|
Construction of RCC Drain (a) H/Q Beg Abdur Razzaq-Bhoiraob River Mattomdanga from Ch: 00-380.00m (Road ID:247694077) (b) RHD Beside Upazila Parishad-Bhoiraob River from Ch: 00-277.00m (Road ID:247694075) (c)Pather Bazar Rail-line Montajer Mor Bazar from Ch: 00- 750.00m (Road ID:247694090) Under Phultala Upazila , Dist: Khulna. [ Salvage Amount: Tk. 254650.00]
UTMIDP/KHUL/FULT/WD-203/e-GP/20241107/923995/00215379
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৪৫ কোটি |
১৭ ডিসে ২০২৩ |
Completed |
|
Construction of 900.00mmX1000.00mm RCC U Box Culvert (1) Phultala Rail Station -Phultala Thana H/Q Road at Ch: 05m (Road ID: 247694099) (2) Jamira GC-Payra GC (Phultala Part) at Ch: 505m (Road ID: 247692004) (3) Jamira Girls School-Alomgir SK House at Ch. 170m (Road ID: 247695003) (4) Afiliute Mill Bazar-PariadangaTib Matha (Kulsumbibi) Road at Ch. 290m(Road ID: 247694074) (5) Domadar UP-Alka Transmeter Bazar Via Damodar Kolony & Alka Dakkin Para Road at Ch. 295m (Road ID: 247693006) (6) Purba Mosiali Das Para-River Ghat at Ch. 155m (Road ID: 247695103) (7) Jugnipasha central RD- Abu Bakkar Gazi Road at Ch. 175m (Road ID: 247694018) (8) Baranpara BaroGhat at Ch. 449m & 811m (Road ID: 247695007) (9) Poygram-Tithter Bastala Road at Ch. 300m & 400m (Road ID: 247694040) (10) Phultala Biddut Office-Alka R&H Road at Ch.238m & 703m (Road ID: 247694063)(11) Dattagaty Puratan hat GC Road at Ch. 135m (Road ID: 247695013) and Construction of 900.00mmx1500.00mm RCC U Box Culvert. (12) Pather Bazar- Amtala Road at Ch. 863m (Road ID: 247694089) (13) Damodar Karikor Para Road at Ch. 170m (Road ID: 247695003) (14) Damodar Sarder Para Road at Ch. 230m (Road ID: 247695008) (15) Damodar Faraji Para Road at Ch. 695m (Road ID: 247695009)&Construction of 1500mmx1800.00mm RCC U-Box Culvert. (16) Eastern Gate Bazar R&H Amtala GC Road at Ch. 536m (Road ID: 247692005) Under Phultala Upazila , Dist: Khulna. [ Salvage Amount: Tk. 50368.00]
UTMIDP/KHUL/FULT/WB-119/e-GP/20241107/924000/00213965
|
Office of the Executive Engineer, LGED, Khulna |
৳৩৪.৬৬ লাখ |
১৭ ডিসে ২০২৩ |
Completed |
|
Site Development work including landscaping at Natore Polytechnic Institute under Sadar Upazila of Natore District.
XEN/EED/NAT/POLYTECHNIC/WD-11/e-GP/20241202/902661/00226167
|
Office of the Executive Engineer, EED, Natore District. |
৳১.৮২ কোটি |
৬ ডিসে ২০২৩ |
Ongoing |
|
Re-Construction of 18.00m Long RCC Girder Bridge on R&H at Hakimpur Bottala - Kamarhat road at Ch. 50m (Road ID no-176834003) under Upazila- Sujanagar, Dist-Pabna
CAFDRIRP/Pabna/VR/Brdg/FD/W-04/2023-24/e-GP/20240706/908191/00164700
|
Office of the Executive Engineer, LGED, Pabna |
৳১.৩৫ কোটি |
২৩ নভে ২০২৩ |
Ongoing |
|
a) Periodic Maintenance of Shilaidah UP-Kushtia Upazila H/Q road via Kalua road (Ch.00-3920m) [Road ID No.250713015] [Upazila-Kumarkhali]. b) Periodic Maintenance of Batikamara Brack office-Khairchara RHD road (Ch. 00-760m) [Road ID No.250714112] [Upazila-Kumarkhali,District-Kushtia].
KDRIDP/Kush/M-44/2023-24/e-GP/20241223/905264/00238329
|
Office of the Executive Engineer, LGED, Kushtia |
৳২.৪৫ কোটি |
১৯ নভে ২০২৩ |
Ongoing |
|
a) Periodic Maintenance of Arenda (Kashipur UP)-Lutia Bazar Road at (Ch. 8960-10140m) (Road ID- 265523004) b) Periodic Maintenance ofDigholia UP-Kotakol Bazar (Lanch Ghat) Road at (Ch. 00-1568m) (Road ID- 265523013) Under Lohagara Upazila, Dist: Narail.
KDRIDP/Narail/M-21/2023-24/e-GP/20241029/891790/00208352
|
Office of the Executive Engineer, LGED, Narail |
৳১.২৫ কোটি |
২ নভে ২০২৩ |
Ongoing |
|
Construction of additional class room Khumuria GPS under NBIDGPS
e-Tender/NBIDGPS/PER/SAD/2023-2024/W1-07948/e-GP/20241029/885302/00207041
|
Office of the Upazila Engineer, LGED, Pirojpur Sadar, Pirojpur |
৳১.০৪ কোটি |
৩১ অক্টো ২০২৩ |
Ongoing |
|
287862002- Periodic Maintenance of Nowabenki GC -Khanpur R&H Via Vetkhali GC road From ch 5850-7830m under Shyamnagar upazila Dist.- Satkhira
KDRIDP/sat/M-33/2023-24/e-GP/20241112/890950/00217771
|
Office of the Executive Engineer, LGED, Satkhira |
৳১.০১ কোটি |
৩০ অক্টো ২০২৩ |
Completed |
|
Part A : Improvement of Bhagjot mor-Sentu Jamadar House Road at (Ch. 0.00-450.00m) [Road ID No.250395111] under [Upazila-Daulatpur, District-Kushtia] Part B : Improvement of Bhagjot Bazar (Ghat)-Insaf Nagar Bazar Road at (Ch. 0.00-1242.00m) [Road ID No.250394146] under [Upazila-Daulatpur, District-Kushtia]
UTMIDP-KUSH/DAUL/WR-399/e-GP/20240922/893370/00179937
|
Office of the Executive Engineer, LGED, Kushtia |
৳৭১.৬৪ লাখ |
৩০ অক্টো ২০২৩ |
Completed |
|
Re-construction of 16.00m Long RCC Bridge on Chaperhat Vullarhat UZR 2008 - Vitorkuti Via Taluk Modati GPS Road at Ch. 4000m under Kaliganj Upazila, District: Lalmonirhat. (Road ID: 152395009)
CAFDRIRP/Lalmonirhat/VR-B/FD/Brdg/W-05/2023-24/e-GP/20241214/889791/00235163
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳১.৯২ কোটি |
২৬ অক্টো ২০২৩ |
Ongoing |
|
Periodic maintenance of Kumarkhali (Shibrampur) RHD -Khorshedpur GC- Shelaidah Kuthibari RHD Road via Shelaidah Ghat from (Ch. 3600m-7020m) [Road ID No. 250712006] [Upazila-Kumarkhali, District-Kushtia].
e-Tender/LGED/Kush/GOBM/23-24/W-36/e-GP/20240915/888188/00176194
|
Office of the Executive Engineer, LGED, Kushtia |
৳২.২৭ কোটি |
১৭ অক্টো ২০২৩ |
Completed |
|
A) Improvement of Pirpurkhullah Armans House-Sodabari Thakurpur Road by BC From Ch. 00-1462m. B) Construction of 01 nos U- Type drain (600mm X 625mm) at Ch.687m. C) Road Safey Work on the same Road, Salvage Cost Tk.18,22,727, ID No:218314023,Under Damurhuda Upazila, District: Chuadanga. D) Improvement of Chayghorias Uttarpara dauder House To Haybatpur Road by BC From Ch. 00-200m. E) Construction of 01 nos U- Type drain (600mm X 625mm) at Ch.195m. F) Road Safey Work on the same Road, Salvage Cost Tk.3,61,696, ID No:218315240,Under Damurhuda Upazila, District: Chuadanga.
GKRIDP/06/CW-113/e-GP/20241016/882515/00197153
|
Office of the Executive Engineer, LGED, Chuadanga |
৳১.৫৪ কোটি |
১০ অক্টো ২০২৩ |
Completed |
|
Improvement of Sreepur Upazila to Kajali Bazarvia Musdia Road by BC from Ch 1620m- 2500m under Sreepur Upazila Dist: Magura (Road ID: 25594073)
UTMIDP/MAGU/SREE/WR-391/e-GP/20241030/877054/00208743
|
Office of the Executive Engineer, LGED, Magura |
৳৬৬.৮৭ লাখ |
৮ অক্টো ২০২৩ |
Completed |
|
Rehabilitation (Widening) of Charavita GC.-Basundia GC. Via Shaitkhali Road from Ch. 2745m- 6475m Road ID-241092007 [Bagherpara]
e-Tender/LGED/Jash/GOBM/23-24/RW-47/e-GP/20240819/877402/00168231
|
Office of the Executive Engineer, LGED, Jashore |
৳২.৫৫ কোটি |
১ অক্টো ২০২৩ |
Completed |
|
Rehabilitation of Jessore Khulna RHD Bhangagate (Badamtala) - Amtala GC via Moricha, Nawly Bazar Road from Ch. 1300m-3650m Road ID-241042007 [Abhoynagar]
e-Tender/LGED/Jash/GOBM/23-24/RW-42/e-GP/20240819/877397/00168254
|
Office of the Executive Engineer, LGED, Jashore |
৳২.৩৭ কোটি |
১ অক্টো ২০২৩ |
Completed |
|
Construction of Public Toilet at Arpara Bazar Under Salikha Upazila. Dist: Magura,
UTMIDP/MAGU/SALI/WT-138/e-GP/20240827/877052/00169625
|
Office of the Executive Engineer, LGED, Magura |
৳১৭.৯৮ লাখ |
২৭ সেপ ২০২৩ |
Completed |
|
Re-Construction of 03 nos(Size 1.5mx1.5m, 03 nos(Size 3.0mx3.0m) RCC Box Culvert, Brick Palisading & Brick Guide Wall on Burigoalini UP-Nildumur Hat Road at Ch.630m, 800m, 1600m, 3375m 1200m &4015m Under Shyamnagar Upazila. Dist:Satkhira. (Road ID No. 287863001)
CAFDRIRP/Satkhira/Culvert/AM/W-01/2023-24/e-GP/20241111/879428/00216878
|
Office of the Executive Engineer, LGED, Satkhira |
৳১.২৮ কোটি |
২৬ সেপ ২০২৩ |
Ongoing |
|
Const. of WMCA office (12.0m x 6.0m) and 2 Nos SP. Identification Signboard & 2 Nos SP. Indication Post. at Muratala CAD Sub-Project (Part: A) under Mujibnagar upazila, District: Meherpur.
SSSWRDP/Meh/WD-54/2023-24/e-GP/20241112/870340/00217793
|
Office of the Executive Engineer, LGED, Meherpur |
৳২১.১০ লাখ |
২০ সেপ ২০২৩ |
Ongoing |
|
Periodic Maintenance of Borhanuddin Upazila H/Q (Kutaba High School)- Borhanganj GC via south Kutab, Nutown bazer Road from Ch. 600m-4000m Under Borhanuddin Upazila, District-Bhola. Road ID No [509212012].
e-tender/LGED/Bhola/GOBM/23-24/RW-21/e-GP/20241127/860827/00224578
|
Office of the Executive Engineer, LGED, Bhola |
৳২.৩৩ কোটি |
১৭ আগ ২০২৩ |
Ongoing |
|
287863009-Periodic Maintenance of Nakipur GC-Chandipur hat road ch: 00-860 +2150-3050 under Shyamnagar upazila,Satkhira
KDRIDP/Sat/M-29/2023-24/e-GP/20241112/856825/00217769
|
Office of the Executive Engineer, LGED, Satkhira |
৳১.৪২ কোটি |
৩১ জুলাই ২০২৩ |
Completed |
|
Construction of Vertical Extension of Existing Academic Building ( 1st & 2nd Floor) including Sanitary, Water Supply & Electrification Works at Sree Sree Thakur Anukul Chandra Tapaban High School, Sadar Upazilla, Pabna
09/SHED/GOVT-NON GOVT Rev. 7016/2021-22/e-GP/20241204/854688/00227491
|
Office of the Executive Engineer, EED,Pabna, District. |
৳১.১০ কোটি |
৩০ জুলাই ২০২৩ |
Ongoing |
|
a) Periodic Maintenance of Babra UP Office-Suktogram Bazar Road at (Ch. 00-2400m) (Road ID- 265283005) b) Periodic Maintenance of Khasial UP Office-Patna Bazar (Tal baria) Road at (Ch. 00-1880m) (Road ID- 265283007) Under Kalia Upazila, Dist: Narail.
KDRIDP/Narail/M-12/2023-24/e-GP/20241125/856915/00223304
|
Office of the Executive Engineer, LGED, Narail |
৳১.৯৪ কোটি |
৩০ জুলাই ২০২৩ |
Completed |
|
a) Periodic Maitenance of Gobra Kanchonpur-Mirpur via Boalia road (Ch.2000-2424m) [Road ID No. 250714019] [upazila-Kumarkhali]. b) Periodic Maitenance of Kumlapur-Dud kumar-Khal bazar road (Ch. 00-1900m) [Road ID No. 250714033] [upazila-Kumarkhali]. c) Periodic Maitenance of Boroichara more-Nowdapara via Sheikhpara road (Ch. 00-1900m) [Road ID No. 250714083] [upazila-Kumarkhali, District-Kushtia].
KDRIDP/Kush/M-40/2022-23/e-GP/20241001/853902/00188433
|
Office of the Executive Engineer, LGED, Kushtia |
৳১.৭৫ কোটি |
১৯ জুলাই ২০২৩ |
Completed |
|
Rehabilitation of Sonatala - Nayapara Road from Ch: 00m - 275m (Road ID No: 333325020) [Salvage Cost Tk. 2,93,961.00] Under Upazila: Kaliakoir, District: Gazipur.
LGED/GAZ/VRRP/Re-hab/22-23/W-36./e-GP/20231023/802346/00113878
|
Office of the Executive Engineer, LGED, Gazipur |
৳২৪.৭০ লাখ |
১৬ মার্চ ২০২৩ |
Ongoing |
|
Rehabilitation of Begum Pur GPS to Begum Pur Khya Ghat Road from Ch. 00m - 1150m (Road ID No: 333324109) [Salvage Cost Tk.1,90,109.00] Under Upazila: Kaliakoir, District: Gazipur.
LGED/GAZ/VRRP/Re-hab/22-23/W-35./e-GP/20231023/802345/00113956
|
Office of the Executive Engineer, LGED, Gazipur |
৳৭৬.৩৩ লাখ |
১৬ মার্চ ২০২৩ |
Ongoing |
|
Rehabilitation of Chowdurytekc - Nayapara Road from Ch. 00m - 530m (Road ID: 333325046) [Salvage Cost: 85,568] Under Upazila: Kaliakoir, District: Gazipur.
LGED/GAZ/VRRP/OL/22-23/W-37./e-GP/20231023/802347/00113893
|
Office of the Executive Engineer, LGED, Gazipur |
৳২৮.৫০ লাখ |
১৬ মার্চ ২০২৩ |
Ongoing |
|
Construction of 16.00m Long RCC Girder Bridge on Sitarampur R&H-Mulia UP Office Road at Ch. 620m (Road ID-265764055) Under Sadar Upazila, Dist: Narail.
CAFDRIRP/Narail/VR-A/Brdg/ER/W-01/2022-23/e-GP/20241125/737921/00223338
|
Office of the Executive Engineer, LGED, Narail |
৳১.৩৪ কোটি |
৬ অক্টো ২০২২ |
Ongoing |
|
Widening of Arenda (Kashipur UP)-Lutia Bazar Road from Ch. 5985m-8960m (Road ID- 265523004) Under Lohagara Upazila, Dist: Narail.
e-Tender/LGED/NRL/GOBM/2022-23/W-08/e-GP/20241025/737005/00203969
|
Office of the Executive Engineer, LGED, Narail |
৳২.১৮ কোটি |
৬ অক্টো ২০২২ |
Completed |
|
Construction of additional class room Kagmari Under PEDP4.(3H+3V/F4+WB)(School Code-99204049007)
e-Tender/PEDP4/JHE/MOH/2021-2022/W1.01782/e-GP/20241218/634031/00237111
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳১.৩১ কোটি |
১২ মে ২০২২ |
Completed |
|
Construction of additional class room Babla Matha Bhangga Under PEDP4(3H+3V/F4+WB)(School Code-99204049042)
e-Tender/PEDP4/JHE/MOH/2021-2022/W2.03606/e-GP/20241218/634033/00237216
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳১.০২ কোটি |
১২ মে ২০২২ |
Completed |
|
Construction of additional class room Sekhar Gari Under PEDP4 (3H+3V/F4)( School Code-99204041007)
e-Tender/PEDP4/JHE/MOH/2021-2022/W1.01780/e-GP/20241218/634029/00237185
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳১.৩২ কোটি |
১২ মে ২০২২ |
Completed |
|
Construction of additional class room Durgapur Under PEDP4(3H+3V/F4+WB)( School Code-99204049011)
e-Tender/PEDP4/JHE/MOH/2021-2022/W2.013605/e-GP/20241218/634032/00237154
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳৯৮.২৩ লাখ |
১২ মে ২০২২ |
Completed |
|
a) Improvement of Sitarampur R&H-Mulia UP Office road ch. 00-2700m (Road ID- 265764055) (Salvage Cost Tk= 39,56,576.00) b) Construction of 02 no 1.00mx1.00m RCC Box Culvert at Ch. 1747m & 2208m on the same road under Sadar Upazila Upazila, Dist: Narail.
IRIDP-3/NRL/DW-15/e-GP/20241028/685336/00205370
|
Office of the Executive Engineer, LGED, Narail |
৳২.৪০ কোটি |
১৭ এপ্রিল ২০২২ |
Ongoing |
|
Widening of Dattapara Bazar-Chandibarpur UP Road from (Ch. 00m-3918m) (Road ID- 265763002) Under Sadar Upazila, Dist: Narail.
e-Tender/LGED/NRL/GOBMR/2021-22/W-30/e-GP/20241027/669588/00204596
|
Office of the Executive Engineer, LGED, Narail |
৳২.২০ কোটি |
১০ মার্চ ২০২২ |
Completed |
|
A) Improvement of Betbaria Hat - Sorderpara - Gusshograme - Modhogari Ghat Road by BC at Ch. 00- 550m & Ch. 1355-3380m Under Gangni Upazila, District : Meherpur, ID No: 257474061 B) Construction of 03 Nos U-Type Drain (625mm X 600mm) at Ch. 1443m, Ch. 2350m & Ch. 3096m on Betbaria Hat - Sorderpara - Gusshograme - Modhogari Ghat Road Under Gangni Upazila, District : Meherpur, ID No: 257474061 C) Improvement of Motmura Moure - Motmura Modhypara Hat Via FLC Road by BC at Ch. 1450-2230m Under Gangni Upazila, District : Meherpur, ID No: 257474041 [ Salvage Material TK. 2,35,029.00]
GKRIDP/04/MW-53/e-GP/20241104/644140/00211385
|
Office of the Executive Engineer, LGED, Meherpur |
৳২.৫৩ কোটি |
৬ জানু ২০২২ |
Completed |
|
Construction of additional class room Alampur 1 No. Kolloni Bridgeghat under PEDP4.(3H+3V/F4+WB)(school code-99204041205)
e-Tender/PEDP4/JHE/MOH/2021-2022/W2. 03483/e-GP/20241218/625709/00237239
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳৯০.৩৩ লাখ |
১৯ ডিসে ২০২১ |
Completed |
|
Construction of additional class room Huda Durgapur under PEDP4.(3H+3V/F4+WB)(school code-99204040902)
e-Tender/PEDP4/JHE/MOH/2021-2022/W2. 03481/e-GP/20241218/625707/00236992
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳৯০.৫৬ লাখ |
১৯ ডিসে ২০২১ |
Completed |
|
Construction of additional class room Patibila Powra under PEDP4.(3H+3V/F4)(school code-99204049023)
e-Tender/PEDP4/JHE/MOH/2021-2022/W2. 03479/e-GP/20241218/625705/00236843
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳৮৮.০০ লাখ |
১৯ ডিসে ২০২১ |
Completed |
|
Construction of additional class room Ghogree under PEDP4.(3H+3V/F4+WB)(school code-99204049026)
e-Tender/PEDP4/JHE/MOH/2021-2022/W2. 03480/e-GP/20241218/625706/00236764
|
Office of the Upazila Engineer, LGED, Moheshpur, Jhenaidah |
৳৯০.৫৬ লাখ |
১৯ ডিসে ২০২১ |
Completed |
|
Widening of Nakosi Bazar (Auria UP)-Chalitala Bazar (Chandibarpur UP) Road from (Ch. 00m-5000m) (Road ID- 265763001) Under Sadar Upazila, Dist: Narail.
e-Tender/LGED/NRL/GOBMR/2021-22/W-25/e-GP/20241027/606395/00204633
|
Office of the Executive Engineer, LGED, Narail |
৳২.৬৮ কোটি |
১৬ সেপ ২০২১ |
Completed |
|
Periodic Maintenance of Chapoilghat-Sachadah bazar Road from (Ch. 3000m-6025m) (Road ID- 265282007) Under Kalia Upazila, Dist: Narail.
e-Tender/LGED/NRL/GOBMR/2021-22/W-21/e-GP/20241024/606391/00203832
|
Office of the Executive Engineer, LGED, Narail |
৳১.৫৫ কোটি |
১৬ সেপ ২০২১ |
Completed |