Part-1: Improvement of Kakdanga Chairman Bari-Katavita via MA Shahid School & College Road by Uni-Block from Ch. 00-1320m; Part-2: Construction of 01 No 1.00x1.00m RCC U-drain at Ch. 1400m on the same road & Part-3: Construction of 01 No 4.00mx4.00m RCC culvert at Ch. 700m on the same road ( Road ID No: 335514174) under Kotwalipara Upazila, District: Gopalganj.
GDIRIIP/Kotali/SP/VR-Uni-Block/20-21/176/e-GP/20230923/593157/0087325
|
Office of the Executive Engineer, LGED, Gopalganj |
৳১.৫৮ কোটি |
৮ জুলাই ২০২১ |
Completed |
|
Construction of 12 Twelve Nos. Community Latrine with 3 Cubicales one urinals 2 wash basins 1 septic tank and 3 soak well with Sanitary and electrical works at Rupsha-4 nos. Terokhada-4 nos. & Digolia-4 nos. Under Water Supply and Sanitation Project at Rupsha Digholia & Terokhada Upazila in Khulna District of DPHE. FY 2020-2021.
000/e-GP/DPHE/2023-07-11/00554235
|
Office of the Executive Engineer DPHE, Khulna |
৳৭৫.৫২ লাখ |
২ মার্চ ২০২১ |
Completed |
|
Construction of 12 Twelve Nos. Community Latrine with 3 Cubicales one urinals 2 wash basins 1 septic tank and 3 soak well with Sanitary and electrical works Under Water Supply and Sanitation Project at Rupsha Digholia & Terokhada Upazila in Khulna District of DPHE. FY 2020-2021.
000/e-GP/DPHE/2023-07-11/00528377
|
Office of the Executive Engineer DPHE, Khulna |
৳৭৫.৫১ লাখ |
২৮ ডিসে ২০২০ |
Completed |
|
Construction of vertical extension of 1st floor of DPHE Koyra upazilla Office Building under Revenue Budget. Fy 2020-2021.
000/e-GP/DPHE/2023-07-11/00518425
|
Office of the Executive Engineer DPHE, Khulna |
৳১৯.৫০ লাখ |
২৯ নভে ২০২০ |
Completed |
|
Construction of additional class room DAKKHIN DUMURITALA GPS under PEDP4
e-Tender/PEDP4/PRJ/SAD/2019-2020/W1.00876/e-GP/20241114/501247/00218734
|
Office of the Upazila Engineer, LGED, Pirojpur Sadar, Pirojpur |
৳১.১৮ কোটি |
২১ অক্টো ২০২০ |
Completed |
|
a Improvement of BC road from sreepur Hat-Jamadder Hat Road at Ch. 2500-4500m including 02 Nos 2.00mX2.00m RCC Box Culvert at Ch. 2650m & 2920m & 2 Nos Double Vent 4.00X3.60m RCC Box Culvert at Ch. 3100m & 3350m under Bhandaria Upazila District- Pirojpur. ID No 579144006.
BJP/PIR/ BAN/ DW-182/e-GP/20241207/497297/00229791
|
Office of the Executive Engineer, LGED, Pirojpur |
৳২.০৪ কোটি |
১ অক্টো ২০২০ |
Ongoing |
|
Periodic Maintenance of Mixmil RHD-Sholgati-Chuknagar GC Road Dumuria portion from Ch.00m - 192m 250m-395m & 544m-2005m Dumuria Road Code-247302007
e-Tender/LGED/Khul/GOBM/20-21/W-40/e-GP/20241021/490375/00200484
|
Office of the Executive Engineer, LGED, Khulna |
৳১.০৬ কোটি |
৩ সেপ ২০২০ |
Completed |
|
Construction of additional class room KATHULIA GPS under PEDP4.
e-Tender/PEDP4/PRJ/SAD/2019-2020/W2.01305/e-GP/20241113/457655/00218327
|
Office of the Upazila Engineer, LGED, Pirojpur Sadar, Pirojpur |
৳৯৩.২১ লাখ |
২০ জুলাই ২০২০ |
Completed |
|
Construction Boundary Wall In/c Gate of DEWANA MOLLA PARA REG. NON GOVT.PRIMARY SCHOOL JABDPUR PRIMARY SCHOOL SATELLITE TOWN SELF HELP CENTRE Under Fourth Primary Education Development Program Khulna City Corporation.
e-Tender/PEDP4/KLN/CIT/2019-20/W14.0478/e-GP/20241105/436065/00213214
|
Office of the Executive Engineer, LGED, Khulna |
৳৫৪.৫৬ লাখ |
২৪ মার্চ ২০২০ |
Completed |
|
Construction of additional class room Sheikh Amjad Hossain under PEDP4
e-Tender/PEDP4/KLN/PHU/2019-20/W2.00873/e-GP/20241120/430253/00221110
|
Office of the Upazila Engineer, LGED, Phultala, Khulna |
৳৯৭.৫১ লাখ |
২৫ ফেব ২০২০ |
Ongoing |
|
1 Minor maintenance of 7.85m long RCC Box Culvert on Chandkhali GC Shahpara RHD - Gugrakati GC Road at Chainage 850m 247642002 under Paikgacha Upazila District khulna. 2 Minor maintenance of 66.6m long RCC Girder Bridge on Harikhaly R&H to Patlahat Growth Centre Road at Chainage 1526m 247942003 Under Terokhada Upazila District Khulna. 3 Minor maintenance of 51.6m long RCC Girder Bridge on Harikhaly R&H to Patlahat Growth Centre Road at Chainage 4472m 247942003 Under Terokhada Upazila District Khulna.
SupRB/Khul/Maint/19-20/W-44/e-GP/20241106/410971/00213915
|
Office of the Executive Engineer, LGED, Khulna |
৳২৪.৭৭ লাখ |
১৭ ফেব ২০২০ |
Completed |
|
Rehabilitation of Kachubuina Hat-Digraj Hat Road from Ch. 00m-2200m Road ID No. 201584001 in Sundorban Union under Mongla Upazila Bagerhat.
LGED/Bag/VRRP/OL/19-20/W-629/e-GP/20241010/405775/00194302
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২৫.৬৪ লাখ |
১ জানু ২০২০ |
Completed |
|
Improvement of Baroikhali Sluice Gate south side to Khona WDB Sluice Gate Via Khona Khatail High School road at ch 1350-6493m 247175156 Under Dacope Upazila Khulna.Salvage Cost of this package is Tk 1121492.00 fixed which will be paid by contractor
KBSRIDP/KHUL/VR-25.1/19/e-GP/20241111/383554/00217064
|
Office of the Executive Engineer, LGED, Khulna |
৳৪.৫৮ কোটি |
৩ ডিসে ২০১৯ |
Completed |
|
Construction of Loudobe union Bhumi Office under Dacope upazila District Khulna under Construction of Town and Union Land Office across the Country Project.
TULO/KLN/W-08/e-GP/20241106/378476/00213909
|
Office of the Executive Engineer, LGED, Khulna |
৳৬৫.৭৪ লাখ |
১৩ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Kapilmuni GCJalalpur UP Office Tala Upazila Via Rahim pur Bazar Road from Ch. 00m - 4562m. Paikgacha Road Code 247643010
e-Tender/LGED/Khul/GOBM/19-20/W-34/e-GP/20241109/374345/00215861
|
Office of the Executive Engineer, LGED, Khulna |
৳৭৬.৬৯ লাখ |
৩১ অক্টো ২০১৯ |
Completed |
|
Periodic Maintenance of Jagirmahal Bazar-Gilabari GC Road from Ch. 00m - 1100m & Ch.1780-4312m Koyra Road Code247532010
e-Tender/LGED/Khul/GOBM/19-20/W-52/e-GP/20241020/375357/00199082
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৭৬ কোটি |
৩১ অক্টো ২০১৯ |
Completed |
|
Improvement of Sukhdara Bazar-Surkhali UP Office road at Ch 3680-5892m & Const of 3nos 625mmx600mm U-drain at ch3761m 4961m & 5380m247123014 Under Batiaghata Upazila District Khulna.Salvage Cost of this package is Tk 1323448.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/UNR-10.1/18/e-GP/20241105/338815/00213229
|
Office of the Executive Engineer, LGED, Khulna |
৳২.০১ কোটি |
১৬ অক্টো ২০১৯ |
Completed |
|
Improvement of Dhamalia Bazar-Dhamalia UP-Baruna-Chacuri Bazar Via Doakhula & Komrail GPS Connecting road at ch 635-2800m & 05 Nos 0.625mx0.600m U-Type Drain Culvert at ch 1479m 1774m1885m 2235m &2525m ID 247303019 Under Dumuria Upazila Dist Khulna.Salvage Cost of this package is Tk 2059914.00 fixed which will be paid by contractor.
KBS-RIDP/KHUL/UNR-01.02/18/e-GP/20241111/338813/00217062
|
Office of the Executive Engineer, LGED, Khulna |
৳২.১৮ কোটি |
১৬ অক্টো ২০১৯ |
Completed |
|
i Construction of class room of Abnali Abdul Aziz Primary Schooli Construction of class room of Arkandi Primary School
e-Tender/NBIDNNGPS/KHU/TER/2018-19/W1.01404/e-GP/20241124/350547/00222652
|
Office of the Upazila Engineer, LGED, Terokhada, Khulna |
৳১.৯৬ কোটি |
২৯ আগ ২০১৯ |
Completed |
|
Construction of 17.00m Long RCC Girder Bridge on Jolabari UP office-Madra bazaar Road at Ch 4096m. Road ID 579873004
IBRP/Piroj/Nesar/Brg-04/e-GP/20241208/328022/00229888
|
Office of the Executive Engineer, LGED, Pirojpur |
৳২.২১ কোটি |
৪ আগ ২০১৯ |
Ongoing |
|
Construction of 23.00m Long RCC Girder Bridge on Sutiakati Up office - Gouranger bazaar via Nandurhar Bazar Road at Ch 2700m Road ID 579873007
IBRP/Piroj/Nesar/Brg-08/e-GP/20241203/328026/00227137
|
Office of the Executive Engineer, LGED, Pirojpur |
৳২.৫৫ কোটি |
৪ আগ ২০১৯ |
Ongoing |
|
Improvement and side widening work of Nazirpur H/Q- Gazalia GC Nazirpur Part from Ch. 0.00-2000m under Nazirpur Upazila Dist Pirojpur. Road ID 579762006
UTMIDP-NAZI/PIRO/WR-52/e-GP/20241203/338739/00226715
|
Office of the Executive Engineer, LGED, Pirojpur |
৳২.০৭ কোটি |
৪ আগ ২০১৯ |
Completed |
|
1. Construction of class room 3H2V/F4WB of Paschim Banisanta Primary School & 2. Construction of class room 3H/F4WB of Madya Dacope Primary School under Dacope Upazila of Khulna District.
e -Tender/NBIDNNGPS/KHU/DAC/2018-19/W1.03346./e-GP/20241119/316457/00220385
|
Office of the Upazila Engineer, LGED, Dacope, Khulna |
৳৩.২৫ কোটি |
৯ জুলাই ২০১৯ |
Completed |
|
Improvement of Gangronkhi mojumder khal-Gangronkhi Bazar Road at Ch00-2200m 247644045Under Paikgacha Upazila Khulna.Salvage Cost of this package is Tk 557845.00 fixed which will be paid by contractor.
KBS-RIDP/KHUL/VR-17/19/e-GP/20241111/324453/00217067
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৯৬ কোটি |
১৭ জুন ২০১৯ |
Completed |
|
Improvement of Mamudkathi mor Via Horidhati Ghosh para Road at Ch00-3900m 247642010 Under Paikgacha Upazila Khulna.Salvage Cost of this package is Tk 8221255.00 fixed which will be paid by contractor.
KBS-RIDP/KHUL/UZR-06/18/e-GP/20241112/324446/00217575
|
Office of the Executive Engineer, LGED, Khulna |
৳৫.২১ কোটি |
১৭ জুন ২০১৯ |
Completed |
|
Const. of KURAL TOLA Primary School
e-Tender/NBIDGPS/BAG/CHI/2018-19/W1.01651/e-GP/20241114/308228/00218935
|
Office of the Upazila Engineer, LGED, Chitalmari, Bagerhat |
৳৯৯.৫৪ লাখ |
২ মে ২০১৯ |
Completed |
|
Improvement of Kalinagar GC -Garaikhali GC road at ch.1280-9004 m and Construction of 3 4 m RCC Box culvert at ch. 2634 m & 1 nos 625mmx900mm u-drain at ch.2080 ID-247172009 Under Dacope Upazila District Khulna.Salvage Cost of this package is Tk 5931121.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/UZR-04/18/e-GP/20241111/305516/00217066
|
Office of the Executive Engineer, LGED, Khulna |
৳৭.৪৪ কোটি |
২৫ এপ্রিল ২০১৯ |
Completed |
|
1. Improvement of Naldanga Village infront of Laxmikhola H/School to Shattapir wooden bridge via Naldanga P/School road at ch 837-1337m & 03 Nos 0.625m0.900m U-Type Drain Culvert at Ch 1043m1205m1281m Under Dacope UpazilaDist Khulna. ID No. 2471750282. Improvement of Trimohani bazar ORET Bridge To Bhutimary bazar Gazi fish via Kalishgong UP Office road at Ch 93.00-1093.0m Under Dacope Upazila Dis Khulna. ID No. 2471740433.Improvement of Kailshgong UP Office to Dhopadi hat via Tarimohani H/School road at ch 5740-5926m & 6826.0-7640m & 03 nos 625x900mm U-drain at ch 7008m 7273m7344m Under Dacope Upazila Dist Khulna ID No. 247174037 Salvage Cost of this package is Tk 846084.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-22/18/e-GP/20241112/302973/00217641
|
Office of the Executive Engineer, LGED, Khulna |
৳২.৫০ কোটি |
২৫ এপ্রিল ২০১৯ |
Completed |
|
Improvement of LoudodeUp Office Khutakhali gate to Loudobe bazarH/O Prosanto Biswas via Khutakhali P/School road at ch 6240-9240m Under Dacope Upazila Dist Khulna.ID No. 247174038 Salvage Cost of this package is Tk 3736392.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-23.3/18/e-GP/20241112/302971/00217291
|
Office of the Executive Engineer, LGED, Khulna |
৳২.৭৭ কোটি |
২৫ এপ্রিল ২০১৯ |
Completed |
|
1. Improvement of Sutarkhali UP-Office-Kalibari Bazar via Upen Nagar Primary School road at Ch 5991.00-6991.00m & Const of 2nos 625mmx900mm U-drain at ch6023m& 6443m ID-247174042 Under Dacope Upazila Khulna.Upazila District Khulna. 2. Improvement of Loudobe WDB to Khutakhali N/H/O Mohadab sarder via Badamtala High School Road at Ch 00-844.0m & Const of 1nos 1.60mx1.60m Rcc Box Culvert at ch650m 4nos 625mmx900mm U-drain at ch 502m ID-247175047 Under Dacope Upazila District Khulna.Salvage Cost of this package is Tk 487840.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-24.2/18/e-GP/20241112/305518/00217383
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৮৪ কোটি |
২৫ এপ্রিল ২০১৯ |
Completed |
|
1. Improvement of Kaminibashi Police Camp to Kaminibashi Shapla Club via Rashkhola East Side Road at Ch 00-1000m & Construction of 1no 2.0mX2.0m RCC Box Culvert at ch 952.0m 5 Nos 625mmx900mm U-Drain at ch 225m 540m 605m730m & 892m Under Dacope Upazila Khulna. ID No. 2471750232. Improvement of Kamarkhola-Kamarkhola WDB Road at Ch 00-1000m & Construction of 1 Nos 625mmx900mm U-Drain at ch 708m Under Dacope Upazila Khulna. ID No. 2471750053. Improvement of Sattyapir Bridge to kaminibasia Binapani GPS Road Taypil Bridge to Kaminidasia Binapani GPS road at Ch 00-1000m & Construction of 5 Nos 625mmx900mm U-Drain at ch 165m 393m 462m696m & 881m Under Dacope Upazila Khulna. ID No. 247175113Salvage Cost of this package is Tk 2960774.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-25/19/e-GP/20241106/302972/00213295
|
Office of the Executive Engineer, LGED, Khulna |
৳৩.২৪ কোটি |
১৮ এপ্রিল ২০১৯ |
Completed |
|
1. Improvement of Phultala Riunion High School & College-Phultala MM College towards R&H road at ch 00-510m Under Phultala Upazila Dist Khulna. ID No. 2476941472. Improvement of Jamira Girls School-Alamgir SK house road at ch 00-567m Under Phultala Upazila Dist Khulna.ID No. 247695050 3. Improvement of Damodar Upazila-Bhya Bari road at ch00-460m Under Phultala Upazila Dist Khulna ID No. 247695075Salvage Cost of this package is Tk 2783069.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-34.2/18/e-GP/20241111/302968/00217054
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৩৪ কোটি |
১৮ এপ্রিল ২০১৯ |
Completed |
|
Improvement of LoudodeUp Office Khutakhali gate to Loudobe bazarH/O Prosanto Biswas via Khutakhali P/School road at ch 00-3563m Under Dacope Upazila Dist Khulna.ID No. 247174038 Salvage Cost of this package is Tk 2144046.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-23.2/18/e-GP/20241112/302970/00217631
|
Office of the Executive Engineer, LGED, Khulna |
৳৩.৬১ কোটি |
১৮ এপ্রিল ২০১৯ |
Completed |
|
Improvement of Kalikabati N/H/O Jamir Gazi to Barobak N/H/O Gafur Farazi Via Ruakata Village road at ch 00-2400m Under Dacope Upazila Dist Khulna. ID No. 247174014Salvage Cost of this package is Tk 143206.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-23.1/18/e-GP/20241112/302969/00217266
|
Office of the Executive Engineer, LGED, Khulna |
৳২.১৯ কোটি |
১৮ এপ্রিল ২০১৯ |
Completed |
|
1. Improvement of Patiabandha-Dhopakhola Hatem House road at ch 00-560m Under Phultala Upazila Dist Khulna. ID No. 2476940422. Improvement of Daukona Gazi Bari road at ch 00-1077m & 01 Nos 1.60mx1.500m U-Type Drain Culvert at ch 805m Under Phultala Upazila Dist Khulna. ID No. 247694053 Salvage Cost of this package is Tk 1467811.00 fixed which will be paid by contractor.
KBSRIDP/KHUL/VR-34.1/18/e-GP/20241111/302967/00217052
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৩৬ কোটি |
১৮ এপ্রিল ২০১৯ |
Completed |
|
1. Improvement of Betagramme R&H-Atlia high School road at ch 00-1130m & 05 Nos 0.625mx0.600m U-Type Drain Culvert at ch 189m 335m 551m 678m &1005m ID 247304060 Under Dumuria Upazila Dist Khulna. 2. Improvement of Measaguna R&H-Ukhra-Baliakhali Bridge road at ch 1400-3900m & 02 Nos 0.90mx0.900m U-Type Drain Culvert at ch 1814m 2088m & 5 nos uPvc Pipe at ch 1998m 2038m2352m 2510m & 2910m ID 247305084 Under Dumuria Upazila Dist Khulna.Salvage Cost of this package is Tk. 2654111.000 fixed which will be paid by contractor.
KBS-RIDP/KHUL/VR-03/18 /e-GP/20241111/300494/00217059
|
Office of the Executive Engineer, LGED, Khulna |
৳৩.৪২ কোটি |
৩ এপ্রিল ২০১৯ |
Completed |
|
a Construction of class room of Poschim Bain Bariya Primary School and b Construction of class room of Bisnopur Primary School under Paikgacha Upazila District Khulna
e-Tender/NBIDNNGPS/KHU/PAI/2018-19/W1.03414/e-GP/20241113/288553/00218309
|
Office of the Upazila Engineer, LGED, Paikgacha, Khulna |
৳১.৯৭ কোটি |
১২ মার্চ ২০১৯ |
Ongoing |
|
a Construction of class room of Bain Bariya Sondip Primary School and b Construction of class room of Poschim Garaikhali Primary School under Paikgacha Upazila District Khulna
e-Tender/NBIDNNGPS/KHU/PAI/2018-19/W1.03324/e-GP/20241113/288550/00218291
|
Office of the Upazila Engineer, LGED, Paikgacha, Khulna |
৳১.৬৯ কোটি |
১২ মার্চ ২০১৯ |
Ongoing |
|
a Construction of class room of Purai Khati Primary School and b Construction of class room of Takiya Poschim Para Primary School under Paikgacha Upazila District Khulna
e-Tender/NBIDNNGPS/KHU/PAI/2018-19/W1.03325/e-GP/20241113/288551/00218317
|
Office of the Upazila Engineer, LGED, Paikgacha, Khulna |
৳১.৯৪ কোটি |
১২ মার্চ ২০১৯ |
Ongoing |
|
a Construction of class room of Pathorkhali Primary School and b Construction of class room of 2 no. Koira Moddobil Primary School under Koira Upazila District Khulna.
e-Tender/NBIDNNGPS/KHU/KOI/2018-19/W1.03321/e-GP/20241113/291589/00218161
|
Office of the Upazila Engineer, LGED, Koyra, Khulna |
৳৩.০২ কোটি |
১০ মার্চ ২০১৯ |
Ongoing |
|
a Construction of class room of Gazipara Primary School and b Construction of class room of Katmarchar Primary School under Koira Upazila District Khulna.
e-Tender/NBIDNNGPS/KHU/KOI/2018-19/W1.03322/e-GP/20241113/291591/00218156
|
Office of the Upazila Engineer, LGED, Koyra, Khulna |
৳৩.০১ কোটি |
১০ মার্চ ২০১৯ |
Completed |
|
a Construction of class room of Poddo Pukur Santimoyee Primary School and b Construction of class room of Chowkuni Adarsha Primary School under Koira Upazila District Khulna.
e-Tender/NBIDNNGPS/KHU/KOI/2018-19/W1.03320/e-GP/20241113/291587/00218149
|
Office of the Upazila Engineer, LGED, Koyra, Khulna |
৳২.৭৩ কোটি |
১০ মার্চ ২০১৯ |
Ongoing |
|
Rehabilitation of Rajbundh - Koiya Hat Road Ch. 00m-2645m ID 24712404045 under Batiaghata Upazila District Khulna.
Khu/VRRP/18-19/ W-03/e-GP/20241105/284261/00212742
|
Office of the Executive Engineer, LGED, Khulna |
৳৭৪.৬৪ লাখ |
১৪ ফেব ২০১৯ |
Completed |
|
Construction of Hoglar Chak Primary School under Paikgacha Upazila District Khulna
e-Tender/NBIDGPS/KHU/PAI/2018-19/W1.03206/e-GP/20241113/265667/00218306
|
Office of the Upazila Engineer, LGED, Paikgacha, Khulna |
৳১.০১ কোটি |
৬ জানু ২০১৯ |
Ongoing |
|
247303006 - Improvement of Salua Bazar - Rahgunathpur Bazar via Rangpur UP Office Road Ch 6180m - 8240m & 10200m -12100m by BC Salvage Cost of this package is Tk 3958346.00 fixed which will be paid by contractor Dumuria
KDRIDP/Khul/W- 79/2018-19/e-GP/20241111/227736/00217032
|
Office of the Executive Engineer, LGED, Khulna |
৳৩.৪৪ কোটি |
২৬ সেপ ২০১৮ |
Completed |
|
247172004 - Improvement of Kalinagar GC - Khutakhali Bajua GC Road Ch 7500m -10133m Dacope Salvage Cost of this package is Tk 5173762.00 fixed which will be paid by contractor
KDRIDP/Khul/W- 55/2017-18/e-GP/20241111/160398/00216633
|
Office of the Executive Engineer, LGED, Khulna |
৳২.৪৬ কোটি |
৭ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Joydehihat-Kulia U.P Office Road from Ch. 00m-1000m under Mollahat Upazila Bagerhat. Road ID No. 201563005
KDRIDP/Bager/M-01/2017-18/e-GP/20241011/160155/00194408
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২০.০০ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Kahalpur Alek house-Kutimia house Road from Ch. 00m-1150m under Mollahat Upazila Bagerhat. Road ID No. 201565017
KDRIDP/Bager/M-04/2017-18/e-GP/20241011/160158/00194434
|
Office of the Executive Engineer, LGED, Bagerhat |
৳১৫.৫৩ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Mollahat Hospital -Derbolia RHD Road from Ch. 00m-695m under Mollahat Upazila Bagerhat. Road ID No. 201564028
KDRIDP/Bager/M-02/2017-18/e-GP/20241011/160156/00194481
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২০.৪৭ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
247305104 - Improvement of Line Bilpabla Rayermohol Sluice Gate - Uttar Bilpabla - Shikderpara - Junction Mor Road by HBB Ch 715m - 3550m Dumuria Salvage Cost of this package is Tk 1310710.00 fixed which will be paid by contractor
KDRIDP/Khul/W- 48/2017-18/e-GP/20241111/155520/00217042
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৫৭ কোটি |
১৬ জানু ২০১৮ |
Completed |