|
Construction of Burirchar Union Parishad Complex Bhaban at Barguna Sadar Upazila Dist: Barguna under Construction of Union Parishad Complex Bhaban Project (Phase-3)
বরগুনা · টেন্ডার →
|
Office of the Upazila Engineer, LGED, Barguna Sadar, Barguna |
৳৪.৮৭ কোটি |
২৮ অক্টো ২০২৬ |
|
(i) Improvement of Mohes Road - Kurighar Uttarpara Road by BC from Ch. 500-1500m [Road ID: 412855142] (ii) Construction of 222 m Protective Work on the Same Road Under [Nabinagar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳১.১৬ কোটি |
২৭ অক্টো ২০২৬ |
|
Part-1: Improvement of (BC) Madhabpasha Shibbari-Kalizira (Sultan Master Road) From Ch.1840-2800m Under Babuganj Upazila Barishal.ID: 506034035 [Salvaged Cost : 371468.00] Part-2: Improvement of (BC) Madhabpasha Bridge-Musuria Sr. Madrasha Road From Ch.0.00-1000m Under Babuganj Upazila Barishal.ID: 506034029[Salvaged Cost : 1978574.00] Part-3: Improvement of (BC) Uttor Deher Goti Abu Munsi's House to Christian Para Road From Ch.0.00-1000m Under Babuganj Upazila Barishal.ID:506034078 [Salvaged Cost : 1431210.00] Part-4: Improvement of (BC) Pangsha Rajardeghi Moslem Ali khan Model Dakhil Madrasha-Gajalia RHD Road. From Ch.1900m-2470m Under Upazila-BabuganjDistrict- Barishal.ID: 506034116 [Salvaged Cost : 381787.00] [Total Salvaged Cost P-1+P-2+P-3+P-4]: 4163039.00]
বরিশাল · টেন্ডার →
|
Office of the Executive Engineer, LGED, Barishal |
৳৩.৮২ কোটি |
১৮ অক্টো ২০২৬ |
|
Part-A: (i) Improvement of Daulatpur UP Office (Paler Bazar)-Srirayerchar Bazar Road at Ch: 1500-2450m (Road ID: 419363003) (Salvage Cost Tk.766367/-) (i) Earth Work (1664.64cum) (ii) Road Work (950m) (iii) Protective Work 153m (iv) Road Safety Work (950m) Part-B: (i) Improvement of Malakhala Shilbari-Dhaneshwar GPS Road at Ch: 126-1000m (Road ID: 419364113) (i) Earth Work (1393.724cum) (ii) Road Work (874m) (iii) Protective Work 132m (iv) Road Safety Work (874m) Part-C: (i) Improvement of Talerseo FWC - Pipiakandi Road at Ch: 1000-1800m (Road ID: 419364019) (i) Earth Work (1206.767cum) (ii) Road Work (800m) (iii) Protective Work 84m (iv) Road Safety Work (800m) under Daudkandi Upazila District: Cumilla.
কুমিল্লা · টেন্ডার →
|
Office of the Executive Engineer, LGED, Cumilla |
৳৩.৩৯ কোটি |
২১ সেপ ২০২৬ |
|
A) Periodic Maintenance (Rehabilitation) of Nurjahanpur Muktarampur Road at Ch. 00-2470m. [ Road ID No.- 412855060] [Salvage Materials Cost: Tk.295454.00]. B) Periodic Maintenance (Rehabilitation) of Tilukia Feryghat - Haripur Subarmpur Nazradaulat Road at Ch. 1150 - 2900m. [Road ID No.- 412854028].[Salvage Materials Cost: Tk.299231.00] C) Periodic Maintenance (Rehabilitation) of Radika R&H (Brammanhata Madrasha West Side) to Kasba Moidagong GC via Brammanhata Chaukbazar and Narui Shibnagar Road at Ch. 00-1200m. [ID No.- 412854054] [Salvage Materials Cost: Tk.253255] [Nabinagar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳১.৯৫ কোটি |
১৬ সেপ ২০২৬ |
|
Development work of road and construction work of drain at Sadek Khan Road Basabo Balur Math adjacent by-lane Wahab Colony by-lane Basabo Central Mosque adjacent by-lane Patwari Goli and Goran Chapra Mosque adjacent roads under Ward No. 4 zone 02 DSCC.
ঢাকা · টেন্ডার →
|
Office of the Executive Engineer Zone-2 DSCC |
৳১.৮৫ কোটি |
১৪ সেপ ২০২৬ |
|
Construction of 20m RCC Girder Bridge on Hazigonj bazar Rail station-Tarapalla (Hazigonj-Chowmuhani Road.) at Ch. 2647m under Haziganj Upazila Chandpur District. Road ID No. 413492008
চাঁদপুর · টেন্ডার →
|
Office of the Executive Engineer, LGED, Chandpur |
৳৩.৫৮ কোটি |
২৯ জুলাই ২০২৬ |
|
Construction of 12m RCC Bridge on Upazila HQ-Shibpur R&H Road at Ch. 6303m under Shahrasti Upazila Chandpur District. Road ID No. 413952001
চাঁদপুর · টেন্ডার →
|
Office of the Executive Engineer, LGED, Chandpur |
৳২.৩৬ কোটি |
৫ জুলাই ২০২৬ |
|
Construction of 18m RCC Girder Bridge on Chandpur (Bagadi R&H)-Chandra GC Road at Ch. 2324m under Sadar Upazila Chandpur District. Road ID No. 413222002. Recovered Material Tk. 158174.00
চাঁদপুর · টেন্ডার →
|
Office of the Executive Engineer, LGED, Chandpur |
৳৩.২১ কোটি |
৫ জুলাই ২০২৬ |
|
(a) Improvement of Alamin Road.(Ch. 00m-1000m). ID no: 475365149 (b)Improvement of Nolchira Thana Pilot Road.(Ch. 00m-1000m) under Hatiya Upazila District: Noakhali ID no: 475365213 (c)Improvement of Daserhat-Santir Hat Road.(Ch. 00m-1000m) ID no: 475365187 (d) Improvement of Bualia High School-Sullukia Gram Road.(Ch. 1800m-2300m) under Hatiya Upazila District: Noakhali ID no: 475364136. Salvage Cost: 809489.00 Tk.
নোয়াখালী · টেন্ডার →
|
Office of the Executive Engineer, LGED, Noakhali |
৳৪.২৭ কোটি |
২৮ জুন ২০২৬ |
|
(a)Improvement of Halima Govt. Primary School Road.(Ch. 00m-1000m). ID 475365204 no: (b)Improvement of Hatiya College - belayet Road.(Ch. 00m-700m) ID no: 475365027 (c) Improvement of Sagoria - Sojil Munshi bazar.(Ch. 00m-1500m) under Hatiya Upazila District: Noakhali 475365074. Salvage Cost: 991994.00 Tk.
নোয়াখালী · টেন্ডার →
|
Office of the Executive Engineer, LGED, Noakhali |
৳৪.২১ কোটি |
২৮ জুন ২০২৬ |
|
a) (i) Improvement of Semontagar Aydur Bhuyan House - Asram via Shahid Member House Road by BC from Ch: 00m - 975m [Road Id: 412854136] (ii) Construction of 100m Protective Work on the Same Road. [Salvage Materials Cost: Tk.440658.00] b) (i) Improvement of Pashim Krishnagar Nadir Ghat - Dakhin Laxmipur Road by BC from Ch: 500m - 1500m [Road Id: 412854148] (ii) Construction of 44m Protective Work on the Same Road. [Salvage Materials Cost: Tk.2318365.00] c) (i) Improvement of Krishnagar -Ballahati Road by BC from Ch: 1000m - 1530m [Road Id: 412854019] (ii) Construction of 32m Protective Work on the Same Road. [Salvage Materials Cost: Tk.717388.00] [Nabinagar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳২.৫৭ কোটি |
১৭ জুন ২০২৬ |
|
Construction of 15m RCC Girder Bridge on Jinodpur R&H-Shahapur GC Road via Satmura UP & Satmura bazar Road at Ch. 10m under Nabinagar Upazila Brahmanbaria District. Road ID No. 412852005. Value of Recovered Material Tk. 224169.00
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳১.৯৮ কোটি |
১৭ জুন ২০২৬ |
|
Installation of 492 Nos improved latrines (twin pit latrines) for the poor at Borhanuddin Upazila of Bhola District under Rural Sanitation Project .Fiscal Year 2025-26
ভোলা · টেন্ডার →
|
Office of the Executive Engineer ,DPHE, Bhola |
৳২.৭৯ কোটি |
১৭ জুন ২০২৬ |
|
Development work of road and construction work of drain at adjacent Padma Hospital Road adjacent Prashanti Hospital Road Shantibagh & Gulbagh Lane by-lane under Ward No. 12 zone 02 DSCC.
ঢাকা · টেন্ডার →
|
Office of the Executive Engineer Zone-2 DSCC |
৳১.৮৪ কোটি |
২১ মে ২০২৬ |
|
a) (i) Improvement of Nabipur Bazar - Fatipur Chittri Road by BC from Ch: 00m - 650m [Road Id: 412855203] (ii) Construction of 70m Protective Work on the Same Road. b) (i) Improvement of Chitri South para-Fathepur Nabipur Road by BC from Ch: 00m - 1870m [Road Id: 412855087] (ii) Construction of 55m Protective Work on the Same Road. [Salvage Materials Cost: Tk.1730363.00] C) (i) Improvement of Chitri kaudarpur-Narshingpur Nabinaga Road by BC from Ch: 1000m - 1500m [Road Id: 412855085] [Salvage Materials Cost: Tk.345267.00] [Nabinagar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳৩.১০ কোটি |
১৭ মে ২০২৬ |
|
a) (i) Improvement of Lapang Graveyard - Jlakanda Road by BC from Ch: 00m - 720m [Road Id: 412855202] (ii) Construction of 28m Protective Work on the Same Road. [Salvage Materials Cost: Tk.258832.00]. b) (i) Improvement of Charpara - Chowria Road by BC from Ch: 00m - 830m [Road Id: 412855030] (ii) Construction of 200m Protective Work on the Same Road. [Salvage Materials Cost: Tk.129248.00] [Nabinagar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳১.৬৯ কোটি |
১৭ মে ২০২৬ |
|
Repair of Food Godown with ancillary facilities at Jariya LSD Birishiri LSD Modon LSD Baoushi LSD of Netrokona & Sreebardi LSD Nokla LSD of Sherpur District
ঢাকা · টেন্ডার →
|
Office of the Project Director, Repair & Renovation of Food Godown located across the country |
৳১২.০৭ কোটি |
১৬ মার্চ ২০২৬ |
|
a) (i) Improvement of Boarder bazar to Sadekpur road (Bashu miah) to Moly miah house Via Alakpur Road by BC from Ch: 00m - 680m [Road Id: 412135071] b) (i) Improvement of Gokarnaghat Fakir Bari - Shalgaon Khorshed Member House by BC from Ch: 00m - 710m [Road Id:412134097] [Salvage Materials Cost: Tk.547186.00] C) (i) Improvement of Basudeb UP (West para) - Ghatiara Modda para via Haliday Road by BC from Ch: 00m - 900m [Road Id: 412134108] (ii) Construction of 150m Protective Work on the Same Road. [Salvage Materials Cost: Tk.170352.00] [Sadar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳২.৩৬ কোটি |
১৬ মার্চ ২০২৬ |
|
a) (i) Improvement of Mohespur Kazibari Bridge - Mirpur Bazar Road by BC from Ch: 00m - 1820m [Road Id: 412855126 ] (ii) Construction of 470m Protective Work on the Same Road [Nabinagar] [Brahmanbaria]
ব্রাহ্মণবাড়িয়া · টেন্ডার →
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳২.১৫ কোটি |
১৬ মার্চ ২০২৬ |
|
Improvement of Kachighata Bazar-Mohandi Bazar Via Khalilnagar UP from Ch. 00-6137m Under Tala Satkhira.
ঢাকা · টেন্ডার →
|
The Disaster Risk Management Enhancement Project |
৳৩.০০ কোটি |
৮ মার্চ ২০২৬ |
|
Construction of 18.00m Long RCC Girder Bridge on Baishwabari Ghat-Teosree GC via Loribhanga Road at Ch. 800m Under Madan Upazila District: Netrakona [Road ID No. 372564047].
নেত্রকোণা · টেন্ডার →
|
Office of the Executive Engineer, LGED, Netrokona |
৳২.৫২ কোটি |
১৫ ফেব ২০২৬ |
|
Construction of 18.00m Long RCC Girder Bridge on Baishwabari Ghat-Teosree GC via Loribhanga Road at Ch. 3750m Under Madan Upazila District: Netrakona [Road ID No. 372564047].
নেত্রকোণা · টেন্ডার →
|
Office of the Executive Engineer, LGED, Netrokona |
৳২.৪৬ কোটি |
১৫ ফেব ২০২৬ |
|
Construction of Brick Toe-Wall at different chainage from 98thkm(p) to 100th(p) km of Bhola (Paran Talukderhat)-Burhanuddin-Lalmohon-Char Fassion-Char Manika Road (R-890) Under Road Division Bhola during the year 2025-2026.
ভোলা · টেন্ডার →
|
Bhola Road Division |
৳২৬.০০ লাখ |
২২ জানু ২০২৬ |
|
Repair of Existing Damaged Pavement providing Aggregate Base Type-1 DBS Wearing Course & Seal Coat work at 49th km(p) 50th km(p) 51st Km (p) 56th km (p) & 61st km(p) of Sylhet-Golapganj-Charkhai-Zakiganj Road (R-250) under Sylhet Road Division Sylhet during the year 2025-2026.
সিলেট · টেন্ডার →
|
Sylhet Road Division |
৳৮৯.০০ লাখ |
১১ জানু ২০২৬ |
|
Repairing of Different Work Sheds SAE Quarter & SDE Residence at Chowhatta & Lakkatura under Sylhet Road Sub-Division of Road Division Sylhet during the year 2025-2026.
সিলেট · টেন্ডার →
|
Sylhet Road Division |
৳২৭.৩০ লাখ |
১১ জানু ২০২৬ |
|
Necessary Repair Work of Damaged Portion by Carpeting Partial Strengthening DBS Base Course & DBS Wearing Course under Periodic Maintenance Work PMP(Road-Minor) At Ch.0+000 to 0+060 (R/S) Ch.0+150 to 0+200 (L/S) Ch.0+300 to 0+350 (R/S) Ch.1+150 to 1+300 (R/S) Ch.1+300 to 1+330 (F/W) Ch.1+330 to 1+430 (B/S) on Osmani Bimanbondor Road (Z-2809) under Road Division Sylhet During the Year 2025-2026.
সিলেট · টেন্ডার →
|
Sylhet Road Division |
৳৪৩.৬০ লাখ |
২৪ ডিসে ২০২৫ |
|
Necessary Repair Work of Damaged Portion by Premix Bituminous Carpeting Partial Strengthening DBS Base Course & DBS Wearing Course under Periodic Maintenance Work PMP(Road-Minor) At Ch.1+850 to 2+600 on Osmani Bimanbondor Road (Z-2809) under Road Division Sylhet During the Year 2025-2026(Z-2809) under Road Division Sylhet During the Year 2025-2026.
সিলেট · টেন্ডার →
|
Sylhet Road Division |
৳৮০.৩০ লাখ |
২৪ ডিসে ২০২৫ |
|
(a) Development work of the road West Upalata Vatnikhola-Meher Station Sorak to Kazir Kamta Gov. Primary School by Uni-Block under Shahrasti pourashava at ward no-1 (Ch.0-377m) (Salvage Cost:Tk 572037.00) (b) Development work of the road Suapara Munshi bari to towards Puran bari road by Uni-Block under Shahrasti pourashava at ward no-3 (Ch.0-417m) (Salvage Cost:Tk 549742.00) (c) Development work of the road Gugushal Sahid Anowar Hossen sorak to West Gugushal Mohila College road(Bainer bari) by Uni-Block under Shahrasti pourashava at ward no-4 (Ch.0-620m+Link-1-Ch.0-80m) (Salvage Cost:Tk 82864.00) (d) Development work of the road Sonapur-Fatehpur road to Sonapur Dighirpar by Uni-Block under Shahrasti pourashava at ward no-4 (Ch.0-173m+Link-1-Ch.0-95m) (Salvage Cost:Tk 0.00) (e) Development work of the road towards Sonapur Atiyer bari by Uni-Block under Shahrasti pourashava at ward no-4 (Ch.0-270m) (Salvage Cost:Tk 40134.00) (f) Development work of the road Gugushal Khadakar bari to Rail Crossing by Uni-Block under Shahrasti pourashava at ward no-4 (Ch.0-140m) (Salvage Cost:Tk 47216.00)
চাঁদপুর · টেন্ডার →
|
PIU Office of Shahrasti Pourashava, Chandpur |
৳২.০৬ কোটি |
৮ জুলাই ২০২৫ |
|
Improvement of Dhaka-Paturia NHW (Aricha Dispensary NHW Boalipara Road Ch:00-900m [Road ID No.356784004] under Shibalaya Upazila District: Manikganj. (Salvage Cost.Tk.537992.00)
মানিকগঞ্জ · টেন্ডার →
|
Office of the Executive Engineer, LGED, Manikganj |
৳৮৮.৬০ লাখ |
৪ জুন ২০২৫ |
|
Improvement of Gangdhusuria-Gonggasagor Road by BC Ch:00-850m [Road ID No.356284027] under Harirampur Upazila District: Manikganj.
মানিকগঞ্জ · টেন্ডার →
|
Office of the Executive Engineer, LGED, Manikganj |
৳৯৮.১০ লাখ |
৪ জুন ২০২৫ |
|
(01) Construction of RCC pipe drain from Sohid Rafiq Road Govt High School North gate to S.K Girls School west South Corner U Drain via Basundora House (ch. 25-301 = 276.00m.). (02) Construction of BC Road from Sohid Rafiq Road Govt High School North gate to S.K Girls School west South Corner U Drain via Basundora House (ch. 00-301m.).
মানিকগঞ্জ · টেন্ডার →
|
Office of the Manikganj Pourashava, Manikganj |
৳৪০.৩০ লাখ |
২৫ মার্চ ২০২৫ |
|
Bank Protection work along the left bank of Mitingga chari Khal at Resom Bagan Police Phari area from km km.0.000 to km 0.050 = 50.00m in Upazila: Kaptai District: Rangamati Hill District Under Rangamati WD Division BWDB Kaptai in connection with Non-Development Budget (Economic Code No. 3258137) during the year 2024-2025.
রাঙ্গামাটি · টেন্ডার →
|
Rangamati WD Division |
৳৪৪.৫০ লাখ |
১৬ মার্চ ২০২৫ |