Development Work of Jhikorgacha Bissohori Madrasa Under Jhikorgacha Upazilla Dist. Jashore.
ZPJ/ADP/JHIKOR/21-22/465/ W-03/e-GP/20241104/800140/00211614
|
Zilla Parishad, Jessore |
৳৯.৯৪ লাখ |
২০ মার্চ ২০২৩ |
Completed |
|
Development Work of Road at Mujib Shorok to H/O Dipu Near Food Godown South side Road Under Sadar Upazila Dist. Jashore.
ZPJ/ADP/Sadar/21-22/SP-100/W-12/e-GP/20241104/802660/00211634
|
Zilla Parishad, Jessore |
৳৩.৯৭ লাখ |
২০ মার্চ ২০২৩ |
Completed |
|
Estimate For Construction Of New Building For Kochua High Schoolpara Jame Mosque, Union:- Kochua, Under Sadar Upazila, Dist.- Jessore.
ZPJ/ADP/SADAR/21-22/465/W08/e-GP/20241104/797584/00211638
|
Zilla Parishad, Jessore |
৳৫.৪০ লাখ |
১২ মার্চ ২০২৩ |
Completed |
|
Estimate For Construction Of New Building For Dr. Rowson Ali College, Union:- Hoibotpur, Under Sadar Upazila, Dist.- Jessore.
ZPJ/ADP/SADAR/21-22/465/W07/e-GP/20241104/797520/00211635
|
Zilla Parishad, Jessore |
৳৯.০০ লাখ |
১২ মার্চ ২০২৩ |
Completed |
|
Estimate For Construction Of New Building At Shamnagar Darul Kuran Adarsha Bohumukhi Madrasha, Union:- Kashimpur, Under Sadar Upazila, Dist.- Jessore.
ZPJ/ADP/SADAR/21-22/465/W09/e-GP/20241104/798042/00211637
|
Zilla Parishad, Jessore |
৳৫.৪০ লাখ |
১২ মার্চ ২০২৩ |
Completed |
|
Installation of 156 (One Hundred Fifty Six) nos. (38 mm) dia Deep Tube well (DTW) (52 nos.-Avg. Depth-370m & 104 nos.-Avg. Depth-242m) at Digholia Upazila in Khulna District Under Project for Safe Water Supply Throughout the Country (PSWSC) of DPHE. FY: 2022-2023.
000/e-GP/DPHE/2023-07-11/00724557
|
Office of the Executive Engineer DPHE, Khulna |
৳১.৩৫ কোটি |
১৭ আগ ২০২২ |
Completed |
|
Installation of 156 (One Hundred Fifty Six) nos. (38 mm) dia Deep Tube well (DTW) at Terokhada Upazila in Khulna District Under Project for Safe Water Supply Throughout the Country (PSWSC) of DPHE. FY: 2022-2023.
000/e-GP/DPHE/2023-07-11/00724556
|
Office of the Executive Engineer DPHE, Khulna |
৳১.০৬ কোটি |
১৭ আগ ২০২২ |
Completed |
|
Installation of 44 (Forty Four) nos. (38 mm) dia Deep Tube well (DTW) at Koyra Upazila in Khulna District Under Project for Safe Water Supply Throughout the Country (PSWSC) of DPHE. FY: 2022-2023.
000/e-GP/DPHE/2023-07-11/00724562
|
Office of the Executive Engineer DPHE, Khulna |
৳২৮.৫৯ লাখ |
১৭ আগ ২০২২ |
Completed |
|
Installation of 100 Nos 100 mm x 38 mm dia Deep Tubewell with Submersible Pump at Sadar Upazila of Netrokona District of Department of Public Health Engineering during 2022-23 Financial Year under Project for Safe Water Supply Throughout the Country.
000/e-GP/DPHE/2023-07-11/00724464
|
Office of the Executive Engineer,DPHE,Netrokona |
৳১.৪৫ কোটি |
১৬ আগ ২০২২ |
Completed |
|
Installation of 100 (One Hundred) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00691912
|
Office of the Executive Engineer DPHE, Khulna |
৳৪৩.০৪ লাখ |
১২ মে ২০২২ |
Completed |
|
Installation of 85 (Eighty Five) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00691915
|
Office of the Executive Engineer DPHE, Khulna |
৳৩৬.৫৯ লাখ |
১২ মে ২০২২ |
Completed |
|
Installations of 14 nos (100 x 38) mm dia. DeepTube Well with # 6 Hand pump and 1 nos (100 x 38) mm dia. Shallow Tube Well with #6 Hand pump at different primary schools of Khulna District.
000/e-GP/DPHE/2023-07-11/00668902
|
Office of the Executive Engineer DPHE, Khulna |
৳৯.৯০ লাখ |
৩ মার্চ ২০২২ |
Completed |
|
Installations of 14 nos (100 x 38) mm dia. Deep Tube Well with # 6 Hand pump and 1 nos (100 x 38) mm dia. Shallow Tube Well with # 6 Hand pump at different primary schools of Khulna District.
000/e-GP/DPHE/2023-07-11/00668898
|
Office of the Executive Engineer DPHE, Khulna |
৳৯.৯০ লাখ |
৩ মার্চ ২০২২ |
Completed |
|
Installation of 120 Nos Rain Water Harvesting (RWH) at Mathbaria upazila in Pirojpur district under Revenue Budget celebrating Mujib year celebration for Homeless and Landless families FY 2021-22.
000/e-GP/DPHE/2023-07-11/00643257
|
Office of the Executive Engineer DPHE, Perojpur |
৳৫১.৬০ লাখ |
৯ জানু ২০২২ |
Completed |
|
Installation of 100 (One Hundred) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00622471
|
Office of the Executive Engineer DPHE, Khulna |
৳৪৩.০৪ লাখ |
২৫ অক্টো ২০২১ |
Completed |
|
Installation of 100 (One Hundred) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00622468
|
Office of the Executive Engineer DPHE, Khulna |
৳৪৩.০৪ লাখ |
২৫ অক্টো ২০২১ |
Completed |
|
Installation of 70 (Seventy) nos. Rain Water Harvesting (RWH) at Rupsha-25 nos., Koyra-25 nos. & Botiaghata-20 nos. in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00622477
|
Office of the Executive Engineer DPHE, Khulna |
৳৩০.১৩ লাখ |
২৫ অক্টো ২০২১ |
Completed |
|
Installation of 100 (One Hundred) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00622469
|
Office of the Executive Engineer DPHE, Khulna |
৳৪৩.০৪ লাখ |
২৫ অক্টো ২০২১ |
Completed |
|
Installation of 91 (Seventy) nos. Rain Water Harvesting (RWH) at Paikgacha Upazila in Khulna District under Revenue Budget. FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00622472
|
Office of the Executive Engineer DPHE, Khulna |
৳৩৯.১৭ লাখ |
২৫ অক্টো ২০২১ |
Completed |
|
Construction of 08 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Jhenaidah District under NBIDGPS-1 FY 2021-22.
000/e-GP/DPHE/2023-07-11/00608164
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳১.১৪ কোটি |
১২ সেপ ২০২১ |
Completed |
|
Construction of 08 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Jhenaidah District under NBIDNNGPS-1 FY 2021-22
000/e-GP/DPHE/2023-07-11/00608231
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳১.১০ কোটি |
১২ সেপ ২০২১ |
Completed |
|
Installation of (100mm x 38mm)dia. 100nos. Deep Tube-Well With Submersible Pump (Capacity 1.00 HP) at Sadar Upazilla in Satkhira District Under Safe Water Supply Through Out The Country (PSWSC) Project in Department of Public Health Engineering. (FY: 2021-2022).
000/e-GP/DPHE/2023-07-11/00595119
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.২৪ কোটি |
২৯ জুলাই ২০২১ |
Completed |
|
Installation of (100mm x 38mm)dia. 100nos. Deep Tube-Well With Submersible Pump (Capacity 1.00 HP) at Sadar Upazilla in Satkhira District Under Safe Water Supply Through Out The Country (PSWSC) Project in Department of Public Health Engineering. (FY: 2021-2022).
000/e-GP/DPHE/2023-07-11/00595118
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.২৪ কোটি |
২৯ জুলাই ২০২১ |
Completed |
|
Installation of 39 Nos Deep Tube well 100x38mm with Submersible pump Kahimpur-13 Hoibotpur-13 Churamonkathi-13 & 39 Nos Shallow Tube well 100x38mm with Submersible pump Kahimpur-13 Hoibotpur-13 Churamonkathi-13 &10 nos RO Filter at Sadar Upazila in Jashore Division Under Project for Safe Water Supply Through Out The Country PSWSC of Department of Public Health Engineering DPHE.
000/e-GP/DPHE/2023-07-11/00593560
|
Office of the Executive Engineer,DPHE,Jessore |
৳১.০৫ কোটি |
৮ জুলাই ২০২১ |
Completed |
|
Installation of different types of Tube well at different Upazila in Satkhira Division under Revenue budget of Department of Public Health Engineering. (22 nos Deep Tube well No. 6 Hand Pump, 5 nos Shallow Tube well No. 6 Hand Pump and 3 nos Deep Tara Tube well) [Amount of Tubewell may increase or decrease]
000/e-GP/DPHE/2023-07-11/00587695
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১৫.৮৭ লাখ |
১৪ জুন ২০২১ |
Completed |
|
Replcement of old AC along with fitting fixing due to modernization of OT Room at the 250 Bed General Hospital
JPWD/20-21/OP/S.M/250Jsr./AC OT Room/e-GP/20220814/578901/0030091
|
Jessore PWD Division |
৳১৯.০০ লাখ |
১২ মে ২০২১ |
Completed |
|
Construction of Pipe Line, House Connection, Fiber Glass Sheet Shad over Treatment plant, Repair of Transmission & Distribution Pipe Line Network & Pump House at Kolaroa Upazila in Satkhira District under Environmental sanitation and water supply with piped Network in Thana Sadar & Growth center Pourashava (2nd phase) Project. FY-2020-21
000/e-GP/DPHE/2023-07-11/00569964
|
Office of the Executive Engineer,DPHE,Satkhira |
৳২৭.৪৩ লাখ |
১৫ এপ্রিল ২০২১ |
Completed |
|
Repair and renovation of Super quater at Jashore PTI under Jashore Sadar Upazila District Jashore.
e-Tender/PEDP4/JSR//2020-21/W11.046/e-GP/20240917/562286/00176563
|
Office of the Executive Engineer, LGED, Jessore |
৳৯.৭২ লাখ |
৪ এপ্রিল ২০২১ |
Completed |
|
Installation of 25 Nos. 100 x 38 mm dia. deep tube well with submersible pump at different primary schools Upazila in Satkhira District under Need Based Infrastructure Newly Nationalized Development of Government Primary Schools Project GPS Project.
000/e-GP/DPHE/2023-07-11/00547276
|
Office of the Executive Engineer,DPHE,Satkhira |
৳৩৬.৪৩ লাখ |
১৫ ফেব ২০২১ |
Completed |
|
Construction of 10 Nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different Upazila in Satkhira District under Need Based Infrastructure Development of Government Primary Schools Project GPS Project.
000/e-GP/DPHE/2023-07-11/00547270
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.৩৭ কোটি |
১৫ ফেব ২০২১ |
Completed |
|
Construction of 10 Nos. 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different Upazila in Satkhira District under Need Based Infrastructure Newly Nationalized Development of Government Primary Schools Project GPS Project.
000/e-GP/DPHE/2023-07-11/00547274
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.৫৩ কোটি |
১৫ ফেব ২০২১ |
Completed |
|
Construction of Additional Class Room Paschim Abad Kochua under PEDP4.e-Tender/PEDP4/JSR/SAD/2019-2020/W1-00545
e-Tender/PEDP4/JSR/SAD/2019-2020/W1-00545/e-GP/20241023/545999/00202730
|
Office of the Upazila Engineer, LGED, Jessore Sadar, Jessore |
৳৯০.২৭ লাখ |
৯ ফেব ২০২১ |
Completed |
|
Laying of Distribution Pipe Line Supply and Installtion of Water Meter & House Connection at Chitalmary Pourashava in Bagerhat District Under Arsenic Risk Reduction Project ARRP FY 2020-2021
000/e-GP/DPHE/2023-07-11/00537641
|
Office of the Executive Engineer,DPHE Bagerhat |
৳১.৭৫ কোটি |
১৪ জানু ২০২১ |
Completed |
|
Installation of 156 nos Deep Tube well with 6 no. Hand pump at Zajira Upazila Bilaspur Barakandi Kunder Char ZanjiraB.K.NagarPurba Naodoba union of Shariatpur District Under the Project for Safe Water Supply Through Out The Country PSWSC FY 2020-21
000/e-GP/DPHE/2023-07-11/00526040
|
Office of the Executive Engineer , DPHE, Sariatpur |
৳৯৮.৮১ লাখ |
২৭ ডিসে ২০২০ |
Completed |
|
Installation of Rain Water Harvesting RWH at Sadar Upazila-90 Nos. Kolaroa Upazila-130 Nos. & Debhata Upazila-42 Nos. Total-262 Nos. in Satkhira District under Project for Safe Water Supply Through Out The Country PSWSC. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00510117
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.১০ কোটি |
১৫ নভে ২০২০ |
Completed |
|
Installation of Deep Tube well 100x38 with Submersible Pump at Sadar Upazila-100 Nos. in Satkhira District under Project for Safe Water Supply Through Out The Country PSWSC. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00510111
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.৩৭ কোটি |
১৫ নভে ২০২০ |
Completed |
|
Installation of Deep Tube well with No.6 Hand Pump at Assasuni Upazila-84 & Shyamnagor Upazila-84 Nos. Total-168 Nos. in Satkhira District under Project for Safe Water Supply Through Out The Country PSWSC. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00510109
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.২৩ কোটি |
১৫ নভে ২০২০ |
Completed |
|
Installation of Rain Water Harvesting RWH at Shyamnagor Upazila-228 Nos. in Satkhira District under Project for Safe Water Supply Through Out The Country PSWSC. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00510120
|
Office of the Executive Engineer,DPHE,Satkhira |
৳৯৬.০৫ লাখ |
১৫ নভে ২০২০ |
Completed |
|
Installation of Deep Tube well 100x38 with Submersible Pump at Sadar Upazila-100 Nos. in Satkhira District under Project for Safe Water Supply Through Out The Country PSWSC. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00510110
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.৩৭ কোটি |
১৫ নভে ২০২০ |
Completed |
|
Construction of Rural Pipe Water Supply Scheme Bisourd Village Anulia Union at Assasuni Upazila in Satkhira District under Water Supply Sanitation and Hygiene WASH Project. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00504689
|
Office of the Executive Engineer,DPHE,Satkhira |
৳৮৯.১৫ লাখ |
২০ অক্টো ২০২০ |
Completed |
|
Installation of 75x38 mm dia Deep Tube Well with 1.0 HP Capacity Submersible Pump at Tala Upazila-90 Nos. & Sadar Upazila-71 Nos. Total-161 Nos. in Satkhira District under Arsenic Risk Reduction Project on Water Supply Department of Public Health Engineering DPHE FY-2020-21
000/e-GP/DPHE/2023-07-11/00498500
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.৬৯ কোটি |
২৯ সেপ ২০২০ |
Completed |
|
Installation of Rain Water Harvesting at Sadar Upazila-135 Nos. Debhata Upazila-58 & Tala Upazila-103 Nos. Total-296 Nos. in Satkhira District under Arsenic Risk Reduction Project on Water Supply Department of Public Health Engineering DPHE FY-2020-21
000/e-GP/DPHE/2023-07-11/00498503
|
Office of the Executive Engineer,DPHE,Satkhira |
৳১.০৫ কোটি |
২৯ সেপ ২০২০ |
Completed |
|
Installation of Deep Tube Well at Sadar Upazila-157 Nos. in Satkhira District under Arsenic Risk Reduction Project on Water Supply Department of Public Health Engineering DPHE FY-2020-21
000/e-GP/DPHE/2023-07-11/00498497
|
Office of the Executive Engineer,DPHE,Satkhira |
৳৯৫.২৬ লাখ |
২৯ সেপ ২০২০ |
Completed |
|
Construction of 08 nos. 2 storied RCC WASH Block having 4 storied foundation i for MT & boys and FT & girls at Fakirhat Upazila in Bagerhat District including all associated construction sanitary plumbing & electrical works Primary Education Development Program - 4 PEDP 4FY-2020-21
000/e-GP/DPHE/2023-07-11/00499576
|
Office of the Executive Engineer,DPHE Bagerhat |
৳১.২৮ কোটি |
২৮ সেপ ২০২০ |
Completed |
|
Installation of 50 nos Deep Tube Well 38mm75mm with Submersible Pump under Preferential Rural Water Supply Project PRWSP in Sharsah Upazilla at Jashore District during the FY-2020-21.
000/e-GP/DPHE/2023-07-11/00490452
|
Office of the Executive Engineer,DPHE,Jessore |
৳৬০.৬৪ লাখ |
৩ সেপ ২০২০ |
Completed |
|
Construction of Boundary wall Including Gate of aBHOMRA bGODAGHATA cKHANPUR dSHALLEY
e-Tender/PEDP4/SKR/SAD/2019-20/W14.1018/e-GP/20241127/484722/00224612
|
Office of the Upazila Engineer, LGED, Satkhira Sadar, Satkhira |
৳৫২.১৩ লাখ |
২৩ আগ ২০২০ |
Completed |
|
Construction of Boundary Wall Including Gate of aBOKCHORA bFINGRI GOVT cHAZI PUR dPERMACHKHOLA REG PRIMARY SCHOOL
e-Tender/PEDP4/SKR/SAD/2019-20/W14.1019/e-GP/20241127/484723/00224629
|
Office of the Upazila Engineer, LGED, Satkhira Sadar, Satkhira |
৳৪০.৯৯ লাখ |
২৩ আগ ২০২০ |
Completed |
|
Conatruction of Boundary wall Including Gate of-aBADDI PUR COLONEY bKAMAR BAYSA c SATANI GIRLS d SATKHIRA MISSION
e-Tender/PEDP4/SKR/SAD/2019-20/W14.1017/e-GP/20241127/484721/00224634
|
Office of the Upazila Engineer, LGED, Satkhira Sadar, Satkhira |
৳৪০.৯৮ লাখ |
২৩ আগ ২০২০ |
Completed |
|
Installation of Deep Tube Well DTW at Assasuni Upazila-17 & Shyamnagor Upazila-17 Total-34 Nos. in Satkhira District for Central Emergency Rehabilitation Fund of UNICEF under Water Supply Sanitation and Hygiene WASH Project. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00482250
|
Office of the Executive Engineer,DPHE,Satkhira |
৳২২.৫৬ লাখ |
৬ আগ ২০২০ |
Completed |
|
Rehabilitation of Deep Tube Well DTW at Assasuni Upazila-30 & Shyamnagor Upazila-30 Total-60 Nos. Pond Sand Filter PSF at Assasuni Upazila-24 & Shyamnagor Upazila-24 Total-48 & Rain Water Harvester RWH at Assasuni Upazila-40 & Shyamnagor Upazila-40 Total-80 in Satkhira District for Central Emergency Rehabilitation Fund of UNICEF under Water Supply Sanitation and Hygiene WASH Project. FY-2020-2021
000/e-GP/DPHE/2023-07-11/00482251
|
Office of the Executive Engineer,DPHE,Satkhira |
৳৩৬.৫৪ লাখ |
৬ আগ ২০২০ |
Completed |