a. (i) Construction of RCC Box Culvert on Palong School to Premtala road at Ch.0+200m. a. (ii) Construction of RCC Box Culvert on Palong School to Premtala road at Ch 0+300m. a. (iii) Construction of RCC Box Culvert on Bus stand to Kurashi Balakhana road at Ch 0+700m. a. (iv) Construction of RCC Box Culvert on Bus stand to Kurashi Balakhana road at Ch 1+250m. a. (v) Construction of RCC Box Culvert on Chowrongi to Shornogosh Dighir Par road at Ch 0+400m. a. (vi) Construction of RCC Box Culvert on Chowrongi to Shornogosh Dighir Par road at Ch 1+500m. b. (i) Construction of 21.00m RCC Bridge at Charpalong Road. b. (ii) Construction of 21.00m Bridge Approach Road at Charpalong road. b. (iii) Street light for 21m R.C.C Bridge at Charpalong Road. c) Construction of 5 Vent 3.6mx4m RCC Box Culvert at PTI complex connecting road at Shariatpur Pourashava,Shariatpur. d) Construction of 5 Vent 4mx3.6m RCC Box Culvert at Brikhatala,Shariatpur Pourashava, Shariatpur. e) Construction of 2 Vent 3.6mx4m RCC Box Culvert at Angaria Bazar to Rajgonj Bazar Road at Ch. 2250m, under Shariatpur Pourashava, Shariatpur.
রেফারেন্স নং: LGED/PD/MGSP/W-13/2014(part-01)/546 Date:8.05.2018
এটা সরকারি তথ্য নয়। বিড করার আগে eprocure.gov.bd-তে মিলিয়ে নিন। · শেষ আপডেট: ১৭ অক্টো ২০২৬, ২৩:২৩
এক নজরে
PIU Office of Shariatpur Pourashava, Shariatpur · শরীয়তপুর
আরও তথ্য
- ধরন
- ওয়ার্কস (নির্মাণ কাজ)
- পদ্ধতি
- OTM (ওপেন টেন্ডার) · দেশি (NCT)
- জেলা
- শরীয়তপুর
- ডকুমেন্টের দাম
- তথ্য নেই
- অফিস (PE)
- PIU Office of Shariatpur Pourashava, Shariatpur
Local Government Engineering Department (LGED) · Ministry of Local Government, Rural Development and Co-operatives - প্রকাশ
- ১৩ জুন ২০১৮, ১৭:০০
- বাজেটের ধরন
- তথ্য নেই
- প্রকল্প
- প্রযোজ্য নয়