M/S M. ALAM
Get new tenders for Moulvibazar every morning and afternoon, free
Enter your mobile number, or start it on Telegram in one tap. No login.
Biggest competitors
| Companies | Shared offices | Total wins |
|---|---|---|
| Mohammed Eunus & Brothers (Pvt.) Ltd. | 20 | 337 |
| M/S Khan Enterprise | 19 | 112 |
| M M ENTERPRISE | 19 | 76 |
| M/s. Rahman Enterprise | 18 | 62 |
| M/S Chowdhury Enterprise | 17 | 90 |
| M/S. Maa Enterprise | 16 | 92 |
| M/S ARIF ENTERPRISE | 15 | 78 |
| MD. SAIFUL ISLAM | 14 | 95 |
| M/S. Nahar Construction | 13 | 41 |
| Al-Amin Traders | 13 | 29 |
Awards
148 resultsContract progress
37 results| Description | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
|
Construction of Blooming Roses School for the Intellectually Handicapped and Autistic in Moulvibazar Sadar Upazila
INF-2020-21-605874-02/e-GP/20220630/637912/0022019 |
Office Of The Upazila Engineer, Moulvibazar Sadar, Moulvibazar | BDT 40.22 lakh | 15 Dec 2021 | Ongoing |
|
(a) Improvement of Kamala Kalash-Sikrail-Pachaun Ferrighat (WDB Bund) Road at Ch. 5500-7085m (b) Protective work Ch. 6442m-6452m=10m, Ch. 6469m-6490m=21m, Ch. 6747m-6876m=127m, Ch. 6945m-6986m=41m, Ch. 7000m-7015m=15m. Total=214m on the same road.
SDIRIIP/Moul/VR/W-059/e-GP/20231005/633181/0097462 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 1.31 crore | 6 Dec 2021 | Completed |
|
(a) Ward no-03, construction of RCC road at Kamalgonj Govt. College [53m]. (b) Ward no-01, construction of RCC road at Gopalnagar Hena/Suvash Dev house road [75m]. (c) Ward no-02, brick drain at Borgach in front of Babul's house west side to west side at Omor's house [60m]. (d) Ward no-02, construction of RCC road at Borgach in front of Ayub Ali house to west side Shamsul islam house [17m). (e) Ward no-03, construction of RCC road at Nasrathpur Malakar Para Rashendra Malakar house [35m]. (f) Ward no-04, construction of RCC road with palisading work at Nagar road via Norendrapur Torab Ali house [30m]. (g) Ward No-04 installation 05 (five) nos shallow tubewell among the poor people. (h) Ward no-04, brick drain at North side of Alepur Abdul Mannan house [83m]. (i) Ward no-05, construction of RCC road at North Alepur in front of Abdul house to the former counsilor Romuj Miah house [74m]. (j) Ward no-06, Re-construction of RCC road and drain culvert at South Kumrakapon In front of Rahmat Miah house to Chadur Munshi house [59m]. (k) Ward no-07, construction of RCC road at Sadhupara Rintu house to Mokul Babu house road [31m]. (l) Ward no-08 Construction of RCC road widening with drain cover slab at Kumrakapon west side of Alik Miah chairman house to end point [51.50m] (m) Ward no-09, construction of RCC road at Rampasa Abdur Rahim house to Sorab Miah house [71m]. (n) Ward no-02, construction of guide wall at Borgach Karim Miah house road [76m]. (o) Ward no-4,5,6, Installation 11 (eleven) nos shallow tubewell among the poor people. (p) Ward No-7,8,9, Installation 8 (eight) nos shallow tube well among the poor people.
KAM/POU/LGSP-3/2020-21/08/e-GP/20231029/590444/00118237 |
Office of the Kamolganj Pourashava, Moulvibazar | BDT 38.20 lakh | 24 Jun 2021 | Completed |
|
Construction of 45.00m Long RCC Girder Bridge On Gazipur UP Office Asampara Bazar Jarulia Bazar Via Osmanpur Road at Ch. 926.00m under Chunarughat Upazila Habiganj District. Road ID 636263004
SDIRIIP/HABI/BRUNR/W-03/e-GP/20231014/526932/00107262 |
Office of the Executive Engineer, LGED, Habiganj | BDT 2.48 crore | 22 Dec 2020 | Completed |
|
Rehabilitation of Adyapasha Road from Ch. 00m-1495m under Upazila Habiganj Sadar District Habiganj Road ID 636444009
LGED/HAB/VRRP/Re-hab/2020-21/W-11501/e-GP/20220630/497456/0022075 |
Office of the Executive Engineer, LGED, Habiganj | BDT 45.32 lakh | 22 Sep 2020 | Completed |
|
Construction of 42.00m Long RCC Girder Bridge on Madhabpur R&H Shahpur Bazar via Dighirpar Road at Ch. 4000m under Upazila Madhabpur District Habiganj Road ID 636714016
FDR/Hab/20-21/BW-09/e-GP/20220630/494928/0024239 |
Office of the Executive Engineer, LGED, Habiganj | BDT 1.97 crore | 22 Sep 2020 | Completed |
|
Construction of additional class room of Khusalpur GPS under PEDP4.
e-tender/PEDP4/MLB/KAM/2019-20/W2.00817/e-GP/20220630/437281/0024297 |
Office of the Upazila Engineer, LGED, Kamalganj, Moulvibazar | BDT 78.88 lakh | 3 May 2020 | Completed |
|
Construction of additional class room of Adampur GPS under PEDP4.
e-tender/PEDP4/MLB/KAM/2019-20/W2.00816/e-GP/20220630/437270/0024288 |
Office of the Upazila Engineer, LGED, Kamalganj, Moulvibazar | BDT 75.93 lakh | 3 May 2020 | Completed |
|
Repair-maintenance and partial rehabilitation work of different type of gates & hoisting devices with accessories c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division BWDB Moulvibazar during the year 2019-20
OTM-08/MMOD/2019-20/e-GP/20220630/433793/0024317 |
Moulvibazar Mech. O&M Division | BDT 35.64 lakh | 26 Feb 2020 | Completed |
|
Construction of Chiknagul Union Health & Family Welfare Center at Jointapur Upazila in Sylhet District.
WP-165/SDP-4GOB-HED/e-GP/20220630/364816/0024316 |
HED, Sylhet Division, Sylhet | BDT 1.44 crore | 8 Jan 2020 | Completed |
|
Supply fitting & fixing work of 06 new lift gates of 6-vent regulator with greasing & painting of necessary parts inside KPI area Kashimpur Pump House c/w Manu River Irrigation Project under Moulvibazar Mechanical O & M Division BWDB Moulvibazar during the year 2019-20.
OTM-02/MMOD/2019-20/e-GP/20220630/381534/0024335 |
Moulvibazar Mech. O&M Division | BDT 6.91 lakh | 12 Nov 2019 | Completed |
|
a.Rehabilitaion of 01Nos. 1x3.00mx2.50m RCC Box Culvert on Choycut-Kalenga Road at Ch. 900m Kamalgonj.Dist.Moulvibazar.RoadID658564032.b.Rehabilitation of 1Nos. 2.50mx2.50m RCC Box culvert at Ch. 807m on Debipur-Dalairpar Road. Road ID 658564007. c.Rehabilitation of 2.00mx2.00m RCC Box Culvert at Ch.3010m on Ramchandrapur-Surananda pur Road Road ID 658564084 .d.Rehabilitation of RCC Box Culvert size1-Vent 2.50mx2.50m on Kalenga circular Road at Ch. 1350m Road ID 658564065. e.Rehabilitaion of RCC Box Culvert size1-Vent 2.50mx2.50m on Bamonusa-Kewlarhoor Road at Ch. 200m Road ID 658564072.Kamalgonj Dist.Moulvibazar.
e-Tender/LGED/Moul/GOBM/19-20/W-47/e-GP/20220630/375698/0024352 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 35.49 lakh | 6 Nov 2019 | Completed |
|
1. aImprovement of shiddeshorpur Madrasa pond E/W Excavation 1336.02m3 . b Construction of 01 NOS.Ghatla 12.8X5.00m for shiddeshorpur Madrasa Pond. 2. a Improvement of Potonushar High School Pond E/W Excavation 1169.24m3 . b Construction of 01 NOS.Ghatla 12.8X5.00m for Potonushar high school pond .3. a Improvement of kamalganj upazila parishad Pond E/W Excavation 12370.609m3 . b Construction of 03 NOS.Ghatla 12.8X5.00m for kamalganj upazila parishad Pond
IPCP/MOUL/KAMAL/P/19-20/1.01/e-GP/20220630/368866/0024363 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 71.00 lakh | 15 Oct 2019 | Completed |
|
Construction of Rampur Girls GPS and Construction of Antehari GPS
e-tender/NBIDGPS/MOU/RAJ/2018-2019/W1.03486/e-GP/20220630/329543/0024384 |
Office of the Upazila Engineer, LGED, Rajnagar, Moulvibazar | BDT 2.69 crore | 19 Jun 2019 | Completed |
|
Construction of Class Room of POSCHIM DIGOLGOZI CO-OPERATIVE & GANDHABPUR Primary School under sadar upazila Disrtict Moulvibazar
e-Tender/NBIDNNGPS/MOU/MOU/2018-19/W1.03072/e-GP/20220630/306384/0024398 |
Office of the Upazila Engineer, LGED, Moulvibazar Sadar, Moulvibazar | BDT 1.90 crore | 22 May 2019 | Completed |
|
a W3 Construction On Drain At Kamalganj Govt. College to Khinni Culvert 0-216m. b W4 Construction On Drain At Adampur road via In front of Dr. Putul house to culvert 0-126m. c W07 Construction On Drain At Mokbul Ali raod in front of proffesor Monjusree Roy house to Yakub house 0-147m. d W05 Construction On Drain Chandipur In Front of South Side On Khutub Miah House to Shamshu Master House Culvert. 0-160m. e W08 Construction On Drain Azamsha road South side to Phutul Miah house 0-181m. f W09 Construction On Drain Rampasha at In front of Era Member House to At Makbul Ali House 0-135m. g W05 Construction On Drain Adampur Road Via Chandipur In Front of Shamshu Master House Culvert Via east Side On Md. Khalilur Rahman House connect on Adampur Road Ch.0-242m and Cross Culvert L8.38m 900x1000.
KAM/Engr-15/2018/JAL/01/e-GP/20220630/266781/0024416 |
Kamalganj Paurashava | BDT 2.00 crore | 8 May 2019 | Completed |
|
Re-Excavation of Hisani to Hingda via Gaida Beel Connecting Khal at Ch. 00-2000m Upazila ItnaHFMLIP/Kishore/18-19/EW-488 Union-Mriga Upazila- Itna
Kishore/Itna/Khal-02/18-19/05/e-GP/20220630/311245/0024460 |
Office of the Executive Engineer, LGED, Kishoreganj | BDT 87.93 lakh | 25 Apr 2019 | Completed |
|
Re-Excavation of Kochua Beel Upazila Itna Package No. HFMLIP/Kishore/18-19/EW-455 Union-Raituti Upazila- ItnaRe-Excavation of Shapla Beel Upazila Itna Package No. HFMLIP/Kishore/18-19/EW-456 Union_Raituti Upazila- Itna
Kishore/Itna/Beel-02/18-19/02/e-GP/20220630/311242/0024444 |
Office of the Executive Engineer, LGED, Kishoreganj | BDT 54.19 lakh | 25 Apr 2019 | Completed |
|
Re-Excavation of Nolua Beel Upazila ItnaPackage No. HFMLIP/Kishore/18-19/EW-451 Union-Alongjuri Upazila- ItnaRe-Excavation of Juaria Beel Upazila ItnaPackage No. HFMLIP/Kishore/18-19/EW-452 Union-Itna Sadar Upazila- ItnaRe-Excavation of Bhera Beel Upazila ItnaPackage No. HFMLIP/Kishore/18-19/EW-454 Union-Bori Bari Upazila- Itna
Kishore/Itna/Beel-03/18-19/01/e-GP/20220630/311241/0024428 |
Office of the Executive Engineer, LGED, Kishoreganj | BDT 56.78 lakh | 25 Apr 2019 | Completed |
|
Construction of Sunatola GPS under NBIDGPS-1
e-Tender/NBIDGPS/MOU/BAR/2018-19/W1.04039/e-GP/20220630/305150/0024480 |
Office of the Upazila Engineer, LGED, Barlekha, Moulvibazar | BDT 92.44 lakh | 17 Apr 2019 | Completed |
|
a Improvement of Ilam-Shashon Madhya Road by BC Ch. 00m-2000m Road ID No. 658835026 under Sreemongal Upazila Moulvibazar b Construction of 4 Nos Drainage Structure 1 x 1.00m x 1.00m at Ch. 5m 530m 618m 772m and 50.00m Protection work on the same road c Improvement of Bhunobir-Maddya Road by BC Ch. 00m-1600m Road ID No. 658835050 under Sreemongal Upazila Moulviazar d Construction of 100.00m Protection work on the same road.
SDIRIIIP/Moul/VR/W-032/e-GP/20231003/298970/0096159 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 2.46 crore | 1 Apr 2019 | Completed |
|
a Improvemet of Ruposhpur-Hail haor road by BC Ch. 1650m-2875m ID No. 658834046 under Sreemongal Upazila Moulvibazar Salvage Value Tk. 2048062/ b Construction of 122m Protection work on the same road.
SDIRIIIP/Moul/VR/W-031/e-GP/20220630/298967/0024487 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 95.25 lakh | 1 Apr 2019 | Completed |
|
a Improvement of Hajipurbazar-Hail haor road by BC Ch. 4390m-6100m Road ID 658835055 under Sreemongal Upazila Moulvibazar.
SDIRIIIP/Moul/VR/W-033/e-GP/20231003/298971/0095513 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 1.12 crore | 1 Apr 2019 | Completed |
|
a Extention building at Poura Bhavan within 3 storied foundation ground floor sanitary work Part-1. b Extention building at Poura Bhavan within 3 storied foundation ground floor electric work Part-1. c Extention building at Poura Bhavan within 3 storied foundation ground floor civil work.
ADP/KAM/2018-19/W-06/e-GP/20220630/282198/0024514 |
Kamalganj Paurashava | BDT 69.30 lakh | 11 Feb 2019 | Completed |
|
i Ward No-01 Bashir Miah House road 55m ii Harun Miah 50m iii Hashim Miah 13m iv Maoula Miah 21m v Shafiq Miah 24m vi Hannan Miah 23m vii Monir Miah 11m viii A. Kuddus 85m ix Yusuf Miah 50m x Hazi Durud 76m xi Abdul Khadir 15m xii Motin Miah 56m xiii Tara Miah 24m xiv Ankhar Miah 73m xv Askir Miah 47m xvi Iqbal Miah 54m xvii RCC Road at In Front Motin Miah House To Durud Miah House 194m xviii Development of RCC Road at In Front of Durud Miah house to keya Ghat road 76m xix Durud Miah 58m xx Ward No-03 RCC Road at Sreenathpur Hafiz Miah House Road 31m xxi Ward No-03 RCC Road at Sreenathpur Shopan Miah House Road 19m xxii Ward No-03 RCC Road at Sreenathpur Rahmat Miah House Road 23m xxiii Ward No-08 Cons. on RCC road Kumrakapon Abdur Rahim Miah House Road 38m xxiv Ward No-07 Cons. on RCC Road at Bhanugach Naboi House Road 48m xxv Ward No-06 Cons. On RCC Road At Kumrakapon Jalil Miah House To East Way Joinal Uddin House 45m xxvi Ward No-06 Cons. on RCC Road at Madabpur Road via Kumrakapon In Front of Shuman Miah House To Malik Miah House 36m xxvii Ward No-03 Cons. on RCC road at Sreenathpur Sahed Ali Master House Road 98m xxviii Ward No-04 Cons. on RCC Road at Norendrapur Badsha Miah shop to Amir Miah House Road 61m xxix Ward No-05 Cons. on Palisiding & Drain Culvert at North Kumrakapon In Front of Samuz Miah House to Rauf Miah house Road 29m xxx Ward No-07 Earth Filling and Sand Filling work at In Side at Makbul Ali High School xxxi Ward No-08 Cons. on RCC drain at North Kumrakapon In Front Alik Miah Chairman house to South side 42m xxxii Ward No.09 Cons. on RCC road at Rampasa Faisal Miah house to Jhaba Begum house 68m xxxiii Ward No-03 Cons. on RCC road at Nasratpur Monoranjon road 65m xxxiv Ward No-4 Cons. On RCC Road At Norendrapur Alim Miah House 75m.
KAM/POU/LGSP-3/2018-19/02/e-GP/20220630/283861/0024504 |
Kamalganj Paurashava | BDT 75.54 lakh | 11 Feb 2019 | Completed |
|
Improvement of Annondopur - Sharifpur road at ch. 200-2100m under Azmiriganj Upazila Habiganj. ID No. 636025005
HILIP/18/WD4/VR-HAB/Azm-06/e-GP/20220630/259426/0024701 |
Office of the Executive Engineer, LGED, Habiganj | BDT 1.48 crore | 6 Dec 2018 | Completed |
|
Improvement of Patuli Para R&H - Shibpasa road at ch. 00-2000m under Azmiriganj UpazilaHabiganj. ID No. 636024020
HILIP/18/WD4/VR-HAB/Azm-05/e-GP/20220630/259425/0024777 |
Office of the Executive Engineer, LGED, Habiganj | BDT 1.46 crore | 6 Dec 2018 | Completed |
|
Periodic Maintenance of Sreemangal GC to Khejuricherra bazar GC via Kalighat Bazar Road from Ch. 8000m-12400m SREEMANGAL Dist Moulvibazar Road Code 658832004
e-Tender/LGED/Moul/GOBM/18-19/W-40/e-GP/20220630/227317/0022200 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 43.15 lakh | 25 Sep 2018 | Completed |
|
Periodic Maintenance of Tegra UP Dewandighi-Kamarchak UP Ferryghat Road from Ch. 600m-2980m RAJNAGAR Dist Moulvibazar Road Code 658803004
e-Tender/LGED/Moul/GOBM/18-19/W-43/e-GP/20220630/227320/0022162 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 36.25 lakh | 25 Sep 2018 | Completed |
|
a Improvement of Giashnagar bazar-Anilceli Road by BC from Ch. 975m-2475m including 364m Protection works on the same road Road Code 658744109 b Improvement of Ekatuna-Uluail-Shompasi Road by BC from Ch. 3700m-4200m including construction of 1no. 0.90mx1.00m U-Drainage Culvert at Ch. 3705m on the same road Road Code 658744065 Salvage Cost Tk. 213736.00 Upazila Moulvibazar Sadar District Moulvibazar.
SDIRIIP/Moul/VR/W-010/e-GP/20220630/215479/0024719 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 1.36 crore | 8 Aug 2018 | Completed |
|
Improvement of Nazirabad UP office-Narayanpasha Bazar Road from Ch. 00m-2000m including Construction of 5 Nos. 0.625mx0.600m Drainage culvert at Ch. 165m 450m 754m 1252m 1900m and 3nos 1.00m x 0.900m Drainage Culvert at Ch. 112m 535m 700m and 1No 1x1.50mx2.00m RCC Bx Culvert at Ch. 915m on the same Road Under Moulvibazar Sadar Upazila Road Code 658743013 Salvage Cost Tk. 503194.00
SDIRIIP/Moul/UNR/W-013/e-GP/20220630/187511/0022227 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 1.33 crore | 15 Apr 2018 | Completed |
|
Improvement of Satbak-Shamshergonj Road from Ch. 1000m-3031m including Construction of 4 Nos. 1.00mx0.900m Drainage culvert at Ch. 1445m 1877m 2360m 2770m and 4nos 0.625m 0.600m RCC Drainage Culvert at Ch. 183m 1577m 1655m & 2395m on the same Road Under Moulvibazar Sadar Upazila Road Code 658743005 Salvage Cost Tk. 52678.00
SDIRIIP/Moul/UNR/W-014/e-GP/20220630/187512/0022254 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 1.30 crore | 15 Apr 2018 | Completed |
|
Improvement of Sarkarbazar-Monumukh UP Office Road from Ch. 00m-545m & 725m-1928m including Construction of 6 Nos. 0.625mx0.600m Drainage culvert at Ch. 12m 95m 516m 1440m 1691m & 1862m and 130m Protection works on the same Road Under Moulvibazar Sadar Upazila Road Code 658743012 Salvage Cost Tk. 1971633.00
SDIRIIP/Moul/UNR/W-011/e-GP/20220630/176344/0022287 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 1.13 crore | 27 Mar 2018 | Completed |
|
Repair of Kamalganj UEO Office under Kamalganj Upazila District Moulvibazar
e-Tender/PEDP-III/MLB/KAM/7017-18/W7.478/e-GP/20220630/170037/0024747 |
Office of the Upazila Engineer, LGED, Kamalganj, Moulvibazar | BDT 9.00 lakh | 1 Mar 2018 | Completed |
|
Construction of Boundary Wall including Gate of a Bashudebpur GPS b Gokul Nagar GPS & c Krishna Chandra GPS Under Kamalganj Upazila District Moulvibazar
e-Tender/PEPD-III/MLB/KAM/2017-18/W17.1255/e-GP/20220630/161858/0024759 |
Office of the Upazila Engineer, LGED, Kamalganj, Moulvibazar | BDT 40.13 lakh | 11 Feb 2018 | Completed |
|
Improvement of M.P. bazar Muraura-Kangla chara Road from Ch. 00m-1000m including Construction of 1no 0.90mx1.00m drainage culvert at Ch. 812m on the same Road Under Rajnagar Upazila District Moulvibazar
SDRIIP/Moul/ W-226/e-GP/20220630/35922/0022142 |
Office of the Executive Engineer, LGED, Moulvibazar | BDT 33.88 lakh | 22 Nov 2015 | Completed |
|
Construction of 22.00m R.C.C Girder Bridge on Kalishiri Khal in the road Gosaibazar-Fatehpur under Upazila:Bahubal,Dist:Habiganj. (Road Code:636064067)
SDRIIP/HABI/W-152/e-GP/20231005/15461/0097454 |
Office of the Executive Engineer, LGED, Habiganj | BDT 1.03 crore | 10 Dec 2014 | Completed |