NEW-58 CONSTRUCTION OF 4-STORIED ACADEMIC BUILDING WITH 4- STORIED FOUNDATION IN/C. SANITARY WATER SUPPLY & ELECTRIFICATION WORKS WITH PRE-CAST PILE FOUNDATION AT BANARIPARA UNION INSTITUTION BANARIPARA BARISHAL.
NEW-58/e-GP/20241231/502597/00241316
|
Office of the Executive Engineer, EED, Barisal, District. |
৳২.৬২ কোটি |
১৮ অক্টো ২০২০ |
Completed |
|
Special repair work of Kirtankhola building for prisoners of Barisal Central Jail. Approved S.L. No-20 .
bari/pwd/Central Jail-44/2019-2020/e-GP/20221022/457607/0051741
|
Barisal PWD Division |
৳১৪.২৪ লাখ |
৩ মে ২০২০ |
Completed |
|
WD-03-3 CONSTRUCTION OF 06 STORIED ACADEMIC BUILDING WITH 06 STORIED FOUNDATION AT BARISHAL MOHILA POLYTECHNIC INSTITUTE SADAR BARISHAL.
WD-03-3/e-GP/20241223/441649/00238840
|
Office of the Executive Engineer, EED, Barisal, District. |
৳৯.৪৯ কোটি |
২৮ এপ্রিল ২০২০ |
Ongoing |
|
Barishal Shahid Abdur Rob Sherniabat Textile Engineering College at old Academic Building repair collapsible gate setting Tiles replacement Drain constructs electrical repair and other renovation work.
Pwd/43/TEC/Civil/E/M/2019-20/e-GP/20221022/455643/0051743
|
Barisal PWD Division |
৳২৪.৬৩ লাখ |
২৮ এপ্রিল ২০২০ |
Completed |
|
Remaining work for Construction of Single Storied Mosque with 3 Storied Foundation in/c Internal Sanitary & Electrification works under Construction of 7Seven RAB Complexes Revised One at Barisal.
bari/pwd/RAB/Remainig/mosque-38/2019-2020/e-GP/20221022/432110/0051751
|
Barisal PWD Division |
৳১৭.৫৮ লাখ |
১ মার্চ ২০২০ |
Completed |
|
CONSTRUCTION OF 05 STORIED ACADEMIC CUM WORKSHOP BUILDING WITH 05 STORIED FOUNDATION AT PATUAKHALI TECHNICAL SCHOOL AND COLLEGE. CATAGORY-3 JOINT PILE
WD-4 24/e-GP/20250101/423658/00241494
|
Office of the Executive Engineer, EED, Patuakhali, District. |
৳৮.৬৫ কোটি |
২৫ ফেব ২০২০ |
Completed |
|
General repair & renovation work including installation of tiles on the floor of male hostel no-01 of Patuakhali Medical College.
EGP/PATUA/19-20/PMC-06/e-GP/20221022/419369/0051753
|
Patuakhali PWD Division |
৳৯.০০ লাখ |
৬ ফেব ২০২০ |
Completed |
|
SL No-1. Re-Construction and repairs to Drain inside the Central Jail Barishal. SL No- 2. Special repairs to Naboday Middle Barrack attached to Central Jail Barishal. SL No-3. Special repairs to Sharnalata Shaheb Barrack attached to Central Jail Barishal. SL No-4. Construction of toilets waiting rooms with Palasiding for the Public and Visitors expected of Service at Barishal Central Jail. SL No-5.Repairing of Detective Sub-mersible water pump Motor Set in Barishal Central Jail.
bari/pwd/CentralJail-35/2019-2020/e-GP/20221022/412976/0051754
|
Barisal PWD Division |
৳৩৪.৭৪ লাখ |
১৬ জানু ২০২০ |
Completed |
|
Providing & Installation of Dual source Electricity 11 KV line for Barishal Central Jail at Barishal.
Pwd/11/Jail/Dual/SourceE/M/2019-20/e-GP/20221022/371176/0051757
|
Barisal PWD Division |
৳২৬.৩৬ লাখ |
৩১ অক্টো ২০১৯ |
Completed |
|
Construction of Divisional and Zilla shilpakala Academies.S.H- Remaining Works of Boundary Wall.
Bari/pwd/Zilla/Shilpakala-17/2019-2020/e-GP/20221022/361706/0051760
|
Barisal PWD Division |
৳৫.৫৮ লাখ |
২২ সেপ ২০১৯ |
Completed |
|
Supplying Fitting and Fixing of Furniture at the Conference Room of PWD Zone Barishal.
Bari/pwd/Divisional/Furniture/Conference-212/2018-/e-GP/20221022/329400/0051761
|
Barisal PWD Division |
৳৫.২৪ লাখ |
১০ জুন ২০১৯ |
Completed |
|
NO-1. Repairs and Weather coat works Front & Back Block of Female Hostel Building of Nursing College in SBMC Barishal SL No- 01. NO-2. Replacement of Rain water down pipe Ground Floor 1st Floor & 2nd Floor Frond & Back Block of Nursing College in SBMC Barishal SL No- 03.
Bari/pwd/178/Mamo/new-210/2018-2019/e-GP/20221022/328261/0051762
|
Barisal PWD Division |
৳৯.০০ লাখ |
৩০ মে ২০১৯ |
Completed |
|
Repair & renovation works including civil and sanitary repair works of 2 units Staff Quarter Supervisors Quarter ASI Quarter and repair works including raising of existing bituminous carpeting road to ASI Quarter at Shagordi Stagging Hurt Barisal and Palisading work including earth filling works of the pond of 3rd class Staff Quarters at Chandmari Barisal.
Bari/pwd/Stagging/Hurt -204/2018-2019 /e-GP/20221023/320945/0051763
|
Barisal PWD Division |
৳৩৮.৫৭ লাখ |
২৭ মে ২০১৯ |
Completed |
|
NO1. Repair and replacement of Unserviceable electric line of Control Sterilizer in/c. other related EI works of SBMCH Barishal Sl No-5. NO-2. Setting tiles in the wall Installation of Thai Aluminium window along with repair works of conduit of female orthopedic word 3rd floor F Block of SBMCH Barishal SL No-22. NO-3. Repair of door & window Painting and Special sanitaty repair works of Ground floo EYE Block of SBMCH Barishal SL No-23
Bari/pwd/Fund/Mamo88-197/2018-2019/e-GP/20221023/318081/0051765
|
Barisal PWD Division |
৳১১.৭০ লাখ |
১৩ মে ২০১৯ |
Completed |
|
NO-1. External repair and replacement works including sewerage line staircase aluminium works weather coat paint etc of ICU Building of SBMC Hospital Barishal.Sl.No-14. NO-2. Replacement of Damaged wooden window with Thai Aluminium window of 3rd floor EYE Block along with repair and renovation work of doors of SBMCH Barishal SL No-20. NO-3. Setting tiles in the wall Installation of Thai Aluminium window along with conduit repair works of Surgery word 4th floor G Block of SBMCH Barishal SL No-21.
Bari/pwd/Fund/Mamo-88/198/2018-2019 /e-GP/20221023/318085/0051764
|
Barisal PWD Division |
৳১৩.৫০ লাখ |
১৩ মে ২০১৯ |
Completed |
|
SL No-1. Repair & Renovation works of Conference Room of SBMC Barishal. SL No-2. Construction of Guide Wall including supply and installation of Fancy Grill on front side of Male Hostel Building No.2 of SBMC Barishal. SL No-3. Repair and rennovation work including tiles work in toilet door window repair paint and sanitary repair works of Flat-1 of Doctors Quarter at SBMC Hospital Barishal.
Bari/pwd/138F/123ma-192/2018-2019 /e-GP/20221023/317947/0051766
|
Barisal PWD Division |
৳১০.৮০ লাখ |
১২ মে ২০১৯ |
Completed |
|
Civil and sanitary repair works including repair of damaged area sanitary and water supply system of old Morgue Building of SBMC Barishal
Bari/pwd/Fund/Mamo121/FA-195/2018-2019 /e-GP/20221023/317914/0051767
|
Barisal PWD Division |
৳৯.০০ লাখ |
১২ মে ২০১৯ |
Completed |
|
NO-1. Repair and Replacement of old damaged Ceiling fans of SBMC Hospital Barisal.SL No-3. NO-2. Supply fitting and Fixing of tiles in Meal deluising at 4th floor of SBMC Hospital Barishal SL No-15. NO-3. Repair and Renovation wash in/c. alluminium partitiaon in administrative block of qeuesal section of SBMC Hospital Barisal SL no-16. NO-4. Repairs and Replacement of woden window and grill with aluminium window at ground floor of block A of SBMC Hospital Barisal SL no-17. NO-5. Supplying fitting and fixing of wall tiles aluminium window at 4th floor of Block G of Surgecy ward SBMC Hospital Barisal SL no-18. NO-6. Remaining woks in/c. Repairs and Renuvation wash of the existing Deputy Directors office Room as office Room of the Convenuer Health Service Committe of SBMC Hospital Barisal SL No-29. NO-7.Supply and Repairs of window Grill in/c. Ancillary Repair works of Rear Block of Female Hostel Building No-3 SBMC Barisal SL no-2. NO-8. Repair work of Civil and Sanitary for 3rd Class Quarter No-2 at SBMC Barishal SL no-5. NO-9. Changing the bathroom window and Sanitary lines on the Ground floor of the Back block Boys Hostel No-1 adjacent to SBMC at Barisal SL no-6. NO-10. Internal Electrical Repairs works of Doctors Quarter No-1 SBMC Barishal.SL No-1. NO-11. General Repair works in/c. Internal Civil and Sanitary works of Female Hostel Building No-1 of SBMC Barishal SL no-2. NO-12. Repair work in/c. Tiles work in Toilet Paint work Door wincdow and Sanitary Repair works of Dining room of Female Hostel Building No-2 at SBMC Barishal SL no-4. NO-13. Reputable repair work with Thai Aluminium window False Ceiling of Gallery No-4 at SBMC. Barisal SL No-5.
Bari/pwd/Fund/Mamo88/118//119/126/AM-194/2018-2019/e-GP/20221023/316075/0051768
|
Barisal PWD Division |
৳৭৬.৪৮ লাখ |
৮ মে ২০১৯ |
Completed |
|
NO-1. Construction of pump shed including supply and installation of 100mm dia deep tube well of SBMC Hospital Barishal. SL No-19. NO-2. Repair works including patent stone roofing compound etc works on the roof of the Microbiology Department of SBMC Barishal Sl No-3.NO-3. Repair works including patent stone roofing compound etc works on the roof of the Pathology Department of SBMC Barishal Sl No-4. NO-4. Supply and Installation of 50.00 mm Deep Tube well for supply of water of Nursing College SBMCH Barishal SL No- 1.NO-5. Supply and Installation of Rooftop Water Tank including Other Sanitary Works Rear Block of Female Hostel Building at Nursing College in SBMC Barishal SL No- 02.NO-6. Repairs of Roof of Kitchen including ancillary repairs works of Female Hostel Building at Nursing College in SBMC Barisal SL No- 04.NO-7. Replacement of Roof topWater Tank of Rear Block in/c ancilary repair Femal Hostel Building at SBMC Barisal SL No- 05.
Bari/pwd/138Su/88/118/127-189/2018-2019/e-GP/20221023/314127/0051770
|
Barisal PWD Division |
৳৩৫.৯৮ লাখ |
৭ মে ২০১৯ |
Completed |
|
No-1. 1.Work of linking the water line with the installation of a deep tube well of 50 mm diameter back side of Hostel-1 2 and 3 at SBMC Barisal SL No-3 NO-2. General Repair Works including Repair of tiles Door Widnow and Sanitary Works of Rear Block of Female Hostel Building No-1 at SBMC Barishal. SL No-1 NO-3. General Repair of Water Supply & Sewarage Lines including Weather Coat Paint Work of Female Hostel Building No-3 of SBMC Barishal. SL No-1 NO-4. Internal Civil Sanitary and other related repair works in Hostel No.3 at SBMC Barishal SL No-3.
Bari/pwd/Fund/Mamo117/118/126/VJ-193/2018-2019 /e-GP/20221023/316070/0051769
|
Barisal PWD Division |
৳৪৬.৭৯ লাখ |
৭ মে ২০১৯ |
Completed |
|
Supply Installation and Commissioning of AC in the Chamber of Jana Nirapatta Bighnokari Aparadh Daman Tribunal Barisal.
Pwd/149/jananirapatta/2018-19 /e-GP/20221023/315790/0051772
|
Barisal PWD Division |
৳১.১৯ লাখ |
৬ মে ২০১৯ |
Completed |
|
NO-1. Repair works including civil and sanitary works on North and South sides of the Auditorium Building of SBMC Sl No-1.NO-2. Repair and Replacement of Electrical Fitting and installation at East Side of the Cafeteria of SBMC Barishal. SL No-2 NO-3. Repair to door window water supply and sanitary lines of Block-I at level-3 of Gynae Ward at SBMC Hospital BarishalSL N o-12. NO-4. Civil and sanitary repair works including sanitary fittings in toilets of level-1 of SBMC Hospital Barishal Sl.No-13.
Bari/pwd/138NuZ/88/125/1882018-2019/e-GP/20221023/314159/0051771
|
Barisal PWD Division |
৳১৮.৯০ লাখ |
৬ মে ২০১৯ |
Completed |
|
Repair and Replacement of Internal Electrical Fitting of Doctors Quarter No-8 of SBMC Barishal. SL No-10
Pwd/133/138-126/E/M/2018-19/e-GP/20221023/313833/0051773
|
Barisal PWD Division |
৳১.৯০ লাখ |
২ মে ২০১৯ |
Completed |
|
No-1-Providing and Installation of Standby 25 HP Submersible Pump Motor of SBMCH Barishal SLNo-1 N0-2- Repairs to Pump Motor Starter Panel Board for 25 HP Submersible Pump Motor of SBMCH Barishal SLNo-08. N0-3-Repairs and Replacement of Windows of in/c ancillary repair works Ground Floor 1st 2nd & 3rd Floor Front Block of Female Hostel Building of Nursing College in SBMC Barishal SL No- 01. N0-4-Repairs and Replacement of Windows of in/c ancillary repair works Ground Floor 1st & 2nd Floor Back Block of Female Hostel Building of Nursing College in SBMC Barishal SL No- 02. No-5-Construction of Drain in Front of Female Hostel Building of Nursing College in SBMC Barisal SL No- 04 .No-6-Supply & Installation of water Purifier for supply of Pure water Front & Rear Block of Female Hostel Building of Nursing College at SBMC Barishal. SL No- 03.
Pwd/136/SBMCH/138-128/88/2018-19 /e-GP/20221023/313939/0051774
|
Barisal PWD Division |
৳২৮.৭৯ লাখ |
২ মে ২০১৯ |
Completed |
|
No-1- Special repair work including civil sanitary from the first floor to the 4th floor of Back Block the male Internee doctors hostel SBMC. Hospital Barishal. Serial No. 25 .No-2-Special repair work including civil sanitary from the first floor to the 4th floor of Front Block the male Internee doctors hostel SBMC. Hospital Barishal. Serial No. 26 .No-3- Establishment of Outer Sewerage line along with Drain Apron around the male Doctor Hostel at SBMC Hospital Barishal. Serial No. 27 . No-4-Construction of R.C.C. Road for Male Nursing Hostel at SBMC Hospital Barisal. Serial No. 28 .No-5-Repair works including change the door & window of Nursery home adjacent to SBMC Hospital Barishal Serial No. 30 No-6-Repair works along with Sanitary and Water supply of the female Internee Doctor Hostel adjacent to SBMC Hospital Barishal Serial No. 31 .No-7-Repars to Door & window for 2nd 3rd 4th floor alongwith Other repair works of female Internee doctor Hostel adjacent to SBMC Hospital Barisal. Serial No. 32 .No-8-Construction of Boundary wall for 4th Class Staff quarters adjacent to Barisal Sher-e-Bangla Medical College.Serial No.33 .No-9-Supply and installation of fire extinguishers in different wards of SBMCH Barishal. SL No-4.No-10-Repair and servicing of 125 and 250 KVA Diesel Generator Sets of SBMCH Barishal Serial No-06 . No-11- Replacement unserviceable electric lines of Scan ward of pediatric SBMC Barishal SL No-7 .No-12- Repair and renovation Internal Electrical of Female Internee Doctor Hostel of SBMC Barishal. SL No-9
Pwd/130/l/fund-138-88/E/M/2018-19 /e-GP/20221023/313136/0051775
|
Barisal PWD Division |
৳৫৮.৪৮ লাখ |
৩০ এপ্রিল ২০১৯ |
Completed |
|
Remaining works of the storage Building of Narcotics Control Department Barisal.
Bari/pwd/Remaining/Narcotics-186/2018-2019/e-GP/20221023/313579/0051777
|
Barisal PWD Division |
৳২৩.৩৬ লাখ |
৩০ এপ্রিল ২০১৯ |
Completed |
|
Construction of 4-Storied Studio apartment with 6-storied foundation Including Civil Sanitary and electrical works at Dhamoirhat Thana Compound Under Naogaon
pwd_naoga-33/2018-19/e-GP/20241219/299253/00237635
|
Naogaon pwd division |
৳২.১৯ কোটি |
২৫ মার্চ ২০১৯ |
Ongoing |
|
SL No-1.Temporary stall Installation including Beautification work for Development Fare 2018 at Barisal. RAPP. SL No-2. Installation of tiles both sides of the gate with reaming work of in front of Boundary wall in Barisal Additional DIG House Barisal. RAPP
Bari/pwd/stall/Fare-145-2018-2019 /e-GP/20221023/283241/0051778
|
Barisal PWD Division |
৳৮.৪৭ লাখ |
১১ ফেব ২০১৯ |
Completed |
|
Auto CAD Trades 1st Floor and Store Room 2nd Floor. Construction of wall plastics fencing and rock carriage second-floor bathroom fittings fixing and tiles electrical repair including ceiling and pre-projecting of the front portion of the building at Women Technical Training Centers Barisal.
Bari/pwd/Women/TTC-128/2018-2019 /e-GP/20221023/270686/0051779
|
Barisal PWD Division |
৳৯.৮৯ লাখ |
১৩ জানু ২০১৯ |
Completed |
|
SL No-1. Special repairs to Bathroom doors & floor tiles with water supply system on 1st and 2nd floors of the office building . SL No-2 Construction of roads along the new gate of the south side of the mosque and SL No-3. Repair work including the floor tiles and the installation of the grill & Thai Glass window of the office room of the principal and vice Principals office room at Barishal Technical Training Center Under the Bureau of Manpower Employment.
Bari/pwd/SANi/TTC-104/2018-2019 /e-GP/20221023/266154/0051780
|
Barisal PWD Division |
৳১৫.৫৮ লাখ |
২৪ ডিসে ২০১৮ |
Completed |
|
Construction of Basketball ground under Construction of 7 Seven RAB Complexes project one at Barisal.
Bari/pwd/RAB/Basket/ball-92/2018-2019/e-GP/20221023/256915/0051781
|
Barisal PWD Division |
৳১৫.৭৮ লাখ |
২৮ নভে ২০১৮ |
Completed |
|
Shahid Abdur Rob Serniabat Stadium Galary VIP Lounge press Conference Room Repair weather code Hyzenic wash Sanitary fittingsDoor-Window Carpet making of Signboard with sanitary works for Honorable Prime Minster visit at Barisal.
Bari/pwd/Stadium/PM-57-2018-2019 /e-GP/20221023/235089/0051784
|
Barisal PWD Division |
৳২৬.৯৫ লাখ |
১১ অক্টো ২০১৮ |
Completed |
|
Weather code & Painting Work East side Galary of Shahid Abdur Rob Serniabat Stadium for Honorable Prime Minster visit at Barisal.
Bari/pwd/East.side/PM-56-2018-2019 /e-GP/20221023/235231/0051782
|
Barisal PWD Division |
৳২৬.৯৭ লাখ |
১১ অক্টো ২০১৮ |
Completed |
|
Construction of Haly pad Barisal Polic line & Construction of LED signboard Main gate Barisah Circuit House for Honorable Prime Minster visit at Barisal.
Bari/pwd/LED/PM-58-2018-2019 /e-GP/20221023/234937/0051783
|
Barisal PWD Division |
৳১৬.৪৩ লাখ |
১১ অক্টো ২০১৮ |
Completed |
|
Shahid Abdur Rob Serniabat Stadium VIP Lounge press Conference Room Repair and renovation works of weather code Plastic paint enamal paint and Hyzenic wash with Sanitary works for Honorable Prime Minster visit at Barisal.
Bari/pwd/primeminster-17-2018-2019 /e-GP/20221023/225101/0051785
|
Barisal PWD Division |
৳২৯.৪৫ লাখ |
২৩ সেপ ২০১৮ |
Completed |
|
Weather code & Painting Work west side Galary of Shahid Abdur Rob Serniabat Stadium for Honorable Prime Minster visit at Barisal.
Bari/pwd/primeminster-18-2018-2019 /e-GP/20221023/223083/0051786
|
Barisal PWD Division |
৳২৯.২৯ লাখ |
১২ সেপ ২০১৮ |
Completed |
|
Special Repairs to DIG Barishal Range Barishal Residence.
Bari/pwd/TAR-177/2017-18 /e-GP/20221023/192955/0051787
|
Barisal PWD Division |
৳৫.১১ লাখ |
৩০ এপ্রিল ২০১৮ |
Completed |
|
SL No-1. Repairs painting and Chinge CI Shed roofing & fals Ceiling works to MuladiHizlaAgailzara Court and CMM Nezarat Section attached to Judges Court Barisal RAPP-66. SL No-2. Sanitary repairs to 4th class Quarter No- 09 10 attached to SBMC Barisal RAPP-106. SL No-3. Repairs and other works to General Bath room door for A Block 2nd Floor Male Arthopadic Work No- 1 & 2 at SBMCH Barisal RAPP-119. SL No-4. Renewing broken glass panes of window for Internee Doctor Hostel at SBMCH Barisal RAPP-149. SL No-5. Installing of doors and ancilliary works in the toilets of Labour word in 2nd Floor J block at SBMC Barisal.RAPP-122. SL No-6. Installation of tiles in Lift wall and painting in 1st floor in ICU at SBMC Barisal RAPP-116. SL No-7. Painting of stair corridor and repair of Aluminum thai in 1st floor of CCU at SBMC Barisal. RAPP-118. SL No-8. Repair to Civil & Sanitary works including Collapsible Gate for Class-III Staff Quarter Building no-4/A at SBMC Barisal. RAPP-149. SL No-9. Supplying Fitting and Fixing of Thi Aluminium window SDE Gournodi residence attached to Sagourdi Staging Hut at Barisal .RAPP-182. SL No-10. Repairs to out side painting and other works SDE Gournodi residence attached Medical Sub-Division at Barisal. RAPP-183. No-11. Repairs to Connecting road Boundary wall & Drain attached to Sagourdi Staging Hut at Barisal.RAPP-208
Bari/pwd/LMS-174/2017-2018 /e-GP/20221023/191141/0051788
|
Barisal PWD Division |
৳১৩.৭৬ লাখ |
২৬ এপ্রিল ২০১৮ |
Completed |
|
No-1-Repair Work of Sanitary lines in the front block female hostel at SBMC Barisal.-RAPP-94 No-2-Repair and maintenance work of B-Block Ramp Veranda grill & Front site weather coat of SBMC for the Honorable Prime Minister Visit.-RAPP-112. No-3-Repair & painting for inside of Cafeteria with Civil and Sanitary Works at SBMC Barisal.-RAPP No-134. No-4-Supplying Gate valve Basin Low-down for Ground Floor 1st Floor & 2nd Floor Lady Interny Hostel attached to SBMC at Barisal RAPP-98.No-5- Repair to E/I works of Office Room at Divisional Commissioner office Barisal.S.H-Repair to E/I works in confarance room.-RAPP-14. No-6-Name of work Supply of water Pump Motor Overhead line repair & Internal E/I repairing works of Police Barrak in the DCs Residence at Barisal. S.H Supply & Installation of water Pump Motor.-RAPP-12.No-7-Repair work to roof of Vaterkhal PWD Staff quarter No- 3/2 West side Barishal RAPP- 201.
Pwd/Bari/111/RAPP/94/112/134/98/14/12/14/2017-2018/e-GP/20221023/191175/0051789
|
Barisal PWD Division |
৳৯.৬৬ লাখ |
২৬ এপ্রিল ২০১৮ |
Completed |
|
.A. Construction of drain works along RCC road in front of E-Block of Barisal Sher-E Bangla Medical College Hospital .138 SL No-11
Bari/pwd/RA-SBMC-152/2017-18 /e-GP/20221023/186104/0051790
|
Barisal PWD Division |
৳৪.৯৫ লাখ |
২৪ এপ্রিল ২০১৮ |
Completed |
|
SL No-1. Repair work with changing the old water line below the soil of the Lady Doctor Hostel attached to Sher-E-Bangla Medical College building Barisal-138. SL No-2. Repair for roofing Compound of Cafetaria roof and protection of wall damp at Sher-E-Bangla Medical College Barisal-138. SL No-3. Repair & rise of Drain Apron and Pit for Nursing girls Hostel SBMCH at Barisal-138. SL No-4. Other Works & Replace of toilet door basin pan for ground 1st 2nd 3rd floor of back block in girls Hostel at Barisal Nursing College-138. SL No-5. General Repair and painting work of indoor & outdoor at Barisal Nursing Boys Hostel-138. SL No-6. Other Works & Replace of toilet door basin pan for ground 1st 2nd 3rd floor of Front block in girls Hostel at Barisal Nursing College-138. SL No- 7. Repair & Replace of toilet water line and sanitary works of ground floor & 1st floor of back block in boys Hostel No. 01 to SBMC at Barisal. SL No-8. Repair & Replace of toilet water line and sanitary works of 2nd floor & 3rd floor of Front block in boys Hostel No. 01 to SBMC at Barisal-138.
Bari/pwd/ZJN-173/2017-18 /e-GP/20221023/190470/0051791
|
Barisal PWD Division |
৳২৬.৭০ লাখ |
২৪ এপ্রিল ২০১৮ |
Completed |
|
No-1-Repair of indoor type electrical sab station equipments and electrical overhead line including polesand installation of electrical digital energy meter at stair room of resident quarter of Technical Training center Barisal.No-2-Painting of floor tilcs Walls door window in computer room of west side 2nd floor at TTCAdministrative Building Barisal.No-3-Special Repair including supply itting fixing of AC at the Rest House of TTC Barisal.
Repair of indoor type electrPwd/114/2017-2018 /e-GP/20221023/189638/0051792
|
Barisal PWD Division |
৳২৯.০৮ লাখ |
২২ এপ্রিল ২০১৮ |
Completed |
|
Emergency Repair of Divisional Givt. Public library under the Project Management & Development of Public Libraries in Online
Bari/pwd/ Publiclibrary-135 /2017-18 /e-GP/20221023/186063/0051793
|
Barisal PWD Division |
৳৩৭.৩৬ লাখ |
১৯ এপ্রিল ২০১৮ |
Completed |
|
138-No-1-13-CN-47.Repair of Electrification works C Block Ground Floor Sher-E-Bangla Medical College Hospital at Barisal.No-2-56-CN-17.Special Repair of Electrification works for Auditorium Sher-E-Bangla Medical College at Barisal N0-3-13-CN-48.Replacement of Unserviceable Bus Ber Tranking System and Related Works Gf to 4th floor at E Block Sher-E-Bangla Medical College Hospital Barisal. No-4-56-CO-456-CN-18.Replacement of Unserviceable Panel BoardSDB Board and others Related Electrical Works at Pharmacology Dept.Sher-E-Bangla Medical College Barisal.N0-5-33-CN-3.Special Repairs to E/I. work & change the unserviceable Electrical Panel Board SDB of Microbiology Block at SBMC Barisal.No-6-33-CN-4.Special Repairs to E/I. work & change the unserviceable Electrical Panel Board SDB of Pathology Block at SBMC Barisal.No-7-13-CN-34.Repairing Supplying and Installation to Air-Cooler with Miscellaneous work for Post CCU & CCU Ward of CCU & ICU Bhaban at SBMCH Barisal.No-8-13-CO-37.Replacement of Electrical light fitting and Related works E Block DBlock& G Block from GF to 4th Floor at Sher-E-Bangla Medical College HospitalBarisal.
e-Gp/102/j/l/m/Sbmc-138/2017-2018 /e-GP/20221023/185725/0051800
|
Barisal PWD Division |
৳২০.৭৫ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |
|
SL No-1. Repair and Renovation works of main building at Divisional Narcotics Control office Barisal. SL No-2. Construction works of Patent stone for stopping water leakage at the roof of main building at Divisional Narcotics Control office Barisal. SL No-3. Construction of garage for keeping cars at the Divisional Narcotics control office Barisal.
Bari/pwd/ZU-Narcotics-161/2017-18 /e-GP/20221023/185595/0051799
|
Barisal PWD Division |
৳২০.৯৯ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |
|
No.1-Electrical repair works and supply of fans with related electrical works at children Sarjari unit in 1st floor of SBMC Barisal No.2-Repair works including sanitary works of male Nursing Hostel at Barisal Nursing College.No.3-Repair works including civil and sanitary works of biology Department of SBMC at Barisal.
Bari/pwd/maleNursing -110/2017-18 /e-GP/20221023/178684/0051794
|
Barisal PWD Division |
৳৮.৯১ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |
|
138.A . Barisal Sher-E Bangla Medical College Hospital west side end Patients water supply for pump Shed Built with water tank water supply line submursible pump up work.-SL No-2 .B . Repair work of sewerage line sewerage system at the Dr. quarter Near by SBMCH Barisal SL No-21 .C.Installation of deep tube well at 3rd class quarter at SBMC Barisal SL No-5 .D. Barisal Sher-E Bangla Medical College Hospital of ICU Building sanitary and sewerage line repair work SL No-8. E. Repair & Renewing of Sanitary & window glass in the internee hostel of SBMC Barisal SL No-9 . F. Barisal Sher-E Bangla Medical College Hospital adjasent to Dr. Quarter no-7 of the roof of water to read prevent patent stone including roofing compound work SL No-20 .G. Roofing compound work with patent stone for prevention of burning of roof water for doctor quarter-6 adjasent Barisal Sher-E Bangla Medical College Hospital SL No-22 . H. Construction of Underground Reservior at Class-III Staff Quarter attached to Shef-E-Bangla Medical College Hospital Barisal SL No-32
Bari/pwd/HMP-SBMCH-134/2017-18 /e-GP/20221023/184198/0051795
|
Barisal PWD Division |
৳২৫.৭৩ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |
|
A. Construction of Boundary wall including grill in the Front south side of intern Male doctors quarter at SBMC Barisal.138 SL No-24 .B. Special Repair of Sanitary line & Change of damaged soil Pipe in Nurses hostel 3 blocks at SBMC Barisal. 138 SL No-30 .C. Installation of 4 new water line from Boys Hostel-3 to 3rd class Quarter at SBMC Barisal.138 SL No-04 .D. Elevate & Carpeting of the road in front of 4th class Quarter No-4 & 5 at SBMC Barisal.138 SL No-31 .E. Construction of RCC Road including drain from the cast side of SBMC to the mosque at Barisal.138 SL No-01.
Bari/pwd/MST-SBMCH-135/2017-18 /e-GP/20221023/184215/0051796
|
Barisal PWD Division |
৳১৮.৮০ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |
|
A. Repair of sewerage line & remaining Door-windows of 4th class quarter No-4 at SBMC Barisal.138. SL No-27. B. Remaining repair works of 4th class quarter No-8 at SBMC Barisal.138.SL No-28
Bari/pwd/PAL-SBMCH-136/2017-18 /e-GP/20221023/184234/0051797
|
Barisal PWD Division |
৳৪.৯৪ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |
|
A. Repair of Door-Window and ancillary work in 4th class Quarter No-6 & 9 at SBMC Barisal. 138.SL No-29. B . Ancillary work with the repair of RCC water tanker on the ceiling of C D & E of the Barisal Sher-E Bangla Medical College Hospital. 138.SL No-16. C. Repair and renewal works in/c plaster grill & micro-concretization in the columns of ABCD & E block of the Ground Floor of Barisal Sher-E Bangla Medical College Hospital . 138.SL No-40. D. Construction of master Drain including connecting with city compotation drain for mitigate water logging in 4th class quarter at SBMC Barisal.138.SL No-26. E. Construction of Nurses canteen in the North West side of C Block at SBMC Barisal.138.SL No-03.
Bari/pwd/BEFM-SBMC-151/2017-18/e-GP/20221023/185293/0051798
|
Barisal PWD Division |
৳১৬.৮১ লাখ |
১১ এপ্রিল ২০১৮ |
Completed |