MGSP/FNI/2017-18/W-05 i) Construction of RCC Drain at Masterpara and Bamon Pukur Road side. Part-I Infront of Feni Jail Khana-Kanon Cinena Hall-Bendu Hazari Gymnasium Road Ch. 0.00m to 250.00m W-01 Part-II Infront of Feni Pourashava to Masterpara Road Ch. 0.00m to Ch. 100.00m W-02 Part-III Masterpara Road and Bamon Pukur Road side Shafiq Vila to Railway Culvert Ch. 0.00m to Ch. 410.00m W-02 Part-IV Ramtara Shishu Park-Moulavi Bazar-Master Rafiqul Islam Road side drain up to Railway Culvert Ch. 0.00m to Ch. 350.00m W-02 Part-V Rail Line to Dhamdhama Khal Ch. 0.00m to Ch. 150.00m W-02 Total Length 1260.00m. ii) Construction of RCC Drain at west side of Trunk Road including link Part-I Main drain Ch. 0.00m to 900.00m Part-II Link-1 Ch. 0.00m to 390.00m Part-III Link-2 Ch. 0.00m to 75.00m Total Length 1365.00m. iii) Construction of RCC Drain at South Side of Feni- Noahkali Road Mohipal Bus Terminal To Panchgachi Khal Ch. 0.00m to 1105.00m Total Length 1105.00m.
রেফারেন্স নং: Ref.: 46.50.3029.250.02.006.17-531, Date: 01-11-20
এটা সরকারি তথ্য নয়। বিড করার আগে eprocure.gov.bd-তে মিলিয়ে নিন। · শেষ আপডেট: ১৭ অক্টো ২০২৬, ২৩:৩৫
এক নজরে
PIU Office of Feni Pourashava, Feni · ফেনী
আরও তথ্য
- ধরন
- ওয়ার্কস (নির্মাণ কাজ)
- পদ্ধতি
- OTM (ওপেন টেন্ডার) · দেশি (NCT)
- জেলা
- ফেনী
- ডকুমেন্টের দাম
- তথ্য নেই
- অফিস (PE)
- PIU Office of Feni Pourashava, Feni
Local Government Engineering Department (LGED) · Ministry of Local Government, Rural Development and Co-operatives - প্রকাশ
- ৫ নভে ২০১৭, ১৭:০০
- বাজেটের ধরন
- তথ্য নেই
- প্রকল্প
- প্রযোজ্য নয়