|
Installation of 78 nos Shallow Tube Well with No.6 Hand Pump & 60 nos Deep Tube well (100*38) with Submersible Pump in Kalihati Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765282
|
Office of the Executive Engineer, DPHE, Tangail |
৳৮১.৪৯ লাখ |
২৮ ডিসে ২০২২ |
Completed |
|
Installation of 120 nos Deep Tube well (100*38) with Submersible Pump in Ghatail Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765278
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.১৯ কোটি |
২৮ ডিসে ২০২২ |
Completed |
|
Installation of 80 nos Deep Tube well (100*38) with Submersible Pump in Ghatail Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765279
|
Office of the Executive Engineer, DPHE, Tangail |
৳৭৯.৫৪ লাখ |
২৮ ডিসে ২০২২ |
Completed |
|
Installation of 90 nos Deep Tube well (100*38) with Submersible Pump in Kalihati Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765284
|
Office of the Executive Engineer, DPHE, Tangail |
৳৯৬.৮৮ লাখ |
২৮ ডিসে ২০২২ |
Completed |
|
Installation of 110 nos Deep Tube well (100*38) with Submersible Pump in Modhupur Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765289
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.১৪ কোটি |
২৮ ডিসে ২০২২ |
Completed |
|
Installation of 100 nos Deep Tube well (100*38) with Submersible Pump in Delduar Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765274
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.১৫ কোটি |
২৮ ডিসে ২০২২ |
Completed |
|
Installation of 60 nos Shallow Tara System Tube Well with No.6 Hand Pump & 80 nos Deep Tube well (100*38) with Submersible Pump in Shakhipur Upazilla, Tangail under PSWSC during the FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00765294
|
Office of the Executive Engineer, DPHE, Tangail |
৳৮৬.২৯ লাখ |
২৭ ডিসে ২০২২ |
Completed |
|
Installation of 75 mm dia 117 Nos. shrouded Tube Well with 1.5 HP capacity submersible pump under PSWSC Project at Kaliakoir upazilla Gazipur District Under Department of Public Health Engineering during the year 2022-2023
000/e-GP/DPHE/2023-07-11/00734591
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৬১ কোটি |
২১ সেপ ২০২২ |
Completed |
|
GSWSSP.009 Installation of 100 x 50mm dia shrouded 100 Nos Tube Well with 1.5 HP capacity submersible pump Under Safe Water Supply & Sanitation Project at Kaliakair Upazilla in Gazipur District.(FY:2022-23)
000/e-GP/DPHE/2023-07-11/00718560
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৭১ কোটি |
৭ আগ ২০২২ |
Completed |
|
Installation of 78 Nos Submersible Pump (100 mm dia) at Sapahar upazila, Naogaon in Safe Water Supply Through Out the Country Project under Department of Public Health Engineering, Naogaon During FY-2022-23. (Sapahar-2) (Package No. PSWSC-2842).
000/e-GP/DPHE/2023-07-11/00720919
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳১.২১ কোটি |
৩ আগ ২০২২ |
Completed |
|
Installation of 260 Nos Shallow Tara Tubewell (75 mm dia) at Mohadebpur upazila, Naogaon in Safe Water Supply Through Out the Country Project under Department of Public Health Engineering, Naogaon During FY-2022-23.(Package No. PSWSC-2835).
000/e-GP/DPHE/2023-07-11/00720912
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳১.০৬ কোটি |
৩ আগ ২০২২ |
Completed |
|
Construction of Community Based Water Supply Scheme by Installing 100 mm dia 1.5 HP Submersible Pump at Kaliakoir Upazilla, Gazipur District Under PSWSC project during FY:2021-2022
000/e-GP/DPHE/2023-07-11/00657366
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳৭৭.৭৫ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Installation of Tubewell for Homeless and Ultrapoor Families in different upazilzas of Tangail Distirct for Observance of Mujib 100 years. (2nd Phase of Ashrayan project)
000/e-GP/DPHE/2023-07-11/00660362
|
Office of the Executive Engineer, DPHE, Tangail |
৳২০.৩০ লাখ |
১৫ ফেব ২০২২ |
Completed |
|
Installation of Tubewell for Homeless and Ultrapoor Families in different upazilas of Tangail Distirct for Observance of Mujib 100 years. (2nd Phase of Ashrayan project)
000/e-GP/DPHE/2023-07-11/00660361
|
Office of the Executive Engineer, DPHE, Tangail |
৳১৭.৭৩ লাখ |
১৫ ফেব ২০২২ |
Completed |
|
Installation of 56 nos Shallow Tube Well with No.6 Hand Pump & 152 nos Deep Tube well (100*38) with Submersible Pump in Shakhipur Upazilla, Tangail under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642503
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৮১ কোটি |
১৬ জানু ২০২২ |
Completed |
|
Installation of 60 nos Shallow Tube Well with No.6 Hand Pump & 96 nos Deep Tube well (100*38) with Submersible Pump in Basail Upazilla, Tangail under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642467
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.২৭ কোটি |
১৩ জানু ২০২২ |
Completed |
|
Installation of 82 nos Deep Tube well (100*38) with Submersible Pump in Mirzapur Upazilla, Tangail under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642482
|
Office of the Executive Engineer, DPHE, Tangail |
৳৯৪.৮৮ লাখ |
১৩ জানু ২০২২ |
Completed |
|
Construction of Community Based Water Supply Scheme by Installing 100mm x 50mm dia Tubewell with 1.5 HP Submersible Pump at Basail and Tangail Sadar Upazila under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642433
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৫২ কোটি |
১৩ জানু ২০২২ |
Completed |
|
Installation of 120 nos Deep Tube well (100*38) with Submersible Pump in Modhupur Upazilla, Tangail under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642484
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৯ কোটি |
১৩ জানু ২০২২ |
Completed |
|
Installation of 100 nos Deep Tube well (100*38) with Submersible Pump in Mirzapur Upazilla, Tangail under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642481
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.১৬ কোটি |
১৩ জানু ২০২২ |
Completed |
|
Installation of 126 nos Shallow Tube Well with No.6 Hand Pump & 56 nos Shallow Tube well (100*38) with Submersible Pump in Mirzapur Upazilla, Tangail under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642479
|
Office of the Executive Engineer, DPHE, Tangail |
৳৮৩.৫৪ লাখ |
১৩ জানু ২০২২ |
Completed |
|
Installation of 75mm dia 95 Nos shrouded Tube Well with 1.5 HP capacity submersible pump under Project for Safe Water Supply Throughout the Country for Kapasia Upazilla Gazipur District under Department of Public Health Engineering FY:2021-2022
000/e-GP/DPHE/2023-07-11/00596953
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৩২ কোটি |
৩০ সেপ ২০২১ |
Completed |
|
Installation of 104 Nos Submersible Pump (100 mm dia) at Niamatpur upazila, Naogaon in Safe Water Supply Through Out the Country Project under Department of Public Health Engineering, Naogaon During FY-2021-22.(Niamatpur-1)(Package No. PSWSC-2812).
000/e-GP/DPHE/2023-07-11/00595826
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳১.০১ কোটি |
১১ আগ ২০২১ |
Completed |
|
Installation of 260 Nos Shallow Tara Tubewell (75 mm dia) at Mohadebpur upazila, Naogaon in Safe Water Supply Through Out the Country Project under Department of Public Health Engineering, Naogaon During FY-2021-22.(Package No. PSWSC-2814).
000/e-GP/DPHE/2023-07-11/00595879
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳৯২.৯৪ লাখ |
১১ আগ ২০২১ |
Completed |
|
Construction of 36 nos Community Based Water Supply scheme by installing 100mm dia tubewell with 1.5 HP Submersible Pump under Project for Safe Water Supply Through Out The Country at Mohadebpur and Manda Upazilla in Naogaon District During the FY-2021-22.
000/e-GP/DPHE/2023-07-11/00596784
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳১.২৬ কোটি |
১০ আগ ২০২১ |
Completed |
|
Installation of 85 nos. TW with Submersible Pump for Community Based Water Supply Project at Low Water Table Area at Sapahar Upazilla in Naogaon District during the FY-2021-22.
000/e-GP/DPHE/2023-07-11/00594612
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳৩.৭৫ কোটি |
১০ আগ ২০২১ |
Completed |
|
Major Maintenance of 68 Nos Government Primary School of Tangail District Under Primary Education Development Programme-4 (PEDP-4)
000/e-GP/DPHE/2023-07-11/00584031
|
Office of the Executive Engineer, DPHE, Tangail |
৳৩২.৪৪ লাখ |
২ জুন ২০২১ |
Completed |
|
Installation of 48 Nos Submersible Pump (100 mm dia) at Niamatpur Upazila Mujib Barsho Ashroyon Project under Department of Public Health Engineering, Naogaon During FY-2020-21.
000/e-GP/DPHE/2023-07-11/00581197
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳৫২.৭৪ লাখ |
২৪ মে ২০২১ |
Completed |
|
Installation of tube well for homeless and ultra poor families in different upazillas of Tangail district for observance of Mujib 100 years.
000/e-GP/DPHE/2023-07-11/00581024
|
Office of the Executive Engineer, DPHE, Tangail |
৳৩৭.৯৩ লাখ |
২৩ মে ২০২১ |
Completed |
|
Installation of 80nos. 100 x 38 mm dia. deep tube well with submersible pump at different primary schools of Tangail District.
000/e-GP/DPHE/2023-07-11/00571256
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.০৪ কোটি |
২০ এপ্রিল ২০২১ |
Completed |
|
Installation of 208 nos. deep Tube well 100x38 with Submersible Pump at Shakhipur Upazilla under Project for Safe Water Supply Throughout the Country.
000/e-GP/DPHE/2023-07-11/00550936
|
Office of the Executive Engineer, DPHE, Tangail |
৳২.৩৬ কোটি |
১০ মার্চ ২০২১ |
Completed |
|
Installation of 38 nos. deep Tube well with No.6 Hand Pump & 200 nos. deep Tube well 100x38 with Submersible Pump at Mirzapur-1 Upazilla under Project for Safe Water Supply Throughout the Country.
000/e-GP/DPHE/2023-07-11/00550934
|
Office of the Executive Engineer, DPHE, Tangail |
৳২.৬৭ কোটি |
১০ মার্চ ২০২১ |
Completed |
|
Installation of 56 nos. deep Tube well with No.6 Hand Pump & 100 nos. deep Tube well 100x38 with Submersible Pump at Basail Upazilla under Project for Safe Water Supply Throughout the Country.
000/e-GP/DPHE/2023-07-11/00550933
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৫৯ কোটি |
১০ মার্চ ২০২১ |
Completed |
|
Installation of 75mm dia 104 Nos shrouded Tube Well with 1.5 HP capacity submersible pump under Project for Safe Water Supply Throughout the Country for Sreepur Upazilla Gazipur district under Department of Public Health Engneering FY 2020-21
000/e-GP/DPHE/2023-07-11/00551977
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৪৪ কোটি |
৮ মার্চ ২০২১ |
Completed |
|
Installation of 75mm dia 104 Nos shrouded Tube Well with 1.5 HP capacity submersible pump under Project for Safe Water Supply Throughout the Country for Sreepur Upazilla Gazipur district under Department of Public Health Engneering FY 2020-21
000/e-GP/DPHE/2023-07-11/00554291
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৪৪ কোটি |
৮ মার্চ ২০২১ |
Completed |
|
Installation of 82 nos. TW with Submersible Pump for Community Based Water Supply Project at Low Water Table Area at Sapahar Upazilla in Naogaon District during the FY-2020-21.
000/e-GP/DPHE/2023-07-11/00551979
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳৩.২৬ কোটি |
১ মার্চ ২০২১ |
Completed |
|
Installation of 70 nos. TW with Submersible Pump for Community Based Water Supply Project at Low Water Table Area at Porsha Upazilla in Naogaon District during the FY-2020-21.
000/e-GP/DPHE/2023-07-11/00552120
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳২.৪৪ কোটি |
১ মার্চ ২০২১ |
Completed |
|
Installation of Shallow 6no hand pump Tube well under Preferential Rural Water Supply Project PRWSP of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00549466
|
Office of the Executive Engineer, DPHE, Tangail |
৳২৬.২২ লাখ |
১৮ ফেব ২০২১ |
Completed |
|
Construction of 10 nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under NBIDNNGPS-1
000/e-GP/DPHE/2023-07-11/00546085
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৭ কোটি |
১৮ ফেব ২০২১ |
Completed |
|
Construction of 10 nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under NBIDGPS-1
000/e-GP/DPHE/2023-07-11/00543329
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৭ কোটি |
১৮ ফেব ২০২১ |
Completed |
|
Construction of 10 nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under NBIDGPS-1
000/e-GP/DPHE/2023-07-11/00543317
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৭ কোটি |
১৮ ফেব ২০২১ |
Completed |
|
Construction of 10 nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under NBIDGPS-1
000/e-GP/DPHE/2023-07-11/00543322
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৭ কোটি |
১৮ ফেব ২০২১ |
Completed |
|
Construction of 10 nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under NBIDNNGPS-1
000/e-GP/DPHE/2023-07-11/00546086
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৭ কোটি |
১৮ ফেব ২০২১ |
Completed |
|
Construction of 10 nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under NBIDNNGPS-1
000/e-GP/DPHE/2023-07-11/00546094
|
Office of the Executive Engineer, DPHE, Tangail |
৳১.৩৭ কোটি |
১৮ ফেব ২০২১ |
Completed |
|
Installation of 208 Nos Shallow Tara Tubewell 75 mm dia at Badalgachi upazila Naogaon in Safe Water Supply Through Out the Country Project under Department of Public Health Engineering Naogaon During FY-2020-21Package No. PSWSC-2807.
000/e-GP/DPHE/2023-07-11/00509984
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳৭৪.৩৭ লাখ |
৩ নভে ২০২০ |
Completed |
|
Installation of 156 Nos Shallow Tara Tubewel 75 mm dia at Naogaon Sadar upazila Naogaon in Safe Water Supply Through Out the Country Project under Department of Public Health Engineering Naogaon During FY-2020-21.Sadar-1Package No. PSWSC-2791.
000/e-GP/DPHE/2023-07-11/00509770
|
Office of the Executive Engineer ,DPHE, Naogaon |
৳৫৩.৪৭ লাখ |
৩ নভে ২০২০ |
Completed |
|
Interconnection of East & West side PTW of Shashanghat to GWTP and necessary repair works for Pump House at Tangail Pourashava under 37 District Towns Water Supply Project. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00503910
|
Office of the Executive Engineer, DPHE, Tangail |
৳২১.৯৪ লাখ |
১১ অক্টো ২০২০ |
Completed |
|
Installation of 75mm dia shrouded Tube Well with 1.5 HP capacity submersible pump under Project for Safe Water Supply Throughout the Country for Sadar Upazilla Gazipur district under Department of Public Health Engneering FY 2020-21.
000/e-GP/DPHE/2023-07-11/00483666
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৪৪ কোটি |
২৫ আগ ২০২০ |
Completed |
|
Installation of 75mm dia shrouded Tube Well with 1.5 HP capacity submersible pump under Project for Safe Water Supply Throughout the Country for Kaliakoir Upazilla Gazipur district under Department of Public Health Engneering FY 2020-21.
000/e-GP/DPHE/2023-07-11/00478854
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.৬২ কোটি |
২৬ জুলাই ২০২০ |
Completed |
|
Installation of 75mm dia shrouded Tube Well with 1.5 HP capacity submersible pump under Project for Safe Water Supply Throughout the Country for Kaligonj Upazilla Gazipur district under Department of Public Health Engneering FY 2020-21.
000/e-GP/DPHE/2023-07-11/00478852
|
Office of the Executive Engineer ,DPHE, Gazipur |
৳১.২৬ কোটি |
২৬ জুলাই ২০২০ |
Completed |