ProcureIndex
Shareable track record
M/S PRIYA ENTERPRISE
25
Contract progress
24
Completed contracts
133
Awards
BDT 17.44 crore
Total value
By year
| Year | Contract progress | Value | Awards | Amount |
|---|---|---|---|---|
| 2026 | 0 | BDT 0 | 25 | BDT 3.01 crore |
| 2025 | 0 | BDT 0 | 16 | BDT 1.57 crore |
| 2024 | 0 | BDT 0 | 7 | BDT 73.70 lakh |
| 2023 | 3 | BDT 22.49 lakh | 17 | BDT 1.20 crore |
| 2022 | 2 | BDT 1.91 crore | 8 | BDT 3.30 crore |
| 2021 | 1 | BDT 17.99 lakh | 12 | BDT 73.70 lakh |
| 2020 | 4 | BDT 84.87 lakh | 12 | BDT 2.33 crore |
| 2019 | 8 | BDT 3.29 crore | 12 | BDT 3.25 crore |
| 2018 | 6 | BDT 20.97 lakh | 11 | BDT 32.30 lakh |
| 2017 | 1 | BDT 30.78 lakh | 2 | BDT 35.90 lakh |
| 2016 | 0 | BDT 0 | 8 | BDT 37.50 lakh |
| 2015 | 0 | BDT 0 | 3 | BDT 26.30 lakh |
By work type
- Unknown 0 contracts · BDT 12.84 crore
- Works 24 contracts · BDT 11.13 crore
- Goods 1 contracts · BDT 43.90 lakh
Contract progress
| Reference no. | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
| ADP/CHH.POU/T-02/2022-23/W-17/e-GP/20231116/803937/00128893 | Office Of The Chhagalniya Pourashava, Feni ↗ | BDT 7.85 lakh | 27 Mar 2023 | Completed |
| ADP/CHH.POU/T-02/2022-23/W-18/e-GP/20231113/803938/00126362 | Office Of The Chhagalniya Pourashava, Feni ↗ | BDT 12.24 lakh | 27 Mar 2023 | Ongoing |
| ADP/MRP/CHH.POU/T-02/2022-23/G-01/e-GP/20231116/803942/00128981 | Office Of The Chhagalniya Pourashava, Feni ↗ | BDT 2.40 lakh | 27 Mar 2023 | Completed |
| e-Tender/LGED/Sht/GOBM/21-22/W-46/e-GP/20230828/695930/0078778 | Office of the Executive Engineer, LGED, Shariatpur ↗ | BDT 1.86 crore | 12 May 2022 | Completed |
| ADP/KAN2021-22/W-01/e-GP/20231122/676931/00134708 | Office of the Upazila Engineer, kanaighat, Sylhet ↗ | BDT 4.85 lakh | 23 Mar 2022 | Completed |
| e-Tender/LGED/SYL/GOBM/21-22/W-69/e-GP/20230814/611246/0077745 | Office of the Executive Engineer, LGED, Sylhet ↗ | BDT 17.99 lakh | 30 Sep 2021 | Completed |
| e-Tender/ADP/SREE/2019-20/11/e-GP/20231101/449783/00120560 | Office of the Upazila Engineer, Sreemangal ↗ | BDT 7.60 lakh | 3 May 2020 | Completed |
| e-Tender/PEDP4/SLT/KAN/2019-2020/W17.01110/e-GP/20231121/446048/00134578 | Office of the Upazila Engineer, LGED, Kanaighat, Sylhet ↗ | BDT 10.61 lakh | 22 Mar 2020 | Completed |
| ADP/CP/19-20/06/e-GP/20231113/438140/00126470 | Office of the Mayor, Chhagalnaiya Paurashava, Feni ↗ | BDT 27.88 lakh | 10 Mar 2020 | Completed |
| LGED/Mou/VRRP/OL/19-20/W-615/e-GP/20231004/422607/0096714 | Office of the Executive Engineer, LGED, Moulvibazar ↗ | BDT 38.78 lakh | 6 Feb 2020 | Completed |
| e-Tender/NBIDGPS/MOU/SRE/2019-2020/W1.04899/e-GP/20231031/377483/00119789 | Office of the Upazila Engineer, LGED, Sreemongal, Moulvibazar ↗ | BDT 1.09 crore | 18 Nov 2019 | Completed |
| e-Tender/LGED/Moul/GOBM/19-20/W-17/e-GP/20231007/376247/0098549 | Office of the Executive Engineer, LGED, Moulvibazar ↗ | BDT 16.33 lakh | 6 Nov 2019 | Completed |
| e-Tender/LGED/SYL/GOBM/19-20/W-67/e-GP/2023919/371794/0084504 | Office of the Executive Engineer, LGED, Sylhet ↗ | BDT 56.65 lakh | 30 Oct 2019 | Completed |
| e-Tender/LGED/SYL/GOBM/19-20 /W-09/e-GP/2023919/371763/0084972 | Office of the Executive Engineer, LGED, Sylhet ↗ | BDT 24.48 lakh | 28 Oct 2019 | Completed |
| ADP/19-20/04/e-GP/20231116/352685/00128934 | Office of the Mayor, Chhagalnaiya Paurashava, Feni ↗ | BDT 40.18 lakh | 5 Sep 2019 | Completed |
| e-Tender/LGED/Kanai/ADP/2018-19/W-03/e-GP/20231225/277754/00157380 | Office of the Upazila Engineer, kanaighat, Sylhet ↗ | BDT 2.70 lakh | 29 Jan 2019 | Completed |
| e-Tender/LGED/Kanai/ADP/2018-19/W-08/e-GP/20231225/277780/00157383 | Office of the Upazila Engineer, kanaighat, Sylhet ↗ | BDT 4.45 lakh | 29 Jan 2019 | Completed |
| e-Tender/NBIDGPS/MOU/KAM/2018-19/W1.03255/e-GP/20231025/269673/00115252 | Office of the Upazila Engineer, LGED, Kamalganj, Moulvibazar ↗ | BDT 74.72 lakh | 15 Jan 2019 | Completed |
| GSIDP/MOU/DW-57/e-GP/20231014/239785/00107364 | Office of the Executive Engineer, LGED, Moulvibazar ↗ | BDT 3.03 lakh | 30 Oct 2018 | Completed |
| GSIDP/MOU/DW-59/e-GP/20231012/239788/00106862 | Office of the Executive Engineer, LGED, Moulvibazar ↗ | BDT 3.05 lakh | 30 Oct 2018 | Completed |
| GSIDP/MOU/DW-10/e-GP/20231011/178718/00105649 | Office of the Executive Engineer, LGED, Moulvibazar ↗ | BDT 4.75 lakh | 28 Mar 2018 | Completed |
| e-Tender/LGED/Kanai/ADP-2017-18/W-01/e-GP/20231122/155171/00134642 | Office of the Upazila Engineer, kanaighat, Sylhet ↗ | BDT 3.15 lakh | 22 Jan 2018 | Completed |
| e-Tender/LGED/Kanai/ADP-2017-18/W-05/e-GP/20231122/155214/00134728 | Office of the Upazila Engineer, kanaighat, Sylhet ↗ | BDT 4.11 lakh | 22 Jan 2018 | Completed |
| e-Tender/LGED/Kanai/ADP-2017-18/W-06/e-GP/20231122/155223/00134726 | Office of the Upazila Engineer, kanaighat, Sylhet ↗ | BDT 2.88 lakh | 22 Jan 2018 | Completed |
| IRIDP-2/SYL/DW-261/e-GP/2023102/117376/0095020 | Office of the Executive Engineer, LGED, Sylhet ↗ | BDT 30.78 lakh | 19 Sep 2017 | Completed |
Awards
| Package | Office (PE) | Amount | Contract date | Official record |
|---|---|---|---|---|
| Supply of Summer cloth Winter cloth Shoes Jacket Umbrella etc for tecnical and non-tecnical workers under S&D Division-2BPDBBrahmanbaria | Executive Engineer,Sales and Distribution-2, Brahmanbaria. | BDT 3.60 lakh | 13 Sep 2026 | Official record |
| Procurement of Uniforms for Technical Employees Working under Sales and Distribution Division-1 BPDB Brahmanbaria. | Distribution Division, BPDB, Brahmanbaria | BDT 4.50 lakh | 7 Sep 2026 | Official record |
| Supply & Installation of cradle guard wire net at Cumilla EPZ. | Executive Engineer (Elec & Mech), CUMEPZ | BDT 6.90 lakh | 2 Jul 2026 | Official record |
| Cleaning jungle in office area ZRS residential area school area and other areas including pond area of jangalia BPDB Campus under Sales and Distribution Division-3 BPDB Cumilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 3.00 lakh | 21 May 2026 | Official record |
| Emergency repairs and maintenance work of 33 KV Ashuganj and 33 KV Ghatura feeders replacement of damaged poles straightening of tilted poles installation of push poles re-tensioning of sagging wires replacement of damaged fittings under Sales & Distribition division-Sarail BPDB Brahmanbaria. | Sales & Distribution Division, Sarail, Brahmanbaria. | BDT 4.00 lakh | 11 May 2026 | Official record |
| Equipments and pole Caring Of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 4.00 lakh | 10 May 2026 | Official record |
| Equipments and Goods purchase For 33kv line and 33/11kv Substation Maintenance works of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 10 May 2026 | Official record |
| Emergency repair and maintenance works including replacement of brake shoes and brake pads repair of the suspension system replacement of clutch plate and pressure plate repair or replacement of self-starter along with other ancillary works for vehicle No. Brahmanbaria-Tha-11-0031 under the jurisdiction of Sales & Distribution Division-1 BPDB Brahmanbaria. | Distribution Division, BPDB, Brahmanbaria | BDT 2.00 lakh | 5 May 2026 | Official record |
| Procurement of foreign-made high-quality tyres and batteries for vehicles No. 11-0031 0055 and 0065 used at Sales & Distribution Division-1 BPDB Brahmanbaria. | Distribution Division, BPDB, Brahmanbaria | BDT 3.00 lakh | 5 May 2026 | Official record |
| Procurement of printer toner computer accessories printing services and stationery items for the office of Sales & Distribution Division-1 BPDB Brahmanbaria. | Distribution Division, BPDB, Brahmanbaria | BDT 3.00 lakh | 5 May 2026 | Official record |
| Supply & installation of TyreTube and Battery for Vehicles of S&D Division-2BPDBBrahmanbaria | Executive Engineer,Sales and Distribution-2, Brahmanbaria. | BDT 1.90 lakh | 10 Mar 2026 | Official record |
| Vehicle Maintenance works Of Mohindraw-1 of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 1.50 lakh | 26 Feb 2026 | Official record |
| Procurement/supply of different types of tools digger chopper saw fittings of 11 kV and 33 kV line etc for use under sales and distribution division – Sarail BPDB Brahmanbaria. | Sales & Distribution Division, Sarail, Brahmanbaria. | BDT 1.50 lakh | 24 Feb 2026 | Official record |
| A). Construction of CC work at Upozila Complex Road (ch.00-130.0m) & (ch.00-40.0m) at kanaighat Pourashava. B). Construction of CC Road from Kurerghat Point to Kelurbond Culvert (ch.00-200.0m) at Ward No.6 Kanaighat Pourashava Sylhet. | Office of the Kanaighat Pourashava, Sylhet | BDT 13.70 lakh | 24 Feb 2026 | Official record |
| A). Construct of Brick drain at Shapla Point (ch.00-125.0m) in ward No.8 Kanaighat Pourashava. B). Construction of CC Work at Kanaighat Bazar Between Kamar Hati to Genji Market ward No-8 Kanaighat Pourashava Sylhet. C). Construction of officers club field at kanaighat Upozila complex in Kanaighat Pourashava Sylhet. | Office of the Kanaighat Pourashava, Sylhet | BDT 15.90 lakh | 24 Feb 2026 | Official record |
| Repair Maintenance and Development work of defected poles and 11 kV11/.4 kV0.4 kV Distribution line of 11 kV Sarail Feeder under sales and distribution division-2BPDBBrahmanbaria. | Executive Engineer,Sales and Distribution-2, Brahmanbaria. | BDT 4.00 lakh | 19 Feb 2026 | Official record |
| The deposit work under the office of Sales and Distribution Division-1 PDB Brahmanbaria and within the approved project titled 'Upgradation of Brahmanbaria City Road from Puniout to Malihata into a 4-Lane Highway' the scope of work comprises the relocation and transportation of the existing 33 kV 11 kV and 0.4 kV lines along with the 11/0.4 kV substation situated at the Bishwa Road intersection within the Nandanpur to Malihata section as part of the road expansion component. | Distribution Division, BPDB, Brahmanbaria | BDT 6.90 lakh | 19 Feb 2026 | Official record |
| Construction of R.C.C Drain & Road at shaplabhag to shantibhag ch.00+285m under 7 no ward under Sreemangal Pourashava Dist: Moulvibazar. | Office of the Sreemangal Pourashava, Moulvibazar | BDT 39.90 lakh | 12 Jan 2026 | Official record |
| Periodic Maintenance of Sindurkhan G.C to Satgaon RHD via Hoglia bazar Road from Ch. 00-4000m under Upazila:-Sreemangal District :-Moulvibazar (Road ID-658832007). | Office of the Executive Engineer, LGED, Moulvibazar | BDT 64.50 lakh | 11 Jan 2026 | Official record |
| 33 KV Lines/ Feeders Schedule and Emergency Maintenance work Of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 6.00 lakh | 8 Jan 2026 | Official record |
| Transformer Installation at load center and Faulty Transformer (11/0.4 KV) Replace and related 11/.4 kv line maintenance works System Up-gradation works Of all 11 kv Feeders of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 6.00 lakh | 8 Jan 2026 | Official record |
| Emergency and Schedule Maintenance Works of 11kv Feeders 11/0.4 kv line maintenance Transformer Installation and System Up-gradation works of Budichong Electric Supply | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 8 Jan 2026 | Official record |
| Goods Equipments and pole Caring Of APP Works For Maintenance works of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.90 lakh | 8 Jan 2026 | Official record |
| Emengency repair and maintenance of non-standard 11 kV 11/0.4 kV and 0.4 kV distribution line and systematic improvement works to eliminate low voltage problems in 11 kV Dhauriya feeder and some regions of 11 kV Shahbazpur feeder including Shahjadapur Gazipur Molaish Aminpara Dhitpur under Sales & Distribition division-Sarail BPDB Brahmanbaria | Sales & Distribution Division, Sarail, Brahmanbaria. | BDT 4.00 lakh | 7 Jan 2026 | Official record |
| Construction of Single Storied Academic Building with 4-Storied foundation including Sanitary Water supply Electrification & Deep Tube-well works at Chandaish Alhaj Alimia Islamia Alim Madrasha Nangalkot Cumilla. | Office of the Executive Engineer, EED, Comilla, District. | BDT 85.00 lakh | 4 Jan 2026 | Official record |
| (65883-26-10061) Improvement By Brick flat Soling on front Side of Biraimpur Masterer Dukan to Baharer bari Sreemangal Up Sreemangal. (65883-26-10062) Improvement By Brick flat Soling on front Side of Poshchim Sreemangal Sundorpur Bridge to Dokshin Mukhi Mosque Sreemangal Up Sreemangal. (65883-26-10063) Improvement By Brick flat Soling on front Side of Ruposhpur Imam Bari to Tuta Miah Basha Sreemangal Up Sreemangal. (65883-26-10064) Improvement By Brick flat Soling on front Side of Shahibag Johirul Islam Jahider Bari to Khukon Miar Bari Road Sreemangal Up Sreemangal. (65883-26-10065) Improvement By Brick flat Soling on front Side of Uttarsur Nasir Miah Dukan to Surab Miah bari Pucca Road Mukh Sreemangal Up Sreemangal. (65883-26-10066) Construction of Guide wall at front Side of Uttarsur Pak Panchaton Majar Road Fotic Miah Bari Road both Side Sreemangal Up. (65883-26-10341) CC Road for 3 NO Sreemangal Union 3 NO word Purbo Biraimpur LGED Pice Road Muk Abdul Mannan Bari to Shan Miah Bari Sreemangal Up Moulvibazar. | Office Of The Upazila Engineer, Sreemangal, Moulvibazar | BDT 13.30 lakh | 30 Dec 2025 | Official record |
| (A) Brick Flat Soling work on road from Sreemangal Alia Madrasha Gate to Abdul Awal Tarader house under Sreeemangal Upazila Dist:Moulvibazar. (B) Development of Shaibug Baitunur Jame Mosque Under Sreemangal Upazila Dist: Moulvibazar. (C ) Renuvation work of Sreemangal Udayan Girl High School Under Sreemangal Upazila Dist: Moulvibazar.(D) Construction of Culvert on Amanatpur and South Uttar Shur Village Siraj mia house side Full Chara Under Sreemangal Upazila Dist:Moulvibazar. | Zilla Parishad Moulvibazar | BDT 11.40 lakh | 18 Nov 2025 | Official record |
| Construction of Boundary wall and Gate of Sreemangal GPS under PEDP4 | Office of the Upazila Engineer, LGED, Sreemongal, Moulvibazar | BDT 20.50 lakh | 17 Aug 2025 | Official record |
| Supply of winter and summer uniform clothing and shoes for technical and non-technical employees working at Sales and Distribution Division-1 BPDB Brahmanbaria office. | Distribution Division, BPDB, Brahmanbaria | BDT 10.70 lakh | 22 Jun 2025 | Official record |
| Procurement of sanitary goods for use in houses offices restaurants and repair shops under Sales and Distribution Division-3 BPDB Cumilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 18 Jun 2025 | Official record |
| Supply of Summer cloth winter clothshoeumbrella etc for technical and non technical workers under S&D Division-2BPDBBrahmanbaria | Executive Engineer,Sales and Distribution-2, Brahmanbaria. | BDT 6.30 lakh | 26 May 2025 | Official record |
| Emergency Baily Bridge Repair at Daulatpur Bridge (10+545) Km Muklishpur Bridge-1 (11+168) Km. Muklishpur Bridge-2 (11+565) Km Metonghor Bridge (12+700) Km Karoibari Bridge (13+372) Km. of Companiganj-Nabinagar Road (Z-1206) & Gomti Bridge (24+050) km. of Eliotgonj-Muradnagor-Ramchandrapur-Bancharampur Road (Z-1042) under Cumilla Road Division Cumilla during the year 2024-2025. | Road Division, Comilla | BDT 11.50 lakh | 26 May 2025 | Official record |
| 11kv Express Feeder line construction Deposit Works for Newly constructed 2 building (load 3.2 MW) in Police line Area by PWD cumilla Division Under Area of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 27.20 lakh | 13 May 2025 | Official record |
| Filling of low places and pits around Officers Dormitory Building construction of drains for waterlogging construction of RCC roads fencing and other related civil and maintenance works under Sales and Distribution Division 3 BPDB Cumilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 3.00 lakh | 5 May 2025 | Official record |
| Emengency repair and maintenance of non-standard 11 kv 11/0.4 kv and 0.4 kv distribution line and systematic improvement works to eliminate low voltage problems in and around Dhitpur bazar under 11 KV Shabazpur feeder of Sales & Distribition division-Sarail BPDB Brahmanbaria | Sales & Distribution Division, Sarail, Brahmanbaria. | BDT 2.70 lakh | 22 Apr 2025 | Official record |
| 33 KV Lines/ Feeders Schedule and Emergency Maintenance work Of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 4.30 lakh | 22 Apr 2025 | Official record |
| Repair Maintenance and Development work of defected poles and 11 kV11/.4 kV0.4 kV Distribution line of 11 kV BISCIC Feeder under sales and distribution division-2BPDBBrahmanbaria | Executive Engineer,Sales and Distribution-2, Brahmanbaria. | BDT 3.40 lakh | 15 Apr 2025 | Official record |
| (1) Improvement By Brick flat Soling on front Side of Uttar Bharaura Manik Miah bari to Narayon Baidda Bari Sreemangal Up Moulvibazar. (2) Construction of Guide wall at Dilbornagar Road Side Sreemangal Up moulvibazar. (3) Improvement By Brick flat Soling on HUGLIA Gazipur Road Shindurkhan Up Sreemangal.Moulvibazar. (4) Improvement By Brick flat Soling & Guide wall on Shondani para Road (Near Apurbo Deb Basha to Brojo Kishor Denath Basha) Sreemangal up.Moulvibazar. (5) Construction of Guide wall at Purbasha Charar Side Sreemangal Up Moulvibazar. | Office Of The Upazila Engineer, Sreemangal, Moulvibazar | BDT 10.90 lakh | 25 Feb 2025 | Official record |
| A). Construction of CC Road at Nonderai Surma Dike Road(Ch0.00m-50.0m) under 03 no word in Kanaighat Pourashava. B). Construction of Guidwall with Brick Flat Salling at Shibnagor Road to Noighor Zame Mosque Road (Ch-00.00m-165.00m) at 04 no word in Kanaighat Pourashava. C). Guidwall with Sand Filling from ShibnagorZame Mosque to MA Hannan House via Lamargram Connecting Road(Ch 0.00m-735.00m) at 04 no word in Kanaighat Pourashava. | Office of the Kanaighat Pourashava, Sylhet | BDT 12.40 lakh | 16 Feb 2025 | Official record |
| A). Guidwall with sand filling work from Jangalkuna Zame mosjid to Bisnupuri Khal via Faruk house (ch.00-160.0m) at 09 no Ward in Kanaighat Pourashava. B). Construction of CC work from Kanaighat-Sahbag road to Yeahia Tanjil house road (ch.00-110.0m) at 09 no Ward in Kanaighat Pourashava. C). Construction of CC work at Bishnopur Borobarhi house road (ch.00-75.0m) at 09 no Ward in Kanaighat Pourashava. | Office of the Kanaighat Pourashava, Sylhet | BDT 9.60 lakh | 16 Feb 2025 | Official record |
| Repair Work of Eliotganj Regulator (14-Vent) of Gumti Phase-1 Project at Upazilla Daudkandi in c/w Operation Expenditure Budget under Cumilla WD Division BWDB Cumilla during the year 2024-25. | Cumilla WD Division, BWDB | BDT 7.60 lakh | 6 Feb 2025 | Official record |
| Right of Way & Tree Trimming of 11kv 0.4 KV Line of all Feeder of Sales & Distribution Division-1 BPDB Cumilla works Of 11 kv Feeder under 33/11 kv Kotbadi Substation of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 9.40 lakh | 29 Dec 2024 | Official record |
| Goods Equipments and pole Carring Of APP Works For Maintenance works of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 10.00 lakh | 10 Dec 2024 | Official record |
| Transformer (11/0.4 KV) installation at load center and related 11/.4 kv line maintenance work System Up-gradation works Of 11 kv Feeder under 33/11 kv Kotbadi Substation of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 8.20 lakh | 5 Dec 2024 | Official record |
| Improvement of Mothurapur Namajkhana-Shadirdha Ghat Road at Ch. 500-825m under Dhunat Upazila District-Bogura. [Road ID # 110274015]. | Office of the Executive Engineer, LGED, Bogura | BDT 32.80 lakh | 1 Apr 2024 | Official record |
| Goods Equipments and pole Carring Of APP Works For Maintenance works of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 8.80 lakh | 20 Feb 2024 | Official record |
| Purchase of various parts tools and accessories for the use of technical staff at Sales & Distribution Division-3 BPDB Comilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 31 Jan 2024 | Official record |
| Emergency Repair and maintenance of Civil works for Jangalia PDB colony residential house No. F/34 F/18 F/29 & F/26 under Sales and Distribution Division 3 BPDB Cumilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.50 lakh | 14 Jan 2024 | Official record |
| Improvement of Boruna Hazipur Muhammadia Latifia Madrasha Mosque under Kalapur union [Latitude: 24.3862 Longitude: 91.7262] | Office of the Executive Engineer, LGED, Moulvibazar | BDT 4.30 lakh | 27 Dec 2023 | Official record |
| Transformer (11/0.4 KV) installation at load center and related 11/.4 kv line maintenance work System Up-gradation works Of 11 kv Feeder under 33/11 kv Kotbadi Substation of Sales & Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 8.00 lakh | 26 Oct 2023 | Official record |
| A). Construction of CC Work at Monsuria-Shibnagor Road infront of Al Modina Market Word No 3 Under Kanaighat pourashava. B). Construction of CC Work at Nonderai Dike Road word No 3 Under Kanaighat Pourashava. C). Construction of CC Work at Shibnagor Madrasa Point to shibnagor shuloghor road (Ch 0.00 to Ch 210.00) Mujimmil House word No 4 under Kanaighat Pourashava. | Office of the Kanaighat Pourashava, Sylhet | BDT 11.40 lakh | 25 Sep 2023 | Official record |
| Construction of CC Work from Moheshpur Moulana abdul Lotif House to Kala Miah house at word No 7 under Kanaighat Pourashava. | Office of the Kanaighat Pourashava, Sylhet | BDT 14.30 lakh | 25 Sep 2023 | Official record |
| A). Construction of CC Work from Bishnupur Borobarhi point Water Priject Road Word No 9 under Kanaighat Pourashava. B). Construction of CC Work at Kanaighat-Suraighat road to Yeahia Tanjil House Word No 9 Under Kanaighat pourashava. C).Construction of CC Work at Mandergram-Kurarghat Road to Azir Master House Word No 9 Under Kanaighat pourashava. | Office of the Kanaighat Pourashava, Sylhet | BDT 13.40 lakh | 25 Sep 2023 | Official record |
| Construction of CC work from Dalaichor mosjid - Stadium road to Shahabuddin house road (ch.00-180.0)m at ward no-08 under Kanaighat Pourashava District:Sylhet. | Office of the Kanaighat Pourashava, Sylhet | BDT 6.50 lakh | 16 Jul 2023 | Official record |
| Work for moving 33 KV 11 KV and 0.4 KV Line Poles and related equipments to a safe distance of 33 KV Safiul Alam and 11 KV Dayara and Daulatpur feeders for construction of an underpass at Beltali under Sadar Dakshin Upazila (at Comilla University entrance) of Dhaka-Chittagong 4-lane National Highway (N-1) under Comilla Road Division. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 6.90 lakh | 25 Jun 2023 | Official record |
| Goods Equipment and Pole Carrying For Maintenance and development works of Sales and Distribution Division-1 BPDB Cumilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 5 Jun 2023 | Official record |
| (1) Construction of Surface drain Beside of Banshpara Primary School road at Banshpara ward no 06Under Chhagalnaiya PourashavaFeni. (2) Construction of RCC Gatla infront to Omad Raza Hazi Bari Ponds atBanshpara Ward no 06Under Chhagalnaiya Pourashava.Feni. | Office Of The Chhagalniya Pourashava, Feni | BDT 6.70 lakh | 23 May 2023 | Official record |
| Construction of Septic Tank (a) Poura Bhaban (b)South Jashpur BGB Camp(c) BFS of Shahin house road (26.00X4.55)(d) CC Work of Ismail Monshi mosque Oju Khana Ward no- 0607 Chhagalnaiya Pourashava Feni. | Office Of The Chhagalniya Pourashava, Feni | BDT 7.80 lakh | 23 May 2023 | Official record |
| Improvement of BFS Banshpara Mozid Patwary bari Link Road(a) Abdul momin House road (5.00X1.80)(b) Balal & Shahab Uddin House road (55.00X1.80) (c) Abdul Gofran House road (13.00X 1.80)(d) Kafil Uddin House road (27.00X1.80)(e) Kamal & Jobar House road (10.00X1.80) (f) Kofil Patwary House Road (45.00X1.80) Construction of Boundary Wall Front side of (g) Banshpara Government Primary School & Earth Filling Work of School Field (h) Grave Yard Wall Patwary bari & Chowdhury bari at Banshpara Ward no 06 Under Chhagalnaiya Pourashava.Feni. | Office Of The Chhagalniya Pourashava, Feni | BDT 7.90 lakh | 23 May 2023 | Official record |
| Installation of Deep Tubewell Infront of (a) Siddique Sareng house for Community use(b) Front of Banshpara Center Mosque(c) Front of Hisachora Mosque(d) West Chhagalnaiya Rafit house at Ward no 03040506 North Pouna Under Chhagalnaiya PourashavaFeni. | Office Of The Chhagalniya Pourashava, Feni | BDT 12.20 lakh | 23 May 2023 | Official record |
| Supplying Toxic Chemicals Fogger Machine & Grass cutter for Mosquito Repellent Program for Chhagalnaiya Pourashava Feni. | Office Of The Chhagalniya Pourashava, Feni | BDT 2.40 lakh | 23 May 2023 | Official record |
| Supplying of Covid-19 (Corona Virus) protection material for Chhagalnaiya Pourashava Feni. | Office Of The Chhagalniya Pourashava, Feni | BDT 2.40 lakh | 23 May 2023 | Official record |
| বিবিবি-à§§ বিà¦?বà§?া à¦?à§?মিলà§?নà§?নার à¦?à¦?তাধà§?ন সà¦?ল à§©à§© à¦?à§?à¦à¦¿ লাà¦?নà§?র à¦?পদ à¦?ালà§?ন à¦?নাà¦?াà¦?à¦?à§?ষিত à¦?বà¦? à¦?à§?à§? বা পà§?রাà¦?à§?তিà¦? দà§?রà§?যà§?াà¦?à§? à¦?à§?ষতিà¦?à§?রসà§?হ লাà¦?নà§?র মà§?রামত à¦? সà¦?রà¦?à§?ষন à¦?াà¦?। | Sales and Distribution Division-1, BPDB, Comilla | BDT 3.50 lakh | 17 May 2023 | Official record |
| Improvement By Brick flat Soling on (1) 3 no Woard Jibangonj Bazar to Purbo Side Kaborstan Road(2) 8 no Woard Aoi Near Masuk House to Kamaicharra Bridge (3) 5 no Woard Bada Alisa Porchim Main Road to Near Teka Mia House(4) 2 no Woard Vhimsi Horu Das House to Porchim Side Mongalchondri Road(5) 5 no Woard Rajpara ( Threemohana) Road(6)Constof Guide Wall at Kalahupacharra Near Charagali HouseVhanabir Up Sreemangal Upazila.Moulvibazar. | Office Of The Upazila Engineer, Sreemangal, Moulvibazar | BDT 5.70 lakh | 18 Apr 2023 | Official record |
| 11 kv line Constraction deposite work | Sales and Distribution Division-1, BPDB, Comilla | BDT 1.40 lakh | 7 Feb 2023 | Official record |
| Division App 2022-23 Malamal Pole and Equipment Carrying work | Sales and Distribution Division-1, BPDB, Comilla | BDT 10.00 lakh | 16 Nov 2022 | Official record |
| Periodic Maintenance of Sahebrampur Launch Ghat to Ramjanpur UP Office (Natun Torkey) Road via Sahebrampur UP Road from Ch.7700m-11150m [Kalkini] | Office of the Executive Engineer, LGED, Madaripur | BDT 1.04 crore | 4 Oct 2022 | Official record |
| Widening of Bhedarganj GC-Chamta UP Via Sottapur road from Ch.00m-2890m.[Bhedarganj]Road ID (386143015) | Office of the Executive Engineer, LGED, Shariatpur | BDT 1.86 crore | 13 Jul 2022 | Official record |
| a) Improvment of CC Work at Karaballah Surma Bazar Jatri Sawni to East Facing Road. b) Construction of Ghatla at Lohajuri Noyabazar Front of Taz Uddin Shop. c) Construction of Guide Wall beside of Nikhil babu house Vati Bara-Poith near Andu-River under 01 no-Laxmiproshad Purbo UP. Upazila- Kanaighat District-Sylhet | Office of the Upazila Engineer, kanaighat, Sylhet | BDT 4.80 lakh | 18 May 2022 | Official record |
| Repair & maintenance work of 11 kv & 0.4 kv poor distribution lines installation of Transformers to mitigate low voltage problem solve of different areas of 11kv Dhonatory & BARD Feeder under Sales and Distribution Division-3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 6.00 lakh | 20 Jan 2022 | Official record |
| Repair & maintenance works of All 11kv feeder damage transformer Rescue/Instillation Low Voltage problem solved for new Transformer Installation & different transformer repair earthing Installation under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 18 Jan 2022 | Official record |
| Carrying work of Electrical goods allocation of Central store of BPDB under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 8.00 lakh | 16 Jan 2022 | Official record |
| Carring of allocated goods from various store of BPDB fro operation maintenance development & emergency work under s&d-1 Division Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 6.00 lakh | 16 Jan 2022 | Official record |
| Periodic Maintenance of RHD Road (Hazipur)-Lolefor Surma Dyke Road (Road ID: 691384054) from Ch. 1000m-1490m [Golapgonj] | Office of the Executive Engineer, LGED, Sylhet | BDT 18.00 lakh | 7 Nov 2021 | Official record |
| Repair & maintenance development works of 11/0.4 & 0.4 kv lines Emergency & Unaccepted natural climate damage All Feeder under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 4.00 lakh | 8 Jun 2021 | Official record |
| Carrying work of Electrical goods allocation of central store of BPDB under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 8 Jun 2021 | Official record |
| Repair & maintenance work of 11 kv & 0.4 kv poor distribution lines installation of Transformers to mitigate low voltage problem solve of world road different areas of 11kv Tomsom Bridge & Doiyara Feeder under Sales and Distribution Division-3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 3.00 lakh | 6 Jun 2021 | Official record |
| Repair and maintenance work of patina stone dahlia of D Type bhabon of Civil work for Jangalia PDB colony residential house No. D/3 E/3 E/25 under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 3.00 lakh | 22 Apr 2021 | Official record |
| Repair and maintenance work of Civil work for Jangalia PDB colony residential house No. E/27 F/28 E/11 under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 22 Apr 2021 | Official record |
| Repair maintenance & wearing electrical line Tiup light switch ceiling fan change repair for Jangalia pdb school under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 3.00 lakh | 22 Apr 2021 | Official record |
| Purchase work of daily necessary sanitary goods for residential Office Rest house ZRS under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 22 Apr 2021 | Official record |
| Repair & maintenance works of side of Shasongasa office bhobon & Resident coloni kaliyajuri 33/11 Kv Sub-station Horindhara 33/11 Kv Sub-station Kotbari 33/11 Kv Sub-station Judge curt compile center Etc palace of road Drein inside and out side of room Sweeping and Cleaning & Cutting & right of way clearing work under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 4.00 lakh | 8 Mar 2021 | Official record |
| Carrying work of Electrical goods allocation of Different store of BPDB under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 3.00 lakh | 16 Feb 2021 | Official record |
| Carring of allocated goods from various store of BPDB fro operation maintenance development & emergency work under s&d-1 Division Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 16 Feb 2021 | Official record |
| 11 KV line Electric pole & Transformer shifting work of tomsom bridge laksam road part of chanpur abedin worshop Tomsom bridge to jangaliya bismilla furniture west side of Regional highways for Regional highways convert to 4 Len development project in comilla(tomsombridge) to Noakhali(Begumgonj) by R&H dipdit work Under Sales and Distribution Division-3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 21.70 lakh | 25 Jan 2021 | Official record |
| (1) Construction of RCC drain beside of West Chhagalnaiya Sorkar bari Road at West ChhagalnaiyaWard no 05 Under Chhagalnaiya Pourashava Chhagalnaiya Feni. (2) Improvent of BFS Road 1) Hazi Abdus Samad mazia bari (30X1.8) 2) Nur Islam amin bari (30X1.8) 3.South Satara master para mofiz rahaman bari (15X1.8)4) Nazir bari Hischira (30X1.8)5) New Mizza bari (30X1.8)Constrction of Drain at South Satara Ward no 01 (R) Under Chhagalnaiya Pourashava Feni. (3) Improvent of BFS Road 1) Reparing of Sopi ullaha road CC(45.00x0.76)2) Constrction of palisading work Sahalah ahamed pond 3) Chadgazi khal palisading work at South Satara Ward no 01 Under Chhagalnaiya Pourashava Feni. (4) Constrction of R/W Kari bari pondSouth side of Tulatole Bazzar at South Satara Ward no 02 Under Chhagalnaiya Pourashava Feni. (5) Improvent of BFS Road 1) Bansh para Shaik ahamed road(60.00x2.00)2)Bansh para Nadir kul Kabir bari road (60.00X2.00)3)North Panua Shab bari road CC(45.00X2.00)2) at North Panua Ward no 02 (R) Under Chhagalnaiya Pourashava Feni. (6) Constrction of Pouro Grage Under Pourashava Complex & Thana road1) Constrction of X Culvert Sufi Ahasan Ullaha road at moutaChhagalnaiya pourashavaFeni. (7) Constrction of Boundary wall at Roshan pokir madrasha South JashpurChhagalnaiya pourashavaFeni.Earth filling work with South satara mizi para road Both side Sholder.Tree planting at Azim bouiaya road North Panuaward no 04.Street light at any roadBansh para nadir kul Madrasha Field CCB/W of Hamid ali hazi bari Gavyeard Under Chhagalnaiya PourashavaFeni. | Office of the Mayor, Chhagalnaiya Paurashava, Feni | BDT 27.90 lakh | 9 Jun 2020 | Official record |
| A. Brick Flat Soling on Sunachara Cha Bagan 1 No Line Kalighat UP Under Sreemangal Upazila. B. Brick Flat Soling on front Side of Kalighat Cha Bagan 10 no Line Raman Kormoker Bari to Throwly Paschim Side Kalighat UP Under Sreemangal Upazila. C. Brick Flat Soling on Lakhai Chara Cha bagan Dig Digia Bostir Purbo & Paschim Line Kalighat Up Under Sreemangal Upazila. D. Construction of Sanitary Latrine at Khaichara Cha Bagan Reg. Non Govt. Pry. School. Kalighat UP Upazila Sreemangal. E. Brick Flat Soling on Jagchara Subol Bourir basa to Uttam Kalindi basa Road Kalighat UP Under Sreemangal Upazila. | Office of the Upazila Engineer, Sreemangal | BDT 7.60 lakh | 7 Jun 2020 | Official record |
| Repair & maintenance works of all 11kv feeders distribution lines Rescue of damage transformers & re-placement new transformers & all 11 kv feeders earthling work under Sales and Distribution Division-3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 3 Jun 2020 | Official record |
| Repair and maintenance work of Civil work of store repair for Regional repair factory under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 5.00 lakh | 3 Jun 2020 | Official record |
| Major Maintenance works of Niz Chaura Govt Primary School and Chotodesh Govt Primary School under Kanaighat Upazila Dist : Sylhet. | Office of the Upazila Engineer, LGED, Kanaighat, Sylhet | BDT 10.60 lakh | 1 Jun 2020 | Official record |
| Repair Work of WMCA Office under ( SP No. 23071) Kandibari Khal Sub-Project Parchim Amura Union Upazila: Golapganj District: Sylhet. | Office of the Executive Engineer, LGED, Sylhet | BDT 6.20 lakh | 14 May 2020 | Official record |
| Purchase work of sanitary goods for repair & maintenance works of residence offices rest house transformer repair shop under sales & distribution division-3 bpdbcomilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 31 Mar 2020 | Official record |
| Rehabilitation of Gobindapurbazar-Dughor High School-Shamshergonj Road from Ch. 00m-2295m (ID# 658744112). | Office of the Executive Engineer, LGED, Moulvibazar | BDT 38.80 lakh | 19 Mar 2020 | Official record |
| The tree Cutting & right of way clearing work of All 33Kv over head line Horindhara to Kaliyajuri Horindhara to Kotbari Jangaliya to Kaliyajuri Jangaliya to Kotbari under Sales and Distribution Division-1 BPDB Comilla | Sales and Distribution Division-1, BPDB, Comilla | BDT 2.00 lakh | 9 Mar 2020 | Official record |
| Repair & maintenance works of sub-station Darin repair setter repair switch yard repair galving filling floor CC Dhalai Cable Conductor etc repair for 33/11 Kv Kotbari sub-station under Sales and Distribution Division-1 BPDB Comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 5.00 lakh | 9 Mar 2020 | Official record |
| a). Re-excavation of Central Jointapur High School Pond b)Construction of 01 Nos. Ghatla 15.20*5.00m for Central Jointapur High School Pond under Upazila Jointapur District Sylhet. | Office of the Executive Engineer, LGED, Sylhet | BDT 16.20 lakh | 26 Feb 2020 | Official record |
| Construction of Class Room of JATORPUR Government Primary School under NBIDGPS Project-1 | Office of the Upazila Engineer, LGED, Sreemongal, Moulvibazar | BDT 1.09 crore | 8 Jan 2020 | Official record |
| Periodic Maintenance of Sreemangal -Kamalgonj R&H Road to Sreemangal Khejuri Bazar Road via BGB Bettelien H/Q Sreemangal Road from ch. 00-1500m .(Road ID 658834074) Sreemangal.Dist.Moulvibazar | Office of the Executive Engineer, LGED, Moulvibazar | BDT 16.30 lakh | 30 Dec 2019 | Official record |
| Periodic Maintenance of Machugram (RHD)-Shahpur Road. Road ID: 691594006 Ch. 00m-1420m under Upazila: Kanaighat District: Sylhet | Office of the Executive Engineer, LGED, Sylhet | BDT 24.50 lakh | 15 Dec 2019 | Official record |
| Periodic Maintenance of Sathbak UP-Bhobanigonj bazaar-Banglabazar Road. Road ID: 691593007 Ch. 1415m-3330m under Upazila: Kanaighat District: Sylhet. | Office of the Executive Engineer, LGED, Sylhet | BDT 56.70 lakh | 15 Dec 2019 | Official record |
| Estimate for extension of Pourashava Bhoban at Banshpara Ward No.-06 under Chhagalnaiya Pourashava Feni. | Office of the Mayor, Chhagalnaiya Paurashava, Feni | BDT 40.20 lakh | 27 Oct 2019 | Official record |
| (1) Mantainance of Banshpara Bottule Road at Banshpara Ward No.- 06 Under Chhaglnaiya Pourashava Feni. (2) Improvement of North Panua Khondker Eayat Ullaha Road C C (Ch.00-160 m) at North PonuaWard no 04 Under Chhagalnaiya Pourashava Chhagalnaiya Feni. (3) Construction of Drain Side Wall (North side) of Chhagalnaiya Bazar at Banshpara Ward No.- 06 Under Chhaglnaiya Pourashava Feni. (4) Construction of R/W at Banshpara Toshalder road sideWard no 06 Under Chhagalnaiya Pourashava Feni. (5) Construction of North Panua DC Road GateChhagalnaiya PourashavaFeni. (6) Construction of Drain Side Wall (South side) of Chhagalnaiya Bazar& R& H WallEarth filling of Nazir bari roadOhaid mia pond R/W at Banshpara Ward No.- 06 Under Chhaglnaiya Pourashava Feni.(7) Construction of R/W Bansh para Hanif mizi mosque pond.Clearing and draging at Joggonnat bari drain. Earth filling work Jibon Shah roadMadrasha road. (8) Construction of Surface drain beside of Omad raza hazi bari R.C.C RoadAtimkhana Road CCZobada Khatun madrashapublic toilat roadNosho mizi bari road & R/WShamsul karim road C.C Installation of Deef tube well of any wardMonshi pond mosque B/WUnder Chhagalnaiya Pourashava Chhagalnaiya Feni. (9) Construction of R/W Pond of Alauddin house Pounds Dar box patwary pounds at Banasha Ward no 06 Under Chhagalnaiya Pourashava Feni. (10) Construction of B/W at Banshpara Eid GahaHakim ali hazi bari Gaveyeard Wall Ward no 06 Under Chhagalnaiya Pourashava Feni.(11) Supply & Installation street light with shad at main road Under Chhagalnaiya Pourashava Chhagalnaiya Feni. (12) Construction of CC Road Jashim member bari at BanshparaWard no 06 Under Chhagalnaiya Pourashava Chhagalnaiya Feni. | Office of the Mayor, Chhagalnaiya Paurashava, Feni | BDT 94.00 lakh | 17 Oct 2019 | Official record |
| Constraction of C.C work at Maligram madrasha Devlopment 7no ward Under 5 no Borchatul UP Upazila: Kanaighat District: Sylhet.and Devalopment of Chatul Eidgha Bazar Under 5 no Borchatul UP Upazila: Kanaighat District: Sylhet.and Constraction of Floor C.C work at Haratoil Asadia madrasha Devlopment Under 5 no Borchatul UP Upazila: Kanaighat District: Sylhet. and Construction of Brick Culvert at Rauthgram Shihab mill front culvert 3 no ward under 5 no Borochatul UP Upazila: Kanaighat District: Sylhet.and Constraction of Floor C.C work at Durgapur Hafijia madrasha Devlopment Under 5 no Borchatul UP Upazila: Kanaighat District: Sylhet. | Office of the Upazila Engineer, kanaighat, Sylhet | BDT 4.40 lakh | 27 Mar 2019 | Official record |
| Construction of Brick Culvert at Ranu house to Choura suroighat Road neat the Kobir house and Improvement of Road by Brick flat Soling at Uttar Lakshmiprshad Alim house to Bodthbari Bazar Road and Improvement of Road by Brick flat Soling at Bourvag 2nd part Horudhone house to Hobib house and Construction of 2 Nos Ring pipe Culvert at Kalinogar Siraj house to Chodha kiari Tila Road and Improvement of Road by Brick flat Soling at Gorokpur prymarischool to Moulana Ang Rahman house Road Remaining part under 2 no Lakshmiprshad UP Upazila: Kanaighat District: Sylhet. | Office of the Upazila Engineer, kanaighat, Sylhet | BDT 2.70 lakh | 27 Mar 2019 | Official record |
| Repair and maintenance work for damage road repair of south side of Jangalia PDB rest house under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 21 Mar 2019 | Official record |
| Construction of additional class room of Adkhani GPS under NBIDGPS Phase-01. | Office of the Upazila Engineer, LGED, Kamalganj, Moulvibazar | BDT 74.70 lakh | 20 Mar 2019 | Official record |
| Repair & maintenance work of Distribution lines system development & service renovation including Instalition of transformers for load sharing of 11 kv Tomasmbridge and EPZ Feeder under Sales and Distribution Division-3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 3.00 lakh | 17 Feb 2019 | Official record |
| Improvement of Ashidullah High School Jame Mosque Under Ashidrone Union Upazila Sreemongal Dist. Moulvibazar. [Latitude 24.2974 Longitude 91.7040] | Office of the Executive Engineer, LGED, Moulvibazar | BDT 3.00 lakh | 9 Jan 2019 | Official record |
| Improvement of Bharaura Cha Bagan Jagonnath Mondir Under Kalighat Union Upazila Sreemongal Dist. Moulvibazar. [Latitude 24.3187 Longitude 91.7435] | Office of the Executive Engineer, LGED, Moulvibazar | BDT 3.00 lakh | 9 Jan 2019 | Official record |
| line maintenance & repair work of 33 Kv comilla-3 line and set up of ACR in 33 KV comilla-3 line under s&d-1 PDB comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 2.00 lakh | 28 Jun 2018 | Official record |
| Purchase work of tubelightfan regulatorsocket switch and other metarial for repair & maintanance works of officesresidencerest housecampustransformer repair shop under sales & distribution division-3bpdbcomilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 1.90 lakh | 20 Jun 2018 | Official record |
| Repair & Maintenance work of door & window plastering & distempering of tin shed house house no- E-05 under s&d-1 BPDB comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 1.90 lakh | 18 Jun 2018 | Official record |
| maintenance/extension of store room of control room maintenance of cable trance & associated work of courtbari sub-station under s&d-1 comilla. | Sales and Distribution Division-1, BPDB, Comilla | BDT 1.90 lakh | 18 Jun 2018 | Official record |
| Improvement of Noyansree Purbopara Koborstan under Kalapara Union Upazila Sreemongal Dist. Moulvibazar. [Latitude 24.4004 Longitude: 91.7228] | Office of the Executive Engineer, LGED, Moulvibazar | BDT 4.80 lakh | 15 May 2018 | Official record |
| a. Construction of Guide wall at Attached HarpaChara Roads Rakhesh Debo Shorma Krishi Jomi Harpachara ganger Road Ashidrone UP under Sreemangal Upazila. b. Providing Brick Flat Soling on Shindurkhan Kunjobon Gramer Pujamondop to Late Abdul Jobbar Shaheber bari Road Shindurkhan UP Sreemangal Upazila. c. Construction of Boundary wall at Janaura GPS Shindurkhan UP Under Sreemangal Upazila. d. Providing Brick Flat Soling on Near Janaura Shofor Ali bari to Near Haris mia bari Road Shindurkhan UP Sreemangal Upazila. e. Construction of Culvert at Teliabda - Mondir gaon Road Shindurkhan UP Under Sreemangal Upazila. f. Construction of Culvert Over Junmburachara -Krisnachara Road Shindurkhan UP Under Sreemangal Upazila. | Office of the Upazila Engineer, Sreemangal | BDT 5.60 lakh | 4 Apr 2018 | Official record |
| Improvement of (a) road by Brick Flat Soling from east side of Botoishail Ismail house to Umorgonj bazar road. b) Improvement of road by brick flat soling at Chatodesh Satipur road under Kanaighat Sador Union Parishad.and c) Improvement of road by CC work from Manna shop frontside to Nurul Haque house under Sador Union Parishad. | Office of the Upazila Engineer, kanaighat, Sylhet | BDT 2.90 lakh | 20 Mar 2018 | Official record |
| Repair and maintenance work of the residential house No. F/6 & F/ 7 under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 13 Mar 2018 | Official record |
| Repair and maintenance work of the residential house No.E/11 F/5 & F/45 under Sales and Distribution Division 3 BPDB Comilla | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 13 Mar 2018 | Official record |
| Construction of (a)culvert near the House of Basir (b) Construction of culvert near the Mosque Mechaticor near suraighat Road and (c) Renovation of TIN shed of Kalinagar GPS and d Improvement of Road by Brick Flat Soaling BFS from Lakshiprashad UP House of Saiful. | Office of the Upazila Engineer, kanaighat, Sylhet | BDT 3.20 lakh | 28 Feb 2018 | Official record |
| Improvement of (a) Kurarpar Road by Brick Flat Soling under Borochatul Union Parishad b) Improvement of Lakhairgram Boro Mosque Road by Brick Flat Soling under Borochatul Union Parishad c) Construction of Sanitary latrine under Borochatul Union Parishad and d) Improvement of road by CC work at Parbatpur Boro mosque Porchim to Abdul Wadul member House. | Office of the Upazila Engineer, kanaighat, Sylhet | BDT 4.10 lakh | 27 Feb 2018 | Official record |
| Improvement of Kanaighat- Suraighat Road to Bodbari Bazar Road Via Kowairgori Pry. School Road (Ch. 600-1000m) (ID No. 691594160) under Upazila: Kanaighat District: Sylhet. (Salvage Cost Tk. 195399.68) | Office of the Executive Engineer, LGED, Sylhet | BDT 30.80 lakh | 5 Dec 2017 | Official record |
| The maintenance repair system development and service renovation of distribution lines Change of wear and tear wire and installation of transformers causing remedial of overall works under the areas of Rajapara Newara and adjacent areas under 11 KV D of S&D-3 comilla. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 5.10 lakh | 12 Feb 2017 | Official record |
| Change of wear and tear wiresdamage or broken pole service renovation and system development work of 11 KV D feeder under s&d-3 PDB comilla Division. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 2.00 lakh | 14 Jun 2016 | Official record |
| BBB-1PDB Comillar Autadhin E-type voboner jolshad shaho prosasonik voboner purto meramot songrokhon ebong waller rong koron kaj. | Sales and Distribution Division-1, BPDB, Comilla | BDT 3.00 lakh | 12 Jun 2016 | Official record |
| BBB-1PDB Comillar prosashonik voboner poschim pranter simana waller meramot ebong songrokhon kaj. | Sales and Distribution Division-1, BPDB, Comilla | BDT 2.50 lakh | 12 Jun 2016 | Official record |
| Emergency development work and Tiles work of VIP room of jangalia rest house under s&d-3comilla PDB. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 10.00 lakh | 7 Jun 2016 | Official record |
| preparation of conferrence room of 3rd floor of bidyut bhaban under s&d-3comilla PDB. | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 10.00 lakh | 6 Jun 2016 | Official record |
| construction of road at the side of boundary wall at north side of PDB jangalia coloney under s&d-3division | Executive Engineer, Sales and Distribution Division-3, BPDB,Comilla | BDT 4.90 lakh | 6 Jun 2016 | Official record |
| BBB-1 PDB Comillar autadhin 11KV | Sales and Distribution Division-1, BPDB, Comilla | BDT 2.10 lakh | 6 Jun 2016 | Official record |
| To mitigate overload of overloaded transformer System improvement Transformer installation repair and maintenance work of 11KV Town and Hospital Feeder under Dist. Division BPDB Brahmanbaria. | Distribution Division, BPDB, Brahmanbaria | BDT 3.00 lakh | 16 May 2016 | Official record |
| Construction of new 11 KV 11/0.4 KV 0.4 KV lines & installation of Distribution S/S under S&D B. Baria. | Urban Project Division, BPDB, Comilla. | BDT 4.50 lakh | 6 Sep 2015 | Official record |
| Construction of new 11 KV 11/0.4 KV 0.4 KV lines and installation of distribution S/S under ES Conpanigonj | Urban Project Division, BPDB, Comilla. | BDT 9.00 lakh | 6 Sep 2015 | Official record |
| 01 | Sales & Distribution Division, Ashuganj | BDT 12.80 lakh | 8 Jun 2015 | Official record |
Source: eprocure.gov.bd (CPTU). Independent service, not a government site.