
Office of the Executive Engineer, DPHE,Feni | BDT 13,000 | 26 May 2022 | Completed |
|
Supply and Installation of Digital Weighing Floor Scale under Revenue Budget of Department of Public Health Engineering (DPHE) at Feni District, in the Financial Year of 2020-2021.
000/e-GP/DPHE/2023-07-11/00690025 |
Office of the Executive Engineer, DPHE,Feni | BDT 44,499 | 26 May 2022 | Completed |
|
(i) Improvement of Uttar Charkishnajoy Advocate Belayet Hossain Road from Ch. 00-1000m (ID No. 430945118) Salvage Mat. Cost Tk. 80267.00 (ii) Construction of 600mmx1125mmm U-drain culvert at Ch. 690m & 890m under Sonagazi, Feni
GNP-3/FENI/SON/21-22/W-252/e-GP/20231213/682663/00153243 |
Office of the Executive Engineer, LGED, Feni | BDT 85.53 lakh | 28 Apr 2022 | Completed |
|
Periodic Maintenance of Ahmadpur Kazirtaluk Nur Zam- E-Mosque & Forkania Madrasah Complex Road from Ch. 00m - 260m (ID No. 430945180) [SONAGAZI], Feni
e-Tender/LGED/Feni/GOBM/21-22/W-079/e-GP/20230913/682396/0082731 |
Office of the Executive Engineer, LGED, Feni | BDT 16.55 lakh | 5 Apr 2022 | Completed |
|
Construction of 54.0m Long RCC Girder Bridge over Dakatia Khal on Dhonipara Tellarghat via Moddho Purbo Charhajari GPS to Taltola Bazar Road at Ch.1975m(Road ID :475214090) Upazila:Companiganj, District;Noakhali
CBU-100/Purto-443/e-GP/20231222/627177/00156663 |
Office of the Executive Engineer, LGED, Noakhali | BDT 4.97 crore | 24 Nov 2021 | Ongoing |
|
Rehabilitation. of Majhihatta UP - Bilhamla Hat Road from Ch. 3180 - 5450m under Upazila: Shibganj, District: Bogura. Road ID No: 110943022.
FDR/Bog/21-22/UNR/W-15/e-GP/20241005/618014/00191176 |
Office of the Executive Engineer, LGED, Bogra | BDT 1.43 crore | 24 Oct 2021 | Completed |
|
Periodic Maintenance of 1 No Single Vent (0.800m x 0.600m) RCC Box culvert at Ch. 1500m on Abu Bakar Road (KutirhatGC-Mohipal National Highway)-Sonagazi Part (ID No. 430942004) [SONAGAZI], Feni
e-Tender/LGED/Feni/GOBM/21-22/W-063/e-GP/20231015/617734/00107767 |
Office of the Executive Engineer, LGED, Feni | BDT 3.83 lakh | 6 Oct 2021 | Completed |
|
Widening of Kazirhat-Nobiullar Dhokan Road (End at No.08 Sluice) (ID No. 430944046) from Ch. 7490m -9100m [SONAGAZI], Feni
e-Tender/LGED/Feni/GOBM/21-22/W-057/e-GP/20230911/610183/0081791 |
Office of the Executive Engineer, LGED, Feni | BDT 83.86 lakh | 19 Sep 2021 | Completed |
|
Periodic Maintenance of Kazirhat-Boiragirpool via H/O Ilias Chairman Road (ID No. 430944040) from Ch. 00m -2020m [SONAGAZI], Feni
e-Tender/LGED/Feni/GOBM/21-22/W-039/e-GP/20231015/608586/00107707 |
Office of the Executive Engineer, LGED, Feni | BDT 52.27 lakh | 14 Sep 2021 | Completed |
|
Periodic Maintenance of Saheberhat-SEBA office (Miarbazar-Amiruddinmunsi) Road (ID No. 430944033) from Ch. 00m -1270m [SONAGAZI], Feni
e-Tender/LGED/Feni/GOBM/21-22/W-015/e-GP/20230911/605503/0081641 |
Office of the Executive Engineer, LGED, Feni | BDT 27.55 lakh | 7 Sep 2021 | Completed |
|
a Improvement of Chalaiya Gopat Road Bastala- Ahmadpur- Safarpur at Alamar Dokan Road at Ch. 00-800m ID no. 430945085 b Construction of 04 No 0.600mx1.125m culvert at Ch. 280m 360m 400m & 800m on the same road under Sonagazi Upazila Feni.Salvage Cost Tk. 881809.00
IRIDP-3/FNI/DW-08/e-GP/20230914/595203/0082972 |
Office of the Executive Engineer, LGED, Feni | BDT 73.03 lakh | 29 Jul 2021 | Completed |
|
a Improvement of Charayetkandi Dowlat Chowdhury Dighi- Motigonj RM Hat Road at Ch. 00-177m & 625-650m ID No. 430945070 b Construction of 01 No 0.600x1.125m culvert at Ch. 101m on the same Road under Sonagazi Upazila Feni.Salvage Cost Tk. 35998.00
IRIDP-3/FNI/DW-07/e-GP/20230914/547779/0082889 |
Office of the Executive Engineer, LGED, Feni | BDT 20.78 lakh | 11 Feb 2021 | Completed |
|
a Improvement of Reazuddin Munshibari- Charelahi Bridge Road at Ch. 00-1000m ID No. 430945063 b Construction of 01 No 0.600x1.125m culvert at Ch. 500m on the same Road under Sonagazi Upazila Feni.Salvage Cost Tk. 92469.00
IRIDP-3/FNI/DW-06/e-GP/20230914/547778/0082878 |
Office of the Executive Engineer, LGED, Feni | BDT 83.57 lakh | 11 Feb 2021 | Completed |
|
1.Improvement of road of 2 no word of Kadipur UP Kiyatola village north west face of Lal mias house calvert to Jomshed Ahmed Jibons house by BFS 2. Improvement of road of 3 no word of Kadipur UP Gobindopur village south east face of Abdul Hais house to Helal mias house by BFS3. Guide wall of north west face of Shofiq mias house under the village of Mouintam of 7 n0 word under Kadipur UP 4. Improvement of road of 8 no word of Kadipur UP Dokkin Catalgaon village Mosque west face road to Late Montaz mias house by BFS 5. BFS road besides Kadipur GPS 6. Improvement of road from Chunghor Dulipara Paka road to Forid/Lilechs house by BFS 7. . Improvement of road from Ningrai paka road to existing road by BFS 8. Calvert on Timuni Drain infront of Monsur sunas house 9. . Improvement of road from Foridpur Jamals house to Ripons house by BFS 10. Improvement Kandigaon road by BFS 11. . Improvement of road from Chunghor Shomchus house to east face by BFS 12. Improvement of Monsur Nurani Jame Mosque 13. . Improvement of Gonipur Kaium Doctors house east face by BFS
eTender/ADP/ KUL/2020-21/9/e-GP/20231109/541516/00124720 |
Office of the Upazila Engineer, Kulaura, Moulvibazar | BDT 13.78 lakh | 2 Feb 2021 | Completed |
|
1. Improvement of Gazipur Kaler Toli & Shongkor pur Pukons house Mondir 2.Culvert on Road in front of Oahid Members house to Konol Miyas house.3. Improvement of Korergram Pobons houseRoad from Benu Malakar house to infront of Borobaris by BFS 4.Improvement of road Minar Mohol Harikh Miyas house to Kuti Miyas house BFS.5.Improvement of Korergram Hz. Ballah Rh. mazar to Probashi Juyel Miyas house under Sodor UP by BFS.6.Improvement of Korergram road from Lutfur Rahman former member house Road toMashuk Miyas house by BFS
eTender/ADP/ KUL/2020-21/1/e-GP/20231109/541411/00124752 |
Office of the Upazila Engineer, Kulaura, Moulvibazar | BDT 13.00 lakh | 2 Feb 2021 | Completed |
|
Rehabilitation of Ghaniamora- Joypur Road from Ch 00m- 930m Road ID 430955035 under Fulgazi Feni
LGED/FEN/VRRP/OL/20-21/W-686/e-GP/20230904/514001/0080661 |
Office of the Executive Engineer, LGED, Feni | BDT 27.87 lakh | 18 Nov 2020 | Completed |
|
Rehabilitation of Khajura Company Road- Gozaria bazar Road from Ch 500m- 2210m Road ID 430954038 under Fulgazi Feni
LGED/FEN/VRRP/Re-hab/20-21/W-1163/e-GP/20230904/514000/0080655 |
Office of the Executive Engineer, LGED, Feni | BDT 60.83 lakh | 18 Nov 2020 | Completed |
|
Rehabilitation of Munshirhat- Bakshibazar Road- Dula Miah Road West Darberpur Road from Ch 00m- 975m Road ID 430955070 under Fulgazi Feni
LGED/FEN/VRRP/OL/20-21/W-687/e-GP/20230904/514002/0080674 |
Office of the Executive Engineer, LGED, Feni | BDT 31.02 lakh | 18 Nov 2020 | Completed |
|
Periodic Maintenance of Kathom kaligonj RHD-Ponditpukur GC Road via Bhatra UP from Ch. 00m-060m & 4500m - 6060m Road ID 110672012 Under Nandigram Upazila District Bogura.
e-Tender/LGED/Bogu/GOBM/20-21/W-50/e-GP/20240915/494816/00176165 |
Office of the Executive Engineer, LGED, Bogra | BDT 67.56 lakh | 27 Sep 2020 | Completed |
|
Periodic Maintenance of KutirhatGC-Takia Bazar RHD Road Road from Ch. 00m - 2315m SONAGAZI ID No. 430942010 Dist Feni.
e-Tender/LGED/Feni/GOBM/20-21/W-57/e-GP/20230904/492140/0080678 |
Office of the Executive Engineer, LGED, Feni | BDT 67.80 lakh | 14 Sep 2020 | Completed |
|
Periodic Maintenance of Hazipur-Mazupur Road from Ch. 00m - 576m SONAGAZI ID No. 430944016 Dist Feni.
e-Tender/LGED/Feni/GOBM/20-21/W-31/e-GP/20230911/490089/0081745 |
Office of the Executive Engineer, LGED, Feni | BDT 12.72 lakh | 3 Sep 2020 | Completed |
|
Construction of 81.00m long PSC Girder Bridge over Choto Feni River on North Jayloskar to Omarpur Point Road at Ch. 3175m Road ID 430254072 Upazila Daganbhuiyan District Feni.
CBU-100/Purto-276/e-GP/20231221/486990/00156550 |
Office of the Executive Engineer, LGED, Feni | BDT 8.30 crore | 3 Sep 2020 | Ongoing |
|
Construction of 96.00m Long PSC Girder Bridge on Kalidash Pahari Khal at Ch. 150m Road ID 430944081 Upazila Sonagazi District Feni
CBU-100/Purto-277/e-GP/20231221/478230/00156521 |
Office of the Executive Engineer, LGED, Feni | BDT 8.94 crore | 7 Jul 2020 | Ongoing |
|
Construction of Additional Class Room Dakkhin Paschim Char Chandia GPS under PEDP4 at Sonagazi Upazila Dist Feni.
e-Tender/PEDP4/FNI/SON/2019-20/W2.01387/e-GP/20231105/459852/00121967 |
Office of the Upazila Engineer, LGED, Sonagazi, Feni | BDT 1.03 crore | 28 Jun 2020 | Completed |
|
Construction of Additional Class Room Sarait Kandi GPS under PEDP4 at Sonagazi Upazila Dist Feni.
e-Tender/PEDP4/FNI/SON/2019-20/W2.00655/e-GP/20231105/459853/00122092 |
Office of the Upazila Engineer, LGED, Sonagazi, Feni | BDT 1.46 crore | 28 Jun 2020 | Completed |
|
Periodic Maintenance of Muktijoddha Shahid Anwar Uddin Road Ch. 00-390m ID No. 430955100 under Fulgazi Upazila Feni
e-Tender/LGED/Feni/GOBM/19-20/W-82/e-GP/20230911/450260/0081667 |
Office of the Executive Engineer, LGED, Feni | BDT 12.94 lakh | 13 May 2020 | Completed |
|
Construction of Boundary wall in/c Gate of a Hazipur Primary School b Kuthirhat Govt. Girl c Sowdagar Hat GPS under Sonagazi Feni.
e-Tender/PEDP4/FNI/SON/2019-20/W14.0609/e-GP/20231105/449679/00121987 |
Office of the Upazila Engineer, LGED, Sonagazi, Feni | BDT 51.76 lakh | 25 Mar 2020 | Completed |
|
Construction of Boundary wall in/c Gate of a Char Sonapur No. 1 b Gunak Govt. Primary Shool under Sonagazi Feni.
e-Tender/PEDP4/FNI/SON/2019-20/W14.0610/e-GP/20231102/449680/00121407 |
Office of the Upazila Engineer, LGED, Sonagazi, Feni | BDT 37.90 lakh | 25 Mar 2020 | Completed |
|
Maintenance of DPHE Upazila Office at Porshuram and Chagolnaiya Upazila in Feni District under National Sanitation Project Phase-III DPHE. Financial Year 2019-2020
000/e-GP/DPHE/2023-07-11/00435297 |
Office of the Executive Engineer, DPHE,Feni | BDT 5.11 lakh | 3 Mar 2020 | Completed |
|
Rehabilitation of Public Toilets at Feni Pouroshova under National Sanitation Project Phase-III of DPHE in Feni. Financial Year 2019-2020
000/e-GP/DPHE/2023-07-11/00435298 |
Office of the Executive Engineer, DPHE,Feni | BDT 3.68 lakh | 3 Mar 2020 | Completed |
|
Construction of 02 nos Public Toilet Civil Sanitary Electrical works & Running Water Supply etc. in Feni District under National Sanitation Project Phase-III DPHE Financial Year 2019-2020
000/e-GP/DPHE/2023-07-11/00435296 |
Office of the Executive Engineer, DPHE,Feni | BDT 31.40 lakh | 3 Mar 2020 | Completed |
|
Periodic Maintenance of Madur Dokan to Via Mohajon Bari Little Feni River upto Mawlana Para Mosque Road from Ch. 00m-770m SONAGAZI ID No. 430945157 at Feni District
e-Tender/LGED/Feni/GOBM/19-20/W-80/e-GP/20230831/423622/0079296 |
Office of the Executive Engineer, LGED, Feni | BDT 22.27 lakh | 11 Feb 2020 | Completed |
|
Construction of Two 2 Storied Rural Market Building with 04 storied Foundation in Olama Bazar Under Sonagazi Feni.
CRMIDP/FEN/W-488/e-GP/20230917/419576/0083847 |
Office of the Executive Engineer, LGED, Feni | BDT 4.05 crore | 2 Feb 2020 | Completed |
|
A. i Improvement of Motigonj Reazuddinmunshi GC -Sonapur RHD Via Manumairhat Ahmed pur road Ch. 4985-6115m. ID No. 430942011. ii Providing 82.00m Palisading work. iii Construction of 3Nos U-Drain Culvert at Ch. 4997m 5190m & 5465m. iv Construction of 1No 1x1.00mx1.00m RCC Box Culvert at Ch. 6055m. B. i Improvement of Commanderhat-Guchhagram road Ch. 950-1560m. ID No. 430944061. ii Providing 55.00m Palisading work. iii Construction of 1No U-Drain Culvert at Ch. 1350m. C. i Widening of Miar Bazar-Amiruddin Munshi road. Ch. 00-1000m. ID No. 430943001. ii Construction of 1No 1x1.00mx1.00m RCC Box Culvert at Ch. 500m under Sonagazi Feni.
GNP-3/FENI/SON/ 18-19/W-107/e-GP/20231002/408959/0095162 |
Office of the Executive Engineer, LGED, Feni | BDT 2.37 crore | 9 Jan 2020 | Completed |
|
Improvement of Bitumenous Carpeting Road from Krisna-Rampur New Briz to Motin Miar Bari Road W-7 Ch-0.00m-745m.
UIIP-BC/PCO/W-28/e-GP/20231019/401300/00112228 |
PIU Office of Dagonbhuiyan Pourashava, Feni | BDT 51.29 lakh | 5 Jan 2020 | Completed |
|
Periodic Maintenance of Kakra Badshatek RHD-Manikpur GC Road from Ch.2525m - 5560m Chakoria Road ID 422162002
e-Tender/LGED/Cox/ GOBM/19-20/W-26/e-GP/20231215/406178/00154188 |
Office of the Executive Engineer, LGED, Cox'sbazar | BDT 1.11 crore | 2 Jan 2020 | Completed |
|
Improvement of Darogarhat Alim Madrasah to Mollah bari road Sonagazi Kutirhat road Boiragirpool Ch.1100-1600m. ID No. 430945199 under Sonagazi Feni
GNP-3/FENI/SON/19-20/W-192/e-GP/20231002/356924/0094852 |
Office of the Executive Engineer, LGED, Feni | BDT 45.57 lakh | 5 Dec 2019 | Completed |