|
Internal & outer renovation works of high school bhaban with related civil works at shikalbaha power plant area.
CDW-51/21-22/e-GP/20221204/672788/0055568
|
Zonal Civil Construction Division, CTG |
৳২৪.৭৭ লাখ |
২৭ মার্চ ২০২২ |
Completed |
|
Internal repairing and repainting works of Flat No- C-1/2, C-1/3, C-1/6, C-1/7 & C-1/8 of 1000 Sft. residential building at CTC, Khulshi.
CMW-22../e-GP/20221204/671298/0055566
|
Zonal Civil Construction Division, CTG |
৳৭.৬৮ লাখ |
১০ মার্চ ২০২২ |
Completed |
|
Yearly emergency repairing & maintenance of Thai-alluminum and re-winding of electrical fans including related electrical repairing works at different bhabans/structures.
CMW-9../e-GP/20221204/589010/0055565
|
Zonal Civil Construction Division, CTG |
৳৭.৯৯ লাখ |
১৭ জুন ২০২১ |
Completed |
|
Construction of RCC open stack yard approach road of Store and renovation of gate/fencing at the store area of S&D-Hathazari
CDW-37 /20-21/e-GP/20221204/584631/0055562
|
Zonal Civil Construction Division, CTG |
৳৩৩.৯৫ লাখ |
৬ জুন ২০২১ |
Completed |
|
Repairing and maintenance works of delivery water supply lines replacing of pump motor and repairing of pump house at Patenga Sub-station area Ctg.
CMW-..99/e-GP/20221204/564772/0055559
|
Zonal Civil Construction Division, CTG |
৳৬.১৬ লাখ |
৪ এপ্রিল ২০২১ |
Completed |
|
Construction works for separating of store office from main store fitting of grill /collapsible gate for separating store rooms for 150MW Power Plant & 225MW power plant and construction of AC room for storing of electronic cards/ spare parts at the 2-storied store building at Shikalbaha Power Plant Ctg.
CDW-90 /20-21/e-GP/20221204/543407/0055560
|
Zonal Civil Construction Division, CTG |
৳৫৯.৭১ লাখ |
২৮ ফেব ২০২১ |
Completed |
|
Construction of 2-storied 4-units 1250sft residential building at the area of Chittagong Traning Centre Khulshi Ctg.
CDW-108 /20-21/e-GP/20221229/523676/0060238
|
Zonal Civil Construction Division, CTG |
৳২.০৩ কোটি |
২৩ ডিসে ২০২০ |
Completed |
|
Renovation of sanitary duct with replacing of sewerage lines / waste water lines/ damaged grills renewing of damp plaster repainting with renovation of outside wall including stair rooms patent stone at roof palcing of water tanks and renovation of drain & apron of 1000 sft residential building at CTC Khulsi.
CDW-33 /20-21/e-GP/20221110/524745/0053338
|
Zonal Civil Construction Division, CTG |
৳১৫.১৬ লাখ |
১৫ ডিসে ২০২০ |
Completed |
|
Overall renovation and internal arrangement works at ground floor for shifting of Executive Engineer SCADA Operation Division Ctg from 1st floor of that building at Khulshi.
CDW-5 /20-21/e-GP/20221110/496613/0053336
|
Zonal Civil Construction Division, CTG |
৳৩৯.৫৮ লাখ |
৫ অক্টো ২০২০ |
Completed |
|
Construction of additional class room of KOLAGAON GPS under PEDP4.
e-Tender/PEDP4/CTG/PAT/2019-20/W2.01802/e-GP/20231121/482238/00133214
|
Office of the Upazila Engineer, LGED, Patiya, Chittagong |
৳৪৫.০৪ লাখ |
১৬ আগ ২০২০ |
Completed |
|
Raising the height of roads from launch ghat to 01 no. gate of 60MW Shikalbaha Power Station Ctg.
CDW-84/19-20/e-GP/20221110/478437/0053334
|
Zonal Civil Construction Division, CTG |
৳৫৪.৯০ লাখ |
১৪ জুলাই ২০২০ |
Completed |
|
Yearly emergency repairing & maintenance of Thai-alluminum and re-winding of electrical fans including related electrical repairing works at different bhabans/structures.
CMW.--17/e-GP/20221201/473214/0055363
|
Zonal Civil Construction Division, CTG |
৳৭.৯৯ লাখ |
২৯ জুন ২০২০ |
Completed |
|
Yearly emergency repairing of electrical plumbing and sanitary operation of water pump cutting of jungles cleaning of sewerage line cleaning of water reservior at Khulshi/RTC/SCADA residential bhaban area.
CMW.--11/e-GP/20221201/473272/0055364
|
Zonal Civil Construction Division, CTG |
৳৫.৯৬ লাখ |
২৮ জুন ২০২০ |
Completed |
|
Renovation and repainting works at outer wall of semi pucca tinshed office bhaban 1-storied control building 1 no. 1000sft residential building with renovation of drain/apron/roof 2 nos. 600sft residential buildings with renovation of drain/apron/roof tinshed store tinshed staff barrack tinshed complain centre tinshed mosque land scapping works in the office/residential area painting works on bottom part of trees/Electric Pole internal fencing & surrounding boundary wall of office area of Distribution Division-Patiya.
CDW-106/ 18-19/e-GP/20220723/398584/0027041
|
Zonal Civil Construction Division, CTG |
৳৩২.০২ লাখ |
১৬ মার্চ ২০২০ |
Completed |
|
Improvement of Abdul Bari Jame Mosque Union Burumchara Latitude 22.1678 Longitude 91.89198 Upazila Anowara District Chattogram.
GSIDP/CTG/DW-392 /e-GP/2023921/413779/0086729
|
Office of the Executive Engineer, LGED, Chittagong |
৳৪.০৪ লাখ |
২১ জানু ২০২০ |
Completed |
|
Yearly emergency repairing & maintenance of Thai-alluminum and re-winding of electrical fans including related electrical repairing works at different bhabans/structures.
CMW--19/e-GP/20220723/349591/0027039
|
Zonal Civil Construction Division, CTG |
৳৭.১৮ লাখ |
৪ সেপ ২০১৯ |
Completed |
|
Yearly emergency repairing of electrical plumbing and sanitary operation of water pump cutting of jungles cleaning of sewerage line cleaning of water reservior at Khulshi/RTC/SCADA residential bhaban area.
CMW--.13/e-GP/20220723/331120/0027038
|
Zonal Civil Construction Division, CTG |
৳৫.৯৭ লাখ |
২৩ জুন ২০১৯ |
Completed |
|
Overall renovation works including internal repainting works replacing of sanitary/ plumbing/ electrical fittings/ broken door/ broken window protective works to remove water seeping from roof raising the apron/drain floor height renovation of sewerage lines with other related civil development works of 800sftKeya and 600 sft Kakoli residential building at Distribution Division-Patiya office compound.
CDW-166/ 18-19/e-GP/20220723/321749/0027037
|
Zonal Civil Construction Division, CTG |
৳২৩.১৮ লাখ |
২৭ মে ২০১৯ |
Completed |
|
Fitting of floor tiles with other renovation works of 2-class rooms renovation of general bathroom block at 1st floor and fitting of false ceiling at 1st floor corridor/lobbi of administrative building of CTC Khulshi Ctg.
CDW-172/ 18-19/e-GP/20220723/320478/0027036
|
Zonal Civil Construction Division, CTG |
৳২৫.৯৪ লাখ |
২৬ মে ২০১৯ |
Completed |
|
Renovation and repainting works at outer wall of office bhaban prayer room garage-cum-complain centre boundary wall of office area and repainting works of boundary wall including outer wall of store building at store area of Dohazari Electric Supply. Chattogram.
CDW-104/ 18-19/e-GP/20220723/319390/0027035
|
Zonal Civil Construction Division, CTG |
৳১৮.৯০ লাখ |
১৯ মে ২০১৯ |
Completed |
|
Renovation and repainting works at outside wall of 2000sft manager bunglow garage security post drain apron and boundary wall/fencing around the bunglow of Shikalbaha 60MW Power Plant Shikalbaha Ctg.
CDW-33/ 18-19/e-GP/20220723/319471/0027033
|
Zonal Civil Construction Division, CTG |
৳১২.১৩ লাখ |
১৯ মে ২০১৯ |
Completed |
|
Renovation and repainting works of boundary wall and internal wall/fencing at the area of Chattogram training centre residential building and SCADA o&M division repainting works at outside wall of guardroom & Pump house and gate/fencing adjacent to the pump house at Chattogram training centre area.
CDW-65/ 18-19/e-GP/20220723/292999/0027032
|
Zonal Civil Construction Division, CTG |
৳১৪.৯৩ লাখ |
১৩ মার্চ ২০১৯ |
Completed |
|
Construction of 2-storied 4-units 1000sft residential building at the area of Chittagong Traning Centre Khulshi Ctg.
CDW-169/ 18-19/e-GP/20220720/290383/0026681
|
Zonal Civil Construction Division, CTG |
৳১.৯৬ কোটি |
৫ মার্চ ২০১৯ |
Completed |
|
Internal repairing and maintenance works of 7-flats of 1000sft residential building adjacent to the Chattogram Training Centre Khulshi.
CMW-80./e-GP/20220720/234223/0026680
|
Zonal Civil Construction Division, CTG |
৳৬.২১ লাখ |
২৬ ফেব ২০১৯ |
Completed |
|
Construction of 2-new gates and renovation & repainting works of boundary wall/barbed wire/grill fencing of residential area renovation of surface drain adjacent to the those boundary wall of residential area of Shikalbaha 60MW Power Plant Shikalbaha Ctg.
CDW-38/ 18-19/e-GP/20220720/248436/0026679
|
Zonal Civil Construction Division, CTG |
৳২৪.৯৩ লাখ |
৩০ জানু ২০১৯ |
Completed |
|
Construction of 2 nos. RCC open yard for using as stock yard at the office compound of Distribution Division-Patiya. BPDB Ctg.
CDW-146/ 18-19/e-GP/20220720/233073/0026678
|
Zonal Civil Construction Division, CTG |
৳৫১.৭২ লাখ |
১৫ জানু ২০১৯ |
Completed |
|
Renovation and repainting works of the outside wall of pump house Power house structure adjacent to the Power house CI Sheet roofing of semi-pucca generator room and reconstruction of damaged fencing started from pump house to security post adjacent to canal of Shikalbaha 60MW Power Plant.
CDW-28/ 18-19/e-GP/20220720/226009/0026676
|
Zonal Civil Construction Division, CTG |
৳৪৯.৫৯ লাখ |
১৭ অক্টো ২০১৮ |
Completed |
|
Internal repairing of western side flat at 1st floor of F-6 building including repairing of roof of that building and internal repairing of western side flat at 2nd floor of 1000sft building adjacent to the Chattogram Training Centre Khulshi Chattogram.
CMW-75./e-GP/20220720/232965/0026674
|
Zonal Civil Construction Division, CTG |
৳৪.৮৭ লাখ |
১৪ অক্টো ২০১৮ |
Completed |
|
Renovation and repainting works at the outside wall of administrative building and the adjacent boundary wall/ fencing with in front guide wall of administrative building outside wall of store building also used as workshop and adjacent semi-pacca store of Shikalbaha 60MW Power Plant Shikalbaha Ctg.
CDW-27/ 18-19/e-GP/20220720/223595/0026673
|
Zonal Civil Construction Division, CTG |
৳৪৪.৯৯ লাখ |
৩০ সেপ ২০১৮ |
Completed |
|
Yearly emergency repairing & maintenance of Thai-aluminum and re-winding of electrical fans including related electrical repairing works at different bhabans/structures.
CMW-..15/e-GP/20220720/209397/0026672
|
Zonal Civil Construction Division, CTG |
৳৭.৯৮ লাখ |
৯ জুলাই ২০১৮ |
Completed |
|
Yearly emergency repairing of electrical plumbing and sanitary operation of water pump cutting of jungles cleaning of sewerage line cleaning of water reservior at Khulshi/RTC/SCADA residential bhaban area.
CMW-..14/e-GP/20220706/209387/0025879
|
Zonal Civil Construction Division, CTG |
৳৫.৯৬ লাখ |
৮ জুলাই ২০১৮ |
Completed |
|
Supplying of different types of electrical bulb bulb holder different types of switch MCB combined socket and gang switch.
GS.-09/e-GP/20220703/204375/0025406
|
Zonal Civil Construction Division, CTG |
৳৩.৯৮ লাখ |
৬ জুন ২০১৮ |
Completed |
|
Repairing of fencing of garden including adjacent drain and repairing of security lighiting system of Chittagong Training Center.
CMW-108/e-GP/20220703/199164/0025404
|
Zonal Civil Construction Division, CTG |
৳৪.৮৬ লাখ |
২৩ মে ২০১৮ |
Completed |
|
Construction of approach road/open Yard at front side of newly constructed S & D-Patiya office building.
CDW-121/e-GP/20220703/191540/0025402
|
Zonal Civil Construction Division, CTG |
৳১৯.৪৩ লাখ |
৩ মে ২০১৮ |
Completed |
|
Overall renovation works including fitting of AC at 2-rooms no-307 and no-309 at hostel bhaban and construction of 2-toilets adjacent to the 2-Deputy Director rooms at Administrative bhaban at Chittagong Training Center.
CDW-..51/e-GP/20220703/177957/0025401
|
Zonal Civil Construction Division, CTG |
৳১৬.৪৪ লাখ |
১ এপ্রিল ২০১৮ |
Completed |
|
Repairing of CI sheet roofing of stair room of administrative building including affected security wall which was occured due to Cyclone Mora.
CMW.-65/e-GP/20220703/168125/0025400
|
Zonal Civil Construction Division, CTG |
৳৬.৭৮ লাখ |
১২ মার্চ ২০১৮ |
Completed |
|
Outer side and stair room repainting works including replacing of sewerage lines water lines rain water lines and fitting of floor tiles at 1st floor stair/corridor at Chittagong Training Center Khulshi.
CDW-.54/e-GP/20220702/149065/0025119
|
Zonal Civil Construction Division, CTG |
৳১৯.৯০ লাখ |
৯ জানু ২০১৮ |
Completed |
|
Supplying of different electrical materials including pump starter.
GS.-22/e-GP/20220702/150826/0025117
|
Zonal Civil Construction Division, CTG |
৳৩.৯৯ লাখ |
৭ জানু ২০১৮ |
Completed |
|
Supplying of double gas burner and different types of gas line fittings.
GS.-12/e-GP/20220702/145835/0025116
|
Zonal Civil Construction Division, CTG |
৳৩.৪৩ লাখ |
২১ ডিসে ২০১৭ |
Completed |
|
Yearly Operation & Maintenance of Air coolers at Bijoy Hall Chief Engineer Southern Zone Office and Different Computers Rooms at Biddyut Bhaban BPDB Ctg.
OMW--3/e-GP/20220702/117503/0025123
|
Zonal Civil Construction Division, CTG |
৳২.৯৬ লাখ |
৩০ আগ ২০১৭ |
Completed |
|
Yearly Operation & Maintenance of Air coolers at Chatteswari Rest House Khulshi Training Center Jamalkhan Civic Center.
OMW--2/e-GP/20220702/109760/0025121
|
Zonal Civil Construction Division, CTG |
৳৩.০৪ লাখ |
৫ জুলাই ২০১৭ |
Completed |
|
Yearly emergency repairing & maintenance of Thai-alluminum and re-winding of electrical fans including related electrical repairing works at different bhabans/structures.
CMW--10/e-GP/20220702/109631/0025122
|
Zonal Civil Construction Division, CTG |
৳৮.০০ লাখ |
৫ জুলাই ২০১৭ |
Completed |
|
Yearly emergency repairing of electrical plumbing and sanitary operation of water pump cutting of jungles cleaning of sewerage line cleaning of water reservior at Khulshi/RTC/SCADA residential bhaban area.
CMW-9/e-GP/20220702/109630/0025120
|
Zonal Civil Construction Division, CTG |
৳৫.৯৬ লাখ |
৪ জুলাই ২০১৭ |
Completed |