Upgradation & Renovation of Joypurhat District Hospital from 100 to 250 bed at Joypurhat (Sub-Head : Fire Protection System and Lighting Arrester in work)
HNP/PWD/GOB/DH/Jaiprht/WD-3/2/e-GP/20241126/713287/00223970
|
Joypurhat pwd division |
৳১.৮৪ কোটি |
২২ জুন ২০২২ |
Completed |
|
Construction of Baniachong Upazila Muktijuddha Complex Bhaban, Upazila Baniachong, District: Habiganj.
CUMCP/HAB/BAN/21/C-453/e-GP/20231224/620517/00157076
|
Office of the Executive Engineer, LGED, Habiganj |
৳২.৫৪ কোটি |
২৮ অক্টো ২০২১ |
Ongoing |
|
Replacing the Existing Faulty and Unserviceable Lift Accessories of 08 Nos Lift of 4 Nos Building in Ruppur Green City Residential Area at Iswardi, Pabna.
OTM/Rooppur/Lift Maintanace/2020-2021/e-GP/20220607/586053/004722
|
Pabna PWD Division, Pabna |
৳৩৩.৪১ লাখ |
৬ জুন ২০২১ |
Completed |
|
Supplying, Fitting and Fixing of PVC False Celling, Pavement Tiles, Verandah railing on Terrace area and other remaining ancillary works of Building no. 5a.2 under the Project -Construction of Nuclear Power Housing Complex at Rooppur, Ishwardi, Pabna".
OTM/Remaining//Rooppur/Civil-05/2020-2021/e-GP/20220702/566049/0025232
|
Pabna PWD Division, Pabna |
৳২.৭৯ কোটি |
৭ এপ্রিল ২০২১ |
Completed |
|
Supplying, Fitting and Fixing of PVC False Celling, Pavement Tiles, Verandah railing on Terrace area and other remaining ancillary works of Building no. 5.7 under the Project -Construction of Nuclear Power Housing Complex at Rooppur, Ishwardi, Pabna".
OTM/Remaining//Rooppur/Civil-07/2020-2021/e-GP/20220623/566051/0012391
|
Pabna PWD Division, Pabna |
৳৩.৫১ কোটি |
৭ এপ্রিল ২০২১ |
Completed |
|
Supplying, Fitting and Fixing of PVC False Celling, Pavement Tiles, Verandah railing on Terrace area and other remaining ancillary works of Building no. 5a.6 under the Project -Construction of Nuclear Power Housing Complex at Rooppur, Ishwardi, Pabna".
OTM/Remaining//Rooppur/Civil-06/2020-2021/e-GP/20220623/566050/0012402
|
Pabna PWD Division, Pabna |
৳৪.১৩ কোটি |
৭ এপ্রিল ২০২১ |
Completed |
|
Providing and Fixing of Kitchen Cabinet, Aluminium Cable Tray and other remaining ancillary works of Building no. 5a.1 under the Project "Construction of Nuclear Power Housing Complex at Rooppur, Ishwardi, Pabna".
OTM/Remaining//Rooppur/EM-04/2020-2021/e-GP/20220609/564910/005088
|
Pabna PWD Division, Pabna |
৳১.৭২ কোটি |
৪ এপ্রিল ২০২১ |
Completed |
|
Providing and Fixing of Kitchen Cabinet, Aluminium Cable Tray and other remaining ancillary works of Building no. 5a.6 under the Project "Construction of Nuclear Power Housing Complex at Rooppur, Ishwardi, Pabna".
OTM/Remaining//Rooppur/EM-06/2020-2021/e-GP/20220611/564912/005492
|
Pabna PWD Division, Pabna |
৳১.৬৩ কোটি |
৪ এপ্রিল ২০২১ |
Completed |
|
Lift repair and maintenance work of 07 seven nos high rise residential building at Ruppur Green City Residential Area for 1 one year
OTM/CNPPR/Lift Maintenance/2020-2021/e-GP/20220607/517818/004719
|
Pabna PWD Division, Pabna |
৳৬১.৮৫ লাখ |
২৯ নভে ২০২০ |
Completed |
|
Maintenance and repairing works of existing split type AC at Conference room 2 of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 176/2019-20/e-GP/20220925/433751/0042479
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply of light fittings and electrical repairing and maintenance works at 2nd floor and 3rd floor of Family Welfare Training Institute at Population Building at Azimpur Dhaka
154156/app/ 168/2019-20/e-GP/20220924/433743/0041465
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply of light fittings and electrical repairing and maintenance works at ground floor and 1st floor of Family Welfare Training Institute at Population Building at Azimpur Dhaka
154156/app/ 167/2019-20 /e-GP/20220924/433742/0041458
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Replacing Compressor Capacitor Thermostat of Air Cooler at ground floor and 1st floor of Maternity Centre and Child Health Training Institute at Azimpur Dhaka
154156/app/ 166/2019-20/e-GP/20220924/433741/0041442
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Maintenance and repairing works of existing split type AC at Conference room 1 of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 177/2019-20/e-GP/20220925/433752/0042482
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply and installation of New IPS replacing old one at Ladies Hostel of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 175/2019-20/e-GP/20220925/433750/0042469
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply and installations of New IPS replacing old one for uninterrupted electricity supply at dining hall kitchen TV room Store room Waiting room of Hostel of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 174/2019-20/e-GP/20220925/433749/0042423
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply of Emergency Spot light Security light of Ladies Hostel of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 173/2019-20/e-GP/20220925/433748/0042382
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply and installation of New IPS replacing old one at Principals office of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 172/2019-20/e-GP/20220925/433747/0042326
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply of Spot light Security light and necessary electrical repairing works of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 171/2019-20/e-GP/20220925/433746/0042308
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply and Installations of New IPS replacing damaged IPS at training rooms of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 170/2019-20/e-GP/20220925/433745/0042294
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Supply installation and refilling of fire fighting equipment at four Storied Ladies Hostel of Family Welfare Training Institute at Population Building Azimpur
154156/app/ 169/2019-20/e-GP/20220925/433744/0042283
|
PWD EM Division-3, Dhaka |
৳১.৮০ লাখ |
২৫ ফেব ২০২০ |
Completed |
|
Modernization of Osmani Memorial Auditorium. Sub Head Electro Mechanical Items Fire Detection & Protection Central Air Conditioning Auditorium Sound System PA Conference System PABX WiFi CCTV Compound Lighting LED Screen Surge Protection BMS and Access Control System.
Osmany/e-GP/20220925/307940/0042513
|
PWD EM Division-3, Dhaka |
৳১৪.৯৪ কোটি |
১৫ এপ্রিল ২০১৯ |
Completed |
|
Construction of Sreepur Upazila model mosque and Islamic cultural center at Gazipur district under the project of Establishing 560 model mosque and Islamic cultural centers in the zilla and upazila of Bangladesh.
Model.masj-02-2018-19/e-GP/20220526/280757/002939
|
Gazipur PWD Division, Gazipur |
৳১৩.৩১ কোটি |
৩ ফেব ২০১৯ |
Ongoing |
|
Repair of road in front of ladies & gents hostel and repair works of residential building-1 outside of staff quarter east side & west side in the compound of BKTTC Mirpur
mirpr/2017-2018/sd2/BKTTC road ladies & gents /e-GP/20220828/202224/0032155
|
Mirpur PWD Division, Dhaka |
৳৩৬.৪৬ লাখ |
২৮ মে ২০১৮ |
Completed |
|
Retrofitting & complete Renovation Emergency Repair Alternation & Maintenance Work of all Specialized Hospital & Old Medical & Hospital Subhead Special Repair Works including Civil & Sanitary reformation roof repair and other relevant works of Outdoor Patient Department Emergency Department and X-Ray & OT Block at Rajshahi Medical College Hospital During year 2017-18
OP/Sp.Rep-2/2017-18 /e-GP/20241210/168713/00232730
|
Rajshahi PWD Division-2 |
৳১.৮০ কোটি |
২৬ ফেব ২০১৮ |
Ongoing |
|
Rehabilitation of 1.300mx2.00m Box culvert at Ch. 3304m on Kunder GC-Dhunder Hat Road Nandigram Structure Re-hab Rd ID-110673011
e-Tender/LGED/Bog/17-18/W-54/e-GP/20241001/149867/00188308
|
Office of the Executive Engineer, LGED, Bogra |
৳৫.০৩ লাখ |
৩১ ডিসে ২০১৭ |
Completed |
|
Improvement of Soilmari - Rangamati road from ch. 00-500m Rd ID-110274127
IRIDP-2/BOG/DW-272/e-GP/20240924/149778/00182088
|
Office of the Executive Engineer, LGED, Bogra |
৳২৩.৩৯ লাখ |
৩১ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Koltapara RDA-Jamunna Hat Road from Ch.00m-870m Sherpur Overlay Rd ID-110884012
e-Tender/LGED/BOG/GOBM/17-18/W-21/e-GP/20241002/149865/00189048
|
Office of the Executive Engineer, LGED, Bogra |
৳১৩.২৮ লাখ |
৩১ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Shariakaidi U.P-Hasnapara hat Road from Ch. 2500m-4140m SariakandiRe-SealRd ID-110813011
e-Tender/LGED/Bog/17-18/W-10/e-GP/20241001/149868/00188853
|
Office of the Executive Engineer, LGED, Bogra |
৳১৫.৭৪ লাখ |
৩১ ডিসে ২০১৭ |
Completed |
|
Construction of Upazila Muktijuddha Complex Bhaban at Chunarughat Upazila under Habiganj District.
CUMCP/HAB/CHU/17/C-364/e-GP/20220514/135295/001806
|
Office of the Executive Engineer, LGED, Habiganj |
৳২.৬৪ কোটি |
১৪ নভে ২০১৭ |
Completed |
|
Widening of Nosibgonj GC Jaborhat GC Road from Ch. 000m -2800m Road ID No. 194822009 Under Pirganj Upazila Dist- Thakurgaon
e-Tender/LGED/Thak/GOBM/17-18/W-13./e-GP/20240926/133626/00184690
|
Office of the Executive Engineer, LGED, Thakurgaon |
৳১.০২ কোটি |
৫ নভে ২০১৭ |
Completed |
|
Supplying and Installation of 1600 KVA Electrical Sub-station equipment 02 Nos 500-KVA Generator 01 No 1000 Kg 20 Stop Passenger Lift and 01 No 1000 Kg 20 Stop Bed Lift Air-Cooler Solar panel Surge Protection CC TV Fire hydrant WI-FI Internet System and Centrifugal pump motor set
21/EM/2016-2017/e-GP/20220630/118276/0022901
|
Pabna PWD Division, Pabna |
৳২৯.৬৫ কোটি |
২৯ আগ ২০১৭ |
Completed |
|
Supplying and Installation of 1600 KVA Electrical Sub-station equipment 02 Nos 500-KVA Generator 01 No 1000 Kg 16 Stop Passenger Lift and 01 No 1000 Kg 16 Stop Bed Lift Air-Cooler Solar panel Surge Protection CC TV Fire hydrant WI-FI Internet System and Centrifugal pump motor set
22/EM/2016-2017/e-GP/20220526/98690/002933
|
Pabna PWD Division, Pabna |
৳২৭.০৩ কোটি |
২৮ আগ ২০১৭ |
Completed |
|
Supplying and Installation of 1600 KVA Electrical Sub-station equipment 02 Nos 500-KVA Generator 01 No 1000 Kg 20 Stop Passenger Lift and 01 No 1000 Kg 20 Stop Bed Lift Air-Cooler Solar panel Surge Protection CC TV Fire hydrant WI-FI Internet System and Centrifugal pump motor set
23/EM/2016-2017 /e-GP/20220618/98691/008200
|
Pabna PWD Division, Pabna |
৳২৯.৬৫ কোটি |
২৮ আগ ২০১৭ |
Completed |
|
Supplying and Installation of 1600 KVA Electrical Sub-station equipment 02 Nos 500-KVA Generator 01 No 1000 Kg 16 Stop Passenger Lift and 01 No 1000 Kg 16 Stop Bed Lift Air-Cooler Solar panel Surge Protection CC TV Fire hydrant WI-FI Internet System and Centrifugal pump motor set.
19/EM/2016-2017/e-GP/20220618/98687/008214
|
Pabna PWD Division, Pabna |
৳২৭.০৩ কোটি |
২৮ আগ ২০১৭ |
Completed |
|
Supplying and fixing of Compound security light garden and street light in Rooppur Nuclear Power Plant Residential Area at Pabna. FY - 2016-2017.
01/egp/EM/Ruppur/2016-17/e-GP/20220623/110307/0012347
|
Pabna PWD Division, Pabna |
৳৭.৯০ কোটি |
১৭ আগ ২০১৭ |
Completed |
|
Construction of 5-Storied academic cum 4-storied Administrative building with Workshop & Single storied Service Area including sanitary Electrification & Rain water preservation works along with site development Construction of internal road Boundary wall Gate and Installlation of Deep tube well at Sathia Upazilla Under Pabna District.
WD----39/e-GP/20241204/110889/00227574
|
Office of the Executive Engineer, Pabna Zone. |
৳১৫.৫০ কোটি |
১৭ জুলাই ২০১৭ |
Completed |
|
Maintenance of Char Gobindapur - Dulai road at Ch. 00 - 890m Road ID No 176834024 under Sujanagar UpazilaDistrict Pabna
GPBRIDP/MW-47/16-17/e-GP/20240711/110575/00165606
|
Office of the Executive Engineer, LGED, Pabna |
৳১৯.৩৩ লাখ |
১০ জুলাই ২০১৭ |
Completed |