|
Inter-Connection of 200mm & 160 mm dia Water line From Block-D Sector-01 Main Road South side to Main Road North side Block-D Sector-02 at DMA-806 Aftab nagar Area under MODS Zone-8 Dhaka WASA
ঢাকা
|
Office of the EE, MODS Zone-8, Dhaka WASA |
৳৫.৮০ লাখ |
২৩ মে ২০২৪ |
|
Construction/Re- Construction of Boundary Wall with related works under EWS Project Dhaka WASA Dhaka (Package No.W-16.113).
ঢাকা
|
Emergency Water Supply Project |
৳৩৬.০০ লাখ |
১১ ডিসে ২০২৩ |
|
Repairing Maintenance and others ancillary works of 2 nos pump house at DMA-615616 and others under MODS Zone-6 Dhaka WASA.
ঢাকা
|
Office of the EE, MODS Zone-6, Dhaka WASA |
৳৪.৭০ লাখ |
৫ অক্টো ২০২৩ |
|
Preventive and post maintenance and repair work at different DMA chamber and sluice valve chamber of DMA 604605606 and others under MODS Zone-6. (Frame Work) (Lot-2)
ঢাকা
|
Office of the EE, MODS Zone-6, Dhaka WASA |
৳৪.৭০ লাখ |
৫ অক্টো ২০২৩ |
|
Construction of pump house with ancillary works at Goran Muslim School DTW under MODS zone-6 Dhaka WASA
ঢাকা
|
Office of the EE, Civil Construction Division, Dhaka WASA |
৳১৪.২০ লাখ |
৫ ফেব ২০২৩ |
|
Repairing S/V & Maintenance S/V Chamber from Armanitola to the West Side of Nawabpur Road and adjacent area under MODS Zone-2. (Frame Work)
ঢাকা
|
Office of the EE, MODS Zone-2, Dhaka WASA |
৳৪.৭০ লাখ |
২৩ মার্চ ২০২২ |
|
Locating Raising of different diameter sluice valve DMA chamber at DMA- 810 Under MODS Zone-8 Dhaka WASA.
ঢাকা
|
Office of the EE, MODS Zone-8, Dhaka WASA |
৳৪.৬০ লাখ |
২৮ ফেব ২০২২ |
|
Location & Raising of Different Diameter Sluice Valve chamber DMA Chamber at DMA-805 under MODS zone-8 of Dhaka WASA.
ঢাকা
|
Office of the EE, MODS Zone-8, Dhaka WASA |
৳৪.৬০ লাখ |
১৬ ফেব ২০২২ |
|
Rising of manhole and re-fitting of manhole cover at existing sewer line at DMA-314 & DMA-308 under MODS Zone-3Dhaka WASA
ঢাকা
|
Office of the EE, MODS Zone-3, Dhaka WASA |
৳৪.৫০ লাখ |
২০ ডিসে ২০২১ |
|
Repair and Maintenance Works of Staff's Quarter at Mirpur Milkvita WASA Compound Dhaka.
ঢাকা
|
Office of the EE, Civil Maintenance Division, Dhaka WASA |
৳৩.৮০ লাখ |
১৫ ডিসে ২০২১ |
|
Re-Excavation/Renovation of Medium Width Khal/Chara including levelling dressing & turfing at any upazila in Project Area.. (Lot-34).
ঢাকা · টেন্ডার →
|
Office of Component Director, Smallholder Agricultural Competitiveness Project (SACP)-BADC Part |
৳২৬.৪০ লাখ |
১৮ এপ্রিল ২০২১ |
|
Repairing and Maintenance of Pump house Boundary wall Approach road at Shamimbagh Tushardhara Vuighar water pump under MODS Zone-7 Dhaka WASA.
ঢাকা
|
Office of the EE, MODS Zone-7, Dhaka WASA |
৳৩.৮০ লাখ |
৩০ ডিসে ২০২০ |
|
Fitting-Fixing of C.I./Composite Manhole Cover at different area under Drainage (O & M) Division-02; (Frame work-1).
ঢাকা
|
Office of the EE, Drainage (O&M) Division-2, Dhaka WASA |
৳৯.৫০ লাখ |
১৪ অক্টো ২০২০ |
|
Installation & operation of 3 (three) no's 5-Cusec diesel de-watering pump at Shahid Nagar Dhaka.
ঢাকা · টেন্ডার →
|
Office of the EE, Drainage (E&M) Division, Dhaka WASA |
৳৫.৫০ লাখ |
১৪ জুলাই ২০২০ |
|
RCC palasiding sand filling and protective work at PSTP Boundary wall. Chainage:0+400m to 0+525m.
ঢাকা
|
Office of the EE, Civil Construction Division, Dhaka WASA |
৳২৩.৩০ লাখ |
১২ মার্চ ২০২০ |
|
Cleaning & Removal of Sludge from Brick Sewer Line at Herman Mainer School to Mirpur-14 (Baunia Khal) and surrounding areas under Drainage (O&M) Division-2.
ঢাকা
|
Office of the EE, Drainage (O&M) Division-2, Dhaka WASA |
৳৪.৭০ লাখ |
১২ মার্চ ২০২০ |
|
611783
ঢাকা
|
Savar pourashava office |
৳২৯.৩০ লাখ |
৪ ফেব ২০২০ |
|
Construction of 1200 mm dia. storm sewer line in west side of Begum Rokeya Sarani from Mirpur Circle 10 to Agargaon Taltola Dhaka Chainage 0+000 to 0+400 KM = 400 Meter (Package : WD 48)
ঢাকা
|
Office of the SE, Drainage (R&D) Circle, Dhaka WASA |
৳৭৭.৯০ লাখ |
৪ ফেব ২০২০ |
|
611779
ঢাকা
|
Savar pourashava office |
৳৩১.১০ লাখ |
৪ ফেব ২০২০ |
|
Single
ঢাকা
|
Office of the EE, MODS Zone-5, Dhaka WASA |
৳৪.৬০ লাখ |
২৪ জুন ২০১৯ |
|
Construction / re-construction of boundary wall of old pump house and sub-store building at Narinda Central Sewerage Pump and Gandaria-2 DTW compound under MODS Zone-1.
ঢাকা · টেন্ডার →
|
Office of the EE, Civil Construction Division, Dhaka WASA |
৳২২.৫০ লাখ |
৫ মে ২০১৯ |
|
Repair and Maintenance of pump house chlorinr room Boundary wall at Kawler-01 & Ashkona water pump under MODS Zone-9
ঢাকা
|
Office of the EE, MODS Zone-9, Dhaka WASA |
৳২.৮০ লাখ |
১০ এপ্রিল ২০১৯ |
|
Re-Construction of Boundary wall & repairing of pump house including painting at Gulshan-5 under MODS Zone-5 DWASA
ঢাকা
|
Office of the EE, MODS Zone-5, Dhaka WASA |
৳২.৭০ লাখ |
২ এপ্রিল ২০১৯ |
|
Cleaning & Removal of Sludge from different dia storm sewer line at Nobab Bagicha Tatkhan lane Chankharpul Nimtoly B.K. Gangly Road etc area Under Drainage (O&M) Division-2.
ঢাকা
|
Office of the EE, Drainage (O&M) Division-2, Dhaka WASA |
৳৪.৭০ লাখ |
৩ ফেব ২০১৯ |
|
Cleaning and removal of floating materials and debries at Khilgaon- Bashaboo Box-culvert at Tilpapara Chaiabithi & Kodomtala Area.
ঢাকা
|
Office of the EE, Drainage (O&M) Division-1, Dhaka WASA |
৳৪.৭০ লাখ |
৩০ জানু ২০১৯ |
|
Re-excavation and removal of sludge/Earth at Jirani khal (Ch 1+600 KM to 3+100 Km) Under Drainage ( O & M ) Division-1. (Group-A)
ঢাকা
|
Office of the EE, Drainage (O&M) Division-1, Dhaka WASA |
৳১.৪২ কোটি |
৯ মে ২০১৮ |
|
Cleaning & removal of floating materials and debris at Jirani khal U-Type RCC Channel Under Drainage (O & M)Division-1 area.(Group -B)
ঢাকা
|
Office of the EE, Drainage (O&M) Division-1, Dhaka WASA |
৳৪.৭০ লাখ |
১৫ এপ্রিল ২০১৮ |
|
Cleaning of all storm sewer line and removal of sludge at Kalmilata market Bijoy Sharoni to paglarpool out & surrounding area.
ঢাকা
|
Office of the EE, Drainage (O&M) Division-1, Dhaka WASA |
৳৪.৭০ লাখ |
১ এপ্রিল ২০১৮ |
|
Shifting of 1050 mm dia Storm Sewer Line of the Alignment of MRT-Lane-6 at Shahbagh Station East SIde (ch 15+271 km to 15+571km) under Dhaka Mass Rapid Transit Development Project.
ঢাকা
|
Utility Shifting Project (USP) |
৳১.৪৭ কোটি |
২৭ মার্চ ২০১৮ |
|
Re-Construction of Toilet at Shanti Bottled water production plant Compound Mirpur Dhaka.
ঢাকা
|
Office of the EE, Civil Construction Division, Dhaka WASA |
৳৩.৫০ লাখ |
৪ ফেব ২০১৮ |
|
Cleaning & removal of sludge/garbage from the sump nearest canal at Dholaikhal Storm Water Pumping Station of Dhaka WASA.(during the pump operation period 120 days)
ঢাকা · টেন্ডার →
|
Office of the EE, Drainage (E&M) Division, Dhaka WASA |
৳৪.৪০ লাখ |
৩১ জানু ২০১৮ |
|
Cleaning of Tollar bag and Dhaka aricha road crosing Box-culvert Under Drainage (O&M) Division-2.
ঢাকা
|
Office of the EE, Drainage (O&M) Division-2, Dhaka WASA |
৳৭.২০ লাখ |
৭ নভে ২০১৭ |
|
Road repair and restoration work from middle of PW 01-02 & PW 01-03 to Bottoli bazarmore at IRP#01 area under TBWFCP Dhaka WASA.
ঢাকা
|
Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazila (part-1) |
৳৪০.৭০ লাখ |
৮ আগ ২০১৭ |
|
Cleaning and Removal of sludge From all storm sewer line at Chankharpool via TSC Doelchattor to paribagh and Anandhabazar and surrounding area.
ঢাকা
|
Office of the EE, Drainage (O&M) Division-1, Dhaka WASA |
৳৪.৭০ লাখ |
১২ এপ্রিল ২০১৭ |
|
Re-construction of Destroyed RCC Manhole Slab and Maintenance of manhole at different area under Drainage (O&M) Division-1 area (Group-3).
ঢাকা
|
Office of the EE, Drainage (O&M) Division-1, Dhaka WASA |
৳৯.৪০ লাখ |
১০ এপ্রিল ২০১৭ |
|
Supply & fitting-fixing of water level measuring scale for different drainage pumping station of Dhaka WASA.
ঢাকা
|
Office of the EE, Drainage (E&M) Division, Dhaka WASA |
৳২.৮০ লাখ |
২০ ফেব ২০১৭ |
|
Road repair and restoration work from PW 02-10 to PW 02-12 via PW 02-11 at IRP # 02 area under TBWFCP(P-1) of Dhaka WASA.
ঢাকা
|
Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazila (part-1) |
৳৩৭.৯০ লাখ |
১ ফেব ২০১৭ |