| Companies | Shared offices | Total wins |
|---|---|---|
| M/S HASAN ENTERPRISE | 24 | 330 |
| MS. CITY TRADE INTERNATIONAL | 19 | 66 |
| Mohammed Eunus & Brothers (Pvt.) Ltd. | 17 | 237 |
| M/S. Mostafa Kamal | 16 | 163 |
| M/S Chowdhury Enterprise | 16 | 72 |
| M/S AYAN ENTERPRISE | 16 | 43 |
| Rita Enterprise | 15 | 146 |
| M/S. Maa Enterprise | 15 | 133 |
| M/S Annesha Enterprise | 15 | 70 |
| M/S. Rinky Enterprise | 14 | 79 |
Awards
220 resultsContract progress
77 results| Description | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
|
Rehabilitation (Uni-Block) of Dhopadi Bazar (FRB) Road-Hazipur Baower (Mosakakka Rd.) Road from Ch. 00-806m (Road ID: 244334040) [Kaligonj]
e-Tender/LGED/Jhe/GOBM/23-24/RW-34/e-GP/20241104/881088/00211261 |
Office of the Executive Engineer, LGED, Jhenaidah | BDT 49.25 lakh | 1 Oct 2023 | Completed |
|
Rehabilitation of Kanapukuria-Alamdanga bazar via Sherpur charpara Road from Ch. 3835m- 5500m (Road ID: 244804071) [Shailkupa]
e-Tender/LGED/JHE/GOBM/22-23/W-56/e-GP/20241105/805240/00212947 |
Office of the Executive Engineer, LGED, Jhenaidah | BDT 1.00 crore | 22 Mar 2023 | Completed |
|
Widening of Kuti Bazar-Kasba Puran Bazar GC Road from Ch. 00- 1690m [Kasba] [Road ID: 412632006]
e-Tender/LGED/BBR/GOBM/21-22/W-92/e-GP/20231128/608947/00142998 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 1.18 crore | 15 Sep 2021 | Completed |
|
Construction of additional class room Jamalpur Paschim Para GPS Under PEDP4.
e-Tender/PEDP4/NRD/MON/2020-2021/W1.01411/e-GP/20231121/536464/00134539 |
Office of the Upazila Engineer, LGED, Monohardi, Narsingdi | BDT 100.00 lakh | 24 Jan 2021 | Completed |
|
Construction of Boundary wall including gate of 1 CHANGAIN GPS 2 TAMAK KANDA GPS 3 UTTAR CHALAKCHAR GPS.
e-tender/PEDP4/NRD/MON/2019-20/W14.0882/e-GP/20231129/502179/00143923 |
Office of the Upazila Engineer, LGED, Monohardi, Narsingdi | BDT 38.95 lakh | 20 Oct 2020 | Completed |
|
Construction of Boundary Wall including Gate of 1. CHITNA 2. JETHAGRAM & 3. SREE GHAR DAKKHIN GPS under PEDP4 at Nasirnagar Upazila Brahmanbaria
e-Tender/PEDP4/BRB/NAS/2019-20/W14.0297/e-GP/20231206/476918/00148610 |
Office of the Upazila Engineer, LGED, Nasirnagar, Brahmanbaria | BDT 32.39 lakh | 7 Jul 2020 | Completed |
|
Construction of Boundary Wall at Anowarpur & Bandusar Government Primary School. Under Upazila- Akhaura Dist.- Brahmanbaria.
e-Tender/PEDP4/BRB/AKH/2019-20/W14.115/e-GP/20231115/449725/00127428 |
Office of the Upazila Engineer, LGED, Akhaura, Brahmanbaria | BDT 12.27 lakh | 24 Mar 2020 | Completed |
|
Construction of Boundary Wall at Colonel Bazar & Umedpur Government Primary School. Under Upazila- Akhaura Dist.- Brahmanbaria.
e-Tender/PEDP4/BRB/AKH/2019-20/W14.116/e-GP/20231115/449726/00127356 |
Office of the Upazila Engineer, LGED, Akhaura, Brahmanbaria | BDT 12.64 lakh | 24 Mar 2020 | Completed |
|
Construction of Boundary Wall & Gate at Khalapara Government Primary School. Undr Upazila- Akhaura Dist. Brahmanbaria.
e-Tender/PEDP4/BRB/AKH/2019-20/W14.0291/e-GP/20231115/431919/00127344 |
Office of the Upazila Engineer, LGED, Akhaura, Brahmanbaria | BDT 12.34 lakh | 25 Feb 2020 | Completed |
|
Construction of additional class room Chandrapur GPS under PEDP4
e-Tender/PEDP4/BRB/KAS/2019-20/W2.00518/e-GP/20231110/403927/00125249 |
Office of the Upazila Engineer, LGED, Kasba, Brahmanbaria | BDT 47.61 lakh | 22 Jan 2020 | Completed |
|
Construction of additional class room Panjarai GPS under PEDP4.
e-Tender/PEDP4/HBG/NAB/2019-2020/W2.00114/e-GP/20231021/370853/00112681 |
Office of the Upazila Engineer, LGED, Nabiganj, Habiganj | BDT 49.68 lakh | 20 Nov 2019 | Completed |
|
Periodic Maintenance of Raipura Bazar-Korarpar Road from Ch. 00m-980m Raipura Road ID 368644007
e-Tender/LGED/Nar/GOBM/19-20/W-24/e-GP/20231030/372100/00118726 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 21.34 lakh | 28 Oct 2019 | Completed |
|
Periodic Maintenance of Maniknagar Bazar- Mehari Bazar Road via Mehari UP Office from Ch. 0m-5100m Road ID412633003 Kasba
e-Tender/LGED/BBR/ GOBM/19-20/W-58/e-GP/20231003/372048/0095637 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 1.35 crore | 24 Oct 2019 | Completed |
|
Construction of Aliabad Government Primary School
e-Tender/NBIDGPS/BRA/NAB/2018-19/W1.04487/e-GP/20231123/363820/00135644 |
Office of the Upazila Engineer, LGED, Nabinagar, Brahmanbaria | BDT 94.13 lakh | 29 Sep 2019 | Completed |
|
Construction of class room CHANDRAPUR SOUTH Government Primary School under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/BRA/KAS/2018-2019/W1.04350/e-GP/20231109/345836/00124841 |
Office of the Upazila Engineer, LGED, Kasba, Brahmanbaria | BDT 80.81 lakh | 30 Jul 2019 | Completed |
|
Construction of Jagdishpur Government Primary School and Adair Government Primary School under NBIDGPS project-1 in Madhabpur Habiganj
e-Tender/NBIDGPS/HAB/MAD/2018-19/W1.03931/e-GP/20231106/286021/00122995 |
Office of the Upazila Engineer, LGED, Madhabpur, Habiganj | BDT 1.67 crore | 27 Feb 2019 | Completed |
|
Improvement of Dewan Dighirpar Dakhinpar-Ararpar Jame Mosque Road at Ch. 15m-355m under Austagram Upazila Dist Kishoreganj ID No 348025036
18/WD/KIS/VR/03/e-GP/20231021/253071/00112922 |
Office of the Executive Engineer, LGED, Kishoreganj | BDT 45.85 lakh | 26 Nov 2018 | Completed |
|
Periodic Maintenance of Hairmara Girls School-Baiderpara Road from Ch. 00m-425m Raipura Road ID 368644093
e-Tender/LGED/Nar/GOBM/18-19/W-56/e-GP/20231014/224313/00107507 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 10.93 lakh | 20 Sep 2018 | Completed |
|
Construction of Class room of Sarail Adarsha Primary School under NBIDGPS Project-1
e-Tender/NBIDGPS/BRB/SAR/2017-2018 /W1.01806/e-GP/20231210/213179/00150097 |
Office of the Upazila Engineer, LGED, Sarail, Brahmanbaria | BDT 85.83 lakh | 14 Aug 2018 | Completed |
|
Construction of Shingerbill Union Parishad Complex under bijoy nagar UpazilaDist B - Baria
e-tender/uccp-2/bij/bbr/2017-18/e-GP/20231129/198346/00144402 |
Office of the Upazila Engineer, LGED, Bijoynagar, Brahmanbaria | BDT 1.07 crore | 4 Jun 2018 | Completed |
|
a. Periodic Maintenance Overlay of Chandiara R&H to Fishing firm R&H Road Ch.00-1500m Under Sadar Upazila Dist Brahmanbaria Road ID No. 412134103.b. Periodic Maintenance Overlay of Adampur Nasingshar Bazar - Birampur bazar Road Ch.00-1615m Under Sadar Upazila Dist Brahmanbaria Road ID No. 412134071.
GCP-3/B-M48/e-GP/20231003/187821/0095677 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 86.42 lakh | 30 Apr 2018 | Completed |
|
Improvement of Ibrahimpur Etim khana from Palpara bazar via- jamuna Khal road via paler Bazar Road Ch.1200-2200m Road under Nabinagar Upazila Dist. Brahmanbaria ID No.412854031
RIDPCBC/B-W154/e-GP/20231003/164751/0095679 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 69.97 lakh | 18 Feb 2018 | Completed |
|
Improvement of Sarail - T- Ghar - Panishwar UP Road Ch.1800-3200m Road Under Sarail Upazila Dist Brahmanbaria ID No.412943012 Salvage Cost Tk1234194.00
RIDPCBC/B-W148/e-GP/20231003/164759/0095654 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 1.00 crore | 15 Feb 2018 | Completed |
|
Improvement of Jinodpur-Barikhola from Barikhala via Fathepur madrasha Road Ch.00-1600m Road ID No.412854013 Salvage Cost Tk.864076.
RIDPCBC/B-W157/e-GP/20231003/164755/0095643 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 1.24 crore | 15 Feb 2018 | Completed |
|
Construction of Class Room of Dhupagul Primary School under NBIDGPS Project-1.
e-Tender/NBIDGPS/SLT/SAD/2017-18/W1.00412/e-GP/20231101/155154/00120355 |
Office of the Upazila Engineer, LGED, Sylhet Sadar, Sylhet | BDT 87.68 lakh | 18 Jan 2018 | Completed |
|
Improvement of Akhitara Doctor Bari Culvert -Noagaon Jarullahati Road Ch00m-380m under Sarail UpazilaDist Brahmanbaria Road ID 412945183
IRIDP-2/BBA/DW-225/e-GP/20231003/149152/0095678 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 22.20 lakh | 8 Jan 2018 | Completed |
|
a Improvement of Barur-Kurakhal Road Ch.00-400m Road ID419404004 b Improvement of Dedidwar-Dalahash Road Ch.1230-2105m Road ID419404011under Upazila Debidwar District Comilla.
RIDPCBC/C-W296/e-GP/20231121/147151/00133234 |
Office of the Executive Engineer, LGED, Comilla | BDT 73.38 lakh | 20 Dec 2017 | Completed |
|
Improvment of Manderpur Principal Kabir house Manderpur Bazar via Manderpur High School Road.at Ch.00m-750m Under Kasba Upazila Dist. Brahmanbaria Road ID 412635293
IRIDP-2/BBA/DW-210./e-GP/20231003/135602/0095661 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 34.17 lakh | 21 Nov 2017 | Completed |
|
Improvement of Badair UP Manderpur to Badair Paschim Mosque Road at Ch.2040m-3340m Under Kasba Upazila Dist Brahmanbaria Road ID 412635056 Salvage Cost 126952 Tk
IRIDP-2/BBA/DW-219./e-GP/20231003/135610/0095682 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 71.70 lakh | 21 Nov 2017 | Completed |
|
Improvement of Durgapur - Tajpur Road Ch. 251-1101m Under Ashuganj Upzila Road Id: 412985002.
IRIDP-2/BBA/DW-129/e-GP/20231003/123293/0095660 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 44.43 lakh | 25 Sep 2017 | Completed |
|
a Const. of Drain Culvert at Charpara Uttar para Primary School Side b Const. of Shahid Minar at Nabinagor Mohila College c Const. of Drain with Slab at Barail Kadir Miah Bari Foot Bridge Approch to Mosjid Road Under Nabinagor Upzila.
ADP-7/e-GP/20231026/118511/00115770 |
Zilla Parishad, Brahmanbaria | BDT 7.60 lakh | 17 Sep 2017 | Completed |
|
Improvement of Shuhilpur Hindupara Kangalipara-Ansar Camp Road at Sadar upazila in Brahmanbaria District. Ch.00-662m. Road ID. 412135224
RIDPCBC/B-W136/e-GP/20231128/115143/00143005 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 34.71 lakh | 12 Sep 2017 | Completed |
|
Periodic Maintenanceoverlay of Merkuta G.C to Rajghat road via natghar U.P Office at Nabinagar upazila under Brahmanbaria.ch.3280-5485. Road ID 412852002
RIDPCBC/B-M133/e-GP/20231003/113688/0095665 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 57.37 lakh | 12 Sep 2017 | Completed |
|
a Const. of Boundary Wall at Bitgor Central Idghah b Imp. of Bogdahor Idgah Madth Floor under Nabinagor Upzila.
ADP-12/e-GP/20231026/111288/00115753 |
Zilla Parishad, Brahmanbaria | BDT 9.50 lakh | 19 Jul 2017 | Completed |
|
Construction of Dunsree Islamabad Primary School including furniture supply under education in emergency
e-Tender/PEDP-III/SLT/DAK/2016-17/W4.263/e-GP/20231129/104209/00143666 |
Office of the Upazila Engineer, LGED, Dakshin Surma, Sylhet | BDT 73.69 lakh | 25 May 2017 | Completed |
|
Improvement of Fatehpur Baseruk Ahmedpur Guchchu gram road Ch 1300-1505 and 2005-3100m under Nabinagar Upazila ID No. 412854004 Salvage Amount Tk.136178.00
IRIDP-2/BBA/DW-138/e-GP/20231003/86125/0095705 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 83.61 lakh | 11 Apr 2017 | Completed |
|
Construction of Char Islampur Union Parishad Complex Bhaban Under BijoynagarDistBBaria
e-Tender/Upc/BIJ/2016-17/e-GP/20231129/80461/00144430 |
Office of the Upazila Engineer, LGED, Bijoynagar, Brahmanbaria | BDT 1.00 crore | 17 Jan 2017 | Completed |
|
Construction of additional class room of Bodhal Primary School.
e-Tender/PEDP-III/BRB/SAD/2016-17/W2.6905/e-GP/20231017/81747/00110132 |
Office of the Upazila Engineer, LGED, Brahmanbaria Sadar, Brahmanbaria | BDT 82.53 lakh | 15 Jan 2017 | Completed |
|
Development of Khayerpur Poschim Para Jame Mosque-Anwarpur Road Ch. 00-218m Sub-margible ID No-348025044 under Austagram Upazila District Kishoreganj.
GMRIDP/KISH/AUST /SR/VR/96/e-GP/20231029/80545/00117931 |
Office of the Executive Engineer, LGED, Kishoreganj | BDT 26.58 lakh | 8 Jan 2017 | Completed |
|
Periodic maintenance (Re-Seal) of Nasirnagar GC - Chatian GC Road (Ch. 2000-3000m and 13000-15660m) under Nasirnagar Upzila. road Id: 412902005
RIDP(CBC)/B-M110/e-GP/20231128/77637/00143001 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 40.77 lakh | 21 Dec 2016 | Completed |
|
Improvement of Noagaon - Nazir Bari (Shahed Ali Mazar) - Titas Nadir Mohna (Ch: 00-1000m), under Sarail Upazila,ID No. 412945163
IRIDP-2/BBA/SDW-124/e-GP/20231003/77641/0095698 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 39.94 lakh | 14 Dec 2016 | Completed |
|
Periodic Maintenance (Widening and Rehabilitation) of dharkar UP - Ruty bazar - Vatamatha ( Tantor) bazar road (Ch.4740-7021m) under Akhaura ID: 412023001
RIDP(KA)/A-W26b/e-GP/20231003/77382/0095701 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 56.54 lakh | 30 Nov 2016 | Completed |
|
Construction of Additional Class room of Maishair Primary school.
e-Tender/PEDP-III/BRB/ASH/2016-17/W2.6641/e-GP/20231212/74341/00152930 |
Office of the Upazila Engineer, LGED, Ashuganj, Brahmanbaria | BDT 76.54 lakh | 15 Nov 2016 | Completed |
|
Improvement of Dowkadi Bazar - Kathalia UP Office (Amtala) Road from ch. 1000-1765m (Road ID: 368603029) under Sadar Upazila, Dist-Narsingdi.(IRIDP-2) (Salvage Materials Tk. 28,145.00)
IRIDP-2/NSD/DW-97/e-GP/20231115/72837/00127740 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 42.87 lakh | 3 Nov 2016 | Completed |
|
a) Improvement of Nuralapur UP Office-Somaj Kollan Bazar Road from ch. 00-1100m (Road ID: 368603037) b) Construction of 04 nos 0.375mx0.450m culvert at ch. 45, 129, 200 & 500m on the same road.under Sadar Upazila, Dist-Narsingdi.(IRIDP-2)
IRIDP-2/NSD/DW-91/e-GP/20231116/72831/00129327 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 50.35 lakh | 3 Nov 2016 | Completed |
|
a) Improvement of Santir Bazar RHD-Paikerchar U.P Office Road via Eidgah (Santir Bazar RHD-Paikerchar U.P Office Road) from ch. 1200-2200m (Road ID: 368603016) under Sadar Upazila, Dist-Narsingdi.. b) Construction of 03 nos 0.375mx0.450m culvert at ch. 1485, 1650 & 1710m on the same road.(IRIDP-2) (Salvage Materials Tk. 2,66,842.00)
IRIDP-2/NSD/DW-89/e-GP/20231115/72829/00127732 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 47.85 lakh | 3 Nov 2016 | Completed |
|
Periodic Maintenance of Nasirnagar GC-Chatiain GC Road from Ch.00m-2000m [Nasirnagar] Road ID : 412902005
e-Tender/LGED/ BBARIA /GOBM/16-17/W-22/e-GP/20231128/71725/00143003 |
Office of the Executive Engineer, LGED, Brahmanbaria | BDT 29.17 lakh | 2 Nov 2016 | Completed |
|
Periodic Maintenance of Valanagor Bazar (Jailkhana Mour)-Rajadi Villege Road Via Titas Gas Office (From RHD #18) Road from Ch. 000m- 1860m [Sadar] (Road ID: 368602009)[GOBM]
e-Tender/LGED/Nar/GOBM/16-17/W-27/e-GP/20231111/69437/00125507 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 44.92 lakh | 18 Oct 2016 | Completed |
|
Periodic Maintenance of Sagordi R&H to Barachapa GC Road from Ch. 2100m -4000m [Monohardi] (Road ID: 368522012)[GOBM]
e-Tender/LGED/Nar/GOBM/16-17/W-32/e-GP/20231116/69442/00129407 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 30.35 lakh | 18 Oct 2016 | Completed |
|
Periodic Maintenance of Mojlishpur - Satpara Road from Ch. 000m -2050m [Shibpur] (Road ID: 368765056)[GOBM]
e-Tender/LGED/Nar/GOBM/16-17/W-30/e-GP/20231118/69440/00130036 |
Office of the Executive Engineer, LGED, Narshingdi | BDT 32.85 lakh | 18 Oct 2016 | Completed |