|
Repair & Maintenance of Property Line Barbed Wire Fencing at Patuakhali 132/33 kV Grid Substation Under GMD Power Grid Barishal.
বরিশাল · টেন্ডার →
|
Grid Maintenance Division, Barishal |
৳৩.১০ লাখ |
১৮ অক্টো ২০২৬ |
|
Improvement of Jhatibunia Gazi Jame Mosque under Badarpur Union. [Latitude:22.432745 Longitude:90.328002] Patuakhali Sadar Patuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৯.৫০ লাখ |
১৬ আগ ২০২৬ |
|
Installation of 04 Nos Deep Tube Well with Submersible Pump (100 mm x 38mm) at Different Upazilla in Patuakhali District under Revenue Budget of Department of Public Health Engineering. FY(2025-2026)
পটুয়াখালী
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳৭.০০ লাখ |
১৭ জুন ২০২৬ |
|
Installation of 05 Nos Deep Tube Well with Submersible Pump (100 mm x 38mm) at Sadar Upazila in Patuakhali District under Revenue Budget of Department of Public Health Engineering. FY(2025-2026)
পটুয়াখালী
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳৮.৩০ লাখ |
১৬ জুন ২০২৬ |
|
Installation of 09 nos. Deep Tube well with 6 no. Hand Pump at Different Upazilla in Patuakhali District under Revenue Budget of Department of Public Health Engineering. FY(2025-2026).
পটুয়াখালী
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳৭.৯০ লাখ |
১৫ জুন ২০২৬ |
|
Supply and Installation of Office Equipments
পটুয়াখালী
|
Office of the Principal, Patuakhali Technical School & College |
৳৪.৩০ লাখ |
১২ মে ২০২৬ |
|
Improvement of Pachim Sharkkhali Village Mohammadia Pada Barir Jame Mosque under Kalikapur Union [Latitude: 22.312318 Longitude: 90.324823]Patuakhali SadarPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৫.০০ লাখ |
১২ মে ২০২৬ |
|
Improvement of Ward 05 Janmahmud Jame Masjid Under Panpotty Union [Latitude: 22.115780. Longitude:90.542908]GalachipaPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of 2 No Word Gabua Village Pachim Gabua Fayzor Ali Howlader Barir Jame Mosque under Badorpur Union [Latitude: 22.401058 Longitude: 90.323819]Patuakhali SadarPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৪.১০ লাখ |
১০ মে ২০২৬ |
|
Improvement of 9 no word Sree Sree Durga Mondir under Bhuria Union [Latitude: 22.376461 Longitude: 90.427475]Patuakhali SadarPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৩.৪০ লাখ |
১০ মে ২০২৬ |
|
Improvement of Ward 08 Haji Abed Ali Matabar Bari Jame Masjid Under Rotondi Taltoli [Latitude: 22.15240266. Longitude:90.48494942]GalachipaPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of 04 No word Panchyet Bazar Jame Mosque Under Muradia Union [Latitude: 22.44048215 Longitude: 90.4048761]DumkiPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of South Gabua Mohammadia Jame Mosque under Kakrabunia Union [Latitude: 22.266753 Longitude: 90.103771] MirzaganjPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of Ward 05 Sri Sri Sarvajanin Kalir Matha Temple Under Charkajol Union [Latitude: 22.08995945. Longitude:90.53714655]GalachipaPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of Uttar Rajakhali Iman Uddin Munsi Bari Jame Mosque under Sreerampur Union [Latitude: 22.46905 Longitude: 90.40943]DumkiPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of Pachim Labukhali Al Akash Jame Mosque under Labukhali Union [Latitude: 22.45477 Longitude: 90.33621]DumkiPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
১০ মে ২০২৬ |
|
Improvement of Kobirkati Village Moslem Ali Mirdha Bari Jame Masjid Under Kalisuri Union [Latitude: 22.50527013. Longitude:90.5157784]BauphalPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৭.৬০ লাখ |
১০ মে ২০২৬ |
|
Supply of Raw Materials For Cycle-8
পটুয়াখালী
|
Office of the Principal, Patuakhali Technical School & College |
৳২.৮০ লাখ |
৫ মে ২০২৬ |
|
Overall Repair Work of 12 Flats of 1st Floor of POM Police Lines Residential Quarter 'Shuktara' at DMP
ঢাকা
|
Development Section, Dhaka Metropoliton Police, Dhaka |
৳১১.৮০ লাখ |
১৯ এপ্রিল ২০২৬ |
|
Complete Repair Work of Newmarket Police Officers' Quarter `Niharika 6/J' at DMP
ঢাকা
|
Development Section, Dhaka Metropoliton Police, Dhaka |
৳১.১০ লাখ |
১৯ এপ্রিল ২০২৬ |
|
Rajarbagh Police Officers' Quarters 'Modhumoti' 7/B Complete Repair Work
ঢাকা
|
Development Section, Dhaka Metropoliton Police, Dhaka |
৳২.৭০ লাখ |
২৫ মার্চ ২০২৬ |
|
(a) Construction of 1 nos RCC Ghatla at 06 no word KachuaShajahan Mia Bari Pond Under Chiknikandi Union. (b) Construction of 1 nos Culvert at 05 no word KotkhaliMorhumNozirAhamed Bari Under Chiknikandi Union. (c) Improvement of 06 no word Meher Ali Pandit Bari Mosque- West Side Road By CC Under Bakulbaria Union. (d) Improvement of RCC Road from 04 no Word PurboMajghram UZR BC Road- Hera Lal Bari Mondir Road UnderChiknikandi Union. (e) Improvement of 06 no word Sayedkathi Community Clinic (Infront) By CC RoadUnderBakulbaria Union. (f) Construction of 1 nosRCC Ghatla at 04 no word ChaduSikder Bari Mosque Pond Under Bakulbaria Union. (g) Improvement of HBB Road from 02 no Word GuabariaNayonDorji Bari- East Side DowaniPatuakhali Culvert UnderBakulbaria Union. (h) Improvement of HBB Road from 02 no Word Ranua Bazar South Side HBB-108 no DowaniPatuakhali GPSUnderBakulbaria Union. (i) Improvement of Soling Road from Bakulbaria 01 no Word MorhumFazlulHaqueShikder Bari Mosque- Government Road (East side) Under GalachipaUpazila Dis: Patuakhali.
পটুয়াখালী
|
Office of the Upazila Engineer, Galachipa, Patuakhali |
৳৯.৯০ লাখ |
১৬ মার্চ ২০২৬ |
|
Improvement of Fazle Ali Shikder Bari Jame Mosque under Mirzaganj Union. [Latitude:22.42056 Longitude:90.26750] MirzaganjPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৩.৮০ লাখ |
৮ মার্চ ২০২৬ |
|
Improvement of North Pukurjana Khorshed Ali Shikder Bari Public Graveyard under Itbaria Union. [Latitude:22.407498 Longitude:90.295653] Patuakhali SadarPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১০.২০ লাখ |
৮ মার্চ ২০২৬ |
|
Improvement of Hortogki Baria Village Kager hat Jame Mosque. Under Chotobegai Union. [Latitude:22.1914003 Longitude:90.1538006]Under Patuakhali SadarPatuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.৯০ লাখ |
৮ মার্চ ২০২৬ |
|
Improvement of Kobirkhati Village Ajahar Uddin Shikder Home Attached Graveyard under Kalisuri Union. [Latitude: 22.50849111 Longitude: 90.51335167] Under Bauphal Upazila District:Patuakhali.
পটুয়াখালী
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৫.৭০ লাখ |
৬ জানু ২০২৬ |
|
Construction of Rural piped water supply scheme with 02 nos Test Tubewell 02 nos Production well 02 nos Pump House 01 Nos R.C.C Over Head Water Tank Mechanical works Electrical Works Pipe Line/water distribution Networks 01 Nos Arsenic and Iron Removal Plant (Capacity:25 m3/hr) etc. in Kalisuri Union of Bauphal Upazila Patuakhali under Safe Water Supply Through Out The Country Project.
পটুয়াখালী · টেন্ডার →
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳৩.২৭ কোটি |
৪ জানু ২০২৬ |
|
Construction of Rural piped water supply scheme with 02 nos Test Tubewell 02 nos Production well 02 nos Pump House 01 Nos R.C.C Over Head Water Tank Mechanical works Electrical Works Pipe Line/water distribution Networks 01 Nos Arsenic and Iron Removal Plant (Capacity:25 m3/hr) etc. in Kalaia Union of Bauphal Upazila Patuakhali under Safe Water Supply Through Out The Country Project.
পটুয়াখালী · টেন্ডার →
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳২.৭০ কোটি |
১১ ডিসে ২০২৫ |
|
(I). Upgrading of RCC road from R&H road to Nurul Haque Mirda (Hasan Mirdia) Bari in ward no-04 Under Baupha l Paurashava. Ch. 0.00-122m. (II). Upgrading of RCC road (A). R&H road to election office (B). Mapeter khal to Alauddin Gazi Bari (C). lged Harun house in ward No-78 & 9 No ward Under Bauphal Paurashava. Ch. 0.00-98m.(III). Upgrading of of RCC road (A). R&H road to Reshe Bari (B). Sattar Store Kiper Road to Hasina Parven House (C). Thakur Bari (Nil Kontoo). (D). Foragi Bari-Hazi Bari link in ward No-07 & 09 Under Bauphal Paurashava. Ch. 0.00-108m.
পটুয়াখালী · টেন্ডার →
|
Office of the Bauphal Pourashava, Patuakhali |
৳৩০.১০ লাখ |
২১ অক্টো ২০২৪ |
|
(I). Upgrading of of RCC road from Al Hiqma Mosque road to Hasem Phada Matiur Rahman Phada bari in ward no-05 Under Bauphal Paurashava. Ch. 0.00-70m.(II). Upgrading of of RCC road Hisbullah sarak to Najir Hujur house via Khalil Sikder Bari in ward no-06 Under Bauphal Paurashava. Ch. 0.00-128m.(III). Upgrading of of RCC road from Sher-E-Bangla road to kodon Bapari/Hakim Howlader Bari in ward no-07 Under Bauphal Paurashava. Ch. 0.00-121m.
পটুয়াখালী · টেন্ডার →
|
Office of the Bauphal Pourashava, Patuakhali |
৳৩৫.৯০ লাখ |
২১ অক্টো ২০২৪ |
|
Construction of 05 nos. Single Storied RCC WASH Block having 2 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Bauphal (site may be given from other upazilla) upazila in Patuakhali District.
পটুয়াখালী · টেন্ডার →
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳৬৭.০০ লাখ |
২৮ ডিসে ২০২৩ |
|
Construction of 10 nos. Two Storied RCC WASH Block having 2 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at Galachipa upazila in Patuakhali District.
পটুয়াখালী · টেন্ডার →
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳১.৩৯ কোটি |
২৮ ডিসে ২০২৩ |
|
Supplying of Desktop Computer and All in one Inkjet WiFi Printer for the Supervision Consultant in Patuakhali District under PEDP-4.
পটুয়াখালী
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳১.০০ লাখ |
১৪ জুন ২০২৩ |
|
Supply of Stationery Seal & Stamps.
পটুয়াখালী
|
Patuakhali Coastal Afforestation Division |
৳১.৩০ লাখ |
২৭ মে ২০২১ |