|
Improvement of Kalkuti-Patanchad Road. (Ch.00-1210m) [R.ID.127694004] under Nawabganj upazila, District: Dinajpur.
IRIDP-3/DNJ/DW-138/e-GP/20240924/913106/00181792
|
Office of the Executive Engineer, LGED, Dinajpur |
৳১.০৫ কোটি |
১৭ ডিসে ২০২৩ |
Ongoing |
|
Periodic Maintenance of Nakol Bazar to Boralidah Westpara Mosque Road from Ch.1445m-2547m under Sreepur Upazila Dist. Magura. Road ID.No. 255954038.(Overlay)
e-Tender/LGED/Mag/GOBM/22-23/RW-23/e-GP/20240820/736451/00168558
|
Office of the Executive Engineer, LGED, Magura |
৳৪২.১১ লাখ |
৪ অক্টো ২০২২ |
Completed |
|
Periodic Maintenance of Gahasiria Village Road-1 (GashiaraBottola to Gashiara Chua Matha) Road from Ch.00m-600m under Sreepur Upazila, Dist. Magura. Road ID.No. 255955019.(Overlay)
e-Tender/LGED/Mag/GOBM/22-23/RW-20/e-GP/20240827/736449/00169592
|
Office of the Executive Engineer, LGED, Magura |
৳২৪.১৬ লাখ |
৪ অক্টো ২০২২ |
Completed |
|
Improving of irrigation Canal by Ferro Cement lining work in irrigation canal K1-1 from km 0.00to 0.135 = 135.00m and turnout repair (total 03 nos) in irrigation canal K12 under Meghna-Dhonagoda O&M division during the year 2021-22.
W-12/21-22/e-GP/20221003/633708/0050236
|
Meghna-Dhonagoda O&M Division |
৳৭.৫১ লাখ |
৫ ডিসে ২০২১ |
Completed |
|
A) Majarinadi : Discharge Measurement of 43 gumti river 110 Comilla & B) Chotonadi : Discharge Measurement of 114 Jibonpur & 330 Bizni = 3 nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Comilla during the year 2021-2022.
PW-34/2021-22/e-GP/20220906/631181/0034257
|
South Eastern Measurement Division |
৳৩.২৮ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Discharge Measurement of 123 Ganga sagor & 264/A Mantola Station at B.Baria Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Cumilla during the year 2021-2022.
PW-32/2021-22/e-GP/20220906/631179/0034259
|
South Eastern Measurement Division |
৳৪.১৩ লাখ |
৩০ নভে ২০২১ |
Completed |
|
A) Majarinadi : Discharge Measurement of 158/1 Shayestagonj & B) Chotonadi : Discharge Measurement of 138 Suphiabad, 280 sutang, = 03 Nos Station at B.Baria Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Cumilla during the year 2021-2022.
PW-31/2021-22/e-GP/20220906/631178/0034261
|
South Eastern Measurement Division |
৳৫.৩৪ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Hiring charge of Rain Gauge Reader for rain gauge data collection = 18 nos station, Rain Gauge & Evaporation Reader for rain gauge & evaporation data collection =4 nos station ,Water sample collection for salinity =13 station, Sediment collection =2 nos station, Emergency flood period data collection = 16 nos station, Maintenance & replacement of water level gauge=22 nos station, supplying, fitting & fixing Rain gauge station sine board = 6 nos , Repair and maintenance of rain gauge station=18 nos at different location of Chittagong Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Cumilla during the year 2021-2022.
PW-41/2021-22/e-GP/20220914/631198/0036773
|
South Eastern Measurement Division |
৳৪.৯৪ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Chotonadi : Discharge Measurement of 119/1 Panchpukuria, 124 Thandachari, 356 Bainnachola,357 Aquliya &152/5 BoroHarina = 05 Nos Station at Chittagong Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Comilla during the year 2021-2022.
PW-38/2021-22/e-GP/20220914/631186/0036774
|
South Eastern Measurement Division |
৳৬.৫০ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Chotonadi : Discharge Measurement of 247/4 Remakri & 203/5 Poamuhuri = 02 No Station at Chittagong Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Comilla during the year 2021-2022.
PW-39/2021-22/e-GP/20220906/631190/0034253
|
South Eastern Measurement Division |
৳৫.৩৪ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Majarinadi : Discharge Measurement of 84/1 Kaliyachori, 212 Parshuram& Chotonadi : Discharge Measurement of 257.5 Subar bazaar = 03nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Comilla during the year 2021-2022
PW-36/2021-22/e-GP/20220906/631184/0034255
|
South Eastern Measurement Division |
৳৬.৫৬ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Chotonadi : Discharge Measurement of 58/A Laksham, 339 Shalda & 334 Mia bazaar = 03 nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division, BWDB, Comilla during the year 2021-2022.
PW-35/2021-22/e-GP/20220906/631183/0034256
|
South Eastern Measurement Division |
৳৫.১৬ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Rehabilitation of 1no. Single vent 1.50mx1.50m RCC Box Culvert on Dangapara hat (Lohachara)- Hariharpur hat Road via Boaldar UP office Road at Ch.12790m. RID. 127473002 [Hakimpur]
e-Tender/LGED/Dina/GOBM/21-22/W-35/e-GP/20240930/613495/00187946
|
Office of the Executive Engineer, LGED, Dinajpur |
৳৬.২৭ লাখ |
২৯ সেপ ২০২১ |
Completed |
|
Rehabilitation of Balidia Laximpur Road -Mofiz Chairman house Road from Ch.00m-270m under Mohammadpur upazila, Dist: Magura, Road ID: 255665208 (Road Re-hab.)
e-Tender/LGED/Mag/GOBM/21-22/RW-16/e-GP/20240902/609344/00171136
|
Office of the Executive Engineer, LGED, Magura |
৳১৭.৫৬ লাখ |
১৬ সেপ ২০২১ |
Completed |
|
Construction work of Shohid miner at Birgonj Pilot Govt. High School under Upazila-Birgonj, Dinajpur.
Exen/EED/Dinaj/GEI-4931/19-20/Rep-20/e-GP/20241224/565077/00239146
|
Office of the Executive Engineer, EED,Dinajpur, District. |
৳৯.৫০ লাখ |
২৯ এপ্রিল ২০২১ |
Completed |
|
Widening of Hazipur UP Office-Poschim Bariala Mosque via Dr. Lutfor Rahman House from ch. 00m-905m by Uni-Block under Sadar Upazila Dist Magura. Road ID No. 255575050. Road widening
e-Tender/LGED/Mag/GOBM-R/20-21/W-32 /e-GP/20240902/543803/00170901
|
Office of the Executive Engineer, LGED, Magura |
৳৫৯.৯৯ লাখ |
১০ ফেব ২০২১ |
Completed |
|
Rehabilitation of Salikha-Satapara Road from Ch.00m-1675m under Salikha Upazila Dist. Magura. Road ID No.255855014
LGED/MAG/VRRP/OL/20-21/W-737/e-GP/20241023/524277/00202696
|
Office of the Executive Engineer, LGED, Magura |
৳৫১.৮৩ লাখ |
৯ ডিসে ২০২০ |
Completed |
|
Chotonadi Discharge Measurement of 203/5 Poamuhuri 40 Ramu& 203 Lama 03 Nos Stationat Chittagong Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2020-2021.
PW-37/2020-21/e-GP/20220905/515806/0033793
|
South Eastern Measurement Division |
৳৪.৫৫ লাখ |
২৪ নভে ২০২০ |
Completed |
|
Chotonadi Discharge Measurement of 119/1 Panchpukuria 124 Thandachari 247 Bandarban 356 Bainnachola & 357 Aquliya 05 Nos Station at Chittagong Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2020-2021.
PW-35/2020-21/e-GP/20220905/515804/0033791
|
South Eastern Measurement Division |
৳৪.৭০ লাখ |
২৪ নভে ২০২০ |
Completed |
|
Discharge Measurement of 123 Ganga sagor & 264/A Mantola Station at B.Baria Hydrology Sub-Division under South Eastern Measurement Division BWDB Cumilla during the year 2020-2021.
PW-30/2020-21/e-GP/20220905/515787/0033788
|
South Eastern Measurement Division |
৳৪.০৮ লাখ |
২৪ নভে ২০২০ |
Completed |
|
Chotonadi Discharge Measurement of 247/4 Remakri & 152/5 BoroHarina 02 No Station at Chittagong Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2020-2021.
PW-36/2020-21/e-GP/20220905/515805/0033792
|
South Eastern Measurement Division |
৳৫.২৫ লাখ |
২৪ নভে ২০২০ |
Completed |
|
Hire charge of Gauge Reader rain gauge data collection of different station at Comilla& B-baria Hydrology Sub-Division 35 nos station under South Eastern Measurement Division BWDB Comilla during the year 2020-2021. -2021.
PW-34/2020-21/e-GP/20220905/515803/0033790
|
South Eastern Measurement Division |
৳৩.৯৯ লাখ |
২৪ নভে ২০২০ |
Completed |
|
Construction of Conduit / Water Pass Structure..
PD/CCBDIADP/e-GP/2020-21/WD-81-95/Lot-7/e-GP/20221012/490237/0050797
|
Office of the Project Director, Cumilla-Chandpur-Bramanbaria District Irrigation Area Development Project, BADC, Cumilla. |
৳১১.৩২ লাখ |
২৪ সেপ ২০২০ |
Completed |
|
Construction of small size irrigation Structure Cattle Crossing / submerged weir / Cross Dam / Siphon etc..
PD/CCBDIADP/e-GP/2020-21/WD-68-80/Lot-12/e-GP/20221012/490222/0050798
|
Office of the Project Director, Cumilla-Chandpur-Bramanbaria District Irrigation Area Development Project, BADC, Cumilla. |
৳৯.৬৬ লাখ |
২৪ সেপ ২০২০ |
Completed |
|
Atkapara Breach closing and Re-Sectioning Embankment of Submersible of Chandibari Haor from km 0.000 to km 0.065 65.00 m in c/w under kabita in Upazilla-Nasirnagar District --Brahmanbaria Under Brahmanbaria W.D. Division BWDBBrahmanbaria during the Year 2019-20.
BB/NDR/W-20/2019-20/e-GP/20220512/463473/001718
|
Brahmanbaria WD Division |
৳৩.৫৮ লাখ |
২৭ মে ২০২০ |
Completed |
|
Improvement by BC Vimpur Dhormohati H/O Alauddin Molla Mosque to Trimohoni via Dhamohati Kali bari road from at Ch 0.00-2000.00m under Boalmari Uapzila Dist-Faridpur Road ID No 329185401 DPP ID NO 329185041
FDIRIDP/F/19-20/VR-BC/615/e-GP/20231011/430612/00105692
|
Office of the Executive Engineer, LGED, Faridpur |
৳১.৫৪ কোটি |
১৫ মার্চ ২০২০ |
Completed |
|
Hire Charge of Gauge Reader Rain Gauge & Evaporation Data Collection of Different Station Collection of 15 Nos. Station of Emergency Flood Period data Collection Sediment Collection Water Sample Collection for Salinity Maintenance and Replacement of Water Level Gauge Maintainance and Replacement of Rain Gauge Station& Hire Charge of Gauge Reader Water Level Data Collection of 152/5 BoroHarina 247/4 Remakri& 203/5 Poamuhuri 03 Nos. station at Chittagong Hydrology Sub- Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020
PW-44/2019-20/e-GP/20220905/388646/0033759
|
South Eastern Measurement Division |
৳৩.৭৪ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Hire Charge of Gauge Reader Water Level Data Collection of 248 Dohazari 120 Telpari 176 Lemshikhali& 125 Rangunia 04 Nos. Station at Chittagong Hydrology Sub- Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020
PW-43/2019-20/e-GP/20220905/388644/0033760
|
South Eastern Measurement Division |
৳২.৯৭ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Hire Charge of Gauge Reader Water Level Data Collection of 84 Ramgar 152/2 Kalurghat 247 Bandarban& 204 Chiringa 04 Nos.& Maintenance & Replacement of Water Level Gauge & Collection of 152/5 BoroHarina 247/4 Remakri& 203/5 Poamohuri 3 Nos. Station at Chittagong Hydrology Sub- Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020
PW-42/2019-20/e-GP/20220905/388643/0033761
|
South Eastern Measurement Division |
৳৪.০১ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Chotonadi Discharge Measurement of 152/5 BoroHarina connection with 58 Karnafuli River District Rangamati 01 Nos. Station&Hire Charge of Gauge Reader Rain Gauge Data Collection of Different Station at Chittagong Hydrology Sub- Division 18 Nos. Station at Chittagong Hydrology Sub- Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020
PW-41/2019-20/e-GP/20220905/388642/0033763
|
South Eastern Measurement Division |
৳২.৯১ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Chotonadi Discharge Measurement of 247/4 Remakri& 203/5 Poamuhuri 2 Nos. Station at Chittagong Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020
PW-40/2019-20/e-GP/20220905/388641/0033764
|
South Eastern Measurement Division |
৳৩.৫৬ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Chotonadi Discharge Measurement of 119/1 Panchpukuria 124 Thandachari 247 Bandarban 40 Ramu& 203 Lama 05 Nos Station at Chittagong Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020
PW-39/2019-20/e-GP/20220905/388640/0033765
|
South Eastern Measurement Division |
৳২.৭৮ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Collection of 23nos station of Emergency flood period data collection Sediment collection Water sample collection for salinity Maintainance& Replacement of water level gauge Maintainance& Replacement of Rain gauge&Hire charge of Gauge Reader rain gauge & evaporation data collection station at Comilla&B-baria Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020
PW-38/2019-20/e-GP/20220905/388639/0033766
|
South Eastern Measurement Division |
৳২.৪৭ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Hire charge of Gauge Reader Water level data collection of 79 Matlob 257.5 Subarbazar 182 companigonj 239 Laxmipur 239.5 Pearapur&240 Bhabanigonj 6 nosstationatComilla Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020
PW-36/2019-20/e-GP/20220905/388637/0033767
|
South Eastern Measurement Division |
৳৪.৪৬ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Chotonadi Discharge Measurement of 58/A Laksham 114 Jibonpur 334 Mia bazaar& 330 Bizni 04nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020
PW-33/2019-20/e-GP/20220905/388634/0033769
|
South Eastern Measurement Division |
৳২.৬৫ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Majarinadi Discharge Measurement of 43 gumti river 110 Comilla 81 Muhuri river 212 Parshuram 2 nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020.
PW-32/2019-20/e-GP/20220905/388633/0033770
|
South Eastern Measurement Division |
৳২.৬২ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Hire Charge of Gauge Reader Water Level Data Collection of 73 Itna 74 dilalpur 272 Madna 158 Chunarughat 296 Akhura& 298 Nobinagar 06 Nos. Station at B.Baria Hydrology Sub- Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020.
PW-31/2019-20/e-GP/20220905/388632/0033772
|
South Eastern Measurement Division |
৳৪.৪৬ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Hire Charge of Gauge Reader Water Level Data Collection of 72 Khaliajuri 271 Ajmiriganj 159 Habiganj& 280 Sutang 04 Nos. Station at B.Baria Hydrology Sub- Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020.
PW-30/2019-20/e-GP/20220905/388631/0033773
|
South Eastern Measurement Division |
৳২.৯৭ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Chotonadi Discharge Measurement of 230/1 Ramnagar Rail bridge 138 Suphiabad 280 sutang 123 Ganga sagor&264/A Mantola 05 Nos Station at B.Baria Hydrology Sub-Division under South Eastern Measurement Division BWDB Cumilla during the year 2019-2020.
PW-29/2019-20/e-GP/20220905/388630/0033774
|
South Eastern Measurement Division |
৳৩.৭৩ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Bara Nadi Discharge Measurement By ADCP of 102 Upper Meghna River 273 Bhairab Bazar Station 1 nos station &Majarinadi Discharge Measurement of 158/1Shayestagonj 01 Nos Station at B-Baria Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020.
PW-28/2019-20 /e-GP/20220905/388629/0033776
|
South Eastern Measurement Division |
৳৩.২৫ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Hire charge of Gauge Reader Water level data collection of 84/1 Kaliyachori 275.5 Meghnaferyghat 277 Chandpur & 212 Parshuram 4nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020
PW-35/2019-20/e-GP/20220905/388636/0033768
|
South Eastern Measurement Division |
৳২.৯৭ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Repair & Maintenance and Dyke Repair work of k22 Secondary irrigation canal in-between from km 3.300 to km 3.700 120m & Water structured Turn Out No-5 8 under Meghna-Dhonagoda O&M Division during the year 2019-2020.
MDIP/OM/W-28/2019-20/e-GP/20221003/383915/0050238
|
Meghna-Dhonagoda O&M Division |
৳৪.৪৬ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
Repair & Maintenance and Dyke Repair work of k23-2 irrigation canal in-between from km 1.500 to km 1.540 40m K23 in-between from km 3.700 to km 3.728 28m K23-1 in between km 0.000 to km 0.300 55m & Water structured Turn Out No-16 18 10 under Meghna-Dhonagoda O&M Division during the year 2019-2020.
MDIP/OM/W-27/2019-20/e-GP/20221003/383914/0050239
|
Meghna-Dhonagoda O&M Division |
৳৬.০১ লাখ |
২৪ নভে ২০১৯ |
Completed |
|
Dyke repair work in DU1 Secondary Irrigation canal in between from Km 0.150 to Km 0.300 37.00 m & DU1-3 Tertiary Irrigation canal in between from Km 1.950 to Km 2.050 50.00 under Meghna-Dhonagoda O&M division during the year 2019-2020.
MDIP/OM/W-21/2019-20/e-GP/20221003/383905/0050237
|
Meghna-Dhonagoda O&M Division |
৳২.৬৭ লাখ |
২৪ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Jaforkhali R&H-Rasulpur GC Via Binokdia Baroia Bazar Road from Ch 00m -2150m Nagarkanda Road ID No. 329622024
e-Tender/LGED/Farid/GOBM/19-20/W-16/e-GP/2023101/376208/0093249
|
Office of the Executive Engineer, LGED, Faridpur |
৳৩০.৪২ লাখ |
১১ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Satoir R&H to Bhimpur GC via Ghospur UP Rotandia bazar Road from Ch 00m -5050m Boalmari Road ID No. 329182005
e-Tender/LGED/Farid/GOBM/19-20/W-27/e-GP/2023101/376220/0093238
|
Office of the Executive Engineer, LGED, Faridpur |
৳১.০৭ কোটি |
১১ নভে ২০১৯ |
Completed |
|
Widening of Pirbari bazar - Bottali Bazar Road from Ch. 0m-950m Road ID412134061 Brahmanbaria-S
e-Tender/LGED/BBR/ GOBM/19-20/W-29/e-GP/20230921/372018/0086470
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳৪৪.১৯ লাখ |
৩০ অক্টো ২০১৯ |
Completed |
|
Improvement of Gobindapur Sarbojonin Mondir Nat Mondir under Talkhori union Latitude 23.4040 Longitude 89.3233 under Salikha upazila Dist. Magura
GSIDP/MAG /DW-115/e-GP/20241008/354837/00192658
|
Office of the Executive Engineer, LGED, Magura |
৳৩.১৮ লাখ |
১৫ সেপ ২০১৯ |
Completed |
|
Improvement of Safolgasha Purbopara Jame Mosque under Nakol union Latitude 23.5314 Longitude 89.5020 under Sreepur upazila Dist. Magura.
GSIDP/MAG /SDW-101/e-GP/20241007/329397/00192269
|
Office of the Executive Engineer, LGED, Magura |
৳২.৮৫ লাখ |
১২ জুন ২০১৯ |
Completed |
|
Choto nadi Discharge Measurement of 58/A Laksham 114 Jibonpur 334 Mia bazaar & 330 Bizni 04 nos station at Comilla Hydrology Sub-Division under South Eastern Measurement Division BWDB Comilla during the year 2019-2020.
PW-05/2019-20/e-GP/20220929/323412/0048341
|
South Eastern Measurement Division |
৳২.৪০ লাখ |
২৬ মে ২০১৯ |
Completed |