ProcureIndex
Shareable track record
M/S. Niaz Traders
128
Contract progress
126
Completed contracts
505
Awards
BDT 1,154.44 crore
Total value
By year
| Year | Contract progress | Value | Awards | Amount |
|---|---|---|---|---|
| 2026 | 0 | BDT 0 | 28 | BDT 128.72 crore |
| 2025 | 0 | BDT 0 | 15 | BDT 67.47 crore |
| 2024 | 0 | BDT 0 | 21 | BDT 107.46 crore |
| 2023 | 0 | BDT 0 | 12 | BDT 26.33 crore |
| 2022 | 0 | BDT 0 | 23 | BDT 75.66 crore |
| 2021 | 2 | BDT 1.22 crore | 31 | BDT 146.37 crore |
| 2020 | 11 | BDT 15.63 crore | 27 | BDT 35.60 crore |
| 2019 | 5 | BDT 6.90 crore | 42 | BDT 123.15 crore |
| 2018 | 46 | BDT 44.70 crore | 160 | BDT 121.38 crore |
| 2017 | 64 | BDT 47.32 crore | 79 | BDT 134.88 crore |
| 2016 | 0 | BDT 0 | 21 | BDT 79.20 crore |
| 2015 | 0 | BDT 0 | 36 | BDT 65.24 crore |
| 2014 | 0 | BDT 0 | 8 | BDT 32.67 crore |
| 2013 | 0 | BDT 0 | 2 | BDT 10.32 crore |
By work type
- Works 128 contracts · BDT 1,267.78 crore
- Unknown 0 contracts · BDT 2.43 crore
Contract progress
| Reference no. | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
| e-Tender/NDR/OTM/BC-16/2020-21/e-GP/20231128/577799/00140698 | Dhaka O&M Division-2 ↗ | BDT 10.59 lakh | 9 May 2021 | Completed |
| 000/e-GP/DPHE/2023-07-11/00546208 | Office of the Executive Engineer DPHE, Perojpur ↗ | BDT 1.11 crore | 15 Feb 2021 | Completed |
| MSRDP/S/20-21/GC/136/e-GP/20231002/506856/0094973 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 1.35 crore | 10 Nov 2020 | Completed |
| 000/e-GP/DPHE/2023-07-11/00494183 | Office of the Executive Engineer DPHE, Perojpur ↗ | BDT 1.34 crore | 20 Sep 2020 | Completed |
| 000/e-GP/DPHE/2023-07-11/00494244 | Office of the Executive Engineer DPHE, Perojpur ↗ | BDT 1.31 crore | 20 Sep 2020 | Completed |
| eTender/PEDP4/GPJ/TUN/2019-2020/W1.00715/e-GP/20231205/461693/00147835 | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj ↗ | BDT 86.50 lakh | 17 Jun 2020 | Completed |
| eTender/PEDP4/GPJ/TUN/2019-2020/W2.01565/e-GP/20231211/461701/00150338 | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj ↗ | BDT 68.50 lakh | 17 Jun 2020 | Completed |
| e-Tender/PEDP4/BAB/BAB/2019-2020/W2.01546/e-GP/20241027/454421/00204764 | Office of the Upazila Engineer, LGED, Babuganj, Barisal ↗ | BDT 90.30 lakh | 31 May 2020 | Completed |
| e-tender/PEDP4/BAR/BAB/2019-20/W1.00421/e-GP/20241023/453737/00202841 | Office of the Upazila Engineer, LGED, Babuganj, Barisal ↗ | BDT 1.11 crore | 31 May 2020 | Completed |
| e-tender/PEDP4/BAR/BAB/2019-20/W2.00656/e-GP/20241023/453734/00202836 | Office of the Upazila Engineer, LGED, Babuganj, Barisal ↗ | BDT 79.35 lakh | 31 May 2020 | Completed |
| e-tender/PEDP4/BAR/BAB/2019-20/W2.01016/e-GP/20241027/453741/00204771 | Office of the Upazila Engineer, LGED, Babuganj, Barisal ↗ | BDT 88.34 lakh | 31 May 2020 | Completed |
| GDIRIIP/Tungi/UZR-SR/19-20/61/e-GP/20230926/462382/0090627 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 5.48 crore | 28 May 2020 | Completed |
| e-Tender/PEDP4/GPJ/TUN/2019-20/W2.00156/e-GP/20231220/403024/00156014 | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj ↗ | BDT 90.50 lakh | 5 Jan 2020 | Completed |
| 000/e-GP/DPHE/2023-07-11/00367002 | Office of the Executive Engineer DPHE, Sylhet ↗ | BDT 96.59 lakh | 9 Oct 2019 | Completed |
| IBRP/Bho/Tazu/Brg-08/e-GP/20241226/355216/00240127 | Office of the Executive Engineer, LGED, Bhola ↗ | BDT 91.11 lakh | 25 Sep 2019 | Completed |
| MAD- 13/e-GP/20241223/360408/00238812 | Office of the Executive Engineer, EED, Barisal Zone. ↗ | BDT 3.08 crore | 22 Sep 2019 | Ongoing |
| 000/e-GP/DPHE/2023-07-11/00307569 | Office of the Executive Engineer DPHE, Habiganj ↗ | BDT 1.12 crore | 18 Apr 2019 | Completed |
| Habi/Bania/Beel & Khal-04/18-19/02/e-GP/20231008/298760/00100138 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 82.47 lakh | 21 Mar 2019 | Ongoing |
| Habiganj-W-07/2018-19/e-GP/20231116/258869/00129272 | Habiganj O&M Division ↗ | BDT 2.53 crore | 2 Dec 2018 | Completed |
| 000/e-GP/DPHE/2023-07-11/00239903 | Office of the Executive Engineer, DPHE,Comilla ↗ | BDT 1.30 crore | 4 Nov 2018 | Completed |
| 000/e-GP/DPHE/2023-07-11/00234942 | Office of the Executive Engineer, DPHE,Comilla ↗ | BDT 2.30 crore | 23 Oct 2018 | Completed |
| FDR/Hab/17-18/UZR/W01/e-GP/20230911/202572/0081809 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 5.97 crore | 31 May 2018 | Completed |
| 000/e-GP/DPHE/2023-07-11/00182637 | Office of the Executive Engineer DPHE, Habiganj ↗ | BDT 2.28 crore | 5 Apr 2018 | Completed |
| RIDPCBC/C-BW37/e-GP/20231011/172686/00105986 | Office of the Executive Engineer, LGED, Comilla ↗ | BDT 2.68 crore | 14 Mar 2018 | Completed |
| IRIDP-2/SRT/DW-90/e-GP/20231024/164705/00114653 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 62.89 lakh | 7 Mar 2018 | Completed |
| e-tender/NBIDNNGPS/SRT/GOS/2017-2018/W1.00071/e-GP/20231102/160990/00121241 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur ↗ | BDT 62.01 lakh | 28 Feb 2018 | Completed |
| e-tender/NBIDNNGPS/SRT/GOS/2017-2018/W1.00074/e-GP/20231102/160992/00121083 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur ↗ | BDT 60.76 lakh | 28 Feb 2018 | Completed |
| e-tender/NBIDNNGPS/SRT/GOS/2017-2018/W1.00075/e-GP/20231102/160994/00120998 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur ↗ | BDT 62.77 lakh | 28 Feb 2018 | Completed |
| e-tender/NBIDNNGPS/SRT/GOS/2017-2018/W1.00188/e-GP/20231102/160995/00121267 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur ↗ | BDT 33.44 lakh | 28 Feb 2018 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-74/e-GP/20231010/167501/00103361 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 70.16 lakh | 20 Feb 2018 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-78/e-GP/20231010/167505/00103327 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 24.04 lakh | 20 Feb 2018 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-80/e-GP/20231009/167507/00102048 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 41.02 lakh | 20 Feb 2018 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-81/e-GP/20231010/167508/00103496 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 28.09 lakh | 20 Feb 2018 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-89/e-GP/20231009/167516/00101643 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 16.92 lakh | 20 Feb 2018 | Completed |
| RIDPCBC/C-BW38/e-GP/20231010/165768/00105084 | Office of the Executive Engineer, LGED, Comilla ↗ | BDT 1.99 crore | 18 Feb 2018 | Completed |
| RIDPCBC/C-BW43/e-GP/20231207/157352/00149063 | Office of the Executive Engineer, LGED, Comilla ↗ | BDT 1.75 crore | 18 Feb 2018 | Completed |
| IRIDPPB/PAT/DUM/UNR-02/e-GP/20241214/159215/00235042 | Office of the Executive Engineer, LGED, Patuakhali ↗ | BDT 1.55 crore | 15 Feb 2018 | Completed |
| GDIRIIP/VR/Bridge/Kash/17-18/52/e-GP/20231026/161332/00117109 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 2.55 crore | 11 Feb 2018 | Completed |
| e-Tender/NBIDNNGPS/NRL/KAL/2017-2018/W1.00362/e-GP/20241106/157705/00213371 | Office of the Upazila Engineer, LGED, Kalia, Narail ↗ | BDT 72.29 lakh | 7 Feb 2018 | Completed |
| e-Tender/NBIDNNGPS /SRT/SAD/ 2017-2018/W1.00062/e-GP/20231113/160326/00126512 | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur ↗ | BDT 62.69 lakh | 5 Feb 2018 | Completed |
| e-Tender/NBIDNNGPS /SRT/SAD/ 2017-2018/W1.00063/e-GP/20231120/160330/00132526 | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur ↗ | BDT 67.34 lakh | 5 Feb 2018 | Completed |
| e-Tender/NBIDNNGPS /SRT/SAD/ 2017-2018/W1.00064/e-GP/20231114/160328/00126923 | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur ↗ | BDT 67.77 lakh | 5 Feb 2018 | Completed |
| e-Tender/NBIDNNGPS /SRT/SAD/ 2017-2018/W1.00066/e-GP/20231112/160332/00125850 | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur ↗ | BDT 65.67 lakh | 5 Feb 2018 | Completed |
| e-Tender/NBIDNNGPS/SRT/SAD/ 2017-2018/W1.00191/e-GP/20231112/160325/00125807 | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur ↗ | BDT 62.98 lakh | 5 Feb 2018 | Completed |
| IRIDP-2/GAZ/MW-144/e-GP/20230926/156629/0090235 | Office of the Executive Engineer, LGED, Gazipur ↗ | BDT 40.67 lakh | 28 Jan 2018 | Completed |
| GFRIDP-II/G/17-18/BL-SR/467/e-GP/20231121/152940/00132922 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 25.49 lakh | 17 Jan 2018 | Completed |
| GFRIDP-II/G/17-18/BL-SR/468/e-GP/20231121/152941/00132906 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 25.85 lakh | 17 Jan 2018 | Completed |
| GFRIDP-II/G/17-18/BL-SR/469/e-GP/20231128/152942/00142884 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 25.49 lakh | 17 Jan 2018 | Completed |
| GFRIDP-II/G/17-18/BL-SR/471/e-GP/20231209/152944/00149717 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 26.35 lakh | 17 Jan 2018 | Completed |
| GFRIDP-II/G/17-18/GC-SR/470/e-GP/20231121/152943/00133103 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 33.84 lakh | 17 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-29/e-GP/20231215/151650/00154331 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 84.03 lakh | 14 Jan 2018 | Completed |
| 000/e-GP/DPHE/2023-07-11/00148878 | Office of the Executive Engineer , DPHE, Sariatpur ↗ | BDT 1.26 crore | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-27/e-GP/20231110/151648/00125176 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 57.39 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-28/e-GP/20231215/151649/00154332 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 62.80 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-30/e-GP/20231215/151651/00154313 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 73.13 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-31/e-GP/20231118/151652/00129844 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 21.21 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-32/e-GP/20231215/151653/00154329 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 84.29 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-33/e-GP/20231110/151654/00125173 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 82.08 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-34/e-GP/20231023/151655/00113983 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 44.68 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-35/e-GP/20231110/151656/00125194 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 51.72 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-36/e-GP/20231215/151658/00154311 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 64.84 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-37/e-GP/20231202/151659/00146602 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 44.75 lakh | 11 Jan 2018 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-38/e-GP/20231118/151660/00130067 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 72.82 lakh | 11 Jan 2018 | Completed |
| e-Tender/NBIDGPS/CHD/MAU/2017-18/W1.00245/e-GP/20231201/149029/00146292 | Office of the Upazila Engineer, LGED, Matlab(N), Chandpur ↗ | BDT 72.32 lakh | 10 Jan 2018 | Completed |
| RIDPCBC/B-M144./e-GP/20230925/147065/0089516 | Office of the Executive Engineer, LGED, Brahmanbaria ↗ | BDT 19.54 lakh | 27 Dec 2017 | Completed |
| IRIDP-2/NSD/MW-194/e-GP/20231030/146631/00119274 | Office of the Executive Engineer, LGED, Narshingdi ↗ | BDT 29.15 lakh | 26 Dec 2017 | Completed |
| IRIDP-2/NSD/MW-195/e-GP/20231030/146632/00118846 | Office of the Executive Engineer, LGED, Narshingdi ↗ | BDT 55.29 lakh | 26 Dec 2017 | Completed |
| RIIDPCBC/B-M138/e-GP/20231003/147047/0095811 | Office of the Executive Engineer, LGED, Brahmanbaria ↗ | BDT 42.31 lakh | 19 Dec 2017 | Completed |
| GDIRIIP/Ramp/Tungi/17-18/33/e-GP/20231111/143455/00125463 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 10.83 lakh | 18 Dec 2017 | Completed |
| GDIRIIP/Ramp/Tungi/17-18/34/e-GP/20231111/143456/00125338 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 12.04 lakh | 18 Dec 2017 | Completed |
| GDIRIIP/Ramp/Tungi/17-18/35/e-GP/20231110/143457/00125250 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 12.27 lakh | 18 Dec 2017 | Completed |
| GDIRIIP/Ramp/Tungi/17-18/36/e-GP/20231109/143458/00125145 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 11.99 lakh | 18 Dec 2017 | Completed |
| GFRIDP-II/S/17-18/VR-BL/393/e-GP/20231016/144053/00108620 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 27.83 lakh | 12 Dec 2017 | Completed |
| GFRIDP/S/17-18/UN-Maint/33/e-GP/20231015/143825/00107734 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 70.48 lakh | 12 Dec 2017 | Completed |
| IRIDPPB/BARG/ BETA/VR-05/e-GP/20241206/143494/00229350 | Office of the Executive Engineer, LGED, Barguna ↗ | BDT 1.30 crore | 5 Dec 2017 | Completed |
| e-Tender/PEDP-III/CHD/MAU/2017-18/W4.470/e-GP/20231205/138578/00147943 | Office of the Upazila Engineer, LGED, Matlab(N), Chandpur ↗ | BDT 82.98 lakh | 23 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-16/e-GP/20231215/132878/00154291 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 66.49 lakh | 19 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-18/e-GP/20231018/132880/00111670 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 46.55 lakh | 19 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-21/e-GP/20231110/132883/00125161 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 64.79 lakh | 19 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-22./e-GP/20231018/134780/00111169 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 1.06 crore | 19 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-23/e-GP/20231029/132885/00118455 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 57.73 lakh | 19 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-24/e-GP/20231029/132886/00118442 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 77.39 lakh | 19 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-04/e-GP/20231029/132861/00118324 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 23.02 lakh | 16 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-08/e-GP/20231023/132866/00113986 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 30.29 lakh | 16 Nov 2017 | Completed |
| e-Tender/LGED/Shari/GOBM/17-18/W-13/e-GP/20231029/132875/00118330 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 29.41 lakh | 16 Nov 2017 | Completed |
| IRIDP-2/GPJ/DW-96/e-GP/20231112/135066/00125560 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 70.19 lakh | 15 Nov 2017 | Completed |
| IRIDP-2/GPJ/DW-97/e-GP/20231112/135067/00125564 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 69.97 lakh | 15 Nov 2017 | Completed |
| e-Tender/LGED/Gopa/GOBM/17-18/W-39/e-GP/20231014/131096/00107379 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 3.83 lakh | 12 Nov 2017 | Completed |
| e-Tender/LGED/Gopa/GOBM/17-18/W-40/e-GP/20231021/131097/00112894 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 4.70 lakh | 12 Nov 2017 | Completed |
| PWA-UZC-Zajira-524/e-GP/202397/134756/0081165 | Office of the Upazila Engineer, LGED, Janjira, Shariatpur ↗ | BDT 3.30 crore | 8 Nov 2017 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-35/e-GP/20231009/128092/00100592 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 43.67 lakh | 29 Oct 2017 | Completed |
| e-Tender/LGED /Habi/GOBM/17-18/W-47/e-GP/20231010/128104/00103362 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 28.06 lakh | 29 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-38/e-GP/20231223/127732/00156822 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 92.53 lakh | 29 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-40/e-GP/20231223/128873/00156823 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 29.71 lakh | 29 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-13/e-GP/20231223/127509/00156859 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 7.10 lakh | 24 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-14/e-GP/20231005/127538/0097874 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 18.64 lakh | 24 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-15/e-GP/20231223/127540/00156848 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 15.81 lakh | 24 Oct 2017 | Completed |
| e-Tender/LGED/Nar/GOBM/17-18/W-28/e-GP/20231028/129564/00117615 | Office of the Executive Engineer, LGED, Narshingdi ↗ | BDT 37.69 lakh | 23 Oct 2017 | Completed |
| e-Tender/LGED/Nar/GOBM/17-18/W-29/e-GP/20231028/129565/00117565 | Office of the Executive Engineer, LGED, Narshingdi ↗ | BDT 36.72 lakh | 23 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-06/e-GP/20231223/127429/00156852 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 17.56 lakh | 23 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-07/e-GP/20231005/127431/0097597 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 15.55 lakh | 23 Oct 2017 | Completed |
| e-Tender/LGED/Net/GOBM/17-18/W-09/e-GP/20231223/127490/00156820 | Office of the Executive Engineer, LGED, Netrokona ↗ | BDT 20.39 lakh | 23 Oct 2017 | Completed |
| GFRIDP-II/G/17-18/BL-SR/451/e-GP/20231122/126225/00135258 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 28.79 lakh | 23 Oct 2017 | Completed |
| GFRIDP-II/S/17-18/VR-BR/373/e-GP/20231215/124485/00154298 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 84.38 lakh | 22 Oct 2017 | Completed |
| GFRIDP-II/S/17-18/VR-HR/367/e-GP/20231011/123427/00105645 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 24.20 lakh | 12 Oct 2017 | Completed |
| GFRIDP-II/S/17-18/VR-HR/370/e-GP/20231018/123441/00111782 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 62.36 lakh | 12 Oct 2017 | Completed |
| GFRIDP-II/S/16-17/VR-BR/357/e-GP/20231014/119414/00107430 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 50.60 lakh | 10 Oct 2017 | Completed |
| BDRIDP/BAR/BAB/CCA-RdR/06/e-GP/20241211/124231/00233533 | Office of the Executive Engineer, LGED, Barisal ↗ | BDT 31.57 lakh | 4 Oct 2017 | Completed |
| BDRIDP/BAR/SDR/UN-Rd/02/e-GP/20241209/112915/00231276 | Office of the Executive Engineer, LGED, Barisal ↗ | BDT 31.18 lakh | 19 Sep 2017 | Completed |
| BDRIDP/BAR/SDR/UZ-Rd/01/e-GP/20241210/112914/00231925 | Office of the Executive Engineer, LGED, Barisal ↗ | BDT 37.89 lakh | 19 Sep 2017 | Completed |
| TULO/HOB/W-02/e-GP/20231001/119165/0093746 | Office of the Executive Engineer, LGED, Habiganj ↗ | BDT 97.68 lakh | 10 Sep 2017 | Completed |
| e-Tender/PEDP-III/GPJ/TUN/2016-17/w2.6957/e-GP/20231204/117317/00147474 | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj ↗ | BDT 56.81 lakh | 31 Aug 2017 | Completed |
| e-Tender/PEDP-III/GPJ/TUN/2016-17/W4.312/e-GP/20231204/117318/00147486 | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj ↗ | BDT 65.76 lakh | 31 Aug 2017 | Completed |
| BDRIDP/PAT/DUM/CCA-Rd/07/e-GP/20241217/115429/00236619 | Office of the Executive Engineer, LGED, Patuakhali ↗ | BDT 52.52 lakh | 20 Aug 2017 | Completed |
| BDRIDP/PAT/DUM/CCA-Rd/08/e-GP/20241212/115430/00233915 | Office of the Executive Engineer, LGED, Patuakhali ↗ | BDT 53.95 lakh | 20 Aug 2017 | Completed |
| BDRIDP/PAT/DUM/CCA-Rd/09/e-GP/20241215/115431/00235429 | Office of the Executive Engineer, LGED, Patuakhali ↗ | BDT 31.33 lakh | 20 Aug 2017 | Completed |
| GFRIDP-II/G/17-18/VR-HR/437/e-GP/20231127/114024/00140505 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 1.76 crore | 16 Aug 2017 | Completed |
| GFRIDP-II/G/17-18/VR-SR/433/e-GP/20231119/114020/00130155 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 79.91 lakh | 16 Aug 2017 | Completed |
| UGIIP-III-2/AF/GOPA/UT-DR-03/2017/e-GP/20220626/108679/0014738 | PIU Office of Gopalganj Pourashava, Gopalganj ↗ | BDT 6.29 crore | 2 Jul 2017 | Completed |
| UGIIP-III-2/AF/GOPA/UT-DR-06/2017/e-GP/20220626/108682/0014752 | PIU Office of Gopalganj Pourashava, Gopalganj ↗ | BDT 9.30 crore | 2 Jul 2017 | Completed |
| BDRIDP/BAR/UZP/UN-Rd/01/e-GP/20241209/106237/00231286 | Office of the Executive Engineer, LGED, Barisal ↗ | BDT 1.36 crore | 12 Jun 2017 | Completed |
| NATA/Gazi/W-09/e-GP/20231002/104159/0094955 | Office of the Executive Engineer, LGED, Gazipur ↗ | BDT 87.61 lakh | 7 Jun 2017 | Completed |
| e-Tender/LGED/Manik/GOBM/17-18/W-01/e-GP/20230914/104605/0082993 | Office of the Executive Engineer, LGED, Manikganj ↗ | BDT 38.13 lakh | 24 May 2017 | Completed |
| e-Tender/LGED/Gopa/GOBM/16-17/W-61/e-GP/20231016/104099/00108668 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 12.84 lakh | 18 May 2017 | Completed |
| e-Tender/LGED/Gopa/GOBM/16-17/W-59/e-GP/20231014/102100/00107432 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 4.39 lakh | 11 May 2017 | Completed |
| e-Tender/LGED/Gopa/GOBM/16-17/W-60/e-GP/20231014/102101/00107447 | Office of the Executive Engineer, LGED, Gopalganj ↗ | BDT 11.66 lakh | 11 May 2017 | Completed |
| IRIDP-2/PBN/DW-109/e-GP/20240710/87074/00165561 | Office of the Executive Engineer, LGED, Pabna ↗ | BDT 59.50 lakh | 8 Mar 2017 | Completed |
| IRIDP-2/PBN/DW-114/e-GP/20240711/87079/00165755 | Office of the Executive Engineer, LGED, Pabna ↗ | BDT 9.92 lakh | 8 Mar 2017 | Completed |
Awards
| Package | Office (PE) | Amount | Contract date | Official record |
|---|---|---|---|---|
| Repair & Renovation works of the Assistant Head Teacher Room Prayer Room Office Room & Common Room at Tikatuli Kamrunnesa Govt. Girls High School under Sutrapur Thana of Dhaka Metro. | Office of the Executive Engineer, EED, Dhaka Metro. | BDT 8.50 lakh | 16 Sep 2026 | Official record |
| Improvement by BC of Rajapur Rayer Bazar to Nilkantha Shamadder house Road from Ch. 00-1000m under Kotwalipara Upazila District Gopalganj [Road ID No: 335514156] (Salvage Materials Cost Tk. 2862873.00). | Office of the Executive Engineer, LGED, Gopalganj | BDT 1.71 crore | 9 Sep 2026 | Official record |
| Cleaning Debris from trash rack & barricade and Pump Operation work for NNIP Pump House during FY 2026-2027. | Dhaka Mech. (Pump House) Division | BDT 21.40 lakh | 16 Aug 2026 | Official record |
| Remaining works of 02-storied with 01 semi basement chicken market building at ward No-38 Kaptan Bazar under DSCC | Office of the Executive Engineer - MCC-DSCC | BDT 24.84 crore | 30 Jul 2026 | Official record |
| River bank protection work of Tetulia river (Right Bank) from Km 1.200 to Km 1.500 total 0.300 Km at Mehendigonj upazila of Barishal district in c/w "River bank protection work at different location of Mehendigonj upazilla from erosion of Tetulia river in Barishal district" under Barishal WD Division BWDB Barishal. | Barishal WD Division | BDT 22.36 crore | 26 Jul 2026 | Official record |
| Repair works of road & drain of R.K Mission road ( H.No-91/1 to H.No 91/D H.No-79/2/2 to H.No 64/J/7 & H.No 89/10 to H.No 34/A/2) Under Ward No-39. | Office of the Executive Engineer (Zone-5) | BDT 82.00 lakh | 16 Jul 2026 | Official record |
| Improvement of Bamongati Bridge (H/O Banchu) to Nischinthopur ( Kalimondir) Pacca Road from Ch. 00-1100m by BC under Muksudpur Upazila District Gopalganj [Road ID No: 335584190] (Salvage Materials Cost Tk. 2421731.00). | Office of the Executive Engineer, LGED, Gopalganj | BDT 1.74 crore | 7 Jul 2026 | Official record |
| Improvement of Nayakanda FWC to Chairman Bari Gazina Road from Ch. 1000-2200m by BC under Muksudpur Upazila District Gopalganj [Road ID No: 335584025] (Salvage Materials Cost Tk. 3428587.00) | Office of the Executive Engineer, LGED, Gopalganj | BDT 1.95 crore | 6 Jul 2026 | Official record |
| Improvement of Mocha UP Complex-WAPDA Khal Bridge Road from Ch. 00-1000m by BC under Muksudpur Upazila District Gopalganj [Road ID No: 335584099] (Salvage Materials Cost Tk. 2486380.00) | Office of the Executive Engineer, LGED, Gopalganj | BDT 1.33 crore | 6 Jul 2026 | Official record |
| Bank protection work on right bank of Tangon River at Kristopur Area from Km. 29.985 to Km. 30.900 = 915.00 m. in Upazila :Thakurgaon Sadar Dist. Thakurgaon. | Thakurgaon WD Division | BDT 7.69 crore | 30 Jun 2026 | Official record |
| Construction of 20.00m Long RCC Girder Bridge on Bishnupur to Silimpur Road at Ch. 1870m (Road ID- 265285045) Under Kalia Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 2.21 crore | 4 Jun 2026 | Official record |
| Development work of road and construction work of drain at North shahajahanpur Khilgoan Jillpar Mosque H: No: 26/1 to Rail Crossing & Amtola Mosque 2nd Goli H: No: 485/1 to Kazi Abdul Awal Member House Ho No: 453 to 423 & H.No. 453 to 465 adjacent Lane by lane under Ward No. 11 zone 02 DSCC. | Office of the Executive Engineer Zone-2 DSCC | BDT 1.81 crore | 14 May 2026 | Official record |
| Development work of road and construction work of pipe drain at Fakirapool Bazar Road under Ward No. 9 zone 02 DSCC. | Office of the Executive Engineer Zone-2 DSCC | BDT 1.81 crore | 14 May 2026 | Official record |
| Re-excavation of Baral River from km 66.500 to km 69.300 = 2.800 km in c/w ''Re-excavation beautification and environmental conservation work of Boral River and Mirja Mahmud Khal of BoraigramUpazilla of Natore District to mitigate the climate change effects and water congestion'' under Natore WD Division BWDB Natore. | Natore WD Division | BDT 3.24 crore | 14 May 2026 | Official record |
| Repair works of road & drain of Gopibag Seventh lany and bylane ( H.No-89/A R.K Mission road to H.No 89/10) Under Ward No-39. | Office of the Executive Engineer (Zone-5) | BDT 98.50 lakh | 20 Apr 2026 | Official record |
| Repair Works of road & drain of Addeen Hospital to Chartara Mosjid Via Sanjida Pharmacy Under Ward No-54. | Office of the Executive Engineer (Zone-5) | BDT 99.90 lakh | 20 Apr 2026 | Official record |
| Construction of 6-Storied Administrative Building With 6-Storied Foundation Including Sanitary and Water Supply Works Along With Electrification and Other Works at Sunamganj Polytechnic Institute Sadar Sunamganj. | Office of the Executive Engineer, EED, Sunamganj District. | BDT 12.72 crore | 15 Apr 2026 | Official record |
| Construction of 2 Storied Academic Building With 4 Storied Foundation Including Sanitary Water Supply And Electrification Works At Adarsha School Matlab Under Matlab South Upazilla Chandpur District. | Office of the Executive Engineer,EED, Chandpur, District. | BDT 1.37 crore | 12 Apr 2026 | Official record |
| Repair of Food Godown with ancillary facilities at Shokhipur LSD Nagorpur LSD Mirzapur LSD & Ghatail LSD of Tangail District. | Office of the Project Director, Repair & Renovation of Food Godown located across the country | BDT 11.95 crore | 8 Mar 2026 | Official record |
| Re-excavation of Lauhajong River from km 22.500 to km 33.500 = 11.00 km under Tangail Sadar & Delduar Upazila of Tangail District under Tangail WD Division BWDB Tangail during the year 2025-26. | Tangail WD Division | BDT 8.09 crore | 1 Mar 2026 | Official record |
| Removal of silt from bed garbage hyacinth jungles and other obstacles; repair and maintenance for the Secondary Drainage Canal-4 (SDC-4) in between Km. 0.000 to km. 4.50=2.633 km in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division BWDB Narayanganj during the FY-2025-26. (Package No: NWDD/NDR/W-13/25-26). | Narayanganj WD Divison, BWDB | BDT 15.90 lakh | 22 Feb 2026 | Official record |
| Removal of silt from the bed garbage hyacinth jungles and other obstacles; repair and maintenance for Secondary Drainage Canal-6 at in between km. 0.000 to km 5.500 = 1.950 km in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division BWDB Narayanganj during the FY- 2025-26.(Package No: NWDD/NDR/W-14/25-26). | Narayanganj WD Divison, BWDB | BDT 17.60 lakh | 22 Feb 2026 | Official record |
| (i) Improvement of Dulalkandi Bazar Jamal bari - Sawalsha Mazar Amlabo via Kadir House Road by BC (Ch.0+000-1+000km) (Road ID No: 368074106) under Belabo Upazila District: Narsingdi. [Salvage Cost: Tk 1057638.40] (ii) Improvement of Weerry Dackbangllaw pucca road - Siddiqe Bari Road by BC (Ch.0+000-0+807km) (Road ID No: 368075241) under Belabo Upazila District: Narsingdi. [Salvage Cost: Tk 111949.14] (iii) Improvement of Patuli UP-Vabla UNR near Patuli Maddapara daktar bari - Patuli Zalu Para Road via Member bari Road by BC (Ch.0+000-0+922km) (Road ID No: 368074092) under Belabo Upazila District: Narsingdi. [Salvage Cost: Tk 632753.42] | Office of the Executive Engineer, LGED, Narsingdi | BDT 3.29 crore | 8 Feb 2026 | Official record |
| Road development work including repair of drainage lines at Mirpur section 1 from Muktijoddha Market via Adarsho Tower to Rainkhola Mor under ward no. 8.. | Office of the Executive Engineer, Zone-02 | BDT 13.20 crore | 5 Feb 2026 | Official record |
| Rehabilitation of Kandi UPC-Naya Kandi Bazar Road from Ch. 2000m-5330m (Road ID 335513004 ) [Kotwalipara] | Office of the Executive Engineer, LGED, Gopalganj | BDT 3.10 crore | 3 Feb 2026 | Official record |
| Various repairs to the inside and outside of the Green Road Office Building of the River Research Institute in Dhaka including adding tiles dyeing adding pipes and fittings to sanitary and plumbing works and adding various electrical goods including changing electrical lines for the financial year 2025-26. | Office of The Director General, RRI, Faridpur | BDT 57.20 lakh | 28 Jan 2026 | Official record |
| Cross-Section Survey (Bathymetric & River Bank Topography) | Dhaka Morphology Division | BDT 11.20 lakh | 7 Jan 2026 | Official record |
| Repair & Maintenance works of North Irrigation Canal from km 0.000 to km 5.500 damaged North Irrigation Canal dyke in between Km 1.000 to Km 5.000 = 1.5 km & Main Irrigation Canal No-1 from Km. 0.000 to Km. 2.170 at North Rupganj Water Conservancy Project (Irrigation Project) at Kaliganj Upazila of Gazipur District under Gazipur WD Division BWDB Gazipur. | Gazipur WD Division, BWDB | BDT 21.40 lakh | 1 Jan 2026 | Official record |
| Removal of garbage hyacinth jungles and other obstacles; repair and maintenance for the Main Irrigation Canal (MIC North) In Between km. 0.00 to km. 5.00 =1.675 km in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division BWDB Narayanganj during the FY- 2025-26.(Package No: NWDD/NDR/25-26/W-03). | Narayanganj WD Divison, BWDB | BDT 12.30 lakh | 23 Dec 2025 | Official record |
| Removal of silt from the bed removal of garbage hyacinth and other obstacles; repair and maintenance for the Secondary Irrigation Canal (SIC-2) in between Km. 0.000 to km. 1.2500 =0.968 km in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division BWDB Narayanganj during the FY- 2025-26. (Package No: NWDD/NDR/25-26/W-04). | Narayanganj WD Divison, BWDB | BDT 4.40 lakh | 23 Dec 2025 | Official record |
| Re-sectioning of dyke from km 0.00 to km 3.000 = 3000 m and Protective work in between km 0.00 to km 3.000 = 660 m at selected locations along the left bank of Gugali Chora at Kulaura Pouroshuva under Moulvibazar WD Division during the year 2025-26. | Moulvibazar WD Division | BDT 5.54 crore | 18 Dec 2025 | Official record |
| Repair & Maintenance Works on Existing Roads at Hatirjheel Area | Superintending Engineer (Civil Circle-1) | BDT 6.75 crore | 8 Dec 2025 | Official record |
| Completion of Incomplete works of Ground Floor of 8-Storied Foundation Building with Vertical Extension 1st & 2nd Floor including Sanitary Water Supply & Internal Electrification Works at Mirza Abbas Mohila Degree College under Motijheel Thana of Dhaka Metro. | Office of the Executive Engineer, EED, Dhaka Metro. | BDT 2.62 crore | 9 Sep 2025 | Official record |
| IUGIP/MATL/UT+DR/03/2023 Improvement/ Construction of 10104.00 m Roads by RCC Uni-block & DBC Pavement respectively in 12 locations including 5348 m Protection Works (Palisading) with 1 no 3 Vent Box Culvert & installation of 40 Nos. Street Lights and Construction of 365.00 m RCC Drains in 02 Locations at Matlab Pourashava District: Chandpur. | PIU Office of Matlab Pourashava, Chandpur | BDT 20.39 crore | 8 Jul 2025 | Official record |
| Construction of open surface drain (by Concrete Solid Block) in Block-B C D E at Sector-17 of Uttara Residential Area RAJUK | Superintending Engineer (Civil Circle-4) | BDT 7.80 crore | 15 Jun 2025 | Official record |
| (1) Construction of New Food Godown (01 Nos 1000 MT) with Ancillary Facilities at Lohagara LSD Narail; (2) Construction of New Food Godown (01 Nos 500 MT) with Ancillary Facilities at Naldi LSD Narail; (3) Construction of New Food Godown (01 Nos 500 MT ) with Ancillary Facilities at Kalia LSD Narail. | Office of the Project Director Construction of New Food Godowns with ancillary facilities in different strategic locations across the country Project | BDT 9.52 crore | 25 May 2025 | Official record |
| Earth Filling in the Tissue Culture Laboratory in Char fasson Bhola | Tissue culture laboratory cum horticulture center Establishment and development project | BDT 1.14 crore | 5 May 2025 | Official record |
| Construction of Internal Road With Repair and Renovation Works of Existing Academic Building at Ibrahimpur Iswarchandra High School Harirampur UpazilaManikganj District. | Office of the Executive Engineer, EED, Manikganj District. | BDT 52.20 lakh | 23 Apr 2025 | Official record |
| Construction of 3(Three) Storied Nikunja Commercial Building including Civil Sanitary & internal Electrification work at Plot No- 2 & 4 Road No.-9 Nikunja-1 (South) Dhaka. | Superintending Engineer (Civil Circle-3) | BDT 4.18 crore | 25 Mar 2025 | Official record |
| Development of Sector-1 Graveyard of Development of Residential and commercial Infrastructure at Jhilmil Residential Project Area. | Development of Residential and commercial Infrastructure at Jhilmil Residential Project Area | BDT 3.34 crore | 9 Mar 2025 | Official record |
| Renovation Work of RAJUK Chairman Bangalow including Door and Window fittings Exterior and Interior Plaster Work Sanitary Pipe Fixture Fittings Marble and Tiles Fittings Water Proofing Work of Roof Top Toilet Kitchen RCC Road Construction and other ancillary Works at Gulshan. | Superintending Engineer (Civil Circle-3) | BDT 1.95 crore | 18 Feb 2025 | Official record |
| Construction of HBB road at rehabilitation area in Patuakhali EPZ project | Patuakhali Export Processing Zone, Patuakhali | BDT 1.97 crore | 19 Jan 2025 | Official record |
| 1.Rehabilitation of Natunpara main road from Jamaipara point to house of Babul Kanti Dey. Ch 00-795.00 link-1 ch 00-70.00. Ward no-05 2.Rehabilitation of Natunpara main drain from Jamaipara point to house of Babul Kanti Dey. Ch 00-795.00 link-1 ch 00-70.00. Ward no-05 | Office Of The Sunamganj Pourashava, Sunamganj | BDT 1.60 crore | 14 Jan 2025 | Official record |
| Repair and Renovation works at Prime Minister's Education Assistance Trust under Dhanmondi Thana of Dhaka Metro. | Office of the Executive Engineer, EED, Dhaka Metro. | BDT 9.00 lakh | 12 Dec 2024 | Official record |
| Construction of 6-Storied Academic Building with 6-Storied Foundation including Sanitary Water Supply & Electrification Works at Kamrunnesa Govt. Girls High School under Sutrapur Thana of Dhaka Metro. | Office of the Executive Engineer, EED, Dhaka Metro. | BDT 8.74 crore | 25 Nov 2024 | Official record |
| CC Block Armoring work of Chayar Haor Submersible embankment from km 5.553 to km 6.753 and Construction of 1 no Flood Fuse at km 6.390 in Upazila-Shalla | Sunamganj WD Division-2 | BDT 17.62 crore | 24 Nov 2024 | Official record |
| Maintenance and Renovation of Internal Road & Surface Drain at sector-02 (Part) of Purbachal New Town Project (Package-PNTP/RP/S-02 Lot-01). | Purbachal New Town Project | BDT 6.45 crore | 12 Nov 2024 | Official record |
| Repair and maintenance work of Madani Avenue (100ft) Road Due to excavation for inatallation Transmission and Distribution pipe line for Dhaka WASA DESWSP Project (Package-P2). | Superintending Engineer (Civil Circle-3) | BDT 10.45 crore | 8 Oct 2024 | Official record |
| Maintenance and Repair of Road & Surface Drain at sector #48 &20 (part) of Purbachal New Town Project (Package No: PNTP/RP/S-0408 20 Lot-01). | Purbachal New Town Project | BDT 2.85 crore | 16 Jul 2024 | Official record |
| Construction of Pucca Road 3 | PD office of Establishment of Seed Multiplication Farm at South-Eastern Region of Bangladesh. | BDT 2.97 crore | 26 Jun 2024 | Official record |
| Land Development 3 | PD office of Establishment of Seed Multiplication Farm at South-Eastern Region of Bangladesh. | BDT 1.50 crore | 26 Jun 2024 | Official record |
| Constructionof 24.00m long RCC Girder Bridge on Babra UP Office-Suktogram Bazar Road at Chainage: 2200m under Replacement category (Road ID- 265283005) Under Kalia Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 2.20 crore | 28 May 2024 | Official record |
| Constructionof 18.00m long RCC Girder Bridge on Purulia UP (RHD at Chandibarpur)-Peroli(Perolisthan) Road at Chainage: 3300m (Old Chainage: 2700m) under Replacement category (Road ID- 265283009) Under Kalia Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 2.00 crore | 28 May 2024 | Official record |
| Repair and maintenance of flap gates of North Rupganj Pump House during the FY 2023-24. | Dhaka Mech. (Pump House) Division | BDT 3.80 lakh | 8 May 2024 | Official record |
| Construction of Drain Culvert Electric work & Beautification of Kashiani Sub-Division office cum Inspection bungalow at Bhatiapara in Upazila- Kashiani District-Gopalganj O&M DivisionBWDB Gopalganj in C/W "West Gopalganj Integrated Water Management project (phase -2)" during the FY of 2023-2024. | Gopalganj O&M Division | BDT 31.40 lakh | 2 May 2024 | Official record |
| Land Development (Lot 1) | Office of Production, Processing and distribution of Quality Spices Seed project | BDT 90.00 lakh | 20 Mar 2024 | Official record |
| WD-08:CONSTRUCTION OF 6-STORIED ACADEMIC BUILDING WITH 6-STORIED FOUNDATION IN/C. SANITARY WATER SUPPLY & ELECTRIFICATION WORKS AT HASNE HENA GIRLS HIGH SCHOOL BAKALIA CHATTOGRAM. (CATEGORY-02) | Office of the Executive Engineer,EED, Chittagong, District. | BDT 4.94 crore | 25 Feb 2024 | Official record |
| River bank protective work along the left bank of Meghna river from km 138.167 to 138.467 = 300 m in c/w "Protection work at the bank of Meghna river at Borokheri Ludhuabazar and Kaderponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District" Project in Upazila-Kamalnagar Dist.-Lakshmipur under Lakshmipur O&M Division BWDB Lakshmipur (Package No.- Lak/W-12/Lot-3). | Laksmipur O&M Division | BDT 29.52 crore | 18 Feb 2024 | Official record |
| Construction of 6-Storied Academic Building with 6-Storied Foundation including Sanitary Water Supply & Internal Electrification Works at Jurain Ashraf Master High School under Kadamtali Thana of Dhaka Metro. | Office of the Executive Engineer, EED, Dhaka Metro. | BDT 7.09 crore | 1 Feb 2024 | Official record |
| Constructionof 15.00m long RCC Girder Bridge on Naldi UP-Lahuria Road at Chainage: 6680m under Replacement category (Road ID- 265523006) Under Lohagara Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 1.95 crore | 10 Jan 2024 | Official record |
| Development works of Road including drain of North brook hall road (holding 01 Northbrook hall road to lalkhuty) and patlakhan bylane (holding no-62/2 patlakhan bylane to 65 no North brook hall road) and Sree Sree durgamata mondir goli at ward no 43 Surtapur Thana Zone-04 Under Parliamentrary Seat Dhaka-6. (Road ID- 0443L-0220 0443L-3431 0443L-3423) | Office of the Executive Engineer (Zone-4) | BDT 3.60 crore | 4 Jan 2024 | Official record |
| Rehabilitation of 12.70m RCC Girder Bridge on Siarbar GC via Lahuria-Mithapur GC R&H More Road at Chainage: 8170m (Road ID- 265522004) Under Lohagara Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 37.40 lakh | 3 Jan 2024 | Official record |
| Installation of 58 nos Rain Water Harvesting (RWH) at Sadar upazila in Pirojpur district under "Project for Safe Water Supply Through out the Country (PSWSC) during FY 2023-2024. | Office of the Executive Engineer DPHE, Perojpur | BDT 26.10 lakh | 3 Jan 2024 | Official record |
| Repair & Improvement Works of different road and lane by lane with drain(H.No- hazi Khorshed ali Sarder road ID 0553C-6332 partial South side lane of Hazi Khorshed Ali Sarder road ID-0553L 605960606061606260636065606660676068 07640747 kabi Nazrul Lane/Garments goli and upa goli ID 0553L-60576122side goli and upo goli of Ashraf master adarsha High School ID 0553L-6069607060716072 goli and upo goli at 1 No.road ID 0553L-6291630963126313631463180745) Under Ward No-53 | Office of the Executive Engineer (Zone-5) | BDT 3.60 crore | 1 Jan 2024 | Official record |
| (1) Major Maintenance of 15.00m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 2433m [Road ID. 419882001]; (2) Major Maintenance of 27.00m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 2940m [Road ID. 419882001]; (3) Major Maintenance of 54.00m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 3700m [Road ID. 419882001]; (4) Major Maintenance of 40.00m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 4000m [Road ID. 419882001]; (5) Major Maintenance of 54.00m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 4545m [Road ID. 419882001]; (6) Major Maintenance of 54.00m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 4690m [Road ID. 419882001] under Meghna Upazilla District: Cumilla. | Office of the Executive Engineer, LGED, Comilla | BDT 20.90 lakh | 15 Oct 2023 | Official record |
| (1) Major Maintenance of 15.00m long RCC Box Culvert on Manikar Char-Alipur Lanch Ghat Road at Chainage: 3200m [Road ID. 419882004]; (2) Major Maintenance of 10.00m long RCC Box Culvert on Manikar Char-Alipur Lanch Ghat Road at Chainage: 4080m [Road ID. 419882004]; (3) Major Maintenance of 8.00m long RCC Girder Bridge on Manikar Char-Alipur Lanch Ghat Road at Chainage: 4862m [Road ID. 419882004] under Meghna Upazilla District: Cumilla. | Office of the Executive Engineer, LGED, Comilla | BDT 11.80 lakh | 15 Oct 2023 | Official record |
| Rehabilitation of 100m RCC Girder Bridge on Tularampur-Shaikhati Road at Chainage: 10365m (Road ID- 265762003) Under Sadar Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 1.42 crore | 3 Sep 2023 | Official record |
| Construction of 12.00m Long RCC Girder Bridge on Lutia Bazar-Kumri Purba Para Bridge Road at Ch. 1200m (Road ID- 265525203) Under Lohagara Upazila Dist: Narail. | Office of the Executive Engineer, LGED, Narail | BDT 1.07 crore | 20 Aug 2023 | Official record |
| Construction of RCC Pavement yard & Drainage Line in front of process building at Baghabarighat Dairy Plant Shahjadpur Sirajgonj. | Maintenance Division, Dhaka Dairy Plant | BDT 43.60 lakh | 14 Aug 2023 | Official record |
| Renovation Works for Rangpur Chilling Plant Factory Building and Tin shed Office Building. at Rangpur | Maintenance Division, Dhaka Dairy Plant | BDT 14.10 lakh | 14 Aug 2023 | Official record |
| Construction of Internal Road and surface drain at Sector-29 (part) Purbachal New Town Project (Package : RDC - 29 LOT - 02). | Purbachal New Town Project | BDT 8.67 crore | 13 Jun 2023 | Official record |
| River bank protection work along the R/B of Meghna river from km. 0.830 to km. 1.00 = 0.170 km in upazilla- Bhairab District: Kishoreganj in C/W River Bank Protection Works Wave Protection and Re-Excavation of Khal in Ten Upazilas of Kishoreganj District Project under Kishoregonj WD Division BWDB Kishoregonj during the financial year 2022-23. | Kishoreganj WD Division | BDT 9.29 crore | 15 May 2023 | Official record |
| Construction of R.C.C Road (Internal Ch.3500-4000 M) | PD office of Establishment of Seed Multiplication Farm at South-Eastern Region of Bangladesh. | BDT 1.14 crore | 12 Apr 2023 | Official record |
| Construction of R.C.C Road (Internal Ch.4500-5000M) | PD office of Establishment of Seed Multiplication Farm at South-Eastern Region of Bangladesh. | BDT 1.14 crore | 12 Apr 2023 | Official record |
| Development works of Road with drainage of Shampur Buhumukhi High School and College road at ward no.-58 of Parliamentary seat Dhaka-4. | Office of the Executive Engineer (Zone-4) | BDT 1.80 crore | 13 Feb 2023 | Official record |
| Repair & Improvement Works of Road & Drain at Gopibag jame mosjid Lane From H.No- 87/a to H.No- 87/5 judge Lane From H.No- 58 to Bismillah Mosjid Koborsthan lane H.no- 28/50 to H.No-78/5/1 West side lane of Tikatuli kamrunnessa school Ho.no- 27 to H.No- 24/4 H.No- 2/E to H.No-2 and Hatkhola bylane H.No-30 to H.no- 31 Under Ward No-39 | Office of the Executive Engineer (Zone-5) | BDT 90.00 lakh | 11 Jan 2023 | Official record |
| Land Development | Office of the Strengthening Production, Preservation & Distribution of Quality Seed Potato to the Farmers Project | BDT 44.90 lakh | 21 Dec 2022 | Official record |
| Road-repair-work after the installation of underground cable from Farmgate to Bangla Motor under Metrorail Under the package-01 of the project entitled "Power Distribution System Development Project under DPDC Area. | SE, Civil Works | BDT 1.34 crore | 5 Dec 2022 | Official record |
| Construction of 52.00m Long RCC Girder Bridge on Chowdhorihat Road to Alauddin Hawlader House Road at Ch. 900m under Kotwalipara Upazila District: Gopalganj [ Road ID No: 335515139] | Office of the Executive Engineer, LGED, Gopalganj | BDT 3.88 crore | 10 Aug 2022 | Official record |
| Construction of 18.00m Long RCC Girder Bridge on Kushli Hat GC to Dharabashail GC Road Via Mitradanga Sonakhali Road at Chainage: 13088m (Road ID No: 335912007) under Tungipara Upazila District: Gopalganj ( Replace Category]. | Office of the Executive Engineer, LGED, Gopalganj | BDT 2.93 crore | 10 Aug 2022 | Official record |
| Construction of 15.00m Long RCC Girder Bridge on Singipara RHD to Patgati GC Road at Chainage: 4580m (Road ID No: 335912006) under Tungipara Upazila District: Gopalganj (Repalcement Category]. | Office of the Executive Engineer, LGED, Gopalganj | BDT 2.42 crore | 21 Jul 2022 | Official record |
| Construction of 15.00m Long RCC Girder Bridge on Kushli Hat to Dharabashail GC Road Via Mitradanga Sonakhali Road at Chainage: 16205m ( Old Chainage: 15408m) (Road ID No: 335912007) under Tungipara Upazila District: Gopalganj (New Construction Category]. | Office of the Executive Engineer, LGED, Gopalganj | BDT 2.73 crore | 21 Jul 2022 | Official record |
| Construction of 15.00m Long RCC Girder Bridge on Kushli Hat to Dharabashail GC Road Via Mitradanga Sonakhali Road at Chainage: 16603m (Road ID No: 335912007) under Tungipara Upazila District: Gopalganj (New Construction Category]. | Office of the Executive Engineer, LGED, Gopalganj | BDT 2.73 crore | 21 Jul 2022 | Official record |
| Remodeling Renovation & Repair of Sujanagar Upazila Health Complex in Pabna District. | Health Engineering Department (HED) Head Office | BDT 1.80 crore | 26 Jun 2022 | Official record |
| Remodeling Renovation & Repair of Chatmohor Upazila Health Complex in Pabna District. | Health Engineering Department (HED) Head Office | BDT 1.80 crore | 26 Jun 2022 | Official record |
| Construction of Main Drain Internal Road & Car Parking and Man Made Lake with Ghat under the project Creation of Tourist Facilities (1st Revised) Parki at Anowara Upazilla Chattogram. | Office of the General Manager of Works Divsion | BDT 5.31 crore | 12 May 2022 | Official record |
| (1) Minor Maintenance of 304.0m long PC Girdge Bridge on Homna-Goripur R&H Road to Maniker Char GC Road st. west side of Kathalia Bridge Road at Chainage: 980m (Road ID. 419882001) (2) Minor Maintenance of 45.0m long RCC Girder Bridge on Homna-Goripur R & H Road to Maniker Char GC Road st.west side of kathalia Bridge Road at Chainage: 2020m (Road ID. 419882001) (3) Minor Maintenance of 90.8m long PC Girdge Bridge on Vaterchar-Omrakanda-UZ HQ Road at Chainage:1445m (Road ID. 419882005) (4) Minor Maintenance of 30.0m long RCC Slab Bridge on Vaterchar-Omrakanda-UZ HQ Road at Chainage: 2230m (Road ID. 419882005) (5) Minor Maintenance of 20.0m long RCC Slab Bridge on Vaterchar-Omrakanda-UZ HQ Road at Chainage: 2458m (Road ID. 419882005) (6) Minor Maintenance of 324.0m long PC Girder Bridge on Vaterchar-Omrakanda-UZ HQ Road at Chainage: 4275m (Road ID. 419882005) (7) Minor Maintenance of 50.0m long RCC Slab Bridge on Vaterchar-Omrakanda-UZ HQ Road at Chainage: 7265m (Road ID. 419882005) (8) Minor Maintenance of 80.0m long RCC Slab Bridge on Vaterchar-Omrakanda-UZ HQ Road at Chainage: 7784m (Road ID. 419882005) under Meghna Upazila District: Cumilla. | Office of the Executive Engineer, LGED, Comilla | BDT 1.26 crore | 26 Apr 2022 | Official record |
| Repair & Renovation Works of Dormitory-02(Sondhamaloti) in/c Sanitary & Electrification at Bangabandhu Sheikh Mujibur Rahman Science & Technology University Gopalganj-8100. | ENGINEERING DEPARTMENT, BSMRSTU | BDT 19.40 lakh | 21 Apr 2022 | Official record |
| Construction of RCC road & RCC Drain at Paddapukur starting from nearable Nowsar House to Banker Borhan House W-07 (2) Estimate for Construction of RCC road at Bedgram Vajaler Math bylane starting from Sumon house to Salim Fakir House L-90.00m Wide 3.00m Ward -01 (3) Estimate for Construction of RCC road at Sisubon starting from Mohila College Gate to Sheikh Hasina Hostel L-126.00m Wide-2.50m Ward-07 (4) Estimate for Construction of RCC Drain at Moulovipara starting from Razu Mojahik to Natun Khan House via Hizbulla house L-120.00m Ward-01 (5) Estimate for Construction of 1) RCC road Karargati starting from Dhaka Khulna road to Doc Probir Banargy house L-73.00m 2) HBB Road Dhaka Khulna road to Roy Bari L=165.00m Wide-3.00m Ward-01 (6) Estimate for Construction of RCC Drain at Islambag starting from Md. Serajul Haque house to Nearable Islambag Mosque L-60.00m Ward-08 | PIU Office of Gopalganj Pourashava, Gopalganj | BDT 61.90 lakh | 18 Apr 2022 | Official record |
| Repair of Bank Protection Work at Left Bank of Bishkhali River from K.m 0.060 to K.m. 0.120= 60.00 m near Hoduya Madrasa area at Nalcity Upazilla under Jhalakathi WD Division BWDB Jhalakathi under NDR Budget during the FY 2021-22. | Jhalokathi WD Division | BDT 51.50 lakh | 5 Apr 2022 | Official record |
| Development works of Road including deep drain & footpath to alleviate waterlogging of plot No.1 to plot No.15 of road No.9 and Shampur Boroy Tala Rail Crossing to Shampur Palpara Khal at Shampur Industrial area Ward No.58 Under Dhaka South City Corporation | Office of the Executive Engineer (Zone-4) | BDT 2.96 crore | 28 Mar 2022 | Official record |
| External Work ( Sub Station & Generator Building Boundary Wall Internal Road Water Reservoir Saluting Dias Gate ( 02 Nos) & Beautification ) of Officers Dormitory Building at KMP Khulna | Khulna PWD Division-2 | BDT 1.14 crore | 6 Mar 2022 | Official record |
| River Bank Protection work along the Left Bank of the Kirtinasha River From Km 0.030 to Km 0.700 = 670m at Naria Pourashova of upazilla Naria District Shariatpur under Shariatpur O&M Division BWDB Shariatpur during the year 2021-2022. | Shariatpur O&M Division | BDT 16.91 crore | 3 Mar 2022 | Official record |
| Construction of RCC Drain at Homna Pourashava of Cumilla District Under Bangladesh Municipal Water Supply and Sanitation Project (30 Pourashavas) during the Financial Year of DPHE 2021-22. | Office of the Executive Engineer, DPHE,Comilla | BDT 7.49 crore | 20 Feb 2022 | Official record |
| Internal Construction Work ( Interior work of 4th 5th & 6th Floor Air Cooler (23 Nos) Water Heater (21 Nos) Fire Extinguisher (30 Nos) Pump ( 2 Nos) LIFT Room Kitchen Room And Stair Room ) of Officer's Dormitory Building at KMP Khulna | Khulna PWD Division-2 | BDT 79.70 lakh | 20 Jan 2022 | Official record |
| Strengthening of both dyke of S9D Irrigation Canal | Syedpur O&M Division | BDT 5.59 crore | 5 Jan 2022 | Official record |
| Construction of bridge at Km. 16.85 and foot bridge at Km. 18.20 over Bogura Irrigation Canal | Syedpur O&M Division | BDT 4.95 crore | 5 Jan 2022 | Official record |
| Inner Side Slope Protection in between km 3.50 to km 17.92 of Left Dyke at different places of Teesta Main Canal in c/w "Rehabilitation & Extension of Command Area of Teesta Irrigation Project" in Upazilla: Dimla and Jaldhaka Dist: Nilphamari under Dalia O&M Division BWDB Dalia Nilphamari during the Financial Year 2021-22. | Dalia O&M Division | BDT 7.79 crore | 2 Jan 2022 | Official record |
| Cross-Section Survey (Bathymetric Survey) work of the Lower Meghna River (Section ID: RMML00 RMML0.1 RMML1 RMML1.1 RMML2 RMML3 Total 6 nos) chainage from KM 2.380 to KM 41.330 in Laxmipur & Chandpur district under Dhaka Morphology Division BWDB Dhaka during the Year 2021-2022. | Dhaka Morphology Division | BDT 9.10 lakh | 2 Jan 2022 | Official record |
| Construction of Boundary Wall | Development of undeveloped area and Repairing,Reconstruction of Developed Area of BSCIC IE, Barishal | BDT 2.36 crore | 26 Dec 2021 | Official record |
| Development works of Road drain & footpath remaining portion of 11 no. road Shampur Kodomtoly industrial area at ward no 58. | Office of the Executive Engineer (Zone-4) | BDT 4.08 crore | 20 Dec 2021 | Official record |
| Construction of 70m PC Girder Bridge on Keora Bunia UP-Ayla GC-Sonarbangla-Nayahat -Pubakata Road at Ch.13380m over Keoralounia Khal (ID No. 504283012) under Sadar Upazila in Barguna District' | Office of the Executive Engineer, LGED, Barguna | BDT 7.26 crore | 25 Nov 2021 | Official record |
| Improvement Works of Road & Drain adjacent to Tikatuli Playground Ho. No. 64/F to Ho. No. 64/2 and Bindu Goli Ho. No. 85 RK Mission Road to Ho. No. 78/5/1 under Ward No. 39 | Office of the Executive Engineer (Zone-5) | BDT 90.00 lakh | 7 Nov 2021 | Official record |
| Development works of Road with drainage of Shampur Katomtuli 1no. road remaining portion at RAJUK Residential area at ward no.-58 under Parliamentary seat Dhaka-4. | Office of the Executive Engineer (Zone-4) | BDT 1.80 crore | 7 Nov 2021 | Official record |
| Anowara Parki | Office of the General Manager of Works Divsion | BDT 3.89 crore | 29 Sep 2021 | Official record |
| Construction of 240m RCC Slab Viaduct as 114m Bridge Approach on Gagar-Bashbaria Road-Gopalpur Madrasha Road at Ch. 114m ( Road ID No: 335515152) under Kotwalipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 11.20 crore | 22 Aug 2021 | Official record |
| Construction of 300m RCC Slab Viaduct as 130m Bridge Approach on Dumuria UP Office-Tungipara H/Q Road at Ch. 55m ( Road ID No: 335913005) under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 13.80 crore | 22 Aug 2021 | Official record |
| Construction of Internal Road and surface Drain at Sector no-04 Part of purbachal new town project Package RDC -04 Lot-01. | Purbachal New Town Project | BDT 14.82 crore | 14 Jul 2021 | Official record |
| Special Repair & Re-Construction of Retaining wall along tank in front of SDE office and South side at Barishal Sub-Division under NHA Khulna Division Khulna during the year of 2020-2021 | Khulna Division | BDT 15.20 lakh | 8 Jul 2021 | Official record |
| Bank Protection work along the Right bank of the Jamuna River from BRE dowel km. 4.720 to km 5.070 equal to 350.00 m at Gobindi in Upazilla: Shaghata Dist. Gaibandha in connection with the project " Protection of Katlamari area at Fulchari Upazilla Gobindi & Holdia area at Shaghata Upazilla from erosion of the Right Bank of Jamuna River in Gaibandha District." under Gaibandha O&M Division BWDB Gaibandha during the year 2020-2021 & 2021-2022. | Gaibandha O&M Division | BDT 23.26 crore | 23 Jun 2021 | Official record |
| Bank Protection work along the Right bank of Jamuna River from BRE km. 96.173 to km 96.373 equal to 200.00 m at Holdia in Upazilla: Shaghata Dist. Gaibandha in connection with the project " Protection of Katlamari area at Fulchari Upazilla Gobindi & Holdia area at Shaghata Upazilla from erosion of the Right Bank of Jamuna River in Gaibandha District." under Gaibandha O&M Division BWDB Gaibandha during the year 2020-2021 & 2021-2022. | Gaibandha O&M Division | BDT 13.49 crore | 21 Jun 2021 | Official record |
| Repair & maintenance of Hygienic wash tiles work door & Thai mosquito net and other related works at 8 no Flat at Banani Officers Quarter under Dhaka O&M Division-2 during the year 2020-21. | Dhaka O&M Division-2 | BDT 10.60 lakh | 10 Jun 2021 | Official record |
| Construction of 4 (Four) storied Upazila Palli Bhaban at TungiparaGopalgonj | Construction | BDT 3.62 crore | 7 Jun 2021 | Official record |
| Installation of 264 nos Rain Water Harvesting at Sadar Indurkani Bhandaria and Nazirpur upazila in Pirojpur district under PSWSC during the FY: 2020-2021. | Office of the Executive Engineer DPHE, Perojpur | BDT 1.11 crore | 20 May 2021 | Official record |
| Construction of Conduit / Water Pass Structure. (Lot-21). | Office of the Project Director, Cumilla-Chandpur-Bramanbaria District Irrigation Area Development Project, BADC, Cumilla. | BDT 12.60 lakh | 21 Apr 2021 | Official record |
| Re-Excavation/Renovation of Small Width Khal/Chara including levelling dressing & turfing at any upazila in Project Area.. (Lot-13). | Office of Component Director, Smallholder Agricultural Competitiveness Project (SACP)-BADC Part | BDT 22.60 lakh | 14 Apr 2021 | Official record |
| Improvement of Approch Road of Bangabandhu Memorial Boat Landing Ramp including RCC Drain at Patgati Unioun under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 77.00 lakh | 11 Apr 2021 | Official record |
| Re-excavation of Ghrinai Korotoa River from km 0.000 to km 35.000 at Saidpur Upazila of Nilphamari District | Syedpur O&M Division | BDT 7.74 crore | 24 Mar 2021 | Official record |
| Land Development Construction of RoadDrainCulvert & Bridge for site & services project at Sadar Upazilla Habiganj District under Sylhet DivisionNational Housing AuthoritySylhet. | Sylhet Division | BDT 7.13 crore | 11 Mar 2021 | Official record |
| Improvement Work of Road & Drain at RK Mission Road and Avay Dash Lane bylane under Ward No. 39. | Office of the Executive Engineer (Zone-5) | BDT 88.70 lakh | 7 Mar 2021 | Official record |
| Bank Protection Work at the Right Bank of Sugandha River from km 1.465 to km 1.765 total 0.300 km to Protect Captain Mohiuddin Jahangir (Dowarika Setu) Bridge from Erosion of the Sugandha River at Babugonj Upazila in Barisal District under Barisal O&M Division BWDB Barisal during the year 2020-21 2021-22 & 2022-23. | Barisal O&M Division | BDT 15.29 crore | 22 Feb 2021 | Official record |
| Painting with repair including patent stone atroof of inspection Banglow & Sub-division office at palashbari Road Sub-Division Compound under Road Division Gaibandha during the year 2020-2021. | Gaibandha Road Division | BDT 17.30 lakh | 14 Feb 2021 | Official record |
| Improvement of Purbo Damuddya U.P Office-Kodalpur G.C (ST.from Khali Rice Mill-Malek Mollah Shop) Road By BC at Ch 1500.00-2790.00m under Damuddya UpazilaDistrict: Shariatpur.(Road ID No: 386254053) | Office of the Executive Engineer, LGED, Shariatpur | BDT 1.13 crore | 2 Feb 2021 | Official record |
| Improvement of Gora Reg.Pry School-Sambukati Kha Ghat Via Rashid Member Bari at Ch 0.00-1260.00m under Damuddya UpazilaDistrict: Shariatpur.(Road ID No: 386255072) | Office of the Executive Engineer, LGED, Shariatpur | BDT 95.10 lakh | 2 Feb 2021 | Official record |
| Development of Bhojeswar Bazar Under Upazila: Naria District: Shariatpur. | Office of the Executive Engineer, LGED, Shariatpur | BDT 1.35 crore | 2 Feb 2021 | Official record |
| Re-excavation of 05 five Nos. Pond of zila parishad at Bhandaria Indurkani Mathbaria upazila & others in Pirojpur district under Water Preservation and Safe water Supply Project through Re-excavation/Maintenance of Ponds/Dighi/Ditches owned by Zilla Parishads during the FY 2020-2021 | Office of the Executive Engineer DPHE, Perojpur | BDT 1.34 crore | 31 Jan 2021 | Official record |
| Re-excavation of 05 five Nos. Pond of zila parishad at Kawkhali Nesarabad upazila & others in Pirojpur district under Water Preservation and Safe water Supply Project through Re-excavation/Maintenance of Ponds/Dighi/Ditches owned by Zilla Parishads during the FY 2020-2021 | Office of the Executive Engineer DPHE, Perojpur | BDT 1.31 crore | 31 Jan 2021 | Official record |
| Re-excavation of Titas River (Lower Titas) From km. 33.150 To km. 40.300=7.150 km at Upazilla Titas in C/W â??Re-excavation of Titas River (Lower Titas) at Titas and Homna Upazilla in Cumilla Districtâ??â?? under Comilla O&M Division BWDB Cumilla during the year 2020-2021 & 2021-2022. | Cumilla O&M Division | BDT 5.33 crore | 21 Jan 2021 | Official record |
| Construction of Boundary wall and Renovation of existing Boundary wall at O & M Circle Barishal under WZPDCL. | Project Director's office of Extension & Augmentation of Power Distribution System Project | BDT 61.60 lakh | 17 Jan 2021 | Official record |
| Pavement repair by Base type-I wearing course at 6th(P) 8th(P) 9th(p) 12th(p) 13th(p) 15th(p) 18th(P) 19th(P) 21th(P) 25th(p) 26th(p) 27th(p) 28th(p) & 29th(P) Km of Gaibandha-Fulchari-Bharatkhali-Shaghata road (Z-5552) Under Gaibandha road division during the year 2020-2021. | Gaibandha Road Division | BDT 15.80 lakh | 5 Jan 2021 | Official record |
| Land Development | Office of the Strengthening Production, Preservation & Distribution of Quality Seed Potato to the Farmers Project | BDT 75.70 lakh | 28 Dec 2020 | Official record |
| Construction of 05- Storied Academic Cum Work Shop Building with 05-Storied Foundation at Joypara Technical School & College at Dohar Upazilla Dhaka District. | Office of the Executive Engineer, EED, Dhaka, District. | BDT 8.65 crore | 6 Dec 2020 | Official record |
| Bridge foundation treatment of Gangniar Char-Ramkrishnapur Bridge at KM 4.650 in C/W Re-excavation of Titas River (Lower Titas) at Titas and Homna Upazilla in Cumilla District under Cumilla O & M Division BWDB Cumilla during the year 2020-21 & 2021-22 | Cumilla O&M Division | BDT 1.78 crore | 24 Nov 2020 | Official record |
| Construction of Kashiganj Primary school | Office of the Upazila Engineer, LGED, Babuganj, Barisal | BDT 88.30 lakh | 18 Nov 2020 | Official record |
| Construction of Dakkhin Vabanipur Primary school | Office of the Upazila Engineer, LGED, Babuganj, Barisal | BDT 1.11 crore | 18 Nov 2020 | Official record |
| Construction of Middle Kismat Chandpasha Primary school | Office of the Upazila Engineer, LGED, Babuganj, Barisal | BDT 1.01 crore | 18 Nov 2020 | Official record |
| Construction with vertical Extension of Rajguru Natun char and Rajkor primary school | Office of the Upazila Engineer, LGED, Babuganj, Barisal | BDT 90.30 lakh | 18 Nov 2020 | Official record |
| Earth work at 1st (p) km to 15th (p) km of Shaghata-Barokona-Jumarbari-Sonatola Road Z-5036 Under Road division Gaibandha during the year 2020-2021. | Gaibandha Road Division | BDT 8.10 lakh | 8 Nov 2020 | Official record |
| Construction of Darika Primary school | Office of the Upazila Engineer, LGED, Babuganj, Barisal | BDT 79.30 lakh | 29 Oct 2020 | Official record |
| Construction of additional class room BARAI HATI Primary school under PEDP4. | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj | BDT 86.50 lakh | 29 Sep 2020 | Official record |
| Construction of additional class room SINGEPARA Primary school under PEDP4. | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj | BDT 68.50 lakh | 29 Sep 2020 | Official record |
| Construction of Main Gate ( 2 nos) at Shibchor Housing Estate ( Dada bhai 2nd phase) Under National Housing Authority Khulna Division Khulna During the year of 2019-20 | Khulna Division | BDT 6.50 lakh | 17 Sep 2020 | Official record |
| Remaining work of 225.00m Long PC Girder Bridge on Patgati GC to Bashbaria GC Road at Ch. 5014m (Road ID No: 335912002) under Tungipara Upazila Dist: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 4.98 crore | 6 Sep 2020 | Official record |
| (1 Construction of RCC road at Arambag starting from Purabi house to Khakan Biswas House L-14m Wide-2.00m W-06 (2) Construction of RCC road at Amena School Road bylane starting from Amena School Gate to Israfil House L-132m Wide-2.00m W-06 (3) Construction of RCC road at Amena School Road bylane starting from Amena School Road to Rakib House L-60m Wide-2.00m W-06 (4) Construction of RCC road & M. Drain at Amena School Road bylane starting from Amena School Road to Tapos House L-57m Wide-2.00m W-06 (5) Construction of RCC road at Arambag (Bypass Connecting Road) bylane starting from Bypass Connecting Road to Jabber House L-105m W-06 (6) Construction of RCC road at East Arambag (Santibag) bylane starting from Santibag Road to Alom House L-90m W-06 (7) Construction of RCC road at Arambag Shamol Podder House to Monir Decotor House L-95m W-06 (8) Construction of RCC road at Arambag starting Bairagi Khal to Sujan Bala House L-67m Wide-2.00m W-06 | PIU Office of Gopalganj Pourashava, Gopalganj | BDT 43.50 lakh | 3 Sep 2020 | Official record |
| Re-exacavation of Charabunia & Arua Khal Total = 2.525 km in Polder No-43/1A under | Barguna O&M Division | BDT 51.20 lakh | 31 Aug 2020 | Official record |
| Temporary Protective work to protect Sorikol Bazar and adjacent area from km 0.288 to km 0.346 equal to 0.058 kmkm 0.388 to km 0.435 equal to 0.047 km & km 0.453 to km 0.470 equal to 0.017 km Total 0.122 km from erosion of the Agarpur Cannel in Gournadi Upazilla Dist. Barishal under Non-Development Revenue Budget under Barishal O&M Division BWDB Barishal during the year 2019-2020. | Barisal O&M Division | BDT 35.70 lakh | 20 May 2020 | Official record |
| Re-Excavation/Renovation of Small Width Khal/Chara including levelling dressing & turfing at any upazila in Project Area. (Lot-09). | Office of Component Director, Smallholder Agricultural Competitiveness Project (SACP)-BADC Part | BDT 23.80 lakh | 16 Mar 2020 | Official record |
| Construction of 22.00 m long RCC Girder Bridge on Road No. 10 Baitul Aman Housing over Ramchandrapur Khal at chainage 2410 M Mohammadpur Dhaka Bridge No 01 | Office of the SE, Drainage (R&D) Circle, Dhaka WASA | BDT 2.37 crore | 8 Mar 2020 | Official record |
| MAD- 13 CONSTRUCTION OF 4-STORIED ACADEMIC BUILDING WITH 4-STORIED FOUNDATION IN/C SANITARY WATER SUPPLY & ELECTRIFICATION WORKS AT JAHAPUR DHAKIL MADRASHA CoE-A AT BABUGONJ UPAZILA BARISAL DISTRICT. | Office of the Executive Engineer, EED, Barisal Zone. | BDT 3.08 crore | 25 Feb 2020 | Official record |
| Construction of additional class room BONNYA BARI GPS under PEDP4. and Construction of additional class room GAJALAA RAG PRY SCHOOL under PEDP4. | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj | BDT 90.50 lakh | 25 Feb 2020 | Official record |
| Repair & Construction of Retaining wall along Tank side in front of SDEs office & Garrage at Barishal under NHA Khulna Division Khulna During the year 2019-2020. | Khulna Division | BDT 35.40 lakh | 20 Feb 2020 | Official record |
| Earth work 26th(p) 27th(p) 28th(p) 29th(p) 30th(p) 31th(p) 32th(p) 33th(p) 34th(p) 37th(p) 38th(p) 39th(p) 40th(p) 41th(p) 42th(p) 43th(p) and 44th(p) Km of Gaibandha-Sundargonj-Pirgacha(Kadamtali)Road (Z-5613) under Road Division Gaibandha during the year 2019-2020. | Gaibandha Road Division | BDT 9.00 lakh | 18 Feb 2020 | Official record |
| Construction of 11.00m Long RCC Girder Bridge on Nobab Member House - Safi Dubi Bridge via Ramrampur GPS at Road at ch. 1532 m ID No-509914035 | Office of the Executive Engineer, LGED, Bhola | BDT 91.10 lakh | 17 Feb 2020 | Official record |
| Further Extension of Nurses Training Institute at Mitford Dhaka. | Health Engineering Department (HED) Head Office | BDT 3.15 crore | 30 Jan 2020 | Official record |
| A) Constuction of WASH Block with anciliary facilities at Panchori Eco Resort Chunarughat Habiganj (Part-A: Civil Works) Constuction of WASH Block with anciliary facilities at Panchori Eco Resort Chunarughat Habiganj (Part-B: Sanitary & Water Supply Works) and Constuction of WASH Block with anciliary facilities at Panchori Eco Resort Chunarughat Habiganj (Part-C: Electrical Works) (B) Construction of Shed and Sitting brench and HBB walkway at Panchori Eco Resort Shankhola Chunarughat Habiganj | Local Government Engineering Department | BDT 32.20 lakh | 30 Jan 2020 | Official record |
| Construction of Boundary wall at Divisional Forest Office Bhola | Bhola Cosatal Forest Division | BDT 9.00 lakh | 21 Jan 2020 | Official record |
| RCC palasiding work at 22th (p) km of Madanpur-Dirai-Sullah road (Z-2807) under road division Sunamganj during the year 2019-2020. | Sunamganj Road Division | BDT 22.50 lakh | 20 Jan 2020 | Official record |
| Construction of four storied academic building with 4-storied foundation in/c Sanitary Water supply & Electrification works at Shayestaganj Kamil Madrasha Sadar Habiganj. | Office of the Executive Engineer, EED, MouloviBazar Zone. | BDT 3.21 crore | 22 Dec 2019 | Official record |
| Construction of RCC WASH Block(MT+Boys and FT+Girls) including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc.) under Need Based Infrastructure Development od Newly Nationalized Government Primary Schools (1st Phase)(NBIDNNGPS-1) | Office of the Executive Engineer DPHE, Sylhet | BDT 96.60 lakh | 18 Dec 2019 | Official record |
| Construction of four storied academic building with 4-storied foundation in/c Sanitary Water supply & Electrification works at Adampur Gauchia Sunnia Dakhil Madrasha Chunarughat Habiganj. | Office of the Executive Engineer, EED, MouloviBazar Zone. | BDT 3.21 crore | 21 Nov 2019 | Official record |
| Construction of 7 Nos RCC WASH Block (MT+Boys and FT+Girls) at Nabiganj Upazila in Habiganj District | Office of the Executive Engineer DPHE, Habiganj | BDT 1.12 crore | 23 Oct 2019 | Official record |
| Re-excavation of 2.00 K.M. Khal (Lot-03) | Executive Engineer(S&W), BADC, Barishal Region, Barishal | BDT 18.00 lakh | 10 Oct 2019 | Official record |
| Construction of Remaining Internal Road and Surface Drain (Package No-RDC-10 Lot-03) at Sector No-10 of Purbachal New Town Project. | Office of the Chief Engineer (Implementation) | BDT 2.53 crore | 1 Oct 2019 | Official record |
| (a)Maintenance work by CC of Court mosque road by lane starting from Court Mosque road to Suren Boddoy house.ward -07 under Gopalganj Pourahsva (ch.00-255.0m) (ID 8100-08-00139) (b) Maintenance work of BC road starting from Education Engineering Department Office to BADC Godown under Gopalganj Pourashava. (c) Maintenance work of Udayon Road bylane by BC starting from Udayon road up to Public Hall road under Gopalganj Pourashava. (d) Maintenance work of Court Mosque bylane Road Side Drain starting from Court Mosque Gate to Science Laboratory road. (e) Maintenance & Replacement of Door & window at Gopalganj Pourashava Office Building under Gopalganj Pourashava(Ground floor) | PIU Office of Gopalganj Pourashava, Gopalganj | BDT 58.20 lakh | 30 Sep 2019 | Official record |
| Construction of 6-storied Academic Building with 6-storied foundation in/c Sanitary Water supply & Internal Electrification works at Police Line High School Adarsha Sadar Cumilla | Office of the Executive Engineer, EED, Comilla Zone. | BDT 4.78 crore | 18 Sep 2019 | Official record |
| Re-excavation of Bhubonesher River from Km. 3.000 to Km. 5.000 = 2.000 Km in connection with the project | Perojpur O&M Division | BDT 1.78 crore | 1 Sep 2019 | Official record |
| Re-excavation of Bhubonesher River from Km. 5.000 to Km. 6.500 = 1.500 Km. in connection with the project | Perojpur O&M Division | BDT 1.53 crore | 1 Sep 2019 | Official record |
| Renovation of Conference room at Gaibandha Road Division under Road Division Gaibandha during the year 2018-2019. | Gaibandha Road Division | BDT 13.70 lakh | 16 Jun 2019 | Official record |
| Beautification of North Lake Within Bangladesh National Zoo. | Bangladesh National Zoo | BDT 54.00 lakh | 12 Jun 2019 | Official record |
| Strengthening of Existing Pavement DBS Wearing Course and Construction of Rigid Pavement earth works at Ch 17+600 to 29+000 (Bharadoba-Ghatail) of Bharadoba - Sagordighi - Ghatail - Bhuapur Road (Z-3037) under Tangail Road Division during the Year 2018-2019 (WP-18) | Mymensingh Zone | BDT 25.51 crore | 10 Jun 2019 | Official record |
| Widening Strengthening of Existing Pavement DBS Wearing Course & Earth work at Ch:( 8+000 to 23+000) of Porabari (Ghatail) - Shaliajani - Gopalpur - Jagannathganj (Sharisabari) Road (Z-4017) Under Tangail Road Division during the Year 2018-2019 (WP-20) | Mymensingh Zone | BDT 23.66 crore | 10 Jun 2019 | Official record |
| 1) Re-Excavation of Arashan Beel Union-Mokrompur Upazila: Baniachong( Package No.HFMLIP/Habi/18-19/EW-401) 2) Re-Excavation of Andaura Beel Union-Shubitpur Upazila: Baniachong( Package No.HFMLIP/Habi/18-19/EW-417) 3) Re-Excavation of Bagha Beel Union-Koilkarkandi Upazila: Baniachong( Package No.HFMLIP/Habi/18-19/EW-420) 4) Re-Excavation of Chandaur Beel Connecting Khal at Ch.00-900m Union-Pukra Upazila: Baniachong ( Package No.HFMLIP/Habi/18-19/EW-482) | Office of the Executive Engineer, LGED, Habiganj | BDT 82.50 lakh | 10 Jun 2019 | Official record |
| 1) Re-Excavation of Silarag Group Fishery Beel Union-Kakailsheo Upazila: Azmiriganj ( Package No.HFMLIP/Habi/18-19/EW-428) 2) Re-Excavation of Shukri Barir Khal Beel Union-Sadar Upazila: Azmiriganj ( Package No.HFMLIP/Habi/18-19/EW-409) | Office of the Executive Engineer, LGED, Habiganj | BDT 47.20 lakh | 10 Jun 2019 | Official record |
| 1) Re-Excavation of Morabatial-Longiapul Beel Connecting Khal at Ch.00-3500m Union-Gopua Upazila: Sadar ( Package No.HFMLIP/Habi/18-19/EW-483) 2) Re-Excavation of Anwarpur-Jalalabad Beel Connecting Khal at Ch.00-1700m Union-Richi Upazila: Sadar ( Package No.HFMLIP/Habi/18-19/EW-484) | Office of the Executive Engineer, LGED, Habiganj | BDT 89.80 lakh | 10 Jun 2019 | Official record |
| Improvement of Srerampur UPC (Labukhali Boga RHD)-Gabtali Bazar Road via LAM United Mohila College & High School including Structure (Ch. 500m-2120m) ( Road ID NO. 578963003) ( Dumki) (Salvage Cost BDT-1660215.00) | Office of the Executive Engineer, LGED, Patuakhali | BDT 1.55 crore | 9 May 2019 | Official record |
| Temporary Protective work with Sand-cement-Gunny Bags along the Right Bank of Nitai River from KM 2.405 to KM 2.455=0.050 KM in c/w Nitai River sub-project in Upzila-Dhobaura District-Mymensingh under Mymensingh O&M DivisionBWDB Mymensingh during the FY2018-19. | Mymensingh O&M Division | BDT 13.50 lakh | 28 Apr 2019 | Official record |
| Vertical Extension Work of Existing Academic Building at Kamrunnesa Govt Girls High School Under Sutrapur Thana Dhaka. | Office of the Executive Engineer, Dhaka Zone. | BDT 2.36 crore | 24 Apr 2019 | Official record |
| Muktijuddha Memorial at Muksudpur Upazila District Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 10.80 lakh | 25 Mar 2019 | Official record |
| Construction of 4-Storied Academic Building with 4-Storied Foundation in/c. Sanitary Water Supply & Electrification Works (Category-06(Saline Area-Co-Education)) at Janardanpur High School Mirsharai Chattogram. | Office of the Executive Engineer, Chittagong Zone. | BDT 2.73 crore | 21 Mar 2019 | Official record |
| River Bank erosion protection using Bamboo Bandaling structures in the Sandha River at / near downstream of the Duarika Bridge under the package RRI/HR/Ba-2 Babugonj Barisal during the year 2017-18 to 2020-21. | Office of the Project Director, G.R. Building, RRI, Faridpur | BDT 88.30 lakh | 19 Mar 2019 | Official record |
| Re-Construction of Char Kheor Union Health & Family Welfare Center at Sadar Upazila in Munsigonj District. | HED, Dhaka Division, Dhaka | BDT 1.44 crore | 14 Mar 2019 | Official record |
| Construction of Door window C.I. Sheet of Labour Shed-3 & Barbed wire of Boundary wall at Shaplapara Stack Yard and Painting of Boundary wall at Polashbari Stack Yard of Road Division Gaibandha during the year 2018-2019. | Gaibandha Road Division | BDT 13.80 lakh | 13 Mar 2019 | Official record |
| Construction of District Jail. Sub-Head Construction of Day time latrine for male prisoners and construction of Day time bathroom . | Khulna PWD Division-2 | BDT 3.38 crore | 3 Mar 2019 | Official record |
| Re-excavation of Baramtala Khal from km. 0.000 to km. 3.600 = 3.600km in c/w | Narsingdi O&M Division | BDT 65.60 lakh | 28 Feb 2019 | Official record |
| Re-excavation of Purepure-Dargabeel khal from km 0.000 to km 2.000 = 2.00km in conection with | Narsingdi O&M Division | BDT 36.00 lakh | 17 Feb 2019 | Official record |
| Re-Excavation of Chardigholdi Khal from Km 0.000 to Km. 3.100 = 3.100 km i/c with | Narsingdi O&M Division | BDT 23.20 lakh | 17 Feb 2019 | Official record |
| Re-Excavation of Kandail Khal from Km 0.000 to Km. 3.000 = 3.00 km i/c with | Narsingdi O&M Division | BDT 72.60 lakh | 17 Feb 2019 | Official record |
| Construction of 6-Storied Academic Building with 6-Storied Foundation including Sanitary Water Supply & Internal Electrification Work at Mitali Biddapith under Wari Thana Dhaka. | Office of the Executive Engineer, Dhaka Zone. | BDT 4.00 crore | 14 Feb 2019 | Official record |
| Water Preservation and Safe Water Supply Through Re-Excavation/ Maintenance of 07 (Seven) Nos Cumilla Zila Parishad Owned Ponds/Dighi/ Ditches Situated in Cumilla Adarsha Sadar Upazila (1 No) Daudkandi Upazila (3 Nos) and Muradnagar Upazila (3 Nos) of Cumilla district Implemented by DPHE. | Office of the Executive Engineer, DPHE,Comilla | BDT 2.30 crore | 12 Feb 2019 | Official record |
| Water Preservation and Safe Water Supply Through Re-Excavation/ Maintenance of 05 (Five) Nos Cumilla Zila Parishad Owned Ponds/Dighi/ Ditches Situated in Cumilla Sadar South Upazila 1 No Brahmanpara Upazila 1 Nos Debiddar Upazila 2 Nos and Homna Upazila 1 Nos of Cumilla district Implemented by DPHE. | Office of the Executive Engineer, DPHE,Comilla | BDT 1.30 crore | 12 Feb 2019 | Official record |
| Renovation and decoration of 3 nos. Executive Engineers room with one new bathroom and 2 nos. bathroom renovation and other related works at CERS BPDB Tongi Gazipur. | Civil Construction Division-1 | BDT 26.40 lakh | 7 Feb 2019 | Official record |
| Re-excavation of Munshipara Pond from km 0.000 to km 0.055 = 0.055 km in c/w â??Re-excavation of Small River Khal and Water Bodies in 64 Districts (Phase-1)â?� Project in Upazila: Gazipur Sadar District: Gazipur under Narsingdi O&M Division BWDB Narsingdi during the year 2018-2019. | Narsingdi O&M Division | BDT 4.70 lakh | 5 Feb 2019 | Official record |
| Construction of 6-Storied Academic Building with 6-Storied Foundation including Sanitary Water Supply & Internal Electrification Work at Naowab Habibullah Model School & College under Uttara Thana Dhaka. | Office of the Executive Engineer, Dhaka Zone. | BDT 4.40 crore | 31 Jan 2019 | Official record |
| Re-Excavation of Moulvir Khal from Km. 0.00 to Km. 3.00 at Golapgonj Upazila in c/w Re-excavation of small river khal & water bodies in 64 Districts (Phase-1) Project under Sylhet O & M Division BWDB Sylhet during the year 2018-19. | Sylhet O&M Division, BWDB | BDT 85.00 lakh | 23 Jan 2019 | Official record |
| Re-Excavation of Kanai Nadi from km0.00 to km6.00 Total 6.00 km in c/w Re-excavation of small river khal & water bodies in 64 districts (1st Phase) in Upazila- Lakhai District- Habiganj under Habiganj O&M Division BWDB Habiganj during the year 2018-19.(Package N0:- Habiganj-W-07/2018-19) | Habiganj O&M Division | BDT 2.53 crore | 23 Jan 2019 | Official record |
| Re-excavation of Koshagari Khal from km 0.000 to km 0.595; Total 0.595 km in c/w | Narsingdi O&M Division | BDT 7.70 lakh | 22 Jan 2019 | Official record |
| Construction of 6-Storied Academic Building with 6-Storied Foundation including Sanitary Water Supply & Internal Electrification Work at Ramkrishna Mission High School under wari Thana Dhaka. | Office of the Executive Engineer, Dhaka Zone. | BDT 4.45 crore | 21 Jan 2019 | Official record |
| Strengthening of Bank Protection Work from Km 1.425 to Km 1.725=300.00m from erosion of the Meghna River at Ulania Gobindapur area which done by CCTF in mehendigonj Upazilla under Barisal District under Barisal O&M Division BWDB Barisal during the year 2018-2019 | Barisal O&M Division | BDT 15.48 crore | 16 Jan 2019 | Official record |
| Construction of a Two storied Farmers training center over three storied Foundation under the project �¢?? Farmers training at the upazila level for transfer of technology (3rd Phase)�¢?� one at Sharasti Chandpur. | Chandpur pwd division | BDT 86.70 lakh | 13 Jan 2019 | Official record |
| Re-excavation of earthen Khal/Nala/Hilly chhora including dewatering dressing turfing etc. (15000 cum/km) (Lot-06). | Sylhet Division Minor Irrigation Development Project | BDT 17.30 lakh | 31 Dec 2018 | Official record |
| Re-excavation of i. Pramaniker Zola km 0.000 to km. 0.900 900.00 m ii. Mora Atrai km 0.000 to km. 0.600 600.00 m iii. Bhuyanpara Zola km 0.000 to km. 0.400 400.00 m iv. Kathaldangi Khal km 0.000 to km. 1.750 1750.00 m v. Lalchander Zola km 0.000 to km. 0.300 300.00 m vi. Koya Zola km 0.050 to km. 0.550 500.00 m vii. Baker Nodi km 0.000 to km. 2.750 2750.00 m viii. Kamalpur Zola km 0.000 to km. 2.050 2050.00 m ix. Mochikadha Zola km 0.000 to km. 2.000 2000.00 m & x. Kalidha Zola km 0.000 to km. 1.950 1950.00 m Total 13.200 KM in C/W the project Re-excavation of connecting rivers development of irrigation facilities & fish culture project of Gazner beel area under Sujanagar upazila in Pabna District under Bera O & M DivisionBWDB Bera Pabna during the FY- 2018-2019. | Bera O&M Division | BDT 1.90 crore | 24 Dec 2018 | Official record |
| Construction of Medium Size Hydraulic structure (Water control/Storage Structure/ Regulator) (Lot-02). | Sylhet Division Minor Irrigation Development Project | BDT 53.80 lakh | 12 Dec 2018 | Official record |
| Construction of 2 Storied SDEâ??S & SOâ??S Quarters And 2 Storied Xen's Residence Building at Shariatpur BWDB Colony in connection with | Shariatpur O&M Division | BDT 2.86 crore | 4 Dec 2018 | Official record |
| Repair of security post at location-2 3 4 5 7 8 10 and 11 at 0Habiganj Gas Field Habiganj. | Civil Engineering Department | BDT 11.30 lakh | 8 Nov 2018 | Official record |
| Improvement & Construction of 3969 m Roads and Construction of 2159 m Drain (R-3 R-4 R-7 R-12 &D-9) in different locations under Gopalgonj Pourashava | PIU Office of Gopalganj Pourashava, Gopalganj | BDT 6.97 crore | 15 Oct 2018 | Official record |
| Precautionary bank protection work with future strengthening from the erosion of Kirtonkhola river at Charaica from Km 0.400 to Km 0.625= 225.00m at Barishal Sadar upazila Barishal district under Barishal O & M division BWDB Barishal during the year 2018-2019. | Barisal O&M Division | BDT 1.84 crore | 4 Oct 2018 | Official record |
| Precautionary bank protection work with future strengthening from the erosion of Kirtonkhola river at Charkawa from Km 0.00 to Km 0.380=380.00m at Barishal Sadar upazila Barishal district under Barishal O & M division BWDB Barishal during the year 2018-2019. | Barisal O&M Division | BDT 4.89 crore | 4 Oct 2018 | Official record |
| Construction of 1.00 KM (CH-03+700 to 04+700 Km) crop protection earthen embankment with leveling & dressing (Lot-4) | Executive Engineer(S&W), BADC, Barishal Region, Barishal | BDT 36.00 lakh | 4 Oct 2018 | Official record |
| Re-excavation of Char Uttar Khal (3.10KM) | Executive Engineer(S&W), BADC, Barishal Region, Barishal | BDT 26.90 lakh | 4 Oct 2018 | Official record |
| Re-excavation of Islampur Khal (2.60KM) | Executive Engineer(S&W), BADC, Barishal Region, Barishal | BDT 22.30 lakh | 4 Oct 2018 | Official record |
| Re-excavation of Baharer Khal (2.10KM) | Executive Engineer(S&W), BADC, Barishal Region, Barishal | BDT 18.90 lakh | 4 Oct 2018 | Official record |
| Re-excavation of Madraser Khal (1.30KM) | Executive Engineer(S&W), BADC, Barishal Region, Barishal | BDT 9.90 lakh | 4 Oct 2018 | Official record |
| Construction of RCC WASH Block MTBoys and FTGirls at Different Upazila of Gaibandha District under Need Based Insfrastructure Development Primary SchoolsNBIDGPS-1. | Office of the Executive Engineer ,DPHE, Gaibandha | BDT 74.10 lakh | 1 Oct 2018 | Official record |
| Rehabilitation of Duliakhal-Mirpur Road ( Habiganj Sadar Part) at Ch. 00m-7447m under Habiganj Sadar Upazila District : Habiganj Road ID:636442006. | Office of the Executive Engineer, LGED, Habiganj | BDT 5.97 crore | 20 Aug 2018 | Official record |
| Vertical extension of Bhola SP Office (Partial) 2nd Floor over 1st Floor in/c Civil Sanitary and electrification work. | Bhola PWD Division | BDT 34.30 lakh | 11 Jul 2018 | Official record |
| Renovation and maintenance of S & D Division-1 of Office building including 2'*2' mirror polish tiles placement plastering painting bathroom renovation door & window changing at S & D Division-1 BPDB Shashangacha Comilla. | Civil Construction Division-1 | BDT 69.20 lakh | 8 Jul 2018 | Official record |
| Modification of different floor at Head Office Building Kawran Bazar Dhaka | Civil Engineering Department | BDT 30.10 lakh | 28 Jun 2018 | Official record |
| Repair & Maintenance of all underground water supply line of all servant quarter and patent stone parapet plastering of roof slab at Building No-3 & 4 at Paribagh officers BPDB Dhaka. | Civil Construction Division-1 | BDT 6.20 lakh | 26 Jun 2018 | Official record |
| Construction of class room of KACHUARCHAR Government Primary School under NBIDNNGPS project-1 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur | BDT 62.00 lakh | 21 Jun 2018 | Official record |
| Construction of class room of MALONGCHORA Government Primary School under NBIDNNGPS project-1 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur | BDT 33.40 lakh | 21 Jun 2018 | Official record |
| Re-excavation of 7nos Ponds at Habiganj Sadar Bahubal Azmiriganj and Chunarughat Upazilas in Habiganj District under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads | Office of the Executive Engineer DPHE, Habiganj | BDT 2.28 crore | 14 Jun 2018 | Official record |
| Construction of class room of UTTAR HATURIA Government Primary School under NBIDNNGPS project-1 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur | BDT 62.80 lakh | 5 Jun 2018 | Official record |
| Re-excavation of Derelicts Khals/Nalas including Construction of RCC Outlets (8 Nos./km Inner dia-450mm Outer dia-550mm Length-2m*3=6m Thickness-50mm) dewatering turfing and Leveling & Dressing (Lot-27). | Barisal Division Minor Irrigation Development Project | BDT 39.50 lakh | 4 Jun 2018 | Official record |
| Re-excavation of Derelicts Khals/Nalas including Construction of RCC Outlets (8 Nos./km Inner dia-450mm Outer dia-550mm Length-2m*3=6m Thickness-50mm) dewatering turfing and Leveling & Dressing (Lot-30). | Barisal Division Minor Irrigation Development Project | BDT 29.60 lakh | 4 Jun 2018 | Official record |
| Re-excavation of Derelicts Khals/Nalas including Construction of RCC Outlets (8 Nos./km Inner dia-450mm Outer dia-550mm Length-2m*3=6m Thickness-50mm) dewatering turfing and Leveling & Dressing (Lot-31). | Barisal Division Minor Irrigation Development Project | BDT 29.60 lakh | 4 Jun 2018 | Official record |
| Edge breaking repair work at 22nd (P) KM and Saucer drain at 23rd (P) KM of Gaibandha-Sundargonj-Pirgacha (Kadamtoli) Road under road division Gaibandha during the year 2017-2018. | Gaibandha Road Division | BDT 10.00 lakh | 4 Jun 2018 | Official record |
| Construction of C.C. Road from chemical building to back-wash water tank & rising of drain wall in front of back-wash water tank. | Office of the EE, SWTP (maintenance) Division, Dhaka WASA | BDT 6.20 lakh | 3 Jun 2018 | Official record |
| Re-excavation of Tungipara khal from Km 1.180 to Km 1.500 total 0.320m which is from Hospital to Edgah North side boundary wall at Tungipara Pourashova in Tungipara upazila under Gopalganj O&M Division under Non-Development Revenue BudgetNDR during the year 2017-2018. | Gopalganj O&M Division | BDT 22.50 lakh | 3 Jun 2018 | Official record |
| Vertical Extension (2 to 5) of Existing Single Storied Hostel Building in/c. Sanitary Water supply & Electrification work at Chittagong Mohila Polytechnic Institute Halishahar Chittagong. | Office of the Executive Engineer, Chittagong Zone. | BDT 2.86 crore | 31 May 2018 | Official record |
| Carriage & Driving of Pre-cast R.C.C Demarcation Pillar around the Goranchatbari Ponding area under Dhaka O&M Division-2 BWDB Dhaka during the year 2017-2018. | Dhaka O&M Division-2 | BDT 16.60 lakh | 22 May 2018 | Official record |
| (a) Improvement of Bangla Bazar Bridge-Nalmuri Bridge via Younus Gazi road (Ch. 700m-1570m) (b) Construction of 01no 2x4.50mx4.50m Culvert at ch.1187m on the same road under Goshairhat Upazila District:- Shariatpur. [Road ID No. 386365042] | Office of the Executive Engineer, LGED, Shariatpur | BDT 62.90 lakh | 20 May 2018 | Official record |
| Providing and fixing of CCTV system for Campus Security with Electrification Work at Tejgoan Govt. Girls High School under Tejgaon Thana Dhaka. | Office of the Executive Engineer, Dhaka Zone. | BDT 4.80 lakh | 16 May 2018 | Official record |
| Temporary protection of Tower No. 30 of Barisal-Bhola-Bhorhanuddin 230kV Transmission Line | Grid Maintenance Division, Barisal | BDT 33.30 lakh | 16 May 2018 | Official record |
| Construction of 36m Long RCC Girder Bridge on Tulatali-Titirchar Road at Ch. 2850m (Road ID#419884008) under Upazila: Meghna District: Comilla. | Office of the Executive Engineer, LGED, Comilla | BDT 2.69 crore | 10 May 2018 | Official record |
| Construction of class room of MOSHORPOTTY Government Primary School under NBIDNNGPS project-1 | Office of the Upazila Engineer, LGED, Goshairhat, Shariatpur | BDT 60.80 lakh | 10 May 2018 | Official record |
| Emergency construction of a new service road providing earth filling and HBB pavement at 26th(p) and 27th(p) km (Ch:25+820-26+120) of Gobindagonj-Chhatak-Dowarabazar road under road division Sunamganj during the year 2017-2018. | Sunamganj Road Division | BDT 38.90 lakh | 7 May 2018 | Official record |
| Vertical Extension of 2nd & 3rd Floor on Existing Two 02 Storied Academic Building including Sanitary Water Supply & Electrification work at Mitaly Biddapith under Sutrapur Thana Dhaka. | Office of the Executive Engineer, Dhaka Zone. | BDT 77.40 lakh | 26 Apr 2018 | Official record |
| Emergency Maintenance of Assampara Bazar-Amorote Bazar via Manik vander & Saddam bazar Road from Ch. 9332m-13320m [Chunarughat] Road ID: 636262005 | Office of the Executive Engineer, LGED, Habiganj | BDT 70.20 lakh | 18 Apr 2018 | Official record |
| Periodic Maintenance of Sharifabad-Aminpur Sluice Gate in Nizampur Road from Ch. 175m-1516m & 1830m-1890m [Habiganj-S] Road ID: 636444026 | Office of the Executive Engineer, LGED, Habiganj | BDT 24.00 lakh | 18 Apr 2018 | Official record |
| Periodic Maintenance of Shaistaganj Dewandi-Ladia Road from Ch. 2500m-4350m [Habiganj-S] Road ID: 636444040 | Office of the Executive Engineer, LGED, Habiganj | BDT 27.00 lakh | 18 Apr 2018 | Official record |
| Periodic Maintenance of Surabai-Lalchand Road from Ch. 1200m-3160m [Habiganj-S] Road ID: 636444041 | Office of the Executive Engineer, LGED, Habiganj | BDT 41.00 lakh | 18 Apr 2018 | Official record |
| Periodic Maintenance of Lakhai R&H-Chanpur via Lukra Goalnagar Kashipur Road from Ch. 00m-930m [Habiganj-S] Road ID: 636444044 | Office of the Executive Engineer, LGED, Habiganj | BDT 28.10 lakh | 18 Apr 2018 | Official record |
| Periodic Maintenance of Lakhai bazar-Shibpur bazar Road from Ch. 00m-700m [Lakhai] Road ID: 636683005 | Office of the Executive Engineer, LGED, Habiganj | BDT 36.80 lakh | 18 Apr 2018 | Official record |
| Periodic Maintenance of Aushkani-Nilam Bazar-Karimpur Road from Ch. 2000m-3300m [Nabiganj] Road ID: 636773013 | Office of the Executive Engineer, LGED, Habiganj | BDT 16.90 lakh | 18 Apr 2018 | Official record |
| Rehabilitation of 1nos Single vent 2.00m x 2.00m RCC Box Culvert on Baniyachong N/E Up H/Q to Baniyachong S/W Up H/Q Via 5/6 Nobazar Road at Ch. 200m [Baniachong] Road ID: 636113001 | Office of the Executive Engineer, LGED, Habiganj | BDT 8.10 lakh | 18 Apr 2018 | Official record |
| Construction of class room of Pani Para Government Primary school. under Kalia Upazila Narail. | Office of the Upazila Engineer, LGED, Kalia, Narail | BDT 72.30 lakh | 12 Apr 2018 | Official record |
| Maintenance of Debalertek More-Noukaghata GPS via Romar Bari Road from ch: 00-1780m under Shibpur Upazila Dist: Narsingdi. | Office of the Executive Engineer, LGED, Narshingdi | BDT 29.10 lakh | 11 Apr 2018 | Official record |
| Maintenance of Sristigar R&H-Jallara Bazar via Noukaghata Road from ch: 3500-5970m under Shibpur Upazila Dist: Narsingdi. | Office of the Executive Engineer, LGED, Narshingdi | BDT 55.30 lakh | 11 Apr 2018 | Official record |
| Construction of 30.00m RCC Slab Bridge on Rajpat0Silta-Tatulia-Nutgram-Suktagram road at Ch. 2710m under Kasiani Upazila District: Gopalganj (Road ID No: 335434083). | Office of the Executive Engineer, LGED, Gopalganj | BDT 2.55 crore | 11 Apr 2018 | Official record |
| Construction of 24m Long RCC Slab Bridge on Kashipur-Taltali Road at Ch. 10m (Road ID#419883001) (Salvage Tk.=129920/-) under Upazila: Meghna District: Comilla. | Office of the Executive Engineer, LGED, Comilla | BDT 1.99 crore | 10 Apr 2018 | Official record |
| Construction of Upazila Muktijoddha Complex under Kalukhali Upazila of Rajbari District. | Office of the Executive Engineer, LGED, Rajbari | BDT 1.99 crore | 10 Apr 2018 | Official record |
| Construction of 23m Long RCC Girder Bridge on Karikandi - Shabiddi - Majidpur Road at Ch.2900m (Road ID#419894027)under Upazila: Titas District: Comilla. | Office of the Executive Engineer, LGED, Comilla | BDT 1.75 crore | 9 Apr 2018 | Official record |
| Improvement of Boat Landing Ramp on Ulpur Bazar (Infront of Ulpur Union Porishad Complex) under Sadar Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 25.50 lakh | 9 Apr 2018 | Official record |
| Improvement of Boat Landing Ramp on Satpar Kheaghat under Sadar Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 25.80 lakh | 9 Apr 2018 | Official record |
| Improvement of Boat Landing Ramp on Manikhar River Ghat (Infront of Manikhar Bazar) under Sadar Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 25.50 lakh | 9 Apr 2018 | Official record |
| Improvement of Chandradighalia Hat under Sadar Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 33.80 lakh | 9 Apr 2018 | Official record |
| Improvement of Boat Landing Ramp on Modhumoti Bazar Kheaghat under Sadar Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 26.40 lakh | 9 Apr 2018 | Official record |
| Construction for Father of the Nation Bangabandhu Sheikh Mujibur Rahman Mural under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 28.50 lakh | 9 Apr 2018 | Official record |
| a) Maintenance of Kaliganj H/Q-Khalapara Bazar (Mill Gate) Road Via Juguli Road from Ch.963-3403m. b) Construction of 4Nos 0.625mx0.600m culvert at Ch.80 2338 2697 & 3016m on the same road (Road ID: 333343011) under Kaliganj Upazila Gazipur. | Office of the Executive Engineer, LGED, Gazipur | BDT 40.70 lakh | 8 Apr 2018 | Official record |
| Protective work providing Geo-bag dumping bullah palasiding earth filling at damaged approach road of culvert no 16/1 Masukhara at 16th km of Dowarabazar-Sunamganj Road Z-2811 under Sunamganj road division during the year 2017-2018. | Sunamganj Road Division | BDT 25.60 lakh | 8 Apr 2018 | Official record |
| Supplying fitting and fixing glazed tiles (1st & 2nd floor with stair) of Annex Building under North Eastern Measurement Division BWDB 72 Green Road Dhaka financial year 2017-2018. | North Eastern Measurement Division | BDT 9.90 lakh | 4 Apr 2018 | Official record |
| Temporary protective work at Babelakona (Union : Singa Barua) along the left bank of Kornojhora River from km 0.083 to km 0.350 = 267.00 m in Upazila Sreebordi District- Sherpur under Non-Development Budget during the year 2017-18 | Jamalpur O&M Division | BDT 56.70 lakh | 2 Apr 2018 | Official record |
| Re-sectioning of embankment from km. 16.500 to km. 17.100 equal 600m in Doiboggohati Sub-project | Bagerhat O&M Division | BDT 13.80 lakh | 1 Apr 2018 | Official record |
| Repair of pavement by Base Type-II Carpeting & Seal Coat Works at 3rd(P) 6th(P) & 7th(P) Km of Dariapur-Kamarzani Road Under Road Division Gaibandha During the Year 2017-2018. | Gaibandha Road Division | BDT 29.50 lakh | 29 Mar 2018 | Official record |
| Periodic maintenance of Flexible Pavement at 4th(P) 5th(P) 6th(P)7th(P) & 8th(P) Km of Osmani Bimanbandar (Z 2809) Road under Sylhet Road Division Sylhet during the year 2017-2018. | Sylhet Road Division | BDT 13.50 lakh | 28 Mar 2018 | Official record |
| Maintenance of Flexible Pavement with carpeting and seal coat work at 1st Km (P) of Shahi Eidgaon - Kumarpara Road ( R 247) under Road Division Sylhet during the year 2017-2018. | Sylhet Road Division | BDT 9.00 lakh | 28 Mar 2018 | Official record |
| Construction of five storied academic building with five storied foundation including sanitary water supply & electrification works at Agrabad Mohila Degree Collage Double Mooring Chittagong | Office of the Executive Engineer, Chittagong Zone. | BDT 2.71 crore | 21 Mar 2018 | Official record |
| Construction of five storied academic building with five storied foundation including sanitary water supply & electrification works at Home Economics College Halishahar Chittagong | Office of the Executive Engineer, Chittagong Zone. | BDT 2.71 crore | 21 Mar 2018 | Official record |
| Construction of five storied academic building with five storied foundation including sanitary water supply & electrification works at Pahartali University College Pahartali Chittagong | Office of the Executive Engineer, Chittagong Zone. | BDT 2.71 crore | 21 Mar 2018 | Official record |
| Re-exacavation of 7 nos ponds at Sadar and Goshairhat of Shariatpur District under Water Preservcation and safe water supply project through Reexcavation/ Maintenence of ponds/ Dighi/ Ditches of zila parishd during FY 2017-18. | Office of the Executive Engineer , DPHE, Sariatpur | BDT 1.26 crore | 20 Mar 2018 | Official record |
| Repairing & Seal coat work of pavement damaged by flood & heavy rainfall at Ch. 17+200m to 17+300m 17+500m to 17+600m 17+800m to 17+900m 18+000m to 18+500m 23+000m to 24+000m 24+300m to 24+800m & 25+100m to 25+350m of Dohar - Kartikpur - Balirtek Road (Z-8209) under Manikganj Road Division during the year 2017-2018. | Manikganj Road Division | BDT 22.40 lakh | 20 Mar 2018 | Official record |
| Periodic Maintenance of Kaneswar Bazar road from Ch. 00m-420m under Damuddya Upazila District Shariatpur [Road ID No. 386252002]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 14.20 lakh | 19 Mar 2018 | Official record |
| Periodic Maintenance of Bhojeswar (Anakhanda)-Kanchanpara road from Ch. 00m-2075m under Naria Upazila District Shariatpur [Road ID No. 386653011]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 57.40 lakh | 19 Mar 2018 | Official record |
| Periodic Maintenance of Nalmuri UP-Tulatala via Dokhin Idulpur Adrasha Bazar road from Ch. 00m-1770m under Goshairhat Upazila District Shariatpur [Road ID No. 386363006]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 62.80 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Uttar Damuddya-Bhedargonj border via Amin Bazar road from Ch. 1305m-1601m under Damuddya Upazila District Shariatpur [Road ID No. 386253002]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 21.20 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Pom More-Atong via Chaygaon UP Office road from Ch. 2860m-4020m under Bhedargonj Upazila District Shariatpur [Road ID No. 386143001]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 82.10 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Pom More-Atong via Chaygaon UP Office road from Ch. 4020m-4865m under Bhedargonj Upazila District Shariatpur [Road ID No. 386143001]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 44.70 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Shariatpur (UPHQ)- Burirhat via Kanar Bazar road (Town bi-Pass road) Road from Ch. 7900m-8500m under Shariatpur-S Upazila District Shariatpur [Road ID No. 386692008]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 51.70 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Shariatpur (UPHQ)- Burirhat via Kanar Bazar road (Town bi-Pass road) Road from Ch. 8500m-9350m under Shariatpur-S Upazila District Shariatpur [Road ID No. 386692008]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 64.80 lakh | 19 Mar 2018 | Official record |
| Widening of Shariatpur (UPHQ)- Burirhat via Kanar Bazar road (Town bi-Pass road) Road from Ch. 4846m-6000m under Shariatpur-S Upazila District Shariatpur [Road ID No. 386692008]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 44.80 lakh | 19 Mar 2018 | Official record |
| Widening of Shariatpur (UPHQ)- Burirhat via Kanar Bazar road (Town bi-Pass road) Road from Ch. 6000m-7900m under Shariatpur-S Upazila District Shariatpur [Road ID No. 386692008]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 72.80 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Bilashpur GC-Janjira via Budirhat road from Ch. 2840m-5960m under Janjira Upazila District Shariatpur [Road ID No. 386943012]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 84.00 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Uttar Damuddya-Bhedargonj border via Amin Bazar road from Ch. 715m-1305m under Damuddya Upazila District Shariatpur [Road ID No. 386253002]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 73.10 lakh | 19 Mar 2018 | Official record |
| Rehabilitation of Pom More-Atong via Chaygaon UP Office road from Ch. 00m-1625m & 2186m-2640m under Bhedargonj Upazila District Shariatpur [Road ID No. 386143001]. | Office of the Executive Engineer, LGED, Shariatpur | BDT 84.30 lakh | 19 Mar 2018 | Official record |
| Construction of CHANDANKAR Primary School under NBIDNNGPS Project-1 of Sadar Upazila District Shariatpur. | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur | BDT 62.70 lakh | 18 Mar 2018 | Official record |
| Construction of GURIPARA Primary School under NBIDNNGPS Project-1 of Sadar Upazila District Shariatpur. | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur | BDT 64.80 lakh | 18 Mar 2018 | Official record |
| Construction of KHAERCHAR Primary School under NBIDNNGPS Project-1 of Sadar Upazila District Shariatpur. | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur | BDT 64.30 lakh | 18 Mar 2018 | Official record |
| Construction of SOUTH CHAR MUNSHI KANDI Primary School under NBIDNNGPS Project-1 of Sadar Upazila District Shariatpur. | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur | BDT 65.70 lakh | 18 Mar 2018 | Official record |
| Construction of class room BAKAINAGAR Government Primary School under NBIDNNGPS Project-1 of Sadar Upazila District Shariatpur. | Office of the Upazila Engineer, LGED, Shariatpur Sadar, Shariatpur | BDT 63.00 lakh | 18 Mar 2018 | Official record |
| Construction of 20.87m Long X 6.00m Wide RCC Ghat (Landing Ramp) at Damuddya River near of 3No. Parchim Damuddya GPS under Damuddya Upazila Dist-Shariatpur. | Office of the Executive Engineer, LGED, Shariatpur | BDT 27.80 lakh | 13 Mar 2018 | Official record |
| Pavement Repairing of Carpeting & Seal Coat work at LRP 108 (p) 109 (p) & 110 (p) of Dhaka(Katchpur)- Bhairab-Jagadishpur-Shaistagonj-Sylhet-Tamabil-Jaflong Road (N2) under Road Division Habiganj during the year 2017-2018. | Habiganj Road Division | BDT 16.30 lakh | 8 Mar 2018 | Official record |
| Pavement Repairing of Carpeting & Seal Coat work at LRP 111 (p) 112 (p) 113 (p) 114 (p) 115 (p) 116 (p) & LRP 128 (p) of Dhaka(Katchpur)- Bhairab-Jagadishpur-Shaistagonj-Sylhet-Tamabil-Jaflong Road (N2) under Road Division Habiganj during the year 2017-2018. | Habiganj Road Division | BDT 18.00 lakh | 8 Mar 2018 | Official record |
| Repairing Pavement with Carpeting & Seal Coat work at LRP 128 (p) to LRP 129 (p) of Dhaka(Katchpur)- Bhairab-Jagadishpur-Shaistagonj-Sylhet-Tamabil-Jaflong Road (N2) under Road Division Habiganj during the year 2017-2018. | Habiganj Road Division | BDT 18.00 lakh | 8 Mar 2018 | Official record |
| Renovation of Chairman Banglow open yard and infornt of road at Hatirpool BPDB Dhaka. | Civil Construction Division-1 | BDT 26.90 lakh | 5 Mar 2018 | Official record |
| Construction of Class Room of Charmasua Government Primary School Under NBIDGPS Project-1Matlab UttarChandpur. | Office of the Upazila Engineer, LGED, Matlab(N), Chandpur | BDT 72.30 lakh | 5 Mar 2018 | Official record |
| Construction of Retard embankment along the Right bank of Surma River from km 5.218 to km 5.278 =60m km 5.788 to km 6.118=330m Total = 390m at Bangouripur under NDR budget in Upazila- Kanaighat Dist-Sylhet during the year 2017-18. | Sylhet O&M Division, BWDB | BDT 29.10 lakh | 26 Feb 2018 | Official record |
| Maintenance of Mulfatgonj-Fatejongapur UP-R&H road ch. 00-4650.00m [Road ID No. 386653002] under Naria Upazila District-Shariatpur. | Office of the Executive Engineer, LGED, Shariatpur | BDT 70.50 lakh | 25 Feb 2018 | Official record |
| Maintenance of Dasherjungle GC-Dhanu Sikder hat via Kuchaipotty road ch. 00-6000.00m [Road ID No. 386362009] under Goshairhat Upazila District-Shariatpur. | Office of the Executive Engineer, LGED, Shariatpur | BDT 25.10 lakh | 25 Feb 2018 | Official record |
| Maintenance of Chhoto Gopalpur-Fazal Dewan Hat road ch. 00-2085.00m [Road ID No. 386943006] under Janjira Upazila District-Shariatpur. | Office of the Executive Engineer, LGED, Shariatpur | BDT 35.40 lakh | 25 Feb 2018 | Official record |
| Periodic Maintenance (Re-Seal) of Shambari Bridge-Raitala High School Road at (Ch.00-2050m) Under Kasba Upazila Dist : Brahmanbaria Road ID : 412634007 | Office of the Executive Engineer, LGED, Brahmanbaria | BDT 42.30 lakh | 25 Feb 2018 | Official record |
| RIDPCBC/B-M144 Periodic Maintenance Reseal of Bijeshwar khandakar para Banian Tree -Panchimpara Titas River road Pashecimpara Titas River Road at Ch.00-1050m Under Brahmanbaria Sadar UpazilaDist.Brahmanbaria Road ID 412135206 | Office of the Executive Engineer, LGED, Brahmanbaria | BDT 19.50 lakh | 25 Feb 2018 | Official record |
| Repair of Potholes Carpeting (partly) Widening of Flexible Pavement (Partly) and HBB (Partly) including Seal coat at Niorpul point (LRP Ch. 229+990) to Chalibandar point ( LRP Ch.229.893) of Dhaka(Katchpur)-Bhairab-Jagadishpur-Shaistagonj-Sylhet-Tamabil-Jaflong Road (Sylhet - Jaflong portion) (N-2) under Sylhet Road Division Sylhet during the year 2017-2018. | Sylhet Road Division | BDT 10.80 lakh | 22 Feb 2018 | Official record |
| Repair of Potholes Carpeting (partly) including Seal coat at Niorpul point (LRP Ch. 229.893) to Subhanighat point (LRP Ch.229.599 ) of Dhaka(Katchpur)-Bhairab-Jagadishpur-Shaistagonj-Sylhet-Tamabil-Jaflong Road (Sylhet - Jaflong portion) (N-2) under Sylhet Road Division Sylhet during the year 2017-2018. | Sylhet Road Division | BDT 10.10 lakh | 22 Feb 2018 | Official record |
| Repairing the existing damaged pavement at 27th (p) 28th(p) and 29th (p) km of Sylhet- Golapganj- Charkhai- Zakiganj road R-250 under Sylhet Road Division during the year 2017-2018. | Sylhet Road Division | BDT 15.30 lakh | 22 Feb 2018 | Official record |
| Repairing the existing damaged pavement at 21st (p) 24th(p) and 25th (p) km of Sylhet- Golapganj- Charkhai- Zakiganj road R-250 under Sylhet Road Division during the year 2017-2018. | Sylhet Road Division | BDT 15.20 lakh | 22 Feb 2018 | Official record |
| Construction of RCC Boat landing Ramp on Dumuria Malopara Ghat under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 10.80 lakh | 20 Feb 2018 | Official record |
| Construction of RCC Boat landing Ramp on Dariarkul Ghat under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 10.80 lakh | 20 Feb 2018 | Official record |
| Construction of RCC Boat landing Ramp on Mitrodanga Ghat under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 10.80 lakh | 20 Feb 2018 | Official record |
| Construction of RCC Boat landing Ramp on Baghiarkul Ghat under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 10.80 lakh | 20 Feb 2018 | Official record |
| Improvement of Barguna Betagi RHD (Moharazer Poo)-Betagi Badnikhali UZR Via Jhilbunia GPS by BC from Ch. 00m-2000m under Betagi Upazila District: Barguna including structure [Road ID- 504474141] (Salvage Cost Tk. 2705258.00) | Office of the Executive Engineer, LGED, Barguna | BDT 1.30 crore | 11 Feb 2018 | Official record |
| Improvement by BC on 37 No. Primary School - Baykandi UZR road at Ch:0.00-970.00m under Damudya Upazila District-Shariatpur. [Road ID No - 386255046] | Office of the Executive Engineer, LGED, Shariatpur | BDT 50.60 lakh | 8 Feb 2018 | Official record |
| Improvement by BC on Naria-Bilishpur to Jankhar Kandi new village road at ch: 00.00-1300.00m under Janjira Upazila Dist-Shariatpur. [Road ID No.386944035] | Office of the Executive Engineer, LGED, Shariatpur | BDT 72.50 lakh | 8 Feb 2018 | Official record |
| Construction of 12.00m Long RCC Girder Bridge on Bangobandhu College-Rupbabur Hat via M. Kandi road at ch: 1953.00m under Janjira Upazila Dist-Shariatpur. [Road ID No.386944027] | Office of the Executive Engineer, LGED, Shariatpur | BDT 62.40 lakh | 8 Feb 2018 | Official record |
| Improvement by BC on Purbo Damuddya UP office-Kodalpur GC road-Khalil Beparir rice Mill-Malek Mollar Shop via Siddik Maler Bari road at ch:00.00-1530.00m under Damuddya Upazila Dist-Shariatpur [Road ID No.386254053] | Office of the Executive Engineer, LGED, Shariatpur | BDT 84.40 lakh | 8 Feb 2018 | Official record |
| Periodic Maintenance of Kartickpur-Shakhipur vai Charbhaga Road from Ch. 000m - 2350m [Bhedargonj] [Road Code 386143023] [Overlay] | Office of the Executive Engineer, LGED, Shariatpur | BDT 1.06 crore | 8 Feb 2018 | Official record |
| CONSTRUCTION OF 1 STORIED ACADEMIC BUILDING WITH 4 STORIED FOUNDATION AT SOBURUNNESA HIGH SCHOOL KASHIANI GOPALGANJ | Office of the Executive Engineer, Gopalgonj Zone | BDT 63.40 lakh | 7 Feb 2018 | Official record |
| Construction of Boat Landing at Gimadanga Natun Bazar under Tungipara Upazila District: Gopalganj. | Office of the Executive Engineer, LGED, Gopalganj | BDT 28.80 lakh | 7 Feb 2018 | Official record |
| Construction of 12.00m RCC Girder Bridge on Dharabashil-Nayakandi road-Dakhin Machartara GPS road at Ch. 00m under Kotwalipara Upazila District: Gopalganj (Road ID No: 335515239). | Office of the Executive Engineer, LGED, Gopalganj | BDT 70.20 lakh | 7 Feb 2018 | Official record |
| Construction of Administrative Extension Building under Upazila: Zajira District : Shariatpur. | Office of the Upazila Engineer, LGED, Janjira, Shariatpur | BDT 3.30 crore | 5 Feb 2018 | Official record |
| Construction of 26.06m RCC Girder Bridge on Tulatoly Village of Shachib-UP Connecting Road at Ch. 500m (Road ID#419885057) under Upazila: Meghna District: Comilla. | Office of the Executive Engineer, LGED, Comilla | BDT 1.66 crore | 5 Feb 2018 | Official record |
| Improvement by HBB on Khajol Khan House-Naya Bazar road at ch: 00.00-750.00m under Janjira Upazila Dist-Shariatpur. [Road ID No.386945084] | Office of the Executive Engineer, LGED, Shariatpur | BDT 24.20 lakh | 4 Feb 2018 | Official record |
| Improvement of 9200 m Road and Construction of 2386m RCC drain in different places of Gopalganj pourashava in Gopalganj district. | PIU Office of Gopalganj Pourashava, Gopalganj | BDT 9.30 crore | 1 Feb 2018 | Official record |
| CONSTRUCTION OF 1 STORIED ACADEMIC BUILDING WITH 4 STORIED FOUNDATION AT BORKOIR AZHARIA HIGH SCHOOL SADAR GOPALGANJ | Office of the Executive Engineer, Gopalgonj Zone | BDT 63.40 lakh | 31 Jan 2018 | Official record |
| Part-A: Periodic Maintenance of Bridge/Box culvert on Puran Muksudpur Bazar-Fularpar Bazar Road at Ch. 806m [Muksudpur] (Road ID No: 335583002); Part-B: Periodic Maintenance of 2Nos Bridge/Box culvert on Desgarhat R&H (Brick field) Fularpar Bazar via Gobindopur UP Office Road at Ch. 1251m 2462m [Muksudpur] (Road ID No: 335584059) & Part-C: Periodic Maintenance of Bridge/Box culvert on Bahugram-Khagradanga Road at Ch. 400m [Muksudpur] (Road ID No: 335585044) | Office of the Executive Engineer, LGED, Gopalganj | BDT 3.80 lakh | 30 Jan 2018 | Official record |
| Part-A: Periodic Maintenance of 2Nos Bridge/Box culvert on Bonogram GC-Dignanar RHD via Bhaghadia â??Baraihat Road at Ch. 744m 2875m [Muksudpur] (Road ID No: 335582009) ; Part-B: Periodic Maintenance of Bridge/Box culvert Dignagar R&H-Vajandi Bazar via Dignagar UP Office Road at Ch. 2200m [Muksudpur] (Road ID No: 335583007) & Part-C: Periodic Maintenance of 02 Nos Bridge/Box culvert on Jalirpar UP Office-Mochna hat â??Nowhata (UZR Bridge) via Nanikhir UP Office Road at Ch. 7539m & 8708m [Muksudpur] (Road ID No: 335583013) | Office of the Executive Engineer, LGED, Gopalganj | BDT 4.70 lakh | 30 Jan 2018 | Official record |
| Construction of 12.00m RCC Girder Bridge on Hashua bazar-Johorerkandi sunil boddo house via kobor bari road at Ch. 00m under Kotwalipara Upazila District: Gopalganj (Road ID No: 335514048). | Office of the Executive Engineer, LGED, Gopalganj | BDT 70.00 lakh | 30 Jan 2018 | Official record |
| Re-excavation of Damudya- Burirhat khal from KM 3.000 to KM 6.750 = 3.750 KM & Tulatala khal from KM 0.000 to KM 4.500 = 4.500 KM at upazilla- Shariatpur Sadar of District-Shariatpur Total Length = 8.250 KM in connection with | Shariatpur O&M Division | BDT 1.70 crore | 30 Jan 2018 | Official record |
| Re-excavation of Norobalakhana Khal from KM 0.000 to KM 1.950 = 1.950 KM at upazilla-Shariatpur Sadar and Gariber Char Bazar khal from KM 0.000 to KM 2.520 = 2.520 KM at upazilla- Goshirhat of District Shariatpur Total Length = 4.470 KM in connection with | Shariatpur O&M Division | BDT 1.01 crore | 30 Jan 2018 | Official record |
| Re-excavation of Islampur khal from KM 0.000 to KM 1.500 = 1.500 KM Keurvanga to Islampur Khal from KM 0.000 to KM 4.000 = 4.000 KM at upazilla- Damudya & DM Khali-Mora Padma khal from KM 0.000 to KM 3.630 = 3.630 at upazilla- Vederganj of District-Shariatpur Total Length = 9.130 KM in connection with | Shariatpur O&M Division | BDT 1.38 crore | 30 Jan 2018 | Official record |
| Periodic Maintenance of Ganganagar GC-Dumshar UP Road from Ch. 4000m - 8440m [Shariatpur Sadar] [Road Code: 386693017] [Overlay] | Office of the Executive Engineer, LGED, Shariatpur | BDT 66.50 lakh | 28 Jan 2018 | Official record |
| Periodic Maintenance of Chikandi UP Office - Ganganagar GC via Paschim Atpara Road from Ch. 000m - 3026m [Shariatpur Sadar] [Road Code: 386693023] [Overlay] | Office of the Executive Engineer, LGED, Shariatpur | BDT 46.50 lakh | 28 Jan 2018 | Official record |
| Periodic Maintenance of Bhojeswar GC-Golar Bazar GC Road from Ch. 000m - 3460m [Naria] [Road Code: 386652003] [Overlay] | Office of the Executive Engineer, LGED, Shariatpur | BDT 64.80 lakh | 28 Jan 2018 | Official record |
| Periodic Maintenance of Baniachong GC- Kumri Durgapur GC Via Jonab Ali Collage & Bithangal GC Road Ch. 2000m-4930m [Baniachong] Road ID: 636112002 | Office of the Executive Engineer, LGED, Habiganj | BDT 43.70 lakh | 25 Jan 2018 | Official record |
| Periodic Maintenance of Baniachang GC-Markuli Road (Kadirgonj GC) from Ch. 000m-1749m [Baniachong] Road ID: 636112003 | Office of the Executive Engineer, LGED, Habiganj | BDT 31.00 lakh | 25 Jan 2018 | Official record |
| Periodic Maintenance of Rasulgonj-Raisgoj-Paniumda Road from Ch. 000m-1530m [ Nabiganj] Road ID: 636773003 | Office of the Executive Engineer, LGED, Habiganj | BDT 28.10 lakh | 25 Jan 2018 | Official record |
| Periodic Maintenance of Subkai RHD â??Lawkai Road from Ch. 000m -2096m [Purbadhala] [Road ID: 372835028] | Office of the Executive Engineer, LGED, Netrokona | BDT 29.70 lakh | 23 Jan 2018 | Official record |
| Renovating the boundary wall of office of the Deputy Commissioner Bhola. | Bhola PWD Division | BDT 1.60 lakh | 22 Jan 2018 | Official record |
| Repair Works of entrance road of 800 sft & 1000 sft quarter along Gazipur Road Bhola. | Bhola PWD Division | BDT 1.10 lakh | 22 Jan 2018 | Official record |
| General Repair Works of District Non-gazated dormitory at Bhola. | Bhola PWD Division | BDT 1.80 lakh | 22 Jan 2018 | Official record |
| General Repair Works of District Gazated dormitory bhaban Bhola. | Bhola PWD Division | BDT 1.80 lakh | 22 Jan 2018 | Official record |
| General Repair Works of Deputy Commissioner Bhola Office (Part) including false ceiling of Deputy director (Local Government Branch) | Bhola PWD Division | BDT 2.70 lakh | 22 Jan 2018 | Official record |
| General Repair Works of barrack No-2 with in the compound of Executive Engineer PWD Division Bhola. | Bhola PWD Division | BDT 1.30 lakh | 22 Jan 2018 | Official record |
| Repair Works of 1000 sft quarter along Gazipur road at District Bhola. | Bhola PWD Division | BDT 1.30 lakh | 22 Jan 2018 | Official record |
| Patent Stone works on Roof of District Accounts Office Bhola. | Bhola PWD Division | BDT 2.20 lakh | 22 Jan 2018 | Official record |
| General Repair Works and fittings of Aluminium window in various wards at Sadar Hospital Bhola. | Bhola PWD Division | BDT 3.10 lakh | 22 Jan 2018 | Official record |
| Construction of South Char Masua Govt Primary School Including Furniture Supply Education in Emergency Under Matlab UttarChandpur. | Office of the Upazila Engineer, LGED, Matlab(N), Chandpur | BDT 83.00 lakh | 17 Jan 2018 | Official record |
| Periodic Maintenance of Aushkani-Nilam bazar-Karimpur Road from Ch. 000m-2000m [Nabiganj] Road ID: 636773013 | Office of the Executive Engineer, LGED, Habiganj | BDT 28.10 lakh | 15 Jan 2018 | Official record |
| Improvement of Road from Telerchar GPS -Najamrari Bari - Jahungirnagar UP road (Start ch.1700m) Satter Mirar Bari -Thakur.ID No.506035103 RDPP ID No.506034109(From Ch.0.0m - 550m) | Office of the Executive Engineer, LGED, Barisal | BDT 31.60 lakh | 11 Jan 2018 | Official record |
| Earth filling work in BIRTAN regional office under Sadar Upazila District : Barisal. | Office of the Executive Engineer, LGED, Barisal | BDT 23.40 lakh | 11 Jan 2018 | Official record |
| Periodic Maintenance of Purbo Damuddya UP Office -Gazipur R&H road via Chairman Bari Road from Ch. 000m - 1210m [Damuddya] [Road Code: 386253010] [Overlay] | Office of the Executive Engineer, LGED, Shariatpur | BDT 23.00 lakh | 11 Jan 2018 | Official record |
| Periodic Maintenance of Damudya GC-Mollar hat GC via Goriberchar Road from Ch. 000m -2250m [Damuddya] [Road Code: 386252005] [Re-Seal ] | Office of the Executive Engineer, LGED, Shariatpur | BDT 30.30 lakh | 11 Jan 2018 | Official record |
| Periodic Maintenance of Goriberchar UP Office-Char Jalalpur via Nuton Bazar Road from Ch. 1600m - 3500m [Goshairhat] [Road Code: 386363005] [Overlay] | Office of the Executive Engineer, LGED, Shariatpur | BDT 29.40 lakh | 11 Jan 2018 | Official record |
| Periodic Maintenance of Dasher Jungle-Mollarhat via Kodalpur GC Road from Ch. 7480m - 9610m [Goshairhat] [Road Code: 386362002] [Road Re-hab.] | Office of the Executive Engineer, LGED, Shariatpur | BDT 57.70 lakh | 11 Jan 2018 | Official record |
| Periodic Maintenance of Kasikando-Kodalpur UP Office via Shakkya bazar Road from Ch. 000m - 3550m [Goshairhat] [Road Code: 386363007] [Road Re-hab.] | Office of the Executive Engineer, LGED, Shariatpur | BDT 77.40 lakh | 11 Jan 2018 | Official record |
| Construction of 2 storied kitchen cum Dining and Class room Building including internal sanitary electrical and other ancillary works under the project of Expansion of Physical Facilities of S.M Barrack for Ansar and VDP at Districts & Battalion Head Quarters. | Chandpur pwd division | BDT 1.48 crore | 10 Jan 2018 | Official record |
| Periodic Maintenance of Chandigar UP Office - Baraiund bazar via karankhola Ferry ghat & Fulpor bazar road from Ch. 2900 - 6727m [Durgapur] [Road ID 372183001] | Office of the Executive Engineer, LGED, Netrokona | BDT 92.50 lakh | 10 Jan 2018 | Official record |
| Improvement of Shehaber Hat Singherkati Chandramohon road from Ch. 729m - 1308m.under Sadar UpazilaBarisal . [ID No. 506512003] | Office of the Executive Engineer, LGED, Barisal | BDT 37.90 lakh | 2 Jan 2018 | Official record |
| Improvement of Charkawa Kheyaghat - Durgapur hat road from Ch. 3000m - 3600m.under Sadar Upazila Barisal District. [ ID No. 506513004] | Office of the Executive Engineer, LGED, Barisal | BDT 31.20 lakh | 2 Jan 2018 | Official record |
| Construction of Ahammadpur and Koitola Union Land Office under Sujanagor and Bera Upazila District Pabna | Office of the Executive Engineer, LGED, Pabna | BDT 84.90 lakh | 1 Jan 2018 | Official record |
| Periodic Maintenance of Upazila H/Q (st at Rail station) - Purbadhala GC Road from Ch. 000m -1296m [Purbadhala] [Road ID: 372832001 ] | Office of the Executive Engineer, LGED, Netrokona | BDT 17.60 lakh | 31 Dec 2017 | Official record |
| Periodic Maintenance of Durgapur UP Office - Chaina Bazar More road from Ch.2140m-3500m [Durgapur] [Road ID: 372183003 ] | Office of the Executive Engineer, LGED, Netrokona | BDT 15.60 lakh | 31 Dec 2017 | Official record |
| Periodic Maintenance of Lengura Bazar - Satshaid Gravevard Road from Ch. 000m-1550m [Kalmakanda] [Road ID: 372404015 ] | Office of the Executive Engineer, LGED, Netrokona | BDT 20.40 lakh | 31 Dec 2017 | Official record |
| Periodic Maintenance of Bangla rail Station Bazar - Shingar Bangla UP Office (Ruhi) Road from Ch. 000m-500m. [Netrokona Sadar] [Road ID: 372743005 ] | Office of the Executive Engineer, LGED, Netrokona | BDT 7.10 lakh | 31 Dec 2017 | Official record |
| Periodic Maintenance of Gohalakanda UP (Shamaj GC) - Bainja Bazar road via Kazla Bazar road from Ch. 1300m - 1500m & 2000m-3000m [Purbadhala] [Road ID: 372833004 ] | Office of the Executive Engineer, LGED, Netrokona | BDT 18.60 lakh | 31 Dec 2017 | Official record |
| Periodic Maintenance of Court Bhaban - Purbadhala GC via G.H. School Road from Ch. 000m -725m [Purbadhala] [Road ID: 372834037 ] | Office of the Executive Engineer, LGED, Netrokona | BDT 15.80 lakh | 31 Dec 2017 | Official record |
| Rehabilitation and Periodic Maintenance of a) Faridpur UZ H/Q-Bhangura UZ H/Q Rd. (Via B.L. Bari UP Office (Ch.0+000-1+778 Km) Upazila : Faridpur b) Banwarinagar GCM-Punguli UP Office Rd. (Ch. 0+000-5+075 Km) Upazila : Faridpur District :Pabna. | Office of the Executive Engineer, LGED, Pabna | BDT 1.73 crore | 28 Dec 2017 | Official record |
| CONSTRUCTION OF ACADEMIC BUILDING AT BAZUNIA PONCHOPOLLI BONKOBIHARI HIGH SCHOOL GOPALGANJ SADAR | Office of the Executive Engineer, Gopalgonj Zone | BDT 63.40 lakh | 18 Dec 2017 | Official record |
| Periodic Maintenance of Shibpur Upazila HQ-Jeshor GC Via Chaitanna Road from Ch. 00m-2000m [Shibpur] | Office of the Executive Engineer, LGED, Narshingdi | BDT 37.70 lakh | 17 Dec 2017 | Official record |
| Periodic Maintenance of Shibpur Upazila HQ-Jeshor GC Via Chaitanna Road from Ch. 2000m-4000m [Shibpur] | Office of the Executive Engineer, LGED, Narshingdi | BDT 36.70 lakh | 17 Dec 2017 | Official record |
| Construction of CCTV Monitoring room under the project of | Madaripur PWD Division | BDT 5.50 lakh | 14 Dec 2017 | Official record |
| Damaged pavment repair by sub-base Base type-ll carpeting & Seal Coat works with repair of potholes and protective works at 22nd(P) 23rd(P) 24th(P) & 25th(P) Km of Gaibandha-Gobindagonj Via Nakaihat Road(Z-5554) Under Road Division Gaibandha During the Year 2017-2018. | Gaibandha Road Division | BDT 23.00 lakh | 10 Dec 2017 | Official record |
| Construction/Re-sectioning of Compartmental dyke from km 10.960 to km 15.500 = 4.540 km of Boro Haor in C/W Pre-Monsoon Flood protection and drainage improvement in Haor areas under Sylhet O&M Division BWDB Sylhet in upazila- Kanaighat Dist- Sylhet during the year 2017-2018. | Sylhet O&M Division, BWDB | BDT 1.41 crore | 7 Dec 2017 | Official record |
| Repair Seal Coat works with HBB & RCC U-drain at 4th(P) Km and proctective work at 3rd(P) Km of Dhupni-Belka(Z-5476) Road Under Road Division Gaibandha During the Year 2017-2018. | Gaibandha Road Division | BDT 22.40 lakh | 7 Dec 2017 | Official record |
| Construction of 01(one) storied Habiganj Pouro and Poil Bhumi office Building with 2(two) storied foundation including 117m Boundary wall with fenching and 117m Boundary wall with fenching respectively Habiganj-S Upazila of Habiganj District under Construction of Town and Union Land Office across the country Project. | Office of the Executive Engineer, LGED, Habiganj | BDT 87.10 lakh | 3 Dec 2017 | Official record |
| Re-excavation of Earthen canal/nala /Hilly chorra including pre & post work survey design with dewatering dressing turfing (15000 m3/km). | Sylhet Division Minor Irrigation Development Project | BDT 23.00 lakh | 27 Nov 2017 | Official record |
| Construction of Medium Size Water control /storage structure. | Sylhet Division Minor Irrigation Development Project | BDT 53.70 lakh | 27 Nov 2017 | Official record |
| Construction of 20.00m RCC Bridge on Khanderpar-Palpara road at Ch. 8m under Muksudpur Upazila District: Gopalganj (Road ID No: 335584027). | Office of the Executive Engineer, LGED, Gopalganj | BDT 89.20 lakh | 27 Nov 2017 | Official record |
| Part-A: Improvement of Road by HBB from Kajulia-Madrasha Road (Dhorail) at Ch. 1020-1730m & 3-Vent Box culvert (Road ID No: 335324068). Part-B: Improvement of Road by HBB from Bijoypasha RHD (H/O Idris Bhuyan) at Ch. 00-930m (Road ID No: 335325385). Part-C: Construction of 4.00mx4.00m 2-Vent RCC Box culvert on Bhennabari RHD-Kodambari Road at Ch. 750m (Road ID No: 335322009) under Sadar Upazila District: Gopalganj.. | Office of the Executive Engineer, LGED, Gopalganj | BDT 1.76 crore | 27 Nov 2017 | Official record |
| Re-excavation of derelict Khals/Nalas including pre & Post work survey design (RCC Pipe Outlet Ring Band Dewatering Turfing levlling & Dressing) | Barisal Division Minor Irrigation Development Project | BDT 31.00 lakh | 23 Nov 2017 | Official record |
| Re-excavation of derelict Khals/Nalas including pre & Post work survey design (RCC Pipe Outlet Ring Band Dewatering Turfing levlling & Dressing) | Barisal Division Minor Irrigation Development Project | BDT 31.00 lakh | 23 Nov 2017 | Official record |
| Re-excavation of derelict Khals/Nalas including pre & Post work survey design (RCC Pipe Outlet Ring Band Dewatering Turfing levlling & Dressing) | Barisal Division Minor Irrigation Development Project | BDT 31.00 lakh | 23 Nov 2017 | Official record |
| Re-excavation of derelict Khals/Nalas including pre & Post work survey design (RCC Pipe Outlet Ring Band Dewatering Turfing levlling & Dressing) | Barisal Division Minor Irrigation Development Project | BDT 23.20 lakh | 23 Nov 2017 | Official record |
| Re-excavation of derelict Khals/Nalas including pre & Post work survey design (RCC Pipe Outlet Ring Band Dewatering Turfing levlling & Dressing) | Barisal Division Minor Irrigation Development Project | BDT 23.20 lakh | 23 Nov 2017 | Official record |
| Re-excavation of derelict Khals/Nalas including pre & Post work survey design (RCC Pipe Outlet Ring Band Dewatering Turfing levlling & Dressing) | Barisal Division Minor Irrigation Development Project | BDT 23.20 lakh | 23 Nov 2017 | Official record |
| Part-A: Construction of U-drain on Dharabashail-South Bhennabari road at Ch. 2700m; Part-B: Construction of 2 Nos 1x4.00x4.00m Box culvert on the same road at Ch. 1700m & 4100m; Part-C: Construction 12.00m RCC Girder Bridge on the same road at Ch. 2250m & Part-D: Construction of 15.00m RCC Girder Bridge on the same road at Ch. 1061m under Kotwalipara Upazila District: Gopalganj (Road ID No: 335514011). | Office of the Executive Engineer, LGED, Gopalganj | BDT 1.53 crore | 9 Nov 2017 | Official record |
| Improvement of road from Jamla Bazar-Kalbari Bazar (Gabtali Bazar-Sreerampur Dakatia Khalgora via Talukder Hat) road by BC at Ch.0.00m-1000.00m (ID No-578964135) | Office of the Executive Engineer, LGED, Patuakhali | BDT 52.50 lakh | 8 Nov 2017 | Official record |
| Improvement of road from Board Office Bridge-Gabtoli Bazar via H/O Salam Mridha (West side of Bridge)- Gabtoli Hat via Salampur Fazil Madrasha by BC at CH.0.00m-1000.00m (ID No-578964041) | Office of the Executive Engineer, LGED, Patuakhali | BDT 54.00 lakh | 8 Nov 2017 | Official record |
| Improvement of road from Labukhali Bauphal RHD (Taltali Chowrasta)-Char Boyra High School road by BC at Ch.0.00m-500.00m Including 1 No 1.00 x 1.00m RCC Box Culvert at Ch. 135.00m (ID No-578964047)[Salvage Cost: 349064.00] | Office of the Executive Engineer, LGED, Patuakhali | BDT 31.30 lakh | 8 Nov 2017 | Official record |
| Improvement of road from Atharogachia Mojibor Sikder Bari-Karthikpasha UZR road by BC at Ch.0.00m-1000.00m Including 1 No 4.00m x 4.00m 2 Nos 1.00m x 1.00m RCC Box Culvert at Ch. 536.00m 155.00m & 900.00m (ID No-578964155) | Office of the Executive Engineer, LGED, Patuakhali | BDT 75.60 lakh | 8 Nov 2017 | Official record |
| Improvement of road from Pangasi Noldoani (High School & GPS) - H/O Jennta Ali Gazi Mosque road by BC at Ch.0.00m-1000.00m Including 1 No 1.50m x 1.50m RCC Box Culvert at Ch. 476.00m (ID No-578965071) | Office of the Executive Engineer, LGED, Patuakhali | BDT 55.00 lakh | 8 Nov 2017 | Official record |
| Construction of NURUL HAQUE RNGPS Primary School including Furniture supply. | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj | BDT 65.80 lakh | 6 Nov 2017 | Official record |
| Construction of additional class room for Gazalia Salpabaya Primary Schoolrural including Furniture Suplly. | Office of the Upazila Engineer, LGED, Tungipara, Gopalganj | BDT 53.60 lakh | 6 Nov 2017 | Official record |
| (a) Improvement of Ikree UP - Bhogiratpur bazar road (Ch.2500-3100m) ID. No.579143006 (b) Construction of 02 Nos 2.0mx2.0m Culvert at Ch.2588m & 2925m on the same road. (c) Construction of 01 Nos 1.30mx1.30m Culvert at Ch.2850m on the same road. | Office of the Executive Engineer, LGED, Pirojpur | BDT 29.30 lakh | 17 Oct 2017 | Official record |
| (a)Improvement of Balipara UP-Jamaddarhat RHD via Uttar Chandipur GPS Uttar Kolaron GPS & Talukderhat.Ch.00-1220m ID No.579883015 (b) Const. of 01No.2.0mx2.0m culvert at Ch.640m on the same road. Salvage Materials Tk.2640543.00 | Office of the Executive Engineer, LGED, Pirojpur | BDT 69.20 lakh | 17 Oct 2017 | Official record |
| (a)Improvement of Debipur - Chandipur road (Ch.00-920m) ID No.579885055 (b) Const. of 03 Nos.0.625mx0.60m culvert at Ch.470m575m & 820m on the same road. | Office of the Executive Engineer, LGED, Pirojpur | BDT 38.90 lakh | 17 Oct 2017 | Official record |
| Repairs works in floor wall plumbing and sanitary (as per BOQ) of engines hall control room Workshop ware house Fuel treatment Unit Water treatment Unit Dormitory building etc. | Rpcl Corporate Office | BDT 99.80 lakh | 8 Oct 2017 | Official record |
| (a) Improvement of Uzirpur H/Q-Bamrail UP Office -Gondesor Bazar(Uzirpur UZHQ Girls School-Kholna More-Bamrail R&H) from Ch.3400m - 5740m under Banaripara UpazilaBarisal District. (DPP ID No.506943007 New ID 506942018) (b) Construction of 2Nos U-Drain on the same road at Ch.4695m & 5090m. | Office of the Executive Engineer, LGED, Barisal | BDT 1.36 crore | 2 Oct 2017 | Official record |
| Re-excavation of Kuchiamara Khal from km. 0.00 to km. 1.903 = 1.903 Km Sowtal Khal from km. 0.00 to km. 2.630 = 2.630 Km Hadikhal from km. 0.00 to km. 3.00 = 3.00 Km Kanjatoli Khal from km. 0.00 to km. 1.914 = 1.914 Km. & Santoshpur Khal from km. 0.00 to km. 2.860 = 2.860 Km Total = 12.307 Km. in Polder No- 72 in Sandwip Upazilla District- Chittagong. | Chittagong O&M Division -2 | BDT 2.08 crore | 21 Sep 2017 | Official record |
| Construction of two storied DG Bangalow at National Agriculture Training Academy (NATA) under Gazipur. | Office of the Executive Engineer, LGED, Gazipur | BDT 87.60 lakh | 6 Aug 2017 | Official record |
| Rehabilitation of Bailzuri Poyla via Boro Poyla Graveryed Road from Ch. 00m to 1230m. ( GHIOR ) Road ID.356225005 | Office of the Executive Engineer, LGED, Manikganj | BDT 38.10 lakh | 17 Jul 2017 | Official record |
| Repairing existing pavement by carpeting and seal coat work at 13th(p) km and 14th(p) km of Jamalganj-Sunamganj Road(R-370) under Sunamganj Road Division during the year 2016-2017. | Sunamganj Road Division | BDT 27.40 lakh | 5 Jul 2017 | Official record |
| Repairing of damaged pavement by aggregate base type-2 with carpeting and seal coat work at 1st(p) km 2nd (p) km 3rd (p) km and 4rth (p) km (Link Portion) of Jamalganj-Sunamganj Road | Sunamganj Road Division | BDT 10.80 lakh | 5 Jul 2017 | Official record |
| â??Construction of 5-Storied Academic cum 4-Storied Administrative Building With Workshop & Single Storied Service Area in/c Sanitary Electrification & Rain Water Preservation works along With Site Development Construction of Internal Road Boundary Wall Gate and Installation of Deep Tube-Wellâ?�- at KAPASIA upazilla under GAZIPUR District. | Office of the Executive Engineer, Norshingdi Zone | BDT 15.48 crore | 22 Jun 2017 | Official record |
| Interior Design of Executive Engineer's Office Roam under Road Division Gaibandha during the year 2016-2017. | Gaibandha Road Division | BDT 8.10 lakh | 14 Jun 2017 | Official record |
| Improvement of Rotongonj WDB - Rotongonj H/O Zabber Sardar road at Ch: 00 - 1200m under Bera UpazilaDistrict : Pabna [Road ID-176165006] | Office of the Executive Engineer, LGED, Pabna | BDT 59.50 lakh | 13 Jun 2017 | Official record |
| Improvement of Nandiara RHD - Farid Chairman House road at Ch: 00 - 200m under Bera Upazila District : Pabna [Road Id-176165087] | Office of the Executive Engineer, LGED, Pabna | BDT 9.90 lakh | 13 Jun 2017 | Official record |
| Emergency Maintenance of Nabin Chandra-Baouskhali Hat road by Earth work from ch. 00m-2580m [Muksudpur] (Road ID No: 335584022) | Office of the Executive Engineer, LGED, Gopalganj | BDT 12.80 lakh | 13 Jun 2017 | Official record |
| VERTICAL EXTENSION OF EXISTING ACADEMIC BUILDING AT 1. SARALAMOIE GIRLS HIGH SCHOOL & 2. HAZRABARI TEKURYBARI HIGH SCHOOL | Office of the Executive Engineer, Gopalgonj Zone | BDT 1.23 crore | 12 Jun 2017 | Official record |
| VERTICAL EXTENSION OF EXISTING ACADEMIC BUILDING AT 1. MANDRA RADHAGONJ UNITED INSTITUTION & 2. SAPTAPALLI JOARIA HIGH SCHOOL & COLLEGE | Office of the Executive Engineer, Gopalgonj Zone | BDT 1.23 crore | 12 Jun 2017 | Official record |
| Repair by Base Type-II and Carpeting Seal coat work at 2nd(p) 3rd(p) & 4th(p) km of Shatpakia (Barisal-Jhalokati Highway)-Nalcity(Z-8709) Road under Jhalokati Road Division during the year 2016-17. | Jhalokati Road Division | BDT 25.10 lakh | 12 Jun 2017 | Official record |
| VETICAL EXTENSION OF ABDUL HAI CITY COLLEGE NARAIL SADAR | Office of the Executive Engineer, Gopalgonj Zone | BDT 1.10 crore | 8 Jun 2017 | Official record |
| VERTICAL EXTENSION OF NOBOGONGA DEGREE COLLEGE LOHAGORA NARAIL | Office of the Executive Engineer, Gopalgonj Zone | BDT 1.10 crore | 8 Jun 2017 | Official record |
| Repairing the existing pavement by Seal coat at 85th (p) 86th (P) 87th(P) & 88th (P) km of Sylhet- Golapganj- Charkhai- Zakiganj road (R-250)under Sylhet Road Division Sylhet during the year 2016-2017. | Sylhet Road Division | BDT 13.40 lakh | 8 Jun 2017 | Official record |
| Repairing of Sand & Bats Spreading at 81st to 83rd (P) Km. Repairing Potholes on the existing at 85th (P) 86th(P) 87th(P) & 88th (P) Km repairing of & Carpeting & Seal coat work at 86th (P) & 88th (P) Km of Sylhet-Golapganj-Charkhai-Zakiganj Road Sylhet Road Division Sylhet during the year 2016-2017. | Sylhet Road Division | BDT 13.20 lakh | 8 Jun 2017 | Official record |
| Repair work of damaged pavement by Sub-base Aggregate Base Type-2 with carpeting and seal coat at 15th(p) km and 16th km of Neamatpur-Tahirpur | Sunamganj Road Division | BDT 32.70 lakh | 7 Jun 2017 | Official record |
| Construction of retired embankment from km 3.940 to km 4.400 =0.460 km in Polder No.BIP-11 Phase -1 at Jhalakathi Sadar Upazila District -Jhalakathi under NDR budget under Jhalakathi WD Division BWDB Jhalakathi during the year 2016-2017.BWDB Jhalakathi during the year 2016-2017. | Jhalokathi WD Division | BDT 7.10 lakh | 5 Jun 2017 | Official record |
| Emergency Maintenance of Pashergati GPS-Krisnadia Hat road by Earth work from ch. 3440m-3735m [Muksudpur] (Road ID No: 335584057) | Office of the Executive Engineer, LGED, Gopalganj | BDT 4.40 lakh | 4 Jun 2017 | Official record |
| Emergency Maintenance of Bholarvita (Nabin Chandra to west Krisnadia GPS) road via Community Clinic by Earth work from ch. 00m-2330m [Muksudpur] (Road ID No: 335585136) | Office of the Executive Engineer, LGED, Gopalganj | BDT 11.70 lakh | 4 Jun 2017 | Official record |
| Construction of retired embankment from km 23.500 to km 24.200 0.700 km and km 24.250 to km 24.500 = 0.250 km total length 0.950 km in polder no.BIP-13 Phase -1 at Jhalakathi Sadar Upazila District -Jhalakathi under NDR budget under Jhalakathi WD Division BWDB Jhalakathi during the year 2016-2017. | Jhalokathi WD Division | BDT 14.20 lakh | 29 May 2017 | Official record |
| Construction of guide bandh (Merginal Dyke) in of Polder No: 72 from km. 0.000 to km.1.000(Left Bank) = 1.000 km and km. 2.360 to km. 3.360(Right Bank) = 1.000 km total = 2.000 km. of Sawtal Khal at Sandwip Upzailla Dist.- Chittagong. | Chittagong O&M Division -2 | BDT 84.50 lakh | 25 May 2017 | Official record |
| Overall maintenance of eastern part of ground floor (from stair case) and proposed teachers room and classroom on second floor of Titas Gas School at Demra CGS area. | Civil Engineering Department | BDT 55.30 lakh | 25 May 2017 | Official record |
| Construction of 200-Bedded Boys Hostel Building with 5-Storied Foundation including Sanitary Water Supply and Electrification Works at Govt. Horoganga College Sadar Upazila Munshiganj District. | Office of the Executive Engineer, Narayanganj Zone | BDT 7.64 crore | 18 May 2017 | Official record |
| Construction of Upazila Muktijoddha Complex Bhaban at Santhia Upazila District.: Pabna | Office of the Executive Engineer, LGED, Pabna | BDT 2.31 crore | 14 May 2017 | Official record |
| R.C.C. plate palisading work at 19th km (p) 23rd km (p) 24th km (p) 28th km (p) 29th km (p) 30th km (p) 31st km (p) & 32nd km (p) of Panchar-Shibchar-Madaripur Road under Madaripur road Division dutring the year 2016-2017 | Madaripur Road Division | BDT 14.20 lakh | 11 May 2017 | Official record |
| Repair and maintenance of Mosque A type B-2 type C type Building at Shaktola BWDB colony under comilla O&M Division BWDB Comilla during the year 2016-17. | Comilla O&M Division | BDT 5.40 lakh | 4 May 2017 | Official record |
| Repair and maintenance of E-2 Type Building North side Gate Inspection pit and Sanitary Line at Shaktola BWDB colony under comilla O&M Division BWDB Comilla during the year 2016-17. | Comilla O&M Division | BDT 5.40 lakh | 4 May 2017 | Official record |
| Repair and maintenance of D-type E-type F-type G-type Tin shed Quarter Overhead Water Tank and Supply of Miscellaneous Electrical Sweeping Sanitary and Plumbing materials at Shaktola BWDB colony under comilla O&M Division BWDB Comilla during the year 2016-17. | Comilla O&M Division | BDT 5.40 lakh | 4 May 2017 | Official record |
| Repairing the existing pavement by Seal coat work at 54th(p) 55th(p) 64th(p) 65th(p) and 69th(p) km of Sylhet- Golapganj- Charkhai- Zakiganj Road (R-250) under Sylhet Road Division Sylhet during the year 2016-2017. | Sylhet Road Division | BDT 28.50 lakh | 30 Apr 2017 | Official record |
| Backing & Re-sectioning/Repairing of Kushiyara Dyke from km. 16.700 to km.16.760 km. 17.750 to km. 17.780 km. 19.200 to km.19.480 km.25.700 to km. 25.730 km. 25.930 to km. 26.000 km. 26.200 to km. 26.500 km. 28.510 to km. 28.750 km. 28.750 to km. 28.800 km. 33.350 to km. 33.380 km. 35.180 to km. 35.220 km. 37.200 to km. 37.350 km. 37.650 to km. 37.750 & km. 39.135 to km. 39.150 = 1.395 Km. | Sylhet O&M Division, BWDB | BDT 29.30 lakh | 24 Apr 2017 | Official record |
| Repairing & Re-sectioning of Embankment from km 16.700 to km 20.415 total 3715 metre in polder no-47/4 by Blue Gold programme under Patuakhali WD Division BWDB Kalapara during the financial year 2016-17. | Patuakhali WD Division | BDT 46.50 lakh | 20 Apr 2017 | Official record |
| Repair work of damaged pavement by sub-base aggregate base type-2 with carpeting and seal coat at 13th(p) km 14th(p) km & 15th(p) km of Neamatpur-Tahirpur Road (Z-2806) under Road Division Sunamganj during the year 2016-2017. | Sunamganj Road Division | BDT 44.90 lakh | 6 Apr 2017 | Official record |
| Construction of accomodation (for Staff) 13200 Sft 05 Storied building ( 02 buildings Side by Side) at Perkul Nabigonj Habigonj. | Office of the Project Director, Bibiyana South 400MW Gas based CCPP Construction Project | BDT 4.24 crore | 21 Mar 2017 | Official record |
| Package- 11: Rehabilitation of road & drain under ward- 23 & 24 of Dhaka South City Corporation. | Project Director (DDIP) | BDT 6.40 crore | 27 Feb 2017 | Official record |
| Re-sectioning of Submersible embankment of Sonamorol Haor Sub-Project from km 0.000 to 6.250 km 9.000 to 10.050 km 11.250 to 12.000 km 20.700 to 21.000 km 23.750 to 25.000 km 26.500 to 27.485 km 29.000 to 29.500 km 32.100 to 32.250 km 36.180 to 36.250 km 40.000 to 40.500 km 41.000 to 41.250 km 44.750 to 44.900 km 45.500 to 45.750 km 48.750 to 49.000 = 12.705 km in c/w â?? Pre-monsoon flood protection and Drainage improvement in haor areas projectâ?� in upzilla: Dharmapasha Dist: Sunamgonj under Sunamgonj O & M Division BWDB Sunamgonj during the year 2016-17. | Sunamganj O&M Division | BDT 1.09 crore | 23 Jan 2017 | Official record |
| Improvement and construction of different Roads Drains and Footpaths of Block Dha (part-02) Mirpur Section -12 of ward -02 under Zone-02 (Mirpur) | Office of the Project Director,Improvement of Different Damaged Road Infrastructure,Drains,Footpath | BDT 11.44 crore | 16 Jan 2017 | Official record |
| Improvement of Road and Drain of Ward-32 under Zone-05 (Karwan bazaar) | Office of the Project Director,Improvement of Different Damaged Road Infrastructure,Drains,Footpath | BDT 13.23 crore | 16 Jan 2017 | Official record |
| Improvement and construction of different Roads Lane Drains and Footpath at Block-A D H & Ka of Section-01 of ward -08 under Zone-02 (Mirpur) | Office of the Project Director,Improvement of Different Damaged Road Infrastructure,Drains,Footpath | BDT 20.31 crore | 3 Jan 2017 | Official record |
| Improvement and construction of different Roads Lanes Drains and Footpath at Block- D E F New-C Chat Bari Nababer bagh of Section-01 of ward -08 under Zone-02 (Mirpur) | Office of the Project Director,Improvement of Different Damaged Road Infrastructure,Drains,Footpath | BDT 18.05 crore | 3 Jan 2017 | Official record |
| Vertical Extension of East & Mid Block of Student (Female) Hall - 1st to 9th Floor | Planning, Development & Works | BDT 13.92 crore | 19 Dec 2016 | Official record |
| Vertical Extension of South & South-West Block of Student (Female) Hall - 1st to 9th Floor | Planning, Development & Works | BDT 13.09 crore | 19 Dec 2016 | Official record |
| Repair of potholes & seal coat work with RCC drain at 18th(P)19th(P) & 20th(P) Km of Palashbari-Gaibandha Road Under Road Division Gaibandha During the Year 2016- 2017. | Gaibandha Road Division | BDT 21.50 lakh | 18 Dec 2016 | Official record |
| Repair of road cut by different Government/ Non-Government Organizations under ward no 30 zone-5 of DNCC. (Group-05) | Office of the Executive Engineer, Zone-05 | BDT 56.90 lakh | 8 Nov 2016 | Official record |
| Protective Work at the Left Bank of Meghna River to Protect the Doshani Village and Bazar from the Wave Attack from Km 0.050 to Km 0.298 = 248.00 m (at Location-7) at Matlab (Uttar) Upazila of Chandpur district under Meghna-Dhonagoda O&M Division during the year 2015-2016 & 2016-2017. | Meghna-Dhonagoda O&M Division | BDT 2.23 crore | 4 Sep 2016 | Official record |
| Temporary Bank Protective work along the Left bank of Padma River at West Narisha Bazar from Km. 4.287 to Km. 4.687 = 400.00 m in connection with ''Temporary Bank Protective work along the Left bank of Padma River at West Narisha Bazar and Meghula Bazar at Dohar Upazila in Dhaka District'' under Dhaka O&M Division-2 BWDB Dhaka during the year 2015-16. | Dhaka O&M Division-2 | BDT 2.59 crore | 10 Aug 2016 | Official record |
| Re-excavation of Curzon Khal from km. 22.200 to km. 35.00 =12.800 and Kala Khal from Kadati bazaar to Curzon Khal from km. 0.000 to km. 5.500 = 5.500 km.at upazila Barura and chandina under Comilla O&M Division BWDB Comilla. During the year 2015-2016 and 2016-2017. | Comilla O&M Division | BDT 3.11 crore | 8 Jun 2016 | Official record |
| Const. of 33.00m long RCC Girder Bridge at Goalbari GC-Ghospur UP office road at Ch. 1640m under Boalmary Upazila Dist. Faridpur | Office of the Executive Engineer, LGED, Faridpur | BDT 2.17 crore | 7 Jun 2016 | Official record |
| Breach closing work in between km.14.200 to km. 14.500 = 0.200km (Bharot Ghona) in between km. 20.000 to km. 20.300 = 0.200km (Mill Ghona) and in between km. 20.500 to km. 20.600 = 0.050 km (Panir Chara) in Polder no.- 70 in Upazilla- Moheshkhali Dist- Cox's Bazar in Connection With | Cox's Bazar O&M Division | BDT 42.70 lakh | 9 May 2016 | Official record |
| Re-construction of submersible embankment Anuakhola to Uthkholakm. 0.000 to km. 1.600 = 1.600 km.under Ghograjola Irrigation Project under Comilla O&M Division BWDB Comilla during the year 2015-2016. | Comilla O&M Division | BDT 18.60 lakh | 5 Apr 2016 | Official record |
| Re-construction of submersible embankment at Sohilpur from km. 0.000 to km. 1.500 = 1.500 km. at Ghograjola Irrigation Project under Comilla O&M Division BWDB Comilla during the year 2015-2016. | Comilla O&M Division | BDT 24.00 lakh | 5 Apr 2016 | Official record |
| Re-construction of submersible embankment at Ambalpur from km. 0.000 to km. 3.000 = 3.000 km. under Ghograjola Irrigation Project under Comilla O&M Division BWDB Comilla during the year 2015-2016. | Comilla O&M Division | BDT 44.60 lakh | 5 Apr 2016 | Official record |
| Construction of embankment along the left bank of Dhaleswary river from km. 1.950 to km. 3.140 = 1.190 km. at Tannery Industrial Area under Savar Upazilla in Dhaka district during the year 2015-2016 & 2016-17. | Dhaka O&M Division-2 | BDT 2.40 crore | 24 Mar 2016 | Official record |
| Bank Protective work along the right bank of of Matamuhuri River from km. 0.000 to km. 0.500 = 0.500 km at Anispara (East Bara Bhaula) of Shaharbil union in c/w | Cox's Bazar O&M Division | BDT 1.96 crore | 29 Feb 2016 | Official record |
| Construction of Herring Bone Bond (HBB) Road in c/w (i) Kumaria wapda hat to Laxmipur Primary school from km 0.000 to km 1.500 (ii) Parulia South Para Zame mosque from km 0.000 to km 0.420 & from km 0.090/0.000 to km 0.120/0.030 of Union-Parulia & (iii) Junasur to Teguria bridge from km 0.000 to km 0.700 of union Mohespur =total 2.650km at Upazila-Kashiani District-Gopalganj under West Gopalganj Integrated Water Management Project under Gopalganj O&M Division BWDB Gopalganj during the FY- 2015-2016. | Gopalganj O&M Division | BDT 96.50 lakh | 18 Feb 2016 | Official record |
| Construction of 03 nos 25.74 m (1x24.40 m) Long P.C. Girder Bridge with approach road at CH-08+700 km & CH 09+300 km and Ch-09+600km and 01 no 6.00m (1x6.00m ) long Box culvert at ch.13+030km in Dohar â??Katakhali-Nikra-Galimpur-Tikarpur Road (Z-8206) under Munshigonj Road division during the year 2015-2016. | Dhaka Circle | BDT 13.81 crore | 9 Feb 2016 | Official record |
| Bank Revetment work along the left bank of Meghna River from km. 0.305 (U/S) to Km. 0.790 (U/S) = 485m at Maniknagar in Upazilla-Nabinagar District- Brahmanbaria under Brahmanbaria W.D. Division BWDB Brahmanbaria During the year 2015-16 & 2016-17. | Brahmanbaria WD Division | BDT 11.39 crore | 3 Feb 2016 | Official record |
| Bank Protective work by C.C Block on the left bank of Sangu river from K.M. 130.800 Km.131.269 = 469m near South Burumchara of Pukuria UP in the Coastal area of Polder no. 64/1B Upazilla Banskhali Dist. Chittagong in Connection with | Chittagong O&M Division -2 | BDT 6.61 crore | 21 Jan 2016 | Official record |
| Installation of rainwater harvesting storage tank including construction of tin shed with supply fitting and fixing of necessary materials for house hold consumption and homestead gardening in Barguna District. | Integrated Agricultural Productivity Project (IAPP) | BDT 1.41 crore | 20 Jan 2016 | Official record |
| Improvement of road including Construction of pipe drain at Rupnagar Extension road no-9/1 & 8/1 of Block-E and repair of road no-3 of Section-12 Mirpur. | Office of the Executive Engineer, Zone-02 | BDT 72.10 lakh | 12 Jan 2016 | Official record |
| Land development of beside approach road at Meghnaghat power station to Dhaka-Chittagonj High way Tol Plaza. | Civil Construction Division-1 | BDT 73.10 lakh | 11 Jan 2016 | Official record |
| Re-sectioning of Submersible embankment of Tangua Haor Sub-Project from km 10.250 to 12.879 = 2.629 km in c/w â?? Pre-monsoon flood protection and Drainage improvement in haor areas projectâ?� in upzilla: Derai Dist: Sunamgonj under Sunamgonj O & M Division BWDB Sunamgonj during the year 2015-16. | Sunamganj O&M Division | BDT 44.90 lakh | 24 Dec 2015 | Official record |
| Repair of Pavement by Base Type-II & Dense Bituminous Surfacing at 1st (P) & 2nd (P) Km and Protective Works at 2nd (P) Km of Dhupni- Belka Road Under Road Division Gaibandha during the year 2015-2016. ( Z- 5476 ). | Gaibandha Road Division | BDT 19.80 lakh | 22 Dec 2015 | Official record |
| Repair of Pavement by Base Type-II Dense Bituminous Surfacing & Seal Coat Works at 1st (P) 2nd (P) & 3rd (P) Km and Protective Works at 7th (P) Km of Sadullapur-Pirgonj-Nawabgonj Road Under Road Division Gaibandha During the Year 2015-2016 (Z- 5075). | Gaibandha Road Division | BDT 22.30 lakh | 22 Dec 2015 | Official record |
| Construction of Ring Bundh of village plateform and protective work of village platform at Issapur from Km. 54.50 to Km 55.79 =1.29 Km of the right bank of Issapur Loopcut in C/W Kalni Kushiyara river Management Project under Kishoreganj WD Division BWDB Kishoreganj during the financial year 2015-2016 . | Kishoreganj WD Division | BDT 7.23 crore | 20 Dec 2015 | Official record |
| Bank Protection work by C.C. Block along the Right bank of Jamunaswari River at Rahimpur Joybangla from Km. 40.30 to Km. 40.75=450 M at upazila Taragonj District Rangpur. | Syedpur O&M Division | BDT 3.73 crore | 15 Oct 2015 | Official record |
| Supply Filling & Dumping of Geo-bag ( 175 kg) and Manufacturing of C.C block including dumping & placing for the Protection of Gudighata Gram from Sarder barir ghat to manashagonj Lunch ghat from the erosion of Arialkhan river from km.0.275 to km.0.490 = 0.215 KM .in upazilla muladi dist. Barisal. | Barisal O&M Division | BDT 4.96 crore | 21 Sep 2015 | Official record |
| Tree plantation on Boradoh bridge approach of Gaibandha-Nakaihat-Gobindoganj Road at 21st KM under road division Gaibandha during the year 2014-15. | Gaibandha Road Division | BDT 1.70 lakh | 3 Sep 2015 | Official record |
| Supply Filling & Dumping of Geo-bag (175 kg) and Manufacturing of C.C block including dumping & placing for the protection of Charbaria Union Lamchari Maharaj and Beltola khayaghat from km 3.500 to km 3.5927=0.0927 km from the erosion of Kirtonkhola river in Barisal Sadar Upazilla under Barisal District. | Barisal O&M Division | BDT 3.00 crore | 5 Aug 2015 | Official record |
| Slope Protection of eroded Bank lines at Nagirpur Pacca Road Side in Powrashava area from Km 0.000 to Km 0.200 = 0.200 m in Polder No 56/57 under Bhola O&M Division-2 BWDB Charfession Bhola during the year 2014-2015. (Package No-BK/2014-2015) | Bhola O&M Division-2 | BDT 1.50 crore | 30 Jul 2015 | Official record |
| Rehabilitation and Periodic Maintenance of Mohadebpur- Zitka GC via Gongasagar Road(Ch.0+000-9+112Km)Upazila:Shivalaya | Office of the Executive Engineer, LGED, Manikganj | BDT 3.96 crore | 1 Jul 2015 | Official record |
| Emergency protective work on the river Brahmaputra from km.57.970 km.58.110= 140 m. for protection of kachkol area in Chilmari Upzilla of Kurigram District under Kurigram O&M Division BWDB Kurigram during the year 2014-15. | Kurigram O&M Division | BDT 1.03 crore | 24 Jun 2015 | Official record |
| Emergency protective work on the river Brahmaputra from km.58.250 km.58.400= 150 m. for protection of kachkol area in Chilmari Upzilla of Kurigram District under Kurigram O&M Division BWDB Kurigram during the year 2014-15. | Kurigram O&M Division | BDT 1.11 crore | 24 Jun 2015 | Official record |
| Emergency protective work on the river Brahmaputra from km.58.550 km.58.700= 150 m. for protection of kachkol area in Chilmari Upzilla of Kurigram District under Kurigram O&M Division BWDB Kurigram during the year 2014-15. | Kurigram O&M Division | BDT 1.10 crore | 24 Jun 2015 | Official record |
| River Bank protective work along the Left bank of Surma river at Munshibazar (JRC) from Km 6.600 to Km 6.90 = 300 m under NDR budget in Upazilla- Zakiganj District-Sylhet. during the year 2014-2015. | Sylhet O&M Division, BWDB | BDT 4.11 crore | 28 May 2015 | Official record |
| Digital survey work for fixing boundary of acquired land for fixing of boundary pillar in between km. 0.00 to km.18.400 and km. 20.400 to km. 30.500 of DIFPP project under Dhaka O&M Division-2 BWDB Dhaka during the year 2014-2015. | Dhaka O&M Division-2 | BDT 32.90 lakh | 21 May 2015 | Official record |
| Remaining Bank Protection work of Kaligonga River from km 4.029 to km 4.220 = 0.191 km near Santir Hat at Kutuba Union of Borhanuddin Upazilla in the District of Bhola under Protection of Santir Hat area from the erosion of Kaligonga River under Sub-Project River Bank Protection & Development and Town Protection-Project (Phase-IV) under Bhola O & M Division-I BWDB Bhola during the year 2014-2015. | Bhola O&M Division-1 | BDT 17.20 lakh | 7 May 2015 | Official record |
| (a) Improvement of road by bituminous carpeting (with X-drain and brick palisading) starting from Dhaka-Mymensingh highway near Bhaluka Degree college to Bhaluka Bazar via Bhandabo moor and Upazila health complex and trauma center (Ch.00-2150m). (b) Construction of RCC surface drain beside at the road starting from Dhaka-Mymensingh highway near Bhaluka Degree college to Bhaluka Bazar via Bhandabo moor and Upazila health complex and trauma center (Ch.800-875m & 1500-1575m). (c) Construction of RCC Retaining wall & brick guide wall beside at the road starting from Dhaka-Mymensingh highway near Bhaluka Degree college to Bhaluka Bazar via Bhandabo moor and Upazila health complex and trauma center (Ch.1600-1680m R/W & 700-850m brick G/w). (d) Improvement of road by bituminous carpeting(with X-drain and brick palisading) starting from Dhaka-Mymensingh highway near Russel spining mills to Labu members house at ward no-09.(Ch.00-570m). (e) Development of road with bituminous carpeting starting from panch rasta moor to S.R office.Ch.00-440m & 118m link road (PDB office road) at Bhaluka Bazar. (f) Improvement of road with RCC casting starting from Bhaluka Bazar S.R office road (Kitchen market moor) Kitchen market.(Ch.00-190m) (g) Improvement of road by bituminous carpeting (with X-drain and brick palisading) starting from Bhaluka-Gafforgaon highway near fire service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka primary School.(Ch.00-1800m). (h) Construction of RCC surface drain beside at the road starting from Bhaluka-Gafforgaon highway near fire service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka primary School.(At Ch.700-800m & Ch.950-1200m) (i) Construction of RCC Retaining wall beside at road starting from Bhaluka-Gafforgaon highway near fire service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka primary School.(At Ch.840-900m) | PIU Office of Bhaluka Pourashava, Mymensingh | BDT 4.87 crore | 5 May 2015 | Official record |
| New Bank Revetment work on the left bank of the River Padma from Meterage 5500.00 to Meterage 5800.00 =300.00m. in connection with Protection of Alatuli area of Chapai Nawabganj District from the erosion of the Padma River under Nawabganj O & M Division BWDB Chapai Nawabganj during FY 2014- 2015. | Nawabganj O&M Division | BDT 11.09 crore | 22 Apr 2015 | Official record |
| Re-sectioning of embankment in between from km. 23.000 to km. 23.500 Total = 0.090m. and km. 24.500 to km. 24.800 =0.160 KM Total = 0.250 km. in polder no- 65 in c/w Non Development Revenue Budget under Coxs Bazar O&M Division BWDB Coxs Bazar during the year 2014-15. | Cox's Bazar O&M Division | BDT 8.10 lakh | 19 Apr 2015 | Official record |
| Protective work on the left bank of the Matamuhuri river from km. 0.020 to km. 0.045 Total =0.025km. at Kuchpara Chakaria Pourashova in c/w Non Development Revenue Budget under Cox�?�¢??s Bazar O&M Division BWDB Cox�?�¢??s Bazar during the year 2014-15. | Cox's Bazar O&M Division | BDT 6.10 lakh | 19 Apr 2015 | Official record |
| Breach closing of embankment from km. 17.000 to km. 17.200 = 0.200. km. and in between k.m 6.000 to km. 7.600 = 0.200km in polder no.66/2 in c/w Non Development Revenue Budget under Coxs Bazar O&M Division BWDB Cox�?�¢??s Bazar during the year 2014-15. | Cox's Bazar O&M Division | BDT 6.30 lakh | 19 Apr 2015 | Official record |
| Temporary bank protection work of river bakkakhali from km. 18.000 to18.040 = 40m (Dewan Para) & km 21.400 to 21.460 km = 60m(Hitupi) Total 100 m. in c/w Non Development Revenue Budget under Coxs Bazar O&M Division BWDB Coxs Bazar during the year 2014-15. | Cox's Bazar O&M Division | BDT 6.50 lakh | 19 Apr 2015 | Official record |
| Water control rehabilitation/Re-construction and re-excavation of alternative canal total 2 nos. in Coxs Bazar in c/w Non Development Revenue Budget under Coxs Bazar O&M Division BWDB Coxs Bazar during the year 2014-15. | Cox's Bazar O&M Division | BDT 4.00 lakh | 19 Apr 2015 | Official record |
| Breach closing & Re-Sectioning of Embankment on the Left bank of Katakhali khal at Dompara from KM 8.000 to KM 8.467= 0.467 km. of U.P- Kanchana in Satkania Upazilla in connection with Katakhali Hilimili System Flood Control Drainage and Irrigation Project; on the Left bank of Tankabati khal at Haiar Ukil Para from KM 3.550 to KM 4.064 = 0.514 km. of Amirabad U.P in Lohagara Upazilla in connection with Tankabati Khal Flood Control Drainage and Irrigation Project and on the Left bank of Hatiar khal at Paiarkheel from KM 10.000 to KM 10.300 = 0.300 km. of Chunati U.P in Upazilla -Lohagara in Chittagong District under Non-Development Revenue Budget (Economic Code No 5974) during the year 2014-2015. | Chittagong O&M Division-1, BWDB | BDT 10.50 lakh | 5 Apr 2015 | Official record |
| Breach closing & Re-Sectioning of Embankment on the Left bank of Dalu River at Sonar Baper Bari area from KM 4.000 to KM 4.200 = 0.200 km. U.P. Amilaish; at south Rupkania village from KM 14.500 to KM 14.700 = 0.200 km. U.P. Satkania Upazilla- Satkania; at Golavita (Sawdagarpara) from KM 18.000 to KM 18.200 = 0.200 km.; at north Harina from KM 20.000 to KM 20.300 = 0.300 km. of Adhunagar U.P. in Lohagara UZ and on the the Right bank of Dalu River at Mazidia from KM 16.700 to KM 16.800 = 0.100 km. & at Dr. Habibur Rahaman Para from KM 17.400 to KM 18.500 = 1.100 km. Total = 2.100 km. Adhunagar UP & Upazilla : Lohagara District -Chittagong in connection with Dalu river Flood Control Project under Non-Development Revenue Budget (Economic Code No 5974) during the year 2014-2015. | Chittagong O&M Division-1, BWDB | BDT 13.70 lakh | 31 Mar 2015 | Official record |
| Bank Protective work at the left bank of Feni river (Border River) from km. 5.150 to km. 5.350= 200.00m at Baganbazar high school in Upazilla- Fatikchari Dist-Chittagong in connection with Non Development Revenue Head (Economic Code: 5974) Under Chittagong O&M Division-II BWDB Chittagong during the year 2014-2015. | Chittagong O&M Division -2 | BDT 2.02 crore | 25 Mar 2015 | Official record |
| Protective work at the left bank of Feni river (Border River) from km. 5.570to km. 5.770= 200.00m at Baganbazar high school in Upazilla- Fatikchari Dist-Chittagong in connection with Non Development Revenue Head (Economic Code: 5974) Under Chittagong O&M Division-II BWDB Chittagong during the year 2014-2015. | Chittagong O&M Division -2 | BDT 1.96 crore | 25 Mar 2015 | Official record |
| Bank Protective work at the left bank of Feni river (Border River) from km. 5.770 to km. 5.970= 200.00m at Baganbazar high school in Upazilla- Fatikchari Dist-Chittagong in connection with Non Development Revenue Head (Economic Code: 5974) Under Chittagong O&M Division-II BWDB Chittagong during the year 2014-2015. | Chittagong O&M Division -2 | BDT 2.00 crore | 25 Mar 2015 | Official record |
| Removal of garbage spoil earth vegetates and other obstacles from Pagla khal from Km. 0.00 to km.3.00 of DND Irrigation Project during 2014-15 under Dhaka O&M Division-1 | Dhaka O&M Division-1 | BDT 9.40 lakh | 15 Mar 2015 | Official record |
| Re-sectioning of Embankment from km. 0.000 to km. 2.500 = 2.500 km. in polder No. 43/2A under Blue Gold Program under Patuakhali O&M Division BWDB Patuakhali during the year 2014-2015. | Patuakhali O&M Division | BDT 43.00 lakh | 5 Mar 2015 | Official record |
| Construction of Administrative Extension Building & Hall room under Laxmipur Sadar Upazila Dist : Laxmipur. | Office of the Upazila Engineer, LGED, Laxmipur Sadar, Laxmipur | BDT 4.29 crore | 16 Feb 2015 | Official record |
| Repair of Wash Room at Udamdi Pump house Supplying and Fixing of Boundary piller in MDIP Irrigation Canal System and Flood Control Embankment. | Meghna-Dhonagoda O&M Division | BDT 4.00 lakh | 4 Feb 2015 | Official record |
| (a)Costrution of chandmari road and Mandertola road starting from post office more to Dhaka Khulna Highway(Road ch.0.00-1894m) (b) Costrution of chandmari road and Mandertola road side drain starting from chandmari to panchuria khal(Total length=1457m) (c) Costrution of D.C office road starting from chandmari road to BB road Under gopalgonj pourashava(Road ch.0.00-247m) (d) Costrution of D.C office road side drain starting from chandmari road to BB road Under gopalgonj pourashava(Road ch.0.00-247m) (e) Costrution of Sabujbag roadBoishakhi road and Janata road by lane starting from Chandmari road to Janata road(Road 815m+148=963m) (f) Costrution of Sabujbag road side drain Top slab(Total length=100m) | PIU office of Gopalganj Pourashava | BDT 3.85 crore | 22 Jan 2015 | Official record |
| Fitting & fixing of Thai glass & Mosquito net at ground floor of 10 Nos. building at Banani BWDB Officers' Quarter under Dhaka O&M Division-II BWDB Dhaka during the year-2014-2015. | Dhaka O&M Division-2 | BDT 21.50 lakh | 21 Jan 2015 | Official record |
| Re-sectioning of submersible embankment of Matian Haor form km. 10.130 to km 11.500 = 1.370 km in connection with | Sunamganj O&M Division | BDT 37.40 lakh | 15 Jan 2015 | Official record |
| Re-sectioning of submersible embankment of Mohalia Haor Sub-Project from km 8.000 to 9.650 = 1.650 km in connection with the â??Pre-Monsoon Flood Protection and Drainage Improvement in haor areas | Sunamganj O&M Division | BDT 34.10 lakh | 15 Jan 2015 | Official record |
| Manufacturing Placing & Dumping of CC Blocks of different sizes in connection with Protection of 1000.00 m (M1000.0-M2000.00) at U/S of Kadamtali & D/S of Ghutail Hard Point of left Bank of Jamuna River of Segment Horindhara to Hargila. | Jamalpur O&M Division | BDT 10.54 crore | 15 Dec 2014 | Official record |
| Manufacturing Placing & Dumping of CC Blocks of different sizes in connection with Protection of 1000.00 m (M2000.0-M3000.00) at U/S of Kadamtali & D/S of Ghutail Hard Point of left Bank of Jamuna River of Segment Horindhara to Hargila. | Jamalpur O&M Division | BDT 10.28 crore | 15 Dec 2014 | Official record |
| Bank Revetment work of Jamuna River at Shaghata from Km. 92.240 to Km. 92.423 = 183m and D/S End Termination 37.00m ie. Total 220.00m under Gaibandha O&M Division Gaibandha during the 2014-2015 | Gaibandha O&M Division | BDT 5.79 crore | 3 Dec 2014 | Official record |
| Re sectioning of Gumti right embankment in between km. 10.500 to km. 35.000 | Comilla O&M Division | BDT 1.11 crore | 12 May 2014 | Official record |
| Filling of 10 Nos. ditch at different places of Gumti left embankment in between km. 0.000 to km. 31.250 | Comilla O&M Division | BDT 39.10 lakh | 12 May 2014 | Official record |
| Filling of 2 Nos. ditch at different places of Gumti right embankment in between km. 0.000 to km. 35.000 | Comilla O&M Division | BDT 19.80 lakh | 12 May 2014 | Official record |
| Re sectioning of Gumti left embankment in between km. 0.000 to km. 15.000 | Comilla O&M Division | BDT 1.28 crore | 12 May 2014 | Official record |
| Re sectioning of Gumti left Embankment in between km 31.250 to km75.284 | Gumti O&M Division | BDT 3.09 crore | 5 May 2014 | Official record |
| Construction of WARPO Bhaban from Ground Floor to 3rd Floor including pile cap at 72 Green Road under Dhaka Operation and Maintenance Division II BWDB Dhaka during the year 2013 to 2015 | Dhaka O&M Division-2 | BDT 10.01 crore | 26 Dec 2013 | Official record |
| Permanenet bank protective work to protect the Char Guhalbaria area from Km 6.142 to Km 6.175 = 0.033 Km under Monohordi Upazilla Dist. Narsingdi in c/w Non-Development Revenue Budget (5974)under Narsingdi O&M Division BWDB Narsingdi during the year 2012-13. | Norshingdi O&M Division | BDT 31.10 lakh | 25 Feb 2013 | Official record |
Source: eprocure.gov.bd (CPTU). Independent service, not a government site.