|
(a) Replacement of require motor type exhaust fan & duct, spare parts, Kitchen hood repair & servicing, distribution board & service line including related electrical works at Kitchen of National Institute of Neurosciences & Hospital. (b) Supply and Installation Air Curter(04 Nos 3 feet, 4 Nos 4 feet) including related electrical works of various important places of National Institute of Neurosciences & Hospital. (c) Replacement of old/damaged/unserviceable sign board by new supply and installation 2 Nos. Digital sign board including related works of National Institute of Neurosciences & Hospital.
E/M-7/278/3742 Date: 27-04-2022/e-GP/20220930/704248/0049467
|
PWD EM Division-7, Dhaka |
৳২৩.৫১ লাখ |
২৯ মে ২০২২ |
Completed |
|
(a) Replacement of require LED tube light fittings, LED tube light, switch socket & wiring including related electrical works of Shaheed Sharowardy Medical College & Hospital. (b) Supply and Installation new LED light, fan including related electrical works at Nurses Dormitory Bhaban corridor, various room & bathroom of Shaheed Sharowardy Medical College & Hospital. (c) Replacement of electrical wiring, fittings fixture including related electrical works at HD(Doctors) Quarter of Shaheed Sharowardy Medical College & Hospital.
E/M-7/279/3743 Date: 27-04-2022/e-GP/20220930/703830/0049457
|
PWD EM Division-7, Dhaka |
৳২৩.৭৫ লাখ |
২৯ মে ২০২২ |
Completed |
|
(a) Repair of damaged/unserviceable AC machine, gas charge, replacement of spare parts, compressor and require wiring including related electrical works of National Institute of Neurosciences & Hospital. (b) Supply and Installation new AC machine( 10 Nos 2 ton & 02 Nos 5 ton) including related electrical works at various places of require of Authority of National Institute of Neurosciences & Hospital. (c) Transfer of existing AC machine, replacement of spare parts & wiring including related works by coordination with Civil works renovation of National Institute of Neurosciences & Hospital.
E/M-7/278/3739 Date: 27-04-2022/e-GP/20220930/704078/0049462
|
PWD EM Division-7, Dhaka |
৳৩৮.০০ লাখ |
২৯ মে ২০২২ |
Completed |
|
(a) Repair of damaged/unserviceable AC machine, gas charge, replacement of spare parts, compressor and require wiring including related electrical works of Shaheed Sharowardy Medical College & Hospital. (b) Supply and Installation new AC machine( 20 Nos 2 ton & 04 Nos 5 ton) including related electrical works at various places of require of Hospital Authority of Shaheed Sharowardy Medical College & Hospital.
E/M-7/279/3744 Date: 27-04-2022/e-GP/20220930/703779/0049449
|
PWD EM Division-7, Dhaka |
৳৩৮.০০ লাখ |
২৫ মে ২০২২ |
Completed |
|
(a) Replacement of require motor type exhaust fan & duct, spare parts and require wiring including related electrical works of Shaheed Sharowardy Medical College & Hospital. (b) Supply and Installation Air Curter( 04 Nos 3 feet, 8 Nos 4 feet) including related electrical works of various important places of Shaheed Sharowardy Medical College & Hospital. (c) Replacement of require motor type exhaust fan & duct, Kitchen hood repair & servicing and replacement of power line including related electrical works at Kitchen of Shaheed Sharowardy Medical College & Hospital.
E/M-7/279/3745 Date: 27-04-2022/e-GP/20220930/703594/0049447
|
PWD EM Division-7, Dhaka |
৳২৩.৭৪ লাখ |
২৫ মে ২০২২ |
Completed |
|
(a) Supply and Installation Air Curter(04 Nos 3 feet, 8 Nos 4 feet) including related electrical works of various important places of National Institute of Cardiovascular Diseases Hospital. (b) Replacement of require motor type exhaust fan & duct, spare parts, Kitchen hood repair & servicing, power line replacement including related electrical works at Kitchen of National Institute of Cardiovascular Diseases Hospital. (c) Supply and Installation new LED light, fan including related electrical works at Nurses Dormitory Bhaban corridor, various room & bathroom of National Institute of Cardiovascular Diseases Hospital. (D) Replacement of electrical wiring, fittings fixture including related electrical works at Doctor's Quarter of National Institute of Cardiovascular Diseases Hospital.
E/M-7/161/3740 Date: 27-04-2022/e-GP/20220930/703588/0049444
|
PWD EM Division-7, Dhaka |
৳২৮.৫০ লাখ |
২৫ মে ২০২২ |
Completed |
|
(a) Repair of damaged/unserviceable AC machine, gas charge, replacement of spare parts, compressor and require wiring including related electrical works of National Institute of Cardiovascular Diseases Hospital. (b) Supply and Installation new AC machine( 15 Nos 2 ton & 02 Nos 5 ton) including related electrical works at various places of require of Authority of National Institute of Cardiovascular Diseases Hospital. (c) Transfer of existing AC machine, replacement of spare parts & wiring including related works by coordination with Civil works renovation of National Institute of Cardiovascular Diseases Hospital. (d) Replacement of require motor type exhaust fan & duct, spare parts & require wiring including related electrical works National Institute of Cardiovascular Diseases Hospital.
E/M-7/161/3741 Date: 27-04-2022/e-GP/20220930/703789/0049452
|
PWD EM Division-7, Dhaka |
৳৩৩.২৫ লাখ |
২৫ মে ২০২২ |
Completed |
|
Repair and renovation fitting fixing of tiles, construction of boundary wall, gate, weather coat, painting of sub-division room at PWD Medical sub-division at Sher-e-Bangla Nagar
195/ SDE-M/RAPP//2021-22/e-GP/20220930/703121/0049164
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳১৯.৯৪ লাখ |
২৪ মে ২০২২ |
Completed |
|
Cleaning septic tank and inspection pits, repairing surface drains and removing rubbish and other work in MP hostel area of National Parliament Building
33/ SDE-1/RAPP//2021-22/e-GP/20220930/694182/0049162
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳২.৯৯ লাখ |
৫ মে ২০২২ |
Completed |
|
Cleaning sewerage lines, pit, soak well, septic tanks and other works in west side of VIP residential area of National Parliament building
34/ SDE-2/RAPP//2021-22/e-GP/20220930/694183/0049158
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳২.৯৯ লাখ |
২৮ এপ্রিল ২০২২ |
Completed |
|
Anti-termite spraying and other work in MP hostel block 2 to 5 in National Parliament area
32/ SDE-1/RAPP//2021-22/e-GP/20220930/694181/0049153
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৩.০০ লাখ |
২৮ এপ্রিল ২০২২ |
Completed |
|
Repairing garden grills, footpath, renewing grills and paints and other works at west side of VIP residential area of National Parliament
36/ SDE-2/RAPP//2021-22/e-GP/20220930/694185/0049149
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳২.৯৮ লাখ |
২৮ এপ্রিল ২০২২ |
Completed |
|
Repairing/renewing drains for discharge of waste water at west side of VIP residential area of National Parliament
37/ SDE-2/RAPP//2021-22/e-GP/20220930/694186/0049155
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳২.৯৫ লাখ |
২৮ এপ্রিল ২০২২ |
Completed |
|
Construction of Upazila Nirbahi Officer's Quarter Under Sonatala Upazila.
Sonatala/21-22/02/e-GP/20241106/649531/00213620
|
Office Of The Upazila Engineer, Sonatala, Bogura |
৳১.১৭ কোটি |
১ মার্চ ২০২২ |
Completed |
|
Vertical Extension of Shahid Shohrawardy Medical College Hospital at S B. Nagar, Dhaka. B: External Electrification. (Sub-Head:- Remaining work of Light fittings & Fan for Block-02, 03, 04, 05, 07 & 08)
E/M-7/279/2777 Date:15-02-2022/e-GP/20220930/668936/0049442
|
PWD EM Division-7, Dhaka |
৳২.০০ কোটি |
২৮ ফেব ২০২২ |
Completed |
|
For Shaheed Shorawardy Medical financial year 2021-22 at Sher e Bangla Nagar, Dhaka.(a) Repair of damaged/unserviceable AC machine, gas charge, replacement of compressor, spare parts, require wiring including electrical works. (b) Supply and Installation of new AC machine(2 ton 10 nos 5 ton 4 nos) of various places of Hospital requirement of College (c) Supply and Installation of Air Curter(3 feet 4 nos 4 feet 4 nos) including related works of various important places.
E/M-7/279/2520 Date:26-01-2022/e-GP/20220930/668635/0049437
|
PWD EM Division-7, Dhaka |
৳১৯.৮০ লাখ |
২৮ ফেব ২০২২ |
Completed |
|
Vertical Extension of Shahid Shohrawardy Medical College Hospital at S B. Nagar, Dhaka. B: External Electrification. (Sub-Head:- Remaining work of Internal Wiring, Switch Socket for Block-07 & 08)
E/M-7/279/2778 Date:15-02-2022/e-GP/20220930/668516/0049433
|
PWD EM Division-7, Dhaka |
৳১.৯৯ কোটি |
২৮ ফেব ২০২২ |
Completed |
|
Finishing Work like laying Marble, wall and floor tiles, Thai Aluminum work and other civil sanitary and internal electrification of South-East, Middle-East, North-East, Middle-South, Middle-North, Middle-West block at Shaheed Suhrawardi hospital at S.B. Nagar Dhaka (Sub Head:- 10 hole Machine made Brick work, fitting fixing of wall tiles, floor tiles, brick work, plaster work, supplying fitting false ceiling fixing of plastic overhead water tank, water distribution line and other related work at public entry block & pathology block).
12/HPNSP/Suhrawar/e-GP/20220930/663948/0049140
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৯০.০০ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Finishing Work like laying Marble, wall and floor tiles, Thai Aluminum work and other civil sanitary and internal electrification of South-East, Middle-East, North-East, Middle-South, Middle-North, Middle-West block at Shaheed Suhrawardi hospital at S.B. Nagar Dhaka (Sub Head:- 10 hole Machine made Brick work, fitting fixing of wall tiles, floor tiles, brick work, plaster work, supplying fitting false ceiling fixing of plastic overhead water tank, water distribution line and other related work at Radiology block & Morgue block).
13/HPNSP/Suhrawar/e-GP/20220930/663949/0049136
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৮৯.৯৯ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Fitting fixing of color sheet angle, patent stone , renewing of plaster, fitting fixing of false ceiling, painting work and other related work at oxygen plant of of Shaheed Suhrawardy Medical College & Hospital, Sher-e-bangla Nagar, Dhaka
72/ SDE-M /RAPP/ 2021-22/e-GP/20220930/665536/0049138
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳১৪.৩৯ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Finishing Work like laying Marble, wall and floor tiles, Thai Aluminum work and other civil sanitary and internal electrification of South-East, Middle-East, North-East, Middle-South, Middle-North, Middle-West block at Shaheed Suhrawardi hospital at S.B. Nagar Dhaka (Sub Head:- Construction of Anser Shed, Kitchen room, toilet, Anser commander room, fitting fixing of wall & floor tiles, colure sheet door & Thai Aluminum window, roof trust, false ceiling, window grill, Brick work plaster, painting work and other related work on the root top of Shaheed Suhrawardi Medical College hospital).
11/HPNSP/Suhrawar/e-GP/20220930/663947/0049145
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৯০.০০ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Vertical Extension of Shahid Shohrawardy Medical College Hospital at S B. Nagar, Dhaka. B: External Electrification. (Sub-Head:- Remaining work of Internal Wiring, Switch Socket for Block-04 & 05)
EM-7/279/2777 Date 15-03-2022/e-GP/20220930/667041/0049425
|
PWD EM Division-7, Dhaka |
৳২.০০ কোটি |
২৩ ফেব ২০২২ |
Completed |
|
Vertical Extension of Shahid Shohrawardy Medical College Hospital at S B. Nagar, Dhaka. B: External Electrification. (Sub-Head:- Remaining work of Internal Wiring, Switch Socket for Block-02 & 03)
EM-7/279/2780 Date 15-02-2022 /e-GP/20220930/666839/0049423
|
PWD EM Division-7, Dhaka |
৳১.৯৭ কোটি |
২৩ ফেব ২০২২ |
Completed |
|
For College of Nursing financial year 2021-22 at Sher e Bangla Nagar, Dhaka.(a) Supply and Installation of 80 nos. new ceiling fan and wiring including related electrical works at Academic & Dormitory bhaban (b) Replacement of old/damaged/unserviceable fluorescent tube light of various room, corridor by new Installation LED tube light, college compound security light, wiring including related work atr Academic & Dormitory bhaban
E/M-7/2670 Date:08-02-2022/e-GP/20220930/662688/0049386
|
PWD EM Division-7, Dhaka |
৳৭.৯৭ লাখ |
২২ ফেব ২০২২ |
Completed |
|
Construction of Boundary wall at front side of Shaheed Suhrawardy Medical College Hospital at Sher-e-Bangla Nagar, Dhaka
HPNSP/Suhrawar/e-GP/20220930/647326/0049135
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৬৮.৯২ লাখ |
১২ জানু ২০২২ |
Completed |
|
(I) Improvement of Korerpool - Mir Bari - Mohamad nagar - Chandkhali Road from Ch: 1000m-1800m [ID No-451434202] under Laxmipur Sadar Upazila (II) Providing 37.0m Palisading Work.
GNP-3/LAX/SAD/21-22/W-218/e-GP/20231028/621805/00117673
|
Office of the Executive Engineer, LGED, Laksmipur |
৳৬০.৮৫ লাখ |
২৭ অক্টো ২০২১ |
Completed |
|
Sand Filling work for Site Development of Palli Janapad Project, Rangpur Division, Rangpur.
APP 2021-22/RDA/Bog/PJP/PW-02/e-GP/20221214/612907/0056895
|
Action Research Project on Construction of Co-operative based Multistoried Palli Janapad Housing with Modern Urban Amenities for Livelihood Improvem |
৳১.৯০ কোটি |
২১ সেপ ২০২১ |
Completed |
|
Construction of Isolation unit & critical care unit/ICU at Shaheed Suhrawardy Medical Collage Hospital, Dhaka. [Sub-head: Construction of 50 bed isolation unit at Shaheed Suhrawardy Medical Collage Hospital. Dhaka. (Lot-1: Civil work at Shaheed Suhrawardy Medical Collage Hospital. Dhaka )]
SSMCH/ICU/ADB/WD-4/e-GP/20220930/591444/0049073
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳১.৩০ কোটি |
৫ সেপ ২০২১ |
Completed |
|
Repair and renovation work of Doctors toilets, nurses toilets, general toilets, fitting fixing of tiles, Thai Aluminium, sanitary fitting, panting of wall and ceiling, fitting fixing of collapsible gate, fitting fixing of partition wall for isolation room general ward for treatment of Covid-19 patient at Ground floor ward-8 converted to covid ward of Shaheed Shurawardy Medical College Hospital.
SDE-M/COVID 19 fund/2/e-GP/20220930/592257/0049134
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৪৪.৯৯ লাখ |
৪ জুলাই ২০২১ |
Completed |
|
Construction of one Storied ANSAR VDP Hostal in Gabtali Upazila Porishad under Gabtali Upazila Dist: Bogura
e-Tender/ADP Own Fund/Gab/2020-21/W14/e-GP/20241028/592191/00205113
|
Office of the Upazila Engineer, Gabtali, Bogura |
৳১৩.৩৮ লাখ |
৩০ জুন ২০২১ |
Completed |
|
Replacement/repair of old/damaged/unserviceable AC Machine including Supply & Installation New AC Machine of Physical Medicine, HDUC and Various Places at National Institute of Neurosciences & Hospital, Sher-e-Bangla Nagar, Dhaka.
E/M-7/278/3748 Date: 25-05-2021/e-GP/20220930/587798/0049360
|
PWD EM Division-7, Dhaka |
৳২২.৫০ লাখ |
১৩ জুন ২০২১ |
Completed |
|
Renovation and Modernization work fitting fixing of wall tiles, Thai Aluminum window grills door frames and shutters, painting and other related work at indoor entry gate to mosque of administrative block and inside of Radiology block of Shaheed Suhrawardy Medical Collage & Hospital, Dhaka.
10/SDE-M/suhrawardy project/e-GP/20220930/576289/0049133
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৮৯.৯৮ লাখ |
৯ জুন ২০২১ |
Completed |
|
Replacement of old/burnout light fittings, fan, power line, SDB, Sub-main line, MDB and Supply Installation new AC Machine including require Cable of Anser camp & Medicine at National Institute of Cardiovascular Diseases and Hospital.
EM-7/161/3822 Date 31-05-2021 /e-GP/20220930/585764/0049356
|
PWD EM Division-7, Dhaka |
৳২২.৫০ লাখ |
৬ জুন ২০২১ |
Completed |
|
Conversion of doctor club to isolation word, Thai Aluminum partition work, Construction of new toilet, Making Reception desk with SS glass, renovation work doctor club renewing of plaster, door, window, and renewing of Sanitary fittings of Shaheed Shuhrawardy Medical College & Hospital at Shere Bangla Nagar, Dhaka.
SDE-M/137/4th HPNSP/14/2020-21/e-GP/20220930/570692/0049127
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৪৪.৮৫ লাখ |
১৮ এপ্রিল ২০২১ |
Completed |
|
Accommodation of Outdoor Dispensary instead of entry stair case and renovation work of stair case of Shaheed Shuhrawardy Medical College & Hospital.
SDE-M/137/4th HPNSP/12/2020-21/e-GP/20220930/570690/0049129
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৩১.৪৯ লাখ |
১৮ এপ্রিল ২০২১ |
Completed |
|
Construction of Sub-station Building, RMU Unit and Pump house of Shaheed Shuhrawardy Medical College & Hospital.
SDE-M/137/4th HPNSP/11/2020-21/e-GP/20220930/570689/0049130
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৮৭.৭৫ লাখ |
১৮ এপ্রিল ২০২১ |
Completed |
|
Supply and Installation of electrical wiring fittings fixture power line sub-main line exhaust fan etc. including electrical works of new sub-station Bhaban at Shaheed Shorawardy Medical College & Hospital Sher e Bangla Nagar Dhaka.
EM-7/279/2478 Date 24-01-2021/e-GP/20220930/542715/0049123
|
PWD EM Division-7, Dhaka |
৳৬.৭৩ লাখ |
৩ ফেব ২০২১ |
Completed |
|
Supply and Installation new AC Machine of Blood Bank 2 nos. 5 ton Micro Biology lab 3 nos. 2 ton Bio camistry lab 2 nos. 5 ton including related works at National Institute of Cardio Vascular Diseases & Hospital.
EM-7/161/3673 Date 07-06-2020/e-GP/20220930/511991/0049350
|
PWD EM Division-7, Dhaka |
৳১৭.৮৯ লাখ |
৮ নভে ২০২০ |
Completed |
|
Electrical works of require ceiling fan light fittings switch socket power socket distribution board & wiring including related works of out door ECO room middle block 343 & 344 no. Doctors room and Administrative branch room 425 428 432 433 of south block and Doctors room including other room adjust with Civil work at National Institute of Cardio Vascular Diseases & Hospital.
EM-7/161/3768 Date 10-06-2020/e-GP/20220930/471443/0049121
|
PWD EM Division-7, Dhaka |
৳১১.৯৩ লাখ |
১৪ জুন ২০২০ |
Completed |
|
Supply and Installation fire Extinguisher of National Institute of Cardio Vascular Diseases & Hospital.
EM-7/161/3767 Date 10-06-2020/e-GP/20220930/471489/0049119
|
PWD EM Division-7, Dhaka |
৳৫.৪০ লাখ |
১৪ জুন ২০২০ |
Completed |
|
Retrofitting/Restrengthring and Damaged area of Ground floor due to Breakout of fire in Shaheed Suhrawardi Hospital.
Health OP Renovation /SSMCH /2019-2020/e-GP/20220930/466059/0049118
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৮৯.৫৫ লাখ |
১১ জুন ২০২০ |
Completed |
|
Construction of 2 rooms with Aluminum thai partition and ceiling for providing medical treatment to corona infected patients construction of rooms for sanitary inspector and ward master with brick wall and Aluminum thai partition construction of room for breakslab of orthopedic patients at Shaheed Suhrawardy Medical College and Hospital
SDE-M/COVID fund2/1/2019-20/e-GP/20220930/466964/0049116
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳১৮.০০ লাখ |
৭ জুন ২০২০ |
Completed |
|
Construction of Dress Changing room and shower room at entry and exit point and fitting of 9 basins and water line sanitary fittings in Shaheed Suhrawardy Medical College Hospital.
SDEM/COVID fund/SSMCH-3/ 2019-2020/e-GP/20220930/466004/0049113
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳১৮.০০ লাখ |
৭ জুন ২০২০ |
Completed |
|
Rehabiliation of Sundarpur Pry. School Road from Ch.750m-1750m Road ID-475104001. Under Chatkhil Upazila Dist Noakhali.
LGED/Noa/ VRRP/Re-hab/19-20/ W-1099/e-GP/20230927/458750/0091137
|
Office of the Executive Engineer, LGED, Noakhali |
৳৩৫.৬১ লাখ |
৭ জুন ২০২০ |
Completed |
|
Repair Renovation and Painting Work for Hostel and Guest House Building at RDA Bogura.
APP-2019-20/RDA/Bog/Admin/PW-04/e-GP/20220926/456330/0043079
|
Director (Administration), Rural Development Academy (RDA), Bogura. |
৳১.৩৫ কোটি |
১০ মে ২০২০ |
Completed |
|
Repair and Renovation work of i Kogsora Community Clinic ii Moriola Community Clinic iii Sultangonj Community Cliniciv Shohospur Community Clinic V Sonkai Community Clinic vi Ishania Community Clinic at Bochagonj Upazilla in Dinajpur District.
WP/SDP-4GOB-HED-12210/e-GP/20221224/450615/0058640
|
HED, Dinajpur Division, Dinajpur |
৳২৫.২৮ লাখ |
৫ এপ্রিল ২০২০ |
Completed |
|
Internal Road carpetingPainting room campus cleaning and necessary renovation work of occasion of visit The honorable Prime Minister in National Institute of Opthalmology and hospital at Sher-e-Banglanagar.
SDE-M/ APP/ Non- Res/2019-2020/e-GP/20220930/448273/0049109
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳১৮.০০ লাখ |
১৯ মার্চ ২০২০ |
Completed |
|
Supply and Installation Air conditioning system including electrical renovation for renovation work by Civil Department of 7 nos OT at National Institute of Cardiovascular Diseases and Hospital Sher-e-Bangla Nagar Dhaka.
EM-7/161/2726 Date 04-02-2020/e-GP/20220930/426890/0049342
|
PWD EM Division-7, Dhaka |
৳৫৩.৯৫ লাখ |
১৩ ফেব ২০২০ |
Completed |
|
Vertical Extension of Shaheed Suhrawardi Hospital S.B. Nagar Dhaka. Sub Head- Fitting Fixing of Door Shutter and Frame Grill Thai Aluminium Window Roof trues collapsible gate verandah railing Door closure sand filing flat soling Brick work.
SDE-M/ Beautification -WD-10 /2019-2020/e-GP/20220930/420205/0049107
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৯৯.৭৫ লাখ |
৪ ফেব ২০২০ |
Completed |
|
Vertical Extension of Shaheed Suhrawardi Hospital S.B. Nagar Dhaka. Sub Head- Fitting fixing of Fiber glass Tempered door Angle window grill G I pipe Rolling shutter veneered board in walling False ceiling Remaing work
SDE-M/ Remaining WD-10 /2019-2020/e-GP/20220930/420206/0049105
|
Shere Bangla Nagar PWD Division-1, Dhaka |
৳৯৯.৮০ লাখ |
৪ ফেব ২০২০ |
Completed |