02 (Two) Nos Inter Connection at Monohordi 01 Nos & Ghorashal 01 Nos Pourashava of Narshingdi under 40 pouroshova water supply & Environmental Sanitation Project (II-Phase) during the FY 2021-22 .
000/e-GP/DPHE/2023-07-11/00703869
|
Office of the Executive Engineer, DPHE,Narsingdi |
BDT 5.67 lakh |
26 May 2022 |
Completed |
|
Construction of 15 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Different Upazilla in sunamganj.
000/e-GP/DPHE/2023-08-02/00685551
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 2.55 crore |
13 Apr 2022 |
Completed |
|
Construction of 15 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Different Upazilla in sunamganj.
000/e-GP/DPHE/2023-08-02/00685542
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 2.55 crore |
13 Apr 2022 |
Completed |
|
Installation of 105(One Hundred and Five) Nos. Shallow Tube well (size=100mmX50mm) with 0.75HP Submersible Pump at Islampur Upazila of Jamalpur District under Safe Water Supply Through Out The Country.(FY-2021-22)
000/e-GP/DPHE/2023-07-11/00671256
|
DPHE,Jamalpur Division |
BDT 83.66 lakh |
27 Mar 2022 |
Completed |
|
Installation of 90(Ninety) Nos. Shallow Tube well (size=100mmX50mm) with 0.75HP Submersible Pump at Bakshiganj Upazila of Jamalpur District under Safe Water Supply Through Out The Country.(FY-2021-22)
000/e-GP/DPHE/2023-07-11/00671383
|
DPHE,Jamalpur Division |
BDT 71.71 lakh |
27 Mar 2022 |
Completed |
|
Installation of 50 Nos Deep Tube well 100X38 with Submersible Pump at Netrokona Zila under Project for Improvement of sustainable Water Supply Sanitation and Hygiene System in Haor Areas during FY-2021-22
000/e-GP/DPHE/2023-07-11/00673409
|
Office of the Executive Engineer,DPHE,Netrokona |
BDT 69.19 lakh |
15 Mar 2022 |
Completed |
|
Construction of Improved Toilet Sanitary Electrical works & Running water supply etc in different upazilla under Improvement of sustainable Water Supply Sanitation and Hygiene System in Haor Areas Project.
000/e-GP/DPHE/2023-07-11/00647235
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.85 crore |
17 Jan 2022 |
Completed |
|
Construction of Community Based Water Supply Scheme by Installing 100mm x 50mm dia Tubewell with 1.5 HP Submersible Pump at Delduar and Nagorpur Upazila under PSWSC project during the FY-2021-2022.
000/e-GP/DPHE/2023-07-11/00642434
|
Office of the Executive Engineer, DPHE, Tangail |
BDT 1.50 crore |
13 Jan 2022 |
Completed |
|
Construction of 1 nos Piped Water Supply Scheme with 02 nos Test Tubewell, 02 nos Production well, 02 nos Pump House, 01 Nos R.C.C Over Head Water Tank, Mechanical works, Electrical Works, Pipe Line/Water distribution Networks etc. at Nalitabari Upazila of Sherpur District under PSWSC Project.
000/e-GP/DPHE/2023-07-11/00642759
|
Office of the Executive Engineer, DPHE,Sherpur |
BDT 1.94 crore |
29 Dec 2021 |
Completed |
|
Construction of One Storied Sreebordi Upazila Office Building of DPHE including additional One Story Staircase arrangement with Four Storied Foundation in Sherpur District.
000/e-GP/DPHE/2023-07-11/00620538
|
Office of the Executive Engineer, DPHE,Sherpur |
BDT 32.81 lakh |
18 Oct 2021 |
Completed |
|
Construction of 10 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Different Upazilla in sunamganj.
000/e-GP/DPHE/2023-08-02/00618458
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 1.60 crore |
11 Oct 2021 |
Completed |
|
Construction of 10 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Different Upazilla in sunamganj.
000/e-GP/DPHE/2023-07-11/00618459
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 1.64 crore |
11 Oct 2021 |
Completed |
|
Installation of 40 Nos 100 x 38 mm dia. deep tube well with submersible pump at different primary schools of Diffarent Upazila at Sunamganj District.
000/e-GP/DPHE/2023-07-11/00618450
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 55.24 lakh |
11 Oct 2021 |
Completed |
|
Construction of 1 nos Piped Water Supply Scheme with 02 nos Test Tubewell, 02 nos Production well, 02 nos Pump House, 01 Nos R.C.C Over Head Water Tank, Mechanical works, Electrical Works, Pipe Line/Water distribution Networks etc. at Jenaigati Upazila of Sherpur District under PSWSC Project.
000/e-GP/DPHE/2023-07-11/00600964
|
Office of the Executive Engineer, DPHE,Sherpur |
BDT 2.00 crore |
5 Sep 2021 |
Completed |
|
Construction or retired embankment from km 3.500/0.00 to km. 3.980/0.592 - 592.00 m and temporary protective work km 3.980 to km. 4.080 - 100.00 m along the left bank of Pungli river at Kamutia of Bathuli beel sub-Project in Bashail Upazila of Tangail District under Non Development Revenue Budget during the year 2020-21
NDR-Kamutia-01/2020-21/e-GP/20231125/560050/00136228
|
Tangail O&M Division |
BDT 87.57 lakh |
21 Mar 2021 |
Completed |
|
Constraction of low cost Sanitary Latrine under Devalopment of Water Supply & Sanitation Infrastructure Project on Jagannatpur Upazilla in Sunamganj
000/e-GP/DPHE/2023-08-02/00537284
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 3.24 crore |
7 Feb 2021 |
Completed |
|
Installation of 70 Nos. 100 mm x 38 mm Shallow Tubewell with Submersible Pump & 60 Nos. Shallow Tara Tube well Extractable of DPHE Mymensingh FY 2020-21 Project for Safe Water Supply Throughout the Country.
000/e-GP/DPHE/2023-07-11/00523565
|
Office of the Executive Engineer, DPHE,Mymensingh |
BDT 99.98 lakh |
10 Dec 2020 |
Completed |
|
Construction of 05 nos 02 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Shulla Upazilla in sunamganj.
000/e-GP/DPHE/2023-07-11/00505395
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 81.67 lakh |
22 Oct 2020 |
Completed |
|
Construction of 10 nos 02 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Dharmapasha Upazilla in sunamganj.
000/e-GP/DPHE/2023-07-11/00505376
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 1.61 crore |
22 Oct 2020 |
Completed |
|
Construction of 06 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Shulla Upazilla in sunamganj.
000/e-GP/DPHE/2023-07-11/00505406
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 1.03 crore |
22 Oct 2020 |
Completed |
|
Construction of 06 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at South Sunamganj Upazilla in sunamganj.
000/e-GP/DPHE/2023-07-11/00505428
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 99.97 lakh |
22 Oct 2020 |
Completed |
|
Construction of 06 nos 02 storied RCC WASH Block having 4 Storied Foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary school at Shulla Upazilla in sunamganj.
000/e-GP/DPHE/2023-07-11/00505404
|
Office of the Executive Engineer DPHE, Sunamganj |
BDT 1.01 crore |
22 Oct 2020 |
Completed |
|
Laying of 5.00km different dia Pipe line at Chakaria Pourashava of District Coxs Bazar under 40 pouroshova water supply & Environmental Sanitation project FY 2020-2021.
000/e-GP/DPHE/2023-07-11/00496800
|
Office of the Executive Engineer,DPHE,coxsbazar |
BDT 46.55 lakh |
17 Sep 2020 |
Completed |
|
Construction of 7 Nos 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at 7 Nos Primary School of Bajitpur Upazila in Kishoreganj District under PEDP-4 during 2019-2020 Financial Year.
000/e-GP/DPHE/2023-07-11/00468490
|
Office of the Executive Engineer DPHE, Kishoreganj |
BDT 1.12 crore |
9 Jun 2020 |
Completed |
|
Installation of 70 Nos Deep Tube well 100x38mm with Submersible pump and 52 Nos Shallow Tube well 100x38mm with Submersible pump at Golapganj Upazila in Sylhet District Under Project for Safe Water Supply Through Out The CountryPSWSC.
000/e-GP/DPHE/2023-07-11/00464976
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.69 crore |
2 Jun 2020 |
Completed |
|
Installation of 30 Nos Deep tara system tube well with 6 No.Hand pumpextractable and 43 Nos Ring wellTara system at Kanaighat Upazila in Sylhet District Under Project for Safe Water Supply Through Out The CountryPSWSC.
000/e-GP/DPHE/2023-07-11/00464987
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 32.81 lakh |
2 Jun 2020 |
Completed |
|
Drilling & Installation of 135 nos Deep Tube Well 100x38mm with Submersible Pump at Kasba Upazila in Brahmanbaria District Under Safe Water Supply Through Out The Country PSWSC.
000/e-GP/DPHE/2023-07-11/00460836
|
Office of the Executive Engineer, DPHE,Brahmanbaria |
BDT 1.60 crore |
17 May 2020 |
Completed |
|
Maintanence of DPHE Upazila Office Building at Companiganj Upazila in Sylhet District Under National Sanitation Project Phase-III
000/e-GP/DPHE/2023-07-11/00458817
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 2.65 lakh |
10 May 2020 |
Completed |
|
Supply & Installation of Submersible Pump with Column Pipe and Others Electrical and Mechanical Accessories at East Site of Over Head Tank Station Road Pump House of Tongi Estama Field. FY 2019-20.
000/e-GP/DPHE/2023-07-11/00416567
|
Office of the Executive Engineer M E Division DPHE Tongi Dhaka |
BDT 7.41 lakh |
28 Jan 2020 |
Completed |
|
Construction of RCC WASH BlockMTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. Need Based Infrastructure Development od Newly Nationalized Government PrimarySchools 1st PhaseNBIDNNGPS-1
000/e-GP/DPHE/2023-07-11/00367000
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 98.32 lakh |
9 Oct 2019 |
Completed |
|
Construction of RCC WASH BlockMTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1
000/e-GP/DPHE/2023-07-11/00366993
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 96.81 lakh |
9 Oct 2019 |
Completed |
|
Installation of rural piped water supply scheme under Arsenic Risk Reduction Project for Water Supply in DPHE Sylhet division Sylhet
000/e-GP/DPHE/2023-07-11/00365199
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.97 crore |
3 Oct 2019 |
Completed |
|
Laying of pipe line different dia at Kaliganj Zakiganj Sylhet district under 40 Pouroshova water supply & Environmental Sanitation project II-Phase during the FY 2019-20
000/e-GP/DPHE/2023-07-11/00349405
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.02 crore |
20 Aug 2019 |
Completed |
|
Supplying of Photocopy Machine and Computer Accessories for Pd Office PRWSP DPHE Dhaka Under Preferential Rural Water Supply Project. 2018-2019
000/e-GP/DPHE/2023-07-11/00328360
|
Office of the Executive Engineer,DPHE, Manikgonj |
BDT 4.99 lakh |
30 May 2019 |
Completed |
|
Installation of 100 mm X 50 mm dia 25 Nos Deep Tube Well with 1.5 HP capacity submersible pump at different primary school in different Upazillas of Kishoreganj District under PEDP-4 project during the Financial Year 2018-19.
000/e-GP/DPHE/2023-07-11/00292978
|
Office of the Executive Engineer DPHE, Kishoreganj |
BDT 58.67 lakh |
6 Mar 2019 |
Completed |
|
200 mmm 150 mm & 100 mm dia PVC pipe line of Coxs Bazar Pourashava under 37 District Water Supply project. During the 2018-2019.
000/e-GP/DPHE/2023-07-11/00266292
|
Office of the Executive Engineer,DPHE,coxsbazar |
BDT 11.76 lakh |
26 Dec 2018 |
Completed |
|
150 mm dia & 100 mm dia PVC pipe line with interconnection of Coxs Bazar Pourashava under 37 District Water Supply project. During the 2018-2019.
000/e-GP/DPHE/2023-07-11/00266293
|
Office of the Executive Engineer,DPHE,coxsbazar |
BDT 4.00 lakh |
26 Dec 2018 |
Completed |
|
Installation of 2 Two Nos. 38 mm dia uPVC Test Tube well 1 One Nos 150mm x 350 mm dia uPVC Production Tubewell Construction of 01 One Nos Pump house with Boundary Wall & Electric Power Connection Supply and Installation of 01 One Nos Submersible Pump motor set with Column Pipe and Electric Panel Board with necessary accessories and 01 One Nos Electric Transformer and other Electrical materials at Bajitpur Poura area of Kishoreganj District under Environmental Sanitation and Water Supply with Piped Network in Thana Sadar and Growth Center Pourashava2nd Phase during the 2018-2019 Financial Year.
000/e-GP/DPHE/2023-07-11/00259835
|
Office of the Executive Engineer DPHE, Kishoreganj |
BDT 38.01 lakh |
5 Dec 2018 |
Completed |
|
Installation of 6 no. Deep Tube well under Preferential Rural Water Supply Project of Department of Public Health Engineering
000/e-GP/DPHE/2023-07-11/00225969
|
Office of the Executive Engineer,DPHE,coxsbazar |
BDT 32.34 lakh |
19 Sep 2018 |
Completed |
|
Supplying & Installation of 4 Four nos. of Exploratory Drilling Test Tube Well 2 Nos Production Well 350 x 150 mm 2 Nos Submersible Pump Procurement with column pipe Electric panel Board Installation etc. 2 Nos Pump House with Electrification & Security Wall Transformer with Electrical/ Mechanical Line Connection etc. under Water Supply & Environmental Sanitation including Faecal Sludge Management Project in 32 Pourashavas.
000/e-GP/DPHE/2023-07-11/00221340
|
DPHE,Jamalpur Division |
BDT 85.00 lakh |
17 Sep 2018 |
Completed |
|
Installation of different type of water point at Fenchuganj Upazila Sylhet under Preferential Rural Water Supply Project PRWSP
000/e-GP/DPHE/2023-07-11/00214591
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.08 crore |
14 Aug 2018 |
Completed |
|
Installation of different type of water point at Beanibazar Upazila Sylhet under Preferential Rural Water Supply Project PRWSP
000/e-GP/DPHE/2023-07-11/00214595
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.60 crore |
14 Aug 2018 |
Completed |
|
Installation of different type of water point at Golapgonj Upazila Sylhet under Preferential Rural Water Supply Project PRWSP
000/e-GP/DPHE/2023-07-11/00214596
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.60 crore |
12 Aug 2018 |
Completed |
|
Repairing and renovation Internal electrification work and outside renovation work etc of Executive Engineers Residential Building Under DPHE Sylhet Division Sylhet.
000/e-GP/DPHE/2023-07-11/00196108
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 3.07 lakh |
11 May 2018 |
Completed |
|
Repairing and renovation Tails work changing old door etc of Executive Engineers Residential Building Ground Floor under DPHE Sylhet division sylhet.
000/e-GP/DPHE/2023-07-11/00196107
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 2.98 lakh |
11 May 2018 |
Completed |
|
Repairing renovation and construction of Main Gate of DPHE Sylhet DivisionSylhet
000/e-GP/DPHE/2023-07-11/00196109
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 3.15 lakh |
10 May 2018 |
Completed |
|
Supply installation and commission of office Furniture for DPHE Upazila Office Under Sylhet Circle Sylhet.
000/e-GP/DPHE/2023-07-11/00165343
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 2.84 lakh |
13 Mar 2018 |
Completed |
|
Supply installation and commission of Computer Printer in the different upazila under Sylhet Circle Sylhet.
000/e-GP/DPHE/2023-07-11/00165342
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 1.40 lakh |
13 Mar 2018 |
Completed |
|
Repair & Renovation works at Dharanjee High School Panchbibi Joypurhat.
Revenue/Rep5974/Nao-Zone/01/e-GP/20241204/160617/00228748
|
office of the Executive Engineer, Naogaon, Zone. |
BDT 4.75 lakh |
13 Feb 2018 |
Completed |
|
Installation of 75nos different type of water point at Fenchugonj Golapgonj Zakigonj Upazila Sylhet
000/e-GP/DPHE/2023-07-11/00161666
|
Office of the Executive Engineer DPHE, Sylhet |
BDT 61.12 lakh |
10 Feb 2018 |
Completed |