ICGP B2 ChCC-34 (a) Installation of GI Pole & LED light with necessary materials at Port Connecting Road Sagorika Moor near Mazar to Nimtola Circle Biman Chattar Length-4.92 km (b) Installation of GI Pole & LED light with necessary materials at Port Connecting Road Sagorika Moor near Mazar to City Gate Length 2.5 km (c) Installation of GI Pole & LED light with necessary materials Southern Medical College Road. Length 1.8 km (d) Installation of GI Pole & LED light with necessary materials at Nasirabad Industrial Road Saider International School to Textile more Length 2.2 km (e) Installation of GI Pole & LED light with necessary materials at Old Rail Station to Kadamtali Both Side Length 2.1 km (f) Installation of GI Pole & LED Light with necessary materials at Stand Road Sadarghat to Baric Building Mid-Island Length-2.2km (g) Installation of GI Pole & LED light with necessary materials Ananda BAzar Road Huzur bari to TG Length-1.8km (h) Installation of GI Pole & LED Light with necessary materials at majir ghat Road Nawaz hotel to Stand Road Length-1.4km
রেফারেন্স নং: CCC/CGP/ED/ICGP/B2/ChCC-34
এটা সরকারি তথ্য নয়। বিড করার আগে eprocure.gov.bd-তে মিলিয়ে নিন। · শেষ আপডেট: ১৭ অক্টো ২০২৬, ২২:৫০
এক নজরে
PIU Office of Chittagong City Corporation
আরও তথ্য
- ধরন
- ওয়ার্কস (নির্মাণ কাজ)
- পদ্ধতি
- OTM (ওপেন টেন্ডার) · দেশি (NCT)
- জেলা
- -
- ডকুমেন্টের দাম
- তথ্য নেই
- অফিস (PE)
- PIU Office of Chittagong City Corporation
Local Government Engineering Department (LGED) · Ministry of Local Government, Rural Development and Co-operatives - প্রকাশ
- ৩০ জানু ২০২০, ২২:০০
- বাজেটের ধরন
- তথ্য নেই
- প্রকল্প
- প্রযোজ্য নয়
এই কাজ আগেও টেন্ডার হয়েছে
এই অফিসে একই কাজের আগের টেন্ডার, নতুনটা আগে।