By year

YearContract progressValueAwardsAmount
2026 0 BDT 0 24 BDT 38.17 crore
2025 0 BDT 0 17 BDT 42.89 crore
2024 0 BDT 0 6 BDT 8.45 crore
2023 0 BDT 0 4 BDT 10.36 crore
2022 0 BDT 0 12 BDT 46.03 crore
2021 1 BDT 1.18 crore 8 BDT 25.82 crore
2020 0 BDT 0 1 BDT 13.90 lakh
2019 0 BDT 0 60 BDT 65.59 crore
2018 2 BDT 1.83 crore 6 BDT 2.60 crore
2017 0 BDT 0 3 BDT 2.34 crore
2016 1 BDT 50.12 lakh 3 BDT 2.04 crore
2015 0 BDT 0 6 BDT 9.20 crore
2014 0 BDT 0 4 BDT 3.12 crore

By work type

  • Works 4 contracts · BDT 260.21 crore
  • Unknown 0 contracts · BDT 5.20 lakh

Contract progress

Reference no.Office (PE)ValueContract dateStatus
01/OTM/siraganj/2020-2021/e-GP/20241204/568530/00227579 Sirajganj PWD Division ↗ BDT 1.18 crore 12 Apr 2021 Completed
Naogaon/W-01/2018-19/e-GP/20241019/256713/00198613 Naogaon O&M Division ↗ BDT 1.43 crore 29 Nov 2018 Completed
Joypurhat -W-03/2018-19./e-GP/20241202/257036/00225935 Joypurhat WD Division ↗ BDT 40.48 lakh 28 Nov 2018 Completed
Randhunibari/2015-2016/e-GP/20241219/50479/00237675 Sirajganj O&M Division ↗ BDT 50.12 lakh 6 Mar 2016 Completed

Awards

PackageOffice (PE)AmountContract dateOfficial record
Bank Revetment work on the left bank of the Padma River from Km. 4.660 To Km. 4.780 = 120 m. at Shibganj Upazila in Chapainawabganj District in cw ''Riverbank Protective Work of both banks of the Padma River in Chapainawabganj District (1st Part)'' project under Nawabganj WD Division BWDB Chapainawabganj.(Package No: MDWP-11) Nawabganj WD Division BDT 12.14 crore 6 Aug 2026 Official record
Supply Filling & Dumping of Geo-textile Bags (Polyestar Fabric) under NDR Budget under Barguna WD Division BWDB Barguna. Barguna WD Division BDT 41.40 lakh 20 Jul 2026 Official record
Construction of 1 No. New Pipe outlet in Polder No. 39/1B at Ghornoli Khal of Mathbaria Upazilla Perojpur District under Perojpur WD Division BWDB Perojpur. Perojpur WD Division BDT 40.60 lakh 9 Jul 2026 Official record
Re-excavation of Hisna and Sagarkhali rivers in Mirpur upazila form km. 41.400 to km. 45.900 total 4.500 km in connection with "Removal Waterlogging and development of irrigation system through re-excavation of Hisna and Sagarkhali rivers in Kushtia district." under Kushtia WD Division BWDB Kushtia during the FY 2025-26. Kushtia WD Division BDT 3.38 crore 11 May 2026 Official record
Re-Sectioning of both dyke of T-1/S-11G Irrigation Canal (from KM. 0.000 to KM. 2.000) T-2/S-11G Irrigation Canal (from KM. 0.000 to KM. 2.700) and T-3/S-11G Irrigation Canal (from KM. 0.000 to KM. 2.400) in total 7.100 KM. in c/w "Emergency Maintenance and Rehabilitation of Ganges Kobadak Irrigation Project" under Chuadanga WD Division BWDB Chuadanga during the FY 2025-26. Chuadanga WD Division BDT 89.00 lakh 11 May 2026 Official record
Re-excavation of Hisna and Sagarkhali rivers in Daulatpur upazila from Km. 8.000 to Km. 18.190= 10.190 Km in connection with "Removal Waterlogging and development of irrigation system through re- excavation of Hisna and Sagarkhali rivers under Kushtia district" under Kushtia WD Division BWDB Kushtia. Kushtia WD Division BDT 9.26 crore 11 May 2026 Official record
Dyke resectioning work height increasing work of the dyke brick work along the toe of dyke and HBB work of top surface of the dyke of I-3 S-1 T-1 irrigation canal from km. 0.690 to km. 1.580 = 890.00m in connection with PIRDP under Bera WD Division BWDB Bera Pabna during the FY: 2025-2026. Bera WD Division BDT 10.50 lakh 15 Mar 2026 Official record
Precautionary Bank Protective work along the Right bank of Dhaleshwrai River at Islampur Village Graveyard Mosque & Madrasa Area from km 10.000 to km 10.120 km = 120.00 meter at Upzilla Sirajdikhan in Dist- Munshiganj under Munshiganj WD Division BWDB Munshiganj during the year 2025-2026. Munshiganj WD Division BDT 46.80 lakh 8 Mar 2026 Official record
Repairing of Riverbank slope protection by CC Block Geo textile and construction of RCC Saucer Drain at 21th (p) & 22th km Gaibandha-Nakaihat-Gobindagonj Road (Z-5554) under road division Gaibandha during the FY 2025-2026. Gaibandha Road Division BDT 1.73 crore 2 Mar 2026 Official record
Re-excavation of Sutang River from km 33.000 to km 36.000 Total 3.000 km in Upazilla- Sayestaganj District- Habiganj under CCTF Project. Habiganj WD Division BDT 2.98 crore 23 Feb 2026 Official record
Resectioning Work of Existing Embankment From Ch. Km. 3.00 To Km. 4.140 = 1140.00m Under Polder No:39/1C at West Amragachia in Amragachia Union of Mathbaria Upazilla Perojpur District Under Perojpur WD Division BWDB Perojpur During theFY2025-26. Perojpur WD Division BDT 77.40 lakh 18 Feb 2026 Official record
Repair & Maintenance of Loose Apron and slope protection of Khal of Rumma (Ramnagar Khalpara) Regulator in Upazila: Birol Dist: Dinajpur in c/w "Dhepa-Punarbhaba water Management project" under O&M budget during the year 2025-2026. Dinajpur WD Division BDT 17.50 lakh 15 Feb 2026 Official record
Precautionary bank protection work to prevent erosion of Kakra River right bank in between km. 17.950 to km. 18.250 = 85.00 m at Current Hat (Volanathpur) in upazila: Chirirbandar Dist: Dinajpur in c/w O&M budget during the year 2025-2026. Dinajpur WD Division BDT 32.40 lakh 15 Feb 2026 Official record
"Raincut & Ghogs Repair Work of Teesta Right Embankment in between from CH KM 10.00 to CH KM 14.00" under O&M Budget under Dalia WD Division BWDB Dalia Nilphamari during the Financial Year 2025-26. Dalia WD Division BDT 4.50 lakh 9 Feb 2026 Official record
Precautionary Protective work at the right bank of Kopotakkho River at Katipara from Km. 75.000 to Km. 75.131 = 0.131 Km. near Polder No. 9 under Khulna W.D. Division-2 BWDB Khulna during the year 2025-2026. Khulna WD Division-2 BDT 26.80 lakh 5 Feb 2026 Official record
Repair of embankment with temporary protective work from Km 10.870 to km 10.970 = 0.100 km at Durgapur (Tikedarbari) in Polder No-22 of Paikgacha upazilla under Operation & Maintenance Budget of Khulna WD Division-2 BWDB Khulna during the year 2025-2026. Khulna WD Division-2 BDT 22.30 lakh 5 Feb 2026 Official record
Civil & Mechanical Repair Works of DS-10A (Sutir Office) 2 Vent Regulator at Polder no.: 13-14/2 in Upazila-Koyra District-Khulna Under Khulna WD Division-2 BWDB Khulna During the FY 2025-2026. Khulna WD Division-2 BDT 22.10 lakh 5 Feb 2026 Official record
Installation and Repair of flap gate lift gate Hoisting Device of various sluice in polder no 31 under Operation & Maintenance budget of Khulna WD Division-2 BWDB Khulna during the year 2025-2026. Khulna WD Division-2 BDT 8.10 lakh 5 Feb 2026 Official record
Re-excavation of Gunahar Khal from km 0.000 to km 2.000 in between total 2.000 km at Gunahar & Gobindopur Union in Dupchanchia Upazila of Bogura District under Bogura WD Division BWDB Bogura in the FY 2025-26. Bogura WD Division BDT 23.10 lakh 22 Jan 2026 Official record
Repair and Strengthining works of River Bank Protective Work km. 131.265 to 131.375 in between total 110.00 m in c/w "Jamuna River Right Bank Protection Project" at Upazila Sariakandi District Bogura under Bogura WD Division BWDB Bogura in the FY 2025-26. Bogura WD Division BDT 35.30 lakh 22 Jan 2026 Official record
Precautionary Protective work from Km 9.500 to Km 9.570=70 m on the Left Bank of Punorvaba River at Kolkolia Alinogor Union Gomostapur Upazilla under Nawabganj WD Division BWDB Chapainawabganj. Nawabganj WD Division BDT 33.90 lakh 21 Jan 2026 Official record
Repair & Strengthening of Hasnapara spur-1 by Geo-bag at BRE Embankment km 110.700 under Bogura WD Division BWDB Bogura during the FY 2025-2026. Bogura WD Division BDT 13.20 lakh 20 Jan 2026 Official record
Precautionary protective work along the left bank of Rupsha River from km. 0.150 to km. 0.300 & km. 0.400 to km. 0.550 total = 0.300 km. at Shoulpur Aijganti union in upazila-Rupsha District-Khulna under Khulna WD. Division-1 BWDB Khulna during the year 2025-2026. Khulna WD Division-1 BDT 2.79 crore 8 Jan 2026 Official record
Construction of Brick Wall to Protect from Over Topping of Embankment from Flood at Shimultala from BRE km. 162.430 to BRE km. 163.000 = 570.00 m along the right bank of Jamuna River in Sadar Upazila of Sirajganj District under Sirajganj WD Division BWDB Sirajganj during the FY 2025-2026. Sirajganj WD Division, BWDB BDT 43.90 lakh 7 Jan 2026 Official record
Pond Excavation and Dyke Compaction with Mechanical Stabilizer at Fish Seed Multiplication Farm Patiya Chattgram and Fish Breeding and Training Centre Raipur Laksmipur. Increasing Fish Production and Capacity Building through Infrastucture Development of Existing Govt. Fish Farm Project (1st Phase) BDT 1.46 crore 2 Nov 2025 Official record
Precautionary bank protective work on the left bank of Teesta river from Km. 96.200 to Km. 96.700=500.00m at Korpura Upazilla-Ulipur District-Kurigram under Kurigram WD Division BWDB Kurigram during the FY 2025-2026. Kurigram WD Division BDT 3.03 crore 8 Oct 2025 Official record
Remaining Silt Removal of Silt Trap in Upazilla:Dimla Dist:Nilphamari under O&M Budget by Dalia WD DivisionBWDBDaliaNilphamari during the Financial Year 2025-2026. Dalia WD Division BDT 1.80 crore 30 Sep 2025 Official record
Bank Protection work with D/S End Termination along Left Bank of Dharla River from Km 30.500 to km 31.000 = 500.00 m at Charboraibari area at Vogdanga Union Upazilla: Kurigram Sadar Dist: Kurigram. Kurigram WD Division BDT 11.87 crore 15 Sep 2025 Official record
Remaining Bank Protection Work at the Right Bank of Sugandha River from km 0.800 to km 1.150 = 0.350 km to Protect Captain Mohiuddin Jahangir (Dowarika Setu) Bridge from Erosion of the Sugandha River at Babugonj Upazila in Barisal District under Barishal WD Division BWDB Barishal. Barishal WD Division BDT 4.22 crore 12 Aug 2025 Official record
Precautionary River Bank protection work at the left bank of Modhumoti River from ch.km. 0.125 to km. 0.272 = 147.00 m. of 11 No. Jonjoniya Govt. Primary School Jonjoniya Islamia Madrasa & adjacent Area at 2no. Malikhali union Nazirpur Upazilla under Perojpur WD Division BWDB Perojpur during the year 2024-25. Perojpur WD Division BDT 1.34 crore 16 Jul 2025 Official record
Supplying Filling Placing and Dumping of 5000 Nos Geo-Bag (175 kg) at different places of Dinajpur District under Dinajpur WD Division BWDB Dinajpur during monsoon 2025. Dinajpur WD Division BDT 14.90 lakh 21 May 2025 Official record
Re-excavation of Jukikhali Khal from Beza Project area to Old Brahmaputra river from Km. 0.000 to Km. 5.200 = 5.200 Km at Union: Duptara Upazila: Araihazar District Narayanganj in C/W Bangladesh Economic Zone Authority (BEZA) Project under Narayanganj WD Division BWDB Narayanganj during the Fy-2024-2025 Narayanganj WD Divison, BWDB BDT 2.36 crore 24 Apr 2025 Official record
Precautionary work to protect the Teesta Right Embankment from km 33.470 to km 33.710 = 240 meters at Holdibari in Upazila: Jaldhaka Dist: Nilphamari under Dalia WD Division BWDB Dalia Nilphamari during the financial year 2024-25. Dalia WD Division BDT 1.28 crore 27 Mar 2025 Official record
Precautionary work to protect the Teesta Right Embankment from km 37.955 to km 38.200= 245 meters at North Dowabari in Upazila: Jaldhaka Dist: Nilphamari under Dalia WD Division BWDB Dalia Nilphamari during the financial year 2024-25. Dalia WD Division BDT 1.31 crore 27 Mar 2025 Official record
Precautionary bank protection work along the left bank of teesta river from km. 71.850 to km. 72.075 = 225.00m to protect river bank erosion at char gokunda area in up. Gokunda uz: lalmonirhat sadar dist. Lalmonirhat under lalmonirhat wd division bwdb lalmonirhat during the year of 2024-2025. Lalmonirhat WD Division BDT 1.17 crore 27 Mar 2025 Official record
Re-sectioning work of Existing Embankment from Ch. Km. 33.000 to Km. 34.150 = 1150.00m under Polder no:39/1B at South Sonakhali Location Amragachia union of Mathbaria Upazilla Perojpur District under Perojpur WD Division BWDB Perojpur during the FY 2024-25. Perojpur WD Division BDT 37.40 lakh 25 Mar 2025 Official record
Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 4.422 to Km. 5.012 = 590.00 M in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River" Project under Nawabganj WD Division BWDB Chapainawabganj (Package No. RHWP-01/Lot-02 Remaining work). Nawabganj WD Division BDT 9.25 crore 20 Mar 2025 Official record
Precautionary Protective Work at Jitrampur along the left bank of Meghna River In between from km. 0.000 to Km. 0.600 (Total = 0.455 km) at Chardigholdi Union Upazila Narsingdi Sadar District - Narsingdi in connection with NDR Budget under Narsingdi WD Division BWDB Narsingdi during the year 2024-2025. Narsingdi WD Division BDT 1.34 crore 9 Mar 2025 Official record
Precautionary Protective Work at Kandapara Primary School from km. 40.790 to Km. 40.915 = 125 m along the Right bank of Meghna River at Union: Mirzarchar Upazila: Raipura Dist: Narsingdi in connection with NDR Budget under Narsingdi WD Division BWDB Narsingdi during the year 2024-2025. Narsingdi WD Division BDT 1.34 crore 9 Mar 2025 Official record
Repair of Right bank flood control embankment of Tulshiganga River in between km. 16.000 to km. 18.000 = 600 m in Upazilla: Akkelpur District: Joypurhat Under Joypurhat WD Division BWDB Joypurhat during the FY 2024-2025. Joypurhat WD Division BDT 24.80 lakh 26 Feb 2025 Official record
River Bank Protective work at Kamalpur in between km 130.975 to km 131.015= 40.00 m in c/w Jamuna River Right Bank Protection Project at Sariakandi upazila district of Bogura under Bogura WD Division BWDB Bogura in the FY 2024-25. Bogura WD Division BDT 35.60 lakh 15 Jan 2025 Official record
River Bank Protective work along Right Bank of Flood Control Embankment of Dharla River from Km 27.460 to Km 27.710 = 250.00 m at Bangturghat area in union Holokhana Upazilla: Kurigram Sadar Dist: Kurigram. Kurigram O&M Division BDT 7.02 crore 26 Dec 2024 Official record
Temporary Slope Protection (by sand filled geobag placing) & Repair of Embankment damaged by Cyclone Remal from ch. km 109.890 to 110.100=0.210 km of Polder No-5 at West Durgabati of Shyamnagar Upazila in Satkhira district. Satkhira WD Division-1 BDT 20.60 lakh 8 Dec 2024 Official record
Temporary Slope Protection (by sand filled geobag placing) & Repair of Embankment damaged by Cyclone Remal from ch. km 118.000 to 118.060=0.060 km from ch. km 118.500 to 118.535=0.035 km & from ch. km 118.700 to 118.730=0.030 km Total 0.125 km of Polder No-5 at Noabeki of Shyamnagar Upazila in Satkhira District. Satkhira WD Division-1 BDT 8.30 lakh 8 Dec 2024 Official record
Temporary Slope Protection (by sand filled geobag placing) & Repair of Embankment damaged by Cyclone Remal from ch. km 127.100 to 127.385=0.285 km of Polder No-5 at Jhapali of Shyamnagar Upazila in Satkhira District. Satkhira WD Division-1 BDT 22.30 lakh 8 Dec 2024 Official record
Geo Bag dumping work From Km 0.000 to Km 0.050 = Total 50 m at Haridaspur under Gopalganj O&M Division BWDB Gopalganj during the FY 2023- 2024. Gopalganj O&M Division BDT 20.90 lakh 2 May 2024 Official record
Precautionary Bank Protection Work along the Right Bank of Taltoli River From Km 0.859 To Km 1.109 = 0.250 Km From Erosion Of Taltoli River at Adhabaria & Adjacent Area in Charbaria Union Barisal Sadar Upazilla Dist. Barisal under Barisal O&M Division BWDB Barisal during the FY-2023-24. Barisal O&M Division BDT 71.20 lakh 25 Mar 2024 Official record
Construction of temporary wooden bridge over Katakhali khal at Chararaipur in sadar Upazila of sirajganj District under Sirajganj O&M Division BWDB Sirajganj In the FY-2022-2023. Sirajganj O&M Division BDT 13.50 lakh 12 Jun 2023 Official record
Rehabilitation (Strengthening of Slope & Launching Apron) of Bank Rivetment work on the left bank of the Padma River at Bakhar Ali from Km. 7.382 to Km. 7.562 = 180.00 M in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River" Project under Nawabganj O&M Division BWDB Chapainawabganj during the FY 2022-2023 & 2023-2024. Nawabganj O&M Division BDT 6.84 crore 11 Jun 2023 Official record
Protective work of Korotoya river in between Km. 70.770 to Km. 71.00 100.00 meters to prevent the erosion of the parking zone of Mahasthangarh tourist area in Upazilla Shibganj district Bogura during FY 2022-23. Bogura O&M Division BDT 44.60 lakh 22 Jan 2023 Official record
Construction of Retired Embankment of Dharla left F.C embankment from Km. 9.500 to Km. 11.750= 2205.00 m at Sonaikazi area at Shimulbari Union in UZ. Fulbari Dist. Kurigram under Kurigram O&M Division BWDB Kurigram Kurigram O&M Division BDT 2.94 crore 9 Jan 2023 Official record
Re-Excavation of Goilla Chari Khal from km:0.00 to km: 2.000 = 2.000 km in Upazila Ramu District Cox's Bazar in connection with Re-excavation of small Rivers Khal and Water bodies Project in 64 Districts (1st Phase 2nd Revised) under Cox's Bazar O&M Division BWBD Cox's Bazar Cox's Bazar O&M Division BDT 36.00 lakh 14 Dec 2022 Official record
Re-Sectioning of Dudhkumar River Right F.C embankment from Km. 14.800 to Km. 17.900= 3100.00 m in UZ. Nageshwari Dist. Kurigram under Kurigram O&M Division BWDB Kurigram. Kurigram O&M Division BDT 2.79 crore 5 Dec 2022 Official record
Re-Excavation of Sreenidhi Beel from Km 0.000 to Km. 1.250= 1.250 Km i/c with "Re-excavation of small river khal & water bodies in 64 District (Phase-1) (1st Revised) Project' at Union: Chanderkandi Upazila: Raipura Dist: Narsingdi under Narsingdi O & M Division BWDB Narsingdi during the year 2021-22. Narsingdi O&M Division BDT 73.30 lakh 10 Aug 2022 Official record
Slope protection work of dredged materials of Gorai river along the left bank from km 2.880 to km 3.600 & km 7.400 to km 8.580 and along the right bank from km 9.600 to km 10.200 in c/w "Gorai River Dredging and Bank Protection" Project under Kushtia O&M Division BWDB Kushtia during the year 2021-22. Kushtia O&M Division BDT 6.48 crore 2 Aug 2022 Official record
Rehabilitation & Strengthening of Both Dyke of T1S1T &T2S1T Irrigation Canal C/W "Rehabilitation & Extension of Command Area of Teesta Irrigation Project�??�?�¢??�??�?�¢?? Upazila: Dimla Dist: Nilphamari under Dalia O&M Division BWDB Dalia Nilphamari during the Financial Year 2021-22.( Package no:- Dalia/Tertiary-44) Dalia O&M Division BDT 6.11 crore 17 Jul 2022 Official record
Rehabilitation and Strengthening both dyke of T6S8T Irrigation canal Rangpur O&M Division BDT 3.13 crore 22 May 2022 Official record
400m River Bank Protection work along the Left bank of Korotoya river at Bisna (Durgapur)) in UZ. Pirgonj Dist. Rangpur under Rangpur O&M Division BWDB Rangpur. Rangpur O&M Division BDT 5.77 crore 10 Apr 2022 Official record
Rehabilitation of protective work along the R/B of padma river from km 55.016 to km 55.169=153 m in c/w "Rajbari Town Protection (Phase-II )(1st Revised)" at Location: Godarbazar Union: Mijanpur Upazilla: Rajbari Sadar Dist. Rajbari under Rajbari O&M Division BWDB Rajbari during the FY 2021-22. Rajbari O&M Division BDT 10.03 crore 10 Mar 2022 Official record
Re-excavation of Shaluka Khal From km.0.000 to km. 5.000 = 5.000 Km. in Polder No.6-8 in Satkhira Sadar & Tala Upazila in c/w Drainage Improvement of Polder No. 1 2 6-8 & 6-8 (Ext) in Satkhira District Under Satkhira O&M Division-2 BWDB Satkhira. Satkhira O&M Division-2 BDT 2.39 crore 16 Feb 2022 Official record
Bank Protection on Left Bank of Border River Mohanandha at Jamadargach from km. 7.950 to Km. 8.650 = 700m in Upazila-Tentulia District-Panchagarh under Panchagarh O & M Division (JRC SL. No. 61/2015-16)(Remaining Part). Panchgarh O&M Division BDT 1.32 crore 2 Feb 2022 Official record
Strengthening of both dyke of S7D Irrigation Canal Syedpur O&M Division BDT 2.19 crore 16 Jan 2022 Official record
Rehabilitation & Strengthening of Both Dyke of T1S3D T2S3D and T3S3D Irrigation Canal in Connection with Rehabilitation and Extension of Command Area of Teesta Irrigation Project at Upazilla: Nilphamari Sadar District: Nilphamari under Nilphamari O&M Division BWDB Nilphamari During FY 2021-22 (Package No: Nilphamari/Tertiary-39). Nilphamari O&M Division BDT 4.72 crore 9 Jan 2022 Official record
Re-Excavation of Charalkata River from km 66.100 to km 71.100 equal to 5.000 km in Upazilla:Kishoregonj & Nilphamari sadar Syedpur O&M Division BDT 9.55 crore 4 Nov 2021 Official record
Remaining Works of Re-excavation of Bhairab River from km 50.000 to km 54.000 total 4.00 km in C/W â??Drainage Improvement and Sustainable water management of Bhairab River Basin (1st revised)" under Jashore O&M Division BWDB Jashore during the year 2021-22 Jashore O&M Division BDT 1.64 crore 19 Oct 2021 Official record
Bank protection work along the Right bank of Charalkata River at U/S of loop cut from km 65.410 to 65.710 (=300 m) at Nitial Union in Upazila Kishoregonj District Nilphamari Syedpur O&M Division BDT 2.85 crore 27 Jul 2021 Official record
Bank protection work at Loop-cutting of Charalkata River along the Left Bank at Nitai Union of Upazila Kishoregonj Syedpur O&M Division BDT 6.40 crore 27 Jul 2021 Official record
Emergency repair and maintenance work to protect the slope of Embankment to control seepage in between km-130.050 to BRE km-130.290 =240.00m at pramanikpara in Upazila Sariakandi of Bogra district during the flood of the year 2021. Bogura O&M Division BDT 18.00 lakh 20 Jul 2021 Official record
Precautionary protection work at the right embankment of river Teesta from km 45.570 to km 45.890 total 320 m at union kaimari in upazila-jaldhaka dist-Nilphamari under Rangpur O & M Division BWDB Rangpur during the year 2020-2021. Rangpur O&M Division BDT 1.25 crore 29 Jun 2021 Official record
Precautionary protection work at the right embankment of river Teesta in between km 41.860 to km 43.100 total 670 m at alsiapara union kaimari in upazila-jaldhaka dist-Nilphamari under Rangpur O & M Division BWDB Rangpur during the year 2020-2021. Rangpur O&M Division BDT 2.93 crore 29 Jun 2021 Official record
Establishment of Shaheed M Monsoor Ali Medical College & 500 Beded Medical College Hospital At Sirajganj (Sub-Head :Construction of Water Body) Sirajganj PWD Division BDT 1.03 crore 24 May 2021 Official record
Construction of retired embankment from km. 2.150/0.000 to km. 2.300/0.150 total 0.150 km. at Khona in Polder no. 31 under Non-Development Revenue Budget during the year 2019-2020. Khulna O&M Division-2 BDT 13.90 lakh 1 Jan 2020 Official record
Repair and maintenance of both dyke of a) T9R irrigation canal in between Km. 0.00 to Km. 1.500 and b) T6+7R irrigation canal in between Km. 0.50 to Km. 1.300. c) T3R irrigation canal from Km. 0.00 to Km. 0.500 Syedpur O&M Division BDT 11.10 lakh 22 Dec 2019 Official record
Repair and maintenance of both dyke and bed cutting of S7T irrigation canal in between Km. 0.00 to Km. 15.72 Syedpur O&M Division BDT 14.30 lakh 22 Dec 2019 Official record
Re-sectioning of Dharla River Right Bank flood Control Embankment from KM 35.000 to KM 43.500 in Upazil-Kurigram Sadar District-Kurigram under Kurigram O&M Division during 2019-2020. Kurigram O&M Division BDT 2.88 crore 19 Dec 2019 Official record
Repair/Maintenance and breach closing of canal dyke di-siltation of canal bed water hyacinth and jungle cutting of MR2 km 0.000 to 4.720 (in between) MR2L1 km 0.000 to 2.000 (in between) MR2L2 km 0.000 to 0.720 and MR3 km 0.000 to 0.850 (in between) of Manumukh canal system in c/w Manu River Project under Moulvibazar O&M Division during the year 2019-20. Moulvibazar O&M Division BDT 5.80 lakh 10 Dec 2019 Official record
Cutting Jungle removing of water hyacinth Removal of Slushy Repairing the breach closing of Irrigation canal dyke of RL-4 in between km. 0.000 to 6.201; Canal RL-4/L1 in between km. 0.000 to 1.991 & Canal RL-5 in between km. 0.000 to 3.651 in c/w Manu River Project under Moulvibazar O&M Division during the year 2019-20. Moulvibazar O&M Division BDT 4.50 lakh 10 Dec 2019 Official record
Repair/Maintenance and breach closing of canal dyke di-siltation of canal bed water hyacinth and jungle cutting of Main canal km 0.000 to 8.000 (in between) MR-1 km 0.000 to 3.480 (in between) MR1R1 km 0.000 to 2.350 (in between) MR1R2 km 0.000 to 1.950 (in between) of Manumukh canal system in c/w Manu River Project under Moulvibazar O&M Division during the year 2019-20. Moulvibazar O&M Division BDT 7.10 lakh 10 Dec 2019 Official record
Cutting & clearing jungles removing water hyacinth removal of slushy earth and re-sectioning of dyke of Main Canal from km 8.000 to 18.000 in between 10.000 km Canal MR-7 from km 0.000 to 3.000 in between 3.000 km and ML-2 from km 0.000 to 1.500 in between 1.500 km of Manumukh Canal System in c/w Manu River Project under Moulvibazar O&M Division during the year 2019-20. Moulvibazar O&M Division BDT 4.00 lakh 10 Dec 2019 Official record
Cutting & clearing jungles removing water hyacinth removing of slushy earth and re-sectioning of dyke of Canal MR-4 from km 0.000 to 1.500 & Canal MR-4/L-1 from km 0.000 to 1.000 in between 2.500 km Canal MR-5 from km 0.000 to 1.500 in between 1.500 km Canal MR-6 from km 0.000 to 4.000 in between 4.000 km and ML-1 from km 0.000 to 4.400 & ML-1/R-1 from km 0.000 to 1.000 in between 5.400 km of Manumukh Canal System in c/w Manu River Project under Moulvibazar O&M Division during the year 2019-20. Moulvibazar O&M Division BDT 4.00 lakh 10 Dec 2019 Official record
Re-Excavation of Ghagot River at Emadpur Adassapara from Km 0.00 to Km 0.250 = 250 m Muhuripara from Km 0.00 to Km 0.200 = 200 m Emadpur Kumarpara from Km 0.000 to Km 0.300= 300m Total = 750 m Upazila-Mithapukur District-Rangpur Under Rangpur O&M DivisionBWDB Rangpur. Rangpur O&M Division BDT 1.24 crore 8 Dec 2019 Official record
Re-excavation of Nalbunia khal from Km. 0.000 to Km. 1.950 = 1.950 Km. in C/W Bagerhat O&M Division BDT 75.00 lakh 3 Nov 2019 Official record
Re-excavation of Andharia khal from km. 0.000 to km. 2.500 = 2.500 km. in C/W Bagerhat O&M Division BDT 1.04 crore 27 Oct 2019 Official record
Re-Excavation of Ghagot River at Singher Char from Km 0.00 to Km 0.510=510m and vagni vorot & Khagojipara from Km 0.000 to Km 0.300= 300mTotal 810m Upazila-Mithapukur District-Rangpur Under Rangpur O&M Division BWDB Rangpur. Rangpur O&M Division BDT 1.13 crore 7 Oct 2019 Official record
Re-excavation of Chouridanga khal from Km. 0.000 to Km. 2.200 = 2.200 Km. in C/W Bagerhat O&M Division BDT 72.60 lakh 9 Sep 2019 Official record
Re-excavation of Jamunesswary River at Jankipur-Charpara from Km 0.000 to km 2.187= 2187 m at Upazila-Mithapukur District- Rangpur Under Rangpur O&M Division BWDB Rangpur. Rangpur O&M Division BDT 2.02 crore 4 Aug 2019 Official record
Backing of embankment from Km. 1.600 to Km. 1.980 = 0.380 Km. in Polder No. 34/2 (Part) Amirpur-Bhandarkot-Baliadanga sub-project at Fultola under Khulna O&M Division-2 BWDB Khulna in c/w Khulna O&M Division-2 BDT 9.00 lakh 30 Jul 2019 Official record
Backing of embankment from Km. 23.460 to Km. 23.540 total 0.080 Km. in Polder No. 34/2 (Part) Amirpur-Bhandarkot-Baliadanga sub-project at Dip-Boronpara under Khulna O&M Division-2 BWDB Khulna in c/w Khulna O&M Division-2 BDT 4.50 lakh 30 Jul 2019 Official record
Backing of embankment from Km. 18.240 to Km. 18.350 = 0.110 Km. in Polder No. 22 at Talikhali under Khulna O&M Division-2 BWDB Khulna in c/w Khulna O&M Division-2 BDT 4.10 lakh 30 Jul 2019 Official record
Backing of embankment from Km. 0.600 to Km. 0.900 total 0.300 Km. in Polder No. 34/2 (Part) Amirpur-Bhandarkot-Baliadanga sub-project at Narankhali under Khulna O&M Division-2 BWDB Khulna in c/w Khulna O&M Division-2 BDT 5.80 lakh 30 Jul 2019 Official record
Re-excavation of Korotoya River at Badnapara from Km 0.000 to Km 0.952=952m and at Chakveka from Km 0.000 to Km 1.500= 1500m Total 2452 mUpazila-Mithapukur District-Rangpur Under Rangpur O&M Division BWDB Rangpur. Rangpur O&M Division BDT 2.14 crore 25 Jul 2019 Official record
Re-excavation of Korotoya River at Bisna (Tukuria) from Km 0.000 to Km 1.500 =1500m Upazila-PirganjDistrict-Rangpur Under Rangpur O&M Division BWDBRangpur. Rangpur O&M Division BDT 1.75 crore 25 Jul 2019 Official record
Development of launching apron of Precautionary Protection Work by dumping sand filled geo-bag from Km 0.295 to km to 1.000 Total 705.00 meter at Tarotia & Dewan Tarotia along the right bank of Jamuna River in Upazilla - Shahzadpur under Bera O & M Division BWDB Bera Pabna during the year-2018-19 & 2019-20 Bera O&M Division BDT 1.36 crore 18 Jul 2019 Official record
Backing of embankment from km. 15.600 to km. 15.700 total 0.100km at Bujbunia & km. 15.900 to km. 16.100 total 0.200km at Shealidanga Grand total 0.300km in Polder No. 34/2-part under Khulna O&M Division-2 BWDB Khulna in c/w Khulna O&M Division-2 BDT 12.80 lakh 26 Jun 2019 Official record
Wave Protection work along the Right bank of Arial kha River at Badarpure from km 3.700 to km 4.000 = 0.300 km in c/w Non-Devlopment Revenue Budget at Upazilla Narsingdi Sadar Dist. Narsingdi under Narsingdi O & M division during the year 2018-2019. Narsingdi O&M Division BDT 1.80 crore 16 Jun 2019 Official record
Re-excavation of Chatra River from km 9.500 to km 16.000= 6.500 km in c/w Re-excavation of small River Khal & water bodies in 64 Districts Phase-1 Project Upazilla- Kalukhali Dist. Rajabri under Rajbari O&M Division BWDB Rajbari during the year 2018-19 2019-20 & 2020-21. Package No.P-5/Rajbari. Rajbari O&M Division BDT 5.30 crore 11 Jun 2019 Official record
Repair-Maintanance of Bridge Railing & Slab Over S-6A Irrigation Canal (Bridge No-348) & T-2/S-6A Irrigation Canal (Nakoil Purbo Para) & Removal of slushy earth of T-2/S-4A in between KM 1.500 To KM 6.000 =3.700 km in Upazilla- Sailkupa Jhenaidah Sadar & Horinakundu District-Jhenaidah under Jhenaidah O&M Division BWDB Jhenaidah during the FY-2018-19 . Jhenaidah O&M Division BDT 13.10 lakh 30 May 2019 Official record
Re-excavation of Kajuli Beel Khal from km. 5.452 to km. 7.400 in Upazilla-Jhenaidah District-Jhenaidah under Jhenaidah O&M Division BWDB Jhenaidah during the FY 2018-19. Jhenaidah O&M Division BDT 12.40 lakh 30 May 2019 Official record
Re-excavation of Dogasi Beel Khal from km. 0.000 to km. 0.735 in Upazilla-Jhenaidah Sadar District-Jhenaidah under Jhenaidah O&M Division BWDB Jhenaidah during the FY 2018-19. Jhenaidah O&M Division BDT 2.70 lakh 30 May 2019 Official record
Repair & maintenance of LT Distribution Line electric work & Replace electric pole of Jhenaidah O&M Division's Collony under Jhenaidah O&M Division BWDB Jhenaidah during the year 2018-19. Jhenaidah O&M Division BDT 9.00 lakh 30 May 2019 Official record
Repair & maintenance of Jhenaidah BWDB Office Collony Inspection Banglow Mosque Bhatoi O&M Section Sailkupa Office & Collony Garagonj Collony Katlagari Collony Langalbandh Collony's boundary wall under Jhenaidah O&M Division BWDB Jhenaidah during the year 2018-19. Jhenaidah O&M Division BDT 15.30 lakh 30 May 2019 Official record
Re-construction of boundary wall office room plaster plumbing work electrical work etc. at Horinakundu and Ramnagor office in Upazila: Horinakundu District: Jhenaidah in C/W NDR budget under Jhenaidah O&M division BWDB Jhenaidah during the year-2018-2019. Jhenaidah O&M Division BDT 2.70 lakh 30 May 2019 Official record
Re-Excavation of Pagla River from km 18.00 to km 24.00 = 6.00 Km at Shibganj upazila of Chapainawabganj district in C/W Re-Excavation of small rivers canals and water bodies in 64 districts Project under Nawabgonj O&M Division BWDB Chapainawabgonj during the FY-2018-2019 & 2019-2020. Nawabganj O&M Division BDT 5.45 crore 16 Apr 2019 Official record
Re-Excavation of Pagla River from km 24.00 to km 32.00 = 8.00 Km at Shibganj upazila of Chapainawabganj district in C/W Re-Excavation of small rivers canals and water bodies in 64 districts Project under Nawabgonj O&M Division BWDB Chapainawabgonj during the FY-2018-2019 & 2019-2020. Nawabganj O&M Division BDT 7.41 crore 16 Apr 2019 Official record
Re-excavation of Shutkigacha Khal from Km 0.000 to Km 8.000 equal to 8000.00 meter in Upazila- Atrai District- Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2018-19 Naogaon O&M Division BDT 1.43 crore 31 Mar 2019 Official record
Construction of Sign Board at Road Crossing River/Khal at different places and repair & maintenance of U/S and D/S Loose Appron of R-4A Regulator in Upazilla: Jhenaidah Sadar Kaligonj & Sailkupa District: Jhenaidah under Jhenaidah O&M Division BWDB Jhenaidah during the year 2018-19. Jhenaidah O&M Division BDT 6.50 lakh 31 Mar 2019 Official record
Re-construction of top slab girder with railing at existing bridge No-4 over S3A irrigatiomn canal in Upazila: Horinakundu Dist: Jhenaidah in C/W NDR Budget Under Jhenaidah O&M Division BWDB Jhenaidah During the year-2018-2019. Jhenaidah O&M Division BDT 6.30 lakh 31 Mar 2019 Official record
Execution of incomplete Protective Work of Bridge No.04 of Alamdanga Main Canal (Ch. At Km. 5.600 Zamzami-Hugladari) under Chuadanga O&M Division BWDB Chuadanga During the year 2018-19. Chuadanga O&M Division BDT 21.10 lakh 19 Mar 2019 Official record
Execution of incomplete Protective Work of Bridge No.05 of Alamdanga Main Canal (Ch. At Km. 6.700 Ghoshbeela-Modhupur) under Chuadanga O&M Division BWDB Chuadanga During the year 2018-19. Chuadanga O&M Division BDT 22.50 lakh 19 Mar 2019 Official record
Execution of incomplete Protective Work of Bridge No.09 of Alamdanga Main Canal (Ch. At Km. 10.500 Kholishakundu-Taherhuda) under Chuadanga O&M Division BWDB Chuadanga During the year 2018-19. Chuadanga O&M Division BDT 22.50 lakh 19 Mar 2019 Official record
Remaining/Vertical Extension works of Zilla Scout Bhaban at Sirajganj. (upto 1st Floor) Expansion of Scouting in Bangladesh and Construction of Scout Satabdi Bhaban Project (ESB & CSSB) BDT 35.50 lakh 13 Mar 2019 Official record
Bank Revetment Work on the Left Bank of Atrai Rivar at Joar from Km 27.00 to Km 27.200 = 200 m at Joar in Upazilla: Khansama Dist: Dinajpur under Dinajpur O&M Division BWDB Dinajpur during the year 2018-2019. Dinajpur O&M Division BDT 1.71 crore 7 Mar 2019 Official record
â??Re-excavation of Sharisua Khal from km. 0.000 to km. 11.400 (=11.400 Km) at Birgonj Upazila in Dinajpur District during the year 2018-2019. Dinajpur O&M Division BDT 2.21 crore 19 Feb 2019 Official record
Re-Excavation of Tulshi River from Km. 1.610 to 11.610 = 10000 m. in Upazila Gurudaspur district Natore Under Natore O&M Division BWDB Natore during the FY 2018-19. Natore O&M Division BDT 3.57 crore 18 Feb 2019 Official record
Re-Excavation Of Harishwar Khal From Km. 0.000 To Km. 3.820 = 3820 m At Uz: Kaunia Dist. Rangpur Under Rangpur O&M Division Bwdb Rangpur. Rangpur O&M Division BDT 91.70 lakh 14 Feb 2019 Official record
Re-Excavation of NawkarKhal in between km 0.000 to km 10.000 at JibonnagarUpazilla of Chuadanga District i/c with the Project Chuadanga O&M Division BDT 2.13 crore 12 Feb 2019 Official record
Repair & Maintenance of Protective Work in '' Protection of Bodonpur and Adjacent Area of Gorai River project`` under Non-Development Revenue Budget under Magura O&M Division BWDB Magura during the year 2018-2019. Magura O&M Division BDT 4.40 lakh 11 Feb 2019 Official record
Re-Sectioning Both Dyke of S-12K/T-3 Irrigation khal from km.0.000 to km. 1.740 in G.K. Irrigation Project Non-Development Revenue Budget under Magura O&M Division BWDB Magura during the year 2018-2019. Magura O&M Division BDT 7.60 lakh 11 Feb 2019 Official record
Re-excavation of Beltia/Konnadah Khal from km. 0.000 to Km. 2.200 Total 2.200 Km. at Upazila- Lohagara Dist.- Narail in Narail O&M Division BDT 46.50 lakh 6 Feb 2019 Official record
Re-excavation of Shiapaglar Khal from Km. 0.000 to Km. 4.250 Total 4.250 Km at Upazila- Narail Sadar Dist.- Narail in Narail O&M Division BDT 35.70 lakh 6 Feb 2019 Official record
Re-excavation of Line Khal from km. 0.000 to km. 15.200 = 15.200 km.at Upazila- Kalia Dist.- Narail in Narail O&M Division BDT 2.28 crore 6 Feb 2019 Official record
Re-excavation of Shamasundori Khal from Km. 7.500 to Km. 15.000= 7500 m at UZ: Rangpur Sadar Dist. Rangpur under Rangpur O&M Division BWDB Rangpur. Rangpur O&M Division BDT 2.14 crore 31 Jan 2019 Official record
Re-Excavation of Jamuna Khal from Km. 0.00 to Km. 10.00 = 10.00 km in c/w Thakurgaon O&M Division BDT 1.80 crore 30 Jan 2019 Official record
Re-excavation of 5.900 km Baniar Khal from km 0.000 to km 5.900 in c/w Alfadanga-Boalmari Sub-Project under SAIWRPMP-AF during the year 2018-2019. Sub-Project Management Office, SWAIWRPMP-2nd Phase BDT 1.50 crore 28 Jan 2019 Official record
Re-Excavation of Ratanpur Khal from Km. 0.00 to Km. 3.240 = 3.240 Km. in connection with Joypurhat WD Division BDT 43.00 lakh 23 Jan 2019 Official record
Re-Excavation of Mothertoli khal from Km. 0.00 to Km. 4.500 = 4.500 Km. in connection with Joypurhat WD Division BDT 40.50 lakh 23 Jan 2019 Official record
Re-Excavation of Kulbondi khal from Km. 0.00 to Km. 6.750 = 6.750 Km. in connection with Joypurhat WD Division BDT 1.27 crore 23 Jan 2019 Official record
Re-excavation of Chungerbeel Kopotakho Khal from km. 0.000 to km. 3.980 in Upazilla-Kotchandpur District-Jhenaidah in c/w Jhenaidah O&M Division BDT 48.30 lakh 20 Jan 2019 Official record
Re-excavation of Tanachera Khal from Km-6.000 to Km. 12.000 in Connection with the Project Re-excavation of small river khal and water bodies in 64 districts (1st Phase)�¢?� at Shaghata Upazila District-Gaibandha under Gaibandha O&M Division BWDB Gaibandha during the year 2018-19 Gaibandha O&M Division BDT 90.50 lakh 17 Jan 2019 Official record
Re-excavation of Vatirchara Khal from Zunithpur to Zanpara Km. 0.00 to Km.6.000 = 6.000 km. Upazila: Sadullapur Dist: Gaibandha under Gaibandha O&M Division BWDB Gaibandha during the year 2018-19 Gaibandha O&M Division BDT 1.64 crore 17 Jan 2019 Official record
Re-excavation of Kujail Khal from Km 0.000 to Km 6.500 equal to 6.500 Km in Upazila- Raninagar District- Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2018-19 Naogaon O&M Division BDT 1.47 crore 9 Jan 2019 Official record
Re-Excavation of Hawaikhali Khal from Km. 0.000 to Km. 7.400 Total 7.400 Km under Re-excavation of Small River Canal Water bodies in 64 Districts (Phase-1) Narail O&M Division BDT 80.70 lakh 8 Jan 2019 Official record
Re-excavation of the Jolarkandhi Khal from km. 0.00 to km. 7.000 = 7.000 km. in Upazila-Natore Sadar District-Natore under Natore O&M Division BWDB Natore during the FY:2018-19 . Natore O&M Division BDT 75.40 lakh 31 Dec 2018 Official record
Re-Excavation of Hitchmi khal from Km. 0.00 to Km. 6.700 = 6.700 Km. in connection with Joypurhat WD Division BDT 1.64 crore 25 Dec 2018 Official record
Construction of Store Rooms (including electric works) adjacent to the south boundary wall of newly constructed rest house under Sirajganj O&M Division BWDB Sirajganj during the FY- 2018-2019. Sirajganj O&M Division BDT 15.50 lakh 23 Dec 2018 Official record
Plantation work at completed Cross bar-02 in C/W Capital (Pilot) Dredging of River System in Bangladesh under Sirajganj O&M Division BWDB Sirajganj during 2017-2018. Sirajganj O&M Division BDT 1.90 lakh 5 Apr 2018 Official record
Repair & Maintenance of Executive Engineer's Residence Road & Garage under Sirajganj O&M Division BWDB Sirajganj During the FY-2017-2018 Sirajganj O&M Division BDT 1.90 lakh 5 Apr 2018 Official record
Repair & Maintenance of boundary wall Painting of gate & other different types of works of Old Rest House under Sirajganj O&M Division BWDB Sirajganj during the FY-2017-2018 Sirajganj O&M Division BDT 1.40 lakh 4 Apr 2018 Official record
Filling in Compound of New Constructed Rest House under Sirajganj O&M Division BWDB Sirajganj during 2016-2017. Sirajganj O&M Division BDT 9.00 lakh 14 Jun 2017 Official record
Site Development at proposed Head Office Complex of PGCL Nalka Sirajganj and Bogra Regional Office. Planning & Development BDT 59.50 lakh 7 Jun 2017 Official record
Re-excvation of Surulia Khal from km. 0.000 to km. 9.400 = 9.400 km. under Jessore O&M Division BDT 1.65 crore 1 Feb 2017 Official record
Emergency Supplying Filling and dumping of Geo-Bags (250kg) in the U/S & D/S of Meghai Spur-1 at BRE. KM. 141.760 at Upazila : Kazipur District: Sirajganj under Sirajganj O & M Division BWDB Sirajganj during the FY 2016-2017 Sirajganj O&M Division BDT 55.20 lakh 10 Oct 2016 Official record
River bank protection from erosion of Jamuna River from m 280.00 to m 313.00 of right bank at Randhunibari in upazila Belkuchi District. Sirajganj under Sirajganj O&M Division BWDB Sirajganj during the FY 2015-2016. Sirajganj O&M Division BDT 50.10 lakh 24 Apr 2016 Official record
Repair & Re-Construction of low height embankment near Rowtara regulator from Ch. 2290.00 m to Ch. 3490.00 m= 1200.00 m in C/W Bhagabari-Nimaichara embankment (SIRDP) under Sirajganj O&M Division BWDB Sirajganj during 2015-2016. Sirajganj O&M Division BDT 98.70 lakh 20 Mar 2016 Official record
Emergency Supply Filling & Dumping of Geo-bags (250 kg) to protect Spur Embankment and Protective Work from flood 2015 in between BRE km. 138.460 to 217.350= 78.790 km at Upazila Sirajganj Sadar Kazipur & Belkuchi in Sirajganj District during 2014-15 & 2015-16. Sirajganj O&M Division BDT 1.41 crore 20 Aug 2015 Official record
Emergency work of Meghai Spur-1 at BRE. Km. 141.760 in Upazila-Kazipur District-Sirajganj under Sirajganj O&M Division BWDB Sirajganj during the year 2014-2015. Sirajganj O&M Division BDT 2.47 crore 22 Apr 2015 Official record
Emergency work of Simla Spur-2 at BRE Km. 157.600 in Upazila-Sirajganj Sadar District-Sirajganj under Sirajganj O&M Division BWDB Sirajganj During the year 2014-2015. Sirajganj O&M Division BDT 61.10 lakh 19 Apr 2015 Official record
Emergency protective work at eroded earthen shank from Meterage 670.00 to Meterage 755.00 = 85.00 meter of Betil Spur-1 at BRE Km.193.53 in Upazila Belkuchi District. Sirajganj under Sirajganj O & M Division BWDB Sirajganj during the FY-2014-2015. Sirajganj O&M Division BDT 1.05 crore 16 Apr 2015 Official record
Re-sectioning of Embankment from km 11.700 to km14.600 = 2.900km in polder no. 26 under Blue Gold programme in Dumuria Upazila District-Khulna under Khulna O&M Division-1 BWDB Khulna during the year 2014-15. Khulna O&M Division-1 BDT 81.40 lakh 9 Feb 2015 Official record
Re-excavation of Chaukhathi Khal from km. 0.000 to 10.300 = 10.300 km under Integrated Water Management Project of Polder- 34/2 in Bagerhat district during the year 2014- 15. Bagerhat O&M Division BDT 2.86 crore 7 Jan 2015 Official record
Earth work royalty lead and turfing Bagerhat O&M Division BDT 1.09 crore 28 Sep 2014 Official record
Emergency protective work from erosion of theJamuna River from Meterage 400.00 to Meterage 700.00 = 300m at Randhunibari Bazar in upazila-Belkuchi District-Sirajganj under Sirajganj O&M Division BWDB Sirajganj during FY 2014-15. Sirajganj O&M Division BDT 53.60 lakh 8 Sep 2014 Official record
Emergency Construction of Ring Bundh at Bahuka Sirajganj in Brahmaputra Right Flood Embankment in between Km. 153.500 to Km. 154.300 of a length of 800.00 m under Non-Development Revenue Budget during 2014-15. Sirajganj O&M Division BDT 22.30 lakh 28 Aug 2014 Official record
Re-excavation of khal Bagerhat O&M Division BDT 1.28 crore 24 Jul 2014 Official record