See which office will tender what, before it happens · Office of the Chief Engineer (West), Rajshahi
0 tenders are coming up
16 more were due to be tendered and have not come out yet
-
Running late Thorough Sleeper Renewal by DG PSC Sleeper in Place of Wooden Sleeper at gate number T/5/M, E/18/M, T/19/M, T/20/M, E/10/DR, T/18/DR, E/29/DR, T/30/DR, E/44/DR, T/45/DR, E/47/DR, T/56/DR, E/61/DR, T/64/DR, T/72/DR by dismantling existing road surfaces, strengthening sub-base with stone chips, and carpeting including other ancillary works in between Parbatipur-Panchagarh station for safe train operation in AEN/Dinajpur section under Divisional Engineer, Lalmonirhat jurisdiction.Tender expected October 2026
-
Running late Re-construction of BG Wooden Sleeper Track on existing railway alignment by BG PSC Sleeper (S/H) and 90 lb rail (S/H) with (N+5) sleeper density of Khulna re-modeling station yard line no. 2 (0.504 km), Yard line no. 3 (0.438 km) and line no. 6 (0.453 km) and other ancillary works in SSAE/Khulna section under Divisional Engineer-1, Paksey's jurisdiction. (Total length 1.395 km).Tender expected September 2026
-
Running late Reconstruction of Badiakhali station yard Loop line No-2 by MG PSC sleeper and 75 lb "R" rail instead of existing 60 lb Rail and Wooden Sleeper with sleeper density=N+5 in SSAE/WAY/Bamondanga Section under Divisional Engineer, Lalmonirhat Jurisdiction. Total Length=0.704 K.M.Tender expected September 2026
13 more packages
Free shows the first 3. The full list is on Basic and Pro.
Offices often push dates back, so treat this as an early heads-up. Check e-GP before you plan a bid.