Installation, Supply and Cleaning of Internal Water Distribution Line, Connecting of Water Pipe with other Ancillary Repair Works at District Core Campus under PWD Division, Chapainawabganj.
PWDCHP/APP/23-24/NR/21/e-GP/20241209/917839/00231368
|
Chapai Nawabganj pwd division |
৳২.৮৫ লাখ |
৩ ডিসে ২০২৩ |
Completed |
|
(1) Laying of 1-500mm dia UPVC Buried Pipe Line M-N from Ch. 00m- 2000m (2) Laying of 1-355mm dia UPVC Buried Pipe Line B-B5 from Ch. 00m- 500m (3) Construction of Over Head Tank (6.050mx3.175m) Near Jampukur (4) Construction of RCC Platform Brick Name Plate SPISB & SPIP Chapai Grameen CAD (SP No. 25289) under Sadar Upazila, Dist: Chapainawabganj.
LGED/SSSWRDP/Cha/WD-264/2022-23/e-GP/20241005/796062/00191123
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳১.৭৭ কোটি |
৬ মার্চ ২০২৩ |
Completed |
|
Installation of 78 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 3 unions (Sundarpur, Baliadanga, Islampur) at Chapainawabganj Sadar Upazila of Chapainawabganj District under PSWSC project of DPHE during FY 2022-23.
000/e-GP/DPHE/2023-07-11/00750231
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳৬৭.৯৭ লাখ |
১৩ নভে ২০২২ |
Completed |
|
Installation of 104 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 4 unions (Char-Anupnagar, Char-Bagdanga, Debinagar, Jhilim) at Chapainawabganj Sadar Upazila of Chapainawabganj District under PSWSC project of DPHE during FY 2022-23.
000/e-GP/DPHE/2023-07-11/00750229
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳৯২.০৯ লাখ |
১৩ নভে ২০২২ |
Completed |
|
Installation of 130 Nos Shallow Tube well (100mm x 38mm) With Submersible Pump at Bagatipara Upazila in Natore District under Project for Safe Water Supply Throughout the Country (FY:2022-23)
000/e-GP/DPHE/2023-07-11/00741985
|
Office of the Executive Engineer ,DPHE, Natore |
৳১.১২ কোটি |
১৮ অক্টো ২০২২ |
Completed |
|
Installation of 182 Nos Shallaw Tube well (100x38mm) with Submersible Pump Natore Sadar Upazila in Natore District Under Project For Safe Water Supply Throughout the Country (FY:2022-23)
000/e-GP/DPHE/2023-07-11/00735317
|
Office of the Executive Engineer ,DPHE, Natore |
৳১.৫৪ কোটি |
১৮ অক্টো ২০২২ |
Completed |
|
(1) Construction of RCC Pump Operating Platefrom Ramp and Stair (Size: 2.4mx12.575m) (2) Construction of RCC Cover Slab Over Existing Open Irrigation Canal (10 Nos) Brick Name Plate (10Nos), Sub-Project Identification Sign board (2 Nos) and Sub-Project Indication Post (2 Nos) (3) Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+000 km to 0+200 km (4) Construction of RCC Over Head Tank (4.450mx3.00m) near Bifurcation Point (5) Construction of 1-450mm dia UPVC buried pipe Line C-G from Ch. 0+000 km to 1+075 km (6) Construction of 1-315mm dia UPVC buried pipe Line G-H from Ch. 0+000 km to 0+375 km & Line G-G1 from Ch. 0+000 km to 0+500 km (7) Repair and Maintenance of WMCA Office (12.00mx6.00m) of Ghughudima Khutbatola CAD (SP No. 43039) under Sadar Upazila, Dist: Chapainawabganj
SSSWRDP/Cha/WD-248/2022-23/e-GP/20240925/738029/00182912
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳১.৬৯ কোটি |
২ অক্টো ২০২২ |
Completed |
|
Installation of 133 Nos 100 mm x 38 mm dia Deep Tubewell with Submersible Pump at Different Unions(Sadar-26, Borkhapan-26, Koilati-26, Najirpur-26 and Pogla-26) of Kolmakanda Upazila of Netrokona District of Department of Public Health Engineering during 2022-23 Financial Year under Project for Safe Water Supply Throughout the Country.
000/e-GP/DPHE/2023-07-11/00724471
|
Office of the Executive Engineer,DPHE,Netrokona |
৳১.৯৪ কোটি |
১৬ আগ ২০২২ |
Completed |
|
Installation of 100 mm dia. tube well with submersible pump at different primary schools of Dinajpur District under Need Based Infrastructure Development of Government Primary Schools Project (1 st phase) (NBIDGPS-1)
000/e-GP/DPHE/2023-07-11/00693863
|
Office of the Executive Engineer ,DPHE, Dinajpur |
৳৪১.৬৯ লাখ |
২৮ এপ্রিল ২০২২ |
Completed |
|
Installation of 17 nos 100 mm dia. Tube well with submersible pump (capacity 1.5 HP) and 10 nos 75 mm dia Shallow Tara Tubewell at different primary schools of Chapainawabganj District under GPS Project during FY 2021-22.
000/e-GP/DPHE/2023-07-11/00690745
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳২৪.৩০ লাখ |
২৫ এপ্রিল ২০২২ |
Completed |
|
Construction of 18 nos Hand Washing Station with running water by Installing Tube Well with overhead tank and associated facilities for Response to COVID-19 & Construction of 4 nos Public Sanitation and Hygiene Facilities with running Water at Horinakundu & Mohespur Upazila in DPHE Jhenaidah District under Rural Water, Sanitation and Hygiene for Human Capacity Development Project (RWSHP)( GoB-World Bank). FY: 2021-2022.
000/e-GP/DPHE/2023-07-11/00672004
|
Office of the Executive Engineer, DPHE,Jhenaidah |
৳৯৩.৮৯ লাখ |
১০ মার্চ ২০২২ |
Completed |
|
1. Supplying of Furniture at different Institute under Shahabajpur UP, Under Shibganj Upazila, District Chapainawabganj.Sl.No:48 2. Installation of Hand Tubewell near the H/O under Shahabajpur UP, Upazila Shibgang, Dist. Chapai Nawabganj.SL.No:47 & 3. Construction of Garage of Chackpara Adorso School under Shabajpur UP, Upazila, Shibganj, Dist.Chapainawabganj.SL.No-52
ADP/C.SHIB/2021-2022/07/e-GP/20241107/667099/00214153
|
Office of the Upazila Engineer, Shibganj, Chapai Nawabganj |
৳৩.৯৪ লাখ |
৬ মার্চ ২০২২ |
Completed |
|
Construction of Boundary Wall at Zabri Kazipara High School, Shibganj, Chapainawabganj. (FY-2020-21)
Chapai/SHED/5974/2020-21/03/e-GP/20241124/667452/00222278
|
Office of the Executive Engineer, EED, Chapainawabanj District. |
৳১৪.২৫ লাখ |
৩ মার্চ ২০২২ |
Completed |
|
Construction of single storied Academic Building with 4- storied foundation to including sanitary water supply & electrification works at Baliadanga High School, Sadar, Chapainawabgonj. (FY-2020-21)
7016/New Cons/2020-21/01/e-GP/20241119/667767/00219928
|
Office of the Executive Engineer, EED, Chapai Nawabganj District. |
৳৮৩.১২ লাখ |
২৮ ফেব ২০২২ |
Ongoing |
|
Construction of boundary railing and gate to protect the land beside gazetted dormitory from unauthorized encroachment at Chapainawabganj.
2021-22-60/e-GP/20241201/667545/00225773
|
Chapai Nawabganj pwd division |
৳৮.০১ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Construction of additional class room Char Jaharpur Dakshinpara GPS under PEDP 4
e-Tender/PEDP4/C.SAD/2021-2022/W1.02168/e-GP/20241023/658808/00202793
|
Office of the Upazila Engineer, LGED, Chapai Nawbaganj Sadar, Chapai Nawbaganj |
৳১.২০ কোটি |
১৩ ফেব ২০২২ |
Completed |
|
Construction of additional class room Char Atroshia GPS under PEDP 4
e-Tender/PEDP4/C.SAD/2021-2022/W1.02161/e-GP/20241023/658787/00202666
|
Office of the Upazila Engineer, LGED, Chapai Nawbaganj Sadar, Chapai Nawbaganj |
৳১.২২ কোটি |
১৩ ফেব ২০২২ |
Completed |
|
Construction of additional class room of Char Khachi Char GPS under PEDP4
e-Tender/PEDP4/C.SAD/2021-2022/W2.04021/e-GP/20241022/650892/00201622
|
Office of the Upazila Engineer, LGED, Chapai Nawbaganj Sadar, Chapai Nawbaganj |
৳১.১৭ কোটি |
২৪ জানু ২০২২ |
Completed |
|
Construction of Two Storied RCC Wash Block having Four Storied foundation for MT Boys and FT Girls including all associated construction , sanitary, plumbing & electrical works.
000/e-GP/DPHE/2023-07-11/00647462
|
Office of the Executive Engineer ,DPHE, Natore |
৳৮১.৩৪ লাখ |
১৬ জানু ২০২২ |
Completed |
|
Renovation & Refurbishment of Auditorium & Classrooms.
CEDP/GNC/2021-22/W-1/e-GP/20221205/646278/0055800
|
NAWABGANJ GOVT. COLLEGE |
৳৯৪.৩৪ লাখ |
১০ জানু ২০২২ |
Completed |
|
Improvement of Shibganj Khasher hat FRB (H/O Sree Churamun Sorkar)- Trimohoni Monakosha UP road Ch. 00m-500m. ID No: 170885114. under Shibganj Upazila, Dist: Chapainawabganj.Salvage Cost: 12,18,943.00 tk
IRIDP-3/CNW/DW-31/e-GP/20240928/640197/00185206
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳৩৫.৫৩ লাখ |
২৭ ডিসে ২০২১ |
Completed |
|
Improvement of Chapai Nawabganj - Sona Mosque R&H from Balia Dhighi mour (Modho Bazar)- Gopal pur (Chang Mari Bill) via Sonapur Ashalot Hazir Mour road Ch. 1000m-1650m. ID No: 170885173 under Shibganj Upazila, Dist: Chapainawabganj.
IRIDP-3/CNW/DW-33/e-GP/20240928/640199/00185138
|
Office of the Executive Engineer, LGED, Chapainawabganj |
৳৪২.৯০ লাখ |
২৭ ডিসে ২০২১ |
Completed |
|
Construction of 4 nos (2 Nachole + 2 Gomastapur) Public Sanitation and Hygiene Facilities with running water and 18 nos (9 Nachole + 9 Gomastapur) Hand Washing station (Response to COVID-19) at Nachole and Gomastapur upazila of Chapainawabganj District under Rural Water, Sanitation and Hygiene for Human Capacity Development Project ( GoB-World Bank) of DPHE during FY 2021-22.
000/e-GP/DPHE/2023-07-11/00640392
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳৮৮.২৮ লাখ |
২৭ ডিসে ২০২১ |
Completed |
|
1. Construction of Tol Ghor at Shahabajpur Hat under Shibganj Upazila, Dist. Chapainawabganj & 2. Development by CC Road start North side shop of Akmol to South side shop of Amdad at Chama Bazar Jame Mosque under Shyumpur UP Upazila Shibhanj, Dist. Chapainawabganj
HAT-15/C.SHIB/2021-22/02/e-GP/20241105/619304/00212820
|
Office of the Upazila Engineer, Shibganj, Chapai Nawabganj |
৳২.৭৬ লাখ |
১৫ নভে ২০২১ |
Completed |
|
Installation of Shallow Tara Tube Well (Non-Extractable) with # 6 Hand Pump on the occasion of MUJIB HUNDRED YEARS celebration for drinking water to the people those who have no house and no land at Different Upazila in Natore District.
000/e-GP/DPHE/2023-07-11/00618921
|
Office of the Executive Engineer ,DPHE, Natore |
৳২১.১৫ লাখ |
১১ অক্টো ২০২১ |
Completed |
|
Construction of additional class room Debinagar-2 GPS under PEDP4
e-Tender/PEDP4/C.SAD/2021-2022/W2.03661/e-GP/20241023/616980/00202553
|
Office of the Upazila Engineer, LGED, Chapai Nawbaganj Sadar, Chapai Nawbaganj |
৳৭৭.৭৩ লাখ |
৬ অক্টো ২০২১ |
Completed |
|
Installation of 71 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at different unions of Chapainawabganj Sadar & Bholahat Upazila of Chapainawabganj District during FY 2021-22 under revenue Budget (Mujib Centenary-2nd Phase).
MBTW-1303/e-GP/20221029/616823/0052450
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳৬৬.৭৪ লাখ |
৩ অক্টো ২০২১ |
Completed |
|
Construction of Pourashava Water Office at Shibganj Pourashava of Chapainawabganj district Under Urban Water Supply and Sanitation in 23 pourashavas in Bangladesh GOB-IDB during FY 2021-22. (Package No: SHIB-PWB-08)
000/e-GP/DPHE/2023-07-11/00603226
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳৪০.৭০ লাখ |
২ সেপ ২০২১ |
Completed |
|
Installation of Shallow Tube well (100mm x 38mm dia.) with 1.0HP capacity Submersible Pump at Naldanga Upazila in Natore District.
000/e-GP/DPHE/2023-07-11/00595006
|
Office of the Executive Engineer ,DPHE, Natore |
৳১.০৭ কোটি |
১৯ জুলাই ২০২১ |
Completed |
|
Installation of 120 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 5 unions (Islampur, Shahajahanpur, Ranihati, Moharajpur, Narayanpur) at Chapainawabganj Sadar Upazila of Chapainawabganj District under PSWSC project of DPHE during FY 2021-22. (Package No: PSWSC-2676)
PSWSC-2676./e-GP/20221029/594025/0052459
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.০৪ কোটি |
১৮ জুলাই ২০২১ |
Completed |
|
Installation of 104 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 4 unions (Jhilim, Gobratala, Baliadanga, Baroghoria) at Chapainawabganj Sadar Upazila of Chapainawabganj District under PSWSC project of DPHE during FY 2021-22. (Package No: PSWSC-2674)
PSWSC-2674/e-GP/20221029/594023/0052458
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.০১ কোটি |
১৮ জুলাই ২০২১ |
Completed |
|
Construction of 30 nos Community Based Water Supply scheme by installing 100mm dia tubewell with 1.5 hp Submersible Pump at different upazilas of Chapainawabganj district under PSWSC project of DPHE during the FY-2021-22. (Package No: PSWSC-2672)
000/e-GP/DPHE/2023-07-11/00594021
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.০৪ কোটি |
১৮ জুলাই ২০২১ |
Completed |
|
Installation of 104 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 4 unions (Bholahat, Gohalbari, Doldoli, Zambaria) at Bholahat Upazila of Chapainawabganj District under PSWSC project of DPHE during FY 2021-22. (Package No: PSWSC-2683)
PSWSC-2683./e-GP/20221029/594032/0052460
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.০২ কোটি |
১৮ জুলাই ২০২১ |
Completed |
|
Repair & Maintenance work of 350 m³/hr capacity Combined (Ground & Surface water) Treatment Plant at Chapainawabgonj Pourashava under 37 District Towns Water Supply Project of DPHE during FY 2020-21.
TPRM-Chapai/e-GP/20221211/572945/0056458
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১৬.১৭ লাখ |
২৬ এপ্রিল ২০২১ |
Completed |
|
Installation of Shallow Tara Tube Well (Non-Extractable) with # 6 Hand Pump on the occasion of MUJIB HUNDRED YEARS celebration for drinking water to the people those who have no house and no land at Different Upazila in Natore District. N.B: Works will be done after available of Fund
000/e-GP/DPHE/2023-07-11/00569743
|
Office of the Executive Engineer ,DPHE, Natore |
৳২৪.০৪ লাখ |
১৫ এপ্রিল ২০২১ |
Completed |
|
Civil sanitary repair of the government quarter Punorvoba (East) at district core complex area, Chapainawabganj.
2020-21-64/e-GP/20241201/566210/00225762
|
Chapai Nawabganj pwd division |
৳৮.৬৯ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Rehabilitation of Tremohoni Ghat to Kalinagor via Noorpur road from Ch. 00m -2000m.under Singra Upazila District Natore. Road ID 169914036
CAFDRIRP/Natore/VR-A/W-03/2020-21/e-GP/20221122/553739/0054352
|
Office of the Executive Engineer, LGED, Natore |
৳৭২.৮৫ লাখ |
৩ মার্চ ২০২১ |
Completed |
|
Installation of 10 nos 75mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at Chapainawabganj Sadar Upazila of Chapainawabganj District under Revenue Budget of DPHE during FY 2020-21.
WS 01/e-GP/20221029/533933/0052476
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳৬.১৪ লাখ |
৬ জানু ২০২১ |
Completed |
|
Construction of 8 nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary schools of Chapainawabganj District under GPS Project during FY 2020-21. GPS-WB-884
000/e-GP/DPHE/2023-07-11/00517854
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.১০ কোটি |
৬ জানু ২০২১ |
Completed |
|
Installation of 130 Nos Shallow Tara System Tube-well with 6No Hand Pump Non extractable at Khetlal Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country PSWSC during FY 2020-2021.
PSWSC-3134/e-GP/20221129/515210/0055148
|
Office of the Executive Engineer , DPHE,Joypurhat |
৳৪৭.৭৬ লাখ |
১০ ডিসে ২০২০ |
Completed |
|
Installation of 208 Nos Shallow Tara System Tube-well with 6No Hand Pump Non extractable at Panchbibi Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country PSWSC during FY 2020-2021.
PSWSC-3132/e-GP/20221130/515208/0055281
|
Office of the Executive Engineer , DPHE,Joypurhat |
৳৭৬.৪২ লাখ |
১০ ডিসে ২০২০ |
Completed |
|
Installation of 208 Nos Shallow Tara System Tube-well with 6No Hand Pump Non Extractable at Panchbibi Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country PSWSC during FY 2019-2020.
PSWSC - 3130/e-GP/20221129/515206/0055141
|
Office of the Executive Engineer , DPHE,Joypurhat |
৳৭৬.৪২ লাখ |
১০ ডিসে ২০২০ |
Completed |
|
Installation of 234 Nos Shallow Tara System Tube-well with 6No Hand Pump Non Extractable at Joypurhat Sadar Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country PSWSC during FY 2019-2020.
PSWSC - 3127/e-GP/20221129/515203/0055142
|
Office of the Executive Engineer , DPHE,Joypurhat |
৳৮৫.৯৭ লাখ |
১০ ডিসে ২০২০ |
Completed |
|
Installation of 130 Nos Shallow Tara System Tube-well with 6No Hand Pump Non Extractable at Kalai Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country PSWSC during FY 2019-2020.
PSWSC - 3128/e-GP/20221129/515204/0055146
|
Office of the Executive Engineer , DPHE,Joypurhat |
৳৪৭.৭৬ লাখ |
১০ ডিসে ২০২০ |
Completed |
|
Installation of 234 Nos Shallow Tara System Tube-well with 6No Hand Pump Non extractable at Sadar Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country PSWSC during FY 2020-2021.
PSWSC-3131/e-GP/20221129/515207/0055144
|
Office of the Executive Engineer , DPHE,Joypurhat |
৳৮৫.৯৭ লাখ |
১০ ডিসে ২০২০ |
Completed |
|
Construction of 08 nos 02 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary schools of Chapainawabganj District under PEDP-4 Project during FY 2020-21. PEDP-4-WB-1124
000/e-GP/DPHE/2023-07-11/00517851
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.৩৫ কোটি |
৩ ডিসে ২০২০ |
Completed |
|
Installation of 20 nos 100 mm dia. Tube well with submersible pump capacity 1.5 HP with RO filter at different primary schools of Chapainawabganj District under GPS Project during FY 2020-21. GPS-WS-127
000/e-GP/DPHE/2023-07-11/00517870
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳২৪.৭৩ লাখ |
৩ ডিসে ২০২০ |
Completed |
|
Maintenance of Lonertiker More-Kuthibari Ghat Road from Ch 00m-2030m Road ID 181724015 Under Paba Upazila Rajshahi District.
LGED/Raj/VRRP/Re-hab/20-21/W-1367/e-GP/20240921/514508/00179153
|
Office of the Executive Engineer, LGED, Rajshahi |
৳৬৬.৭৯ লাখ |
১৯ নভে ২০২০ |
Completed |
|
Installation of 104 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 4 unions of Durgapur Upazila of Rajshahi District under Project for Safe Water Supply throughout the Country of DPHE during FY 2020-21.
PSWSC-2606/e-GP/20221103/510203/0052854
|
Office of the Executive Engineer, DPHE,Rajshahi |
৳১.০৯ কোটি |
১০ নভে ২০২০ |
Completed |
|
Installation of 104 nos 100mm dia Shallow Tube Well with 1.0 HP capacity submersible pump at 4 Four Bholahat Gohalbari Doldoli Zambaria unions of Bholahat Upazila of Chapainawabganj District under Project for Safe Water Supply throughout the Country of DPHE during FY 2020-21.
PSWSC-2668/e-GP/20221029/512318/0052474
|
Office of the Executive Engineer, DPHE,Chapai Nawabganj |
৳১.০৩ কোটি |
১০ নভে ২০২০ |
Completed |