M/S Kamrul & Brothers
Top offices
Top districts
- Gopalganj135
- Bagerhat62
- Pirojpur14
- Chattogram10
- Dhaka10
Get new tenders for Gopalganj every morning and afternoon, free
Enter your mobile number, or start it on Telegram in one tap. No login.
Biggest competitors
| Companies | Shared offices | Total wins |
|---|---|---|
| Mohammed Eunus & Brothers (Pvt.) Ltd. | 35 | 466 |
| M/S. SHEIKH ENTERPRISE | 21 | 276 |
| M/S Alif Enterprise | 21 | 126 |
| M/S Khan Enterprise | 21 | 120 |
| M M ENTERPRISE | 20 | 69 |
| M/S. Showrove Traders | 18 | 216 |
| Shaikat Enterprise | 18 | 103 |
| M/S Sajib Enterprise | 17 | 97 |
| M/S MIM ENTERPRISE | 17 | 39 |
| MOZAHAR ENTERPRISE (PVT.) LTD. | 16 | 170 |
Awards
295 resultsContract progress
74 results| Description | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
|
Construction of Additional Class room of Girishnagr GPS Under NBIDGPS-1 Upazila Mollahat Dist: Bagerhat [3H+1V/F3+WB]
e-Tender/NBIDGPS/BAG/MOL/2023-24/W1.07765/e-GP/20241102/888101/00210327 |
Office of the Upazila Engineer, LGED, Mollahat, Bagerhat | BDT 97.76 lakh | 22 Oct 2023 | Ongoing |
|
(a)Construction of Fish Shed, Meat Shed, Multipurpose Shed, Open Shed, RCC Road, V-Drain, Surface Drain at Garfa Bazar [Mollahat] [Bagerhat]. (b)Construction of Slaughter Shed in Garfa Bazar [Mollahat] [Bagerhat].
UTMIDP-BAGE/MOLL/WKM-30 WSS-27/e-GP/20241017/882839/00198074 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 83.55 lakh | 15 Oct 2023 | Ongoing |
|
Rehabilitation (Widening) of Jhalakati HQ - Gagonhat via Manpasha GC RoadRoad (Up to Chalitabari) from Ch. 10150m-13425m [Road ID 542402002] [JHALOKATHI-S]
e-Tender/LGED/Jha/GOBM/23-24/RW-14/e-GP/20241210/874258/00232644 |
Office of the Executive Engineer, LGED, Jhalokati | BDT 2.26 crore | 17 Sep 2023 | Ongoing |
|
(a) Improvement of Baraigati H/O Omar SK - WAPDA Khal Road by BC from Ch: 00m - 1000m [Road ID: 201565054] [Salvage Cost: 3,08,243tk.] (b) (a) Improvement of Rajpat - Gaola UP Road by BC from Ch: 00m - 600m & Ch: 2910m - 3500m [Road ID: 201564007] [Salvage Cost: 23,74,086tk.] [Mollahat] [Bagerhat]
KDRIDP/Bager/W-167/2023-24/e-GP/20241122/864139/00221859 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 2.10 crore | 23 Aug 2023 | Completed |
|
1. a) Improvement of Sayna Raghunathpur Khal from CH. 0.00m to 1168.5m. Under Kawkhali Upazila, Dist: Pirojpur. b) Construction of reference Bed Block & TBM at Sayna Raghunathpur Khal.
IPCP/PIRO/KAWKH/C/22-23/34.03/e-GP/20241203/828047/00227279 |
Office of the Executive Engineer, LGED, Pirojpur | BDT 23.08 lakh | 16 May 2023 | Completed |
|
Estimate for Brick Flat Soling at Chairkhali Roket Ghat to Babu Doctor Bari Under Bhandaria Upazila, Dist: Bhandaria.
ADP/PER/BHAN/2022_2023/05/e-GP/20241121/758805/00221695 |
Office Of The Upazila Engineer, Bhandaria, Perojpur | BDT 95,000 | 1 Dec 2022 | Completed |
|
1. Installation of Deep Tube well near Ahmed Ullah Miah's house, Baha's house - Ward No-3 2. Installation of Deep Tube well near Mosleh Uddin Member's house - Ward No-4 3. Installation of Deep Tube well near Mollah Bari Shahnaz Akter's house - Ward No-4 4. Construction of Public Toilet Near Baytul Mamur Zam-E-Masque - Word No-4 5. Re-Consts: of R.C Road by C.C Work at Ward No-4
ADP/UZP/KOMO/2021-22/07/C/e-GP/20230921/659433/0086191 |
Office of the Upazila Engineer, LGED, Komolnagar, Laxmipur | BDT 6.85 lakh | 17 Feb 2022 | Completed |
|
Construction of additional Class Room of Char Astail GPS Under PEDP4 [3H+3V] Upazila Mollahat District Bagerhat.
e-Tender/PEDP4/BAG/Mol/2021-2022/W1.01955/e-GP/20241031/642411/00210012 |
Office of the Upazila Engineer, LGED, Mollahat, Bagerhat | BDT 1.86 crore | 4 Jan 2022 | Completed |
|
Construction of additional Class Room of Natun Chargobra GPS Under PEDP4 [3H+3V] Upazila Mollahat District Bagerhat.
e-Tender/PEDP4/BAG/Mol/2021-2022/W1.01954/e-GP/20241031/642410/00209988 |
Office of the Upazila Engineer, LGED, Mollahat, Bagerhat | BDT 1.70 crore | 3 Jan 2022 | Completed |
|
Construction of additional Class Room of Vandar Khola GPS Under PEDP4 [2H+2V] Upazila Mollahat District Bagerhat.
e-Tender/PEDP4/BAG/Mol/2021-2022/W2.03994/e-GP/20241031/642412/00210001 |
Office of the Upazila Engineer, LGED, Mollahat, Bagerhat | BDT 1.25 crore | 3 Jan 2022 | Completed |
|
Periodic Maintenance of Kushla UPC - Ghagore Bazar Road from Ch. 00m-1190m [Kotwalipara] (Road ID No: 335513025).
e-Tender/LGED/Gopa/GOBM/21-22/W-03/e-GP/20231005/605971/0097399 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 43.23 lakh | 7 Sep 2021 | Completed |
|
Periodic Maintenance of Borfa - Boalia Road (UP Office-Boalia Bazar) from Ch. 5680m-7500m [Gopalganj-S] (Road ID No: 335323001).
e-Tender/LGED/Gopa/GOBM/21-22/W-22/e-GP/20231003/605994/0096020 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 54.76 lakh | 7 Sep 2021 | Completed |
|
Periodic Maintenance of Kadampur (Rishatala Stand) RHD - Khanderpara GC Road from Ch. 00m-4000m [Muksudpur] (Road ID No: 335582002).
e-Tender/LGED/Gopa/GOBM/21-22/W-33/e-GP/20231003/606005/0096096 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 2.42 crore | 7 Sep 2021 | Completed |
|
Rehabiliation of Gopinathpur Kazi Bazar-H/O DC Kazi Rezaul Hoque Road from Ch. 00-578m under Sadar Upazila, District: Gopalganj. (Road ID No: 335325395).
CAFDRIRP/Gopalganj/VR-B/W-06/2020-21/e-GP/20230929/583364/0092199 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 22.74 lakh | 9 Jun 2021 | Completed |
|
Construction of Additional Class room of Kahalpur GPS Under PEDP4 Upazila Mollahat District Bagerhat.3H2V/F4WB
e-Tender/PEDP4/BAG/MOL/2020-2021/W1.00864 /e-GP/20241031/513605/00210009 |
Office of the Upazila Engineer, LGED, Mollahat, Bagerhat | BDT 1.30 crore | 10 Dec 2020 | Completed |
|
Construction of 20.00m Long RCC Girder Bridge on Haridhamore - Masuarkul Road at Ch. 5660m Road ID No 201562008 Under Mollahat Upazila Dist Bagerhat.
KBS-RIDP/BAG/UZR/ST-06.2/2020-2021/e-GP/20241016/510777/00197423 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 1.53 crore | 2 Dec 2020 | Completed |
|
Construction of 22.00m Long RCC Girder Bridge on Haridhamore - Masuarkul Road at Ch. 3985m Road ID No 201562008 Under Mollahat Upazila Dist Bagerhat.
KBS-RIDP/BAG/UZR/ST-06.1/2020-2021/e-GP/20241014/510776/00195001 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 1.65 crore | 2 Dec 2020 | Completed |
|
Construction of 21.00m Long RCC Slab Bridge on Borashi RHDShatisir pull-Mujib Bazar Road at Ch. 1890m under Sadar Upazila District Gopalganj Road ID No 335324090.
GDIRIIP/Gopal/Sadar-SR/20-21/152/e-GP/20231002/512280/0094928 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 1.91 crore | 12 Nov 2020 | Completed |
|
Improvement of Pinjuri-Sonakhali via Chairman Bazar Road by BC from Ch. 6200-8600m Road ID No 335512018 under Kotwalipara Upazila District Gopalganj Salvage Materials Cost Tk. 7214324.00.
GDIRIIP/Kotali/UZR-BC/20-21/130/e-GP/20230923/499870/0087281 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 2.08 crore | 4 Oct 2020 | Completed |
|
Part-A Improvement of Chokpukuria Gonesh Pagol Mondir to Kotalipara Simana Road by HBB from Ch 00m-1350m Road ID No 335515528 Part-B Construction of 16.00m Long RCC Girder Bridge at Ch. 410m on the same road Part-C Construction of 01 No 4.00x4.00m RCC Box culvert at Ch. 800m & Part-D Construction of 02Nos 600mmx600mm size RCC U-drain culvert at Ch. 150m & 1020m on the same road under Kotwalipara Upazila Dist Gopalganj
GDIRIIP/Kotali/SP/VR-HBB-SR/20-21/125/e-GP/20230924/485935/0088277 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 2.00 crore | 3 Sep 2020 | Completed |
|
Part-A Improvement of Konagram-Gopinathpur Road by BC from Ch. 480-1480m & Part-B Constrcution of 3-vent 4.50x4.50m RCC Box culvert at Ch. 518m on the same road Road ID No 335323010 under Sadar Upazila Dist Gopalganj Salvage Materials Cost. Tk. 468992.00.
GDIRIIP/Sadar/BC/19-20/146/e-GP/20230929/465320/0092188 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 1.23 crore | 4 Jun 2020 | Completed |
|
Improvement of Arpara Dhopar Miabari Jame mosque Union Mohespur Latitude 23.6642 Longitude 89.7675 under Kasiani Upazila District Gopalganj.
GSIDP/GPJ/SDW-220/e-GP/20231212/451490/00152671 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 3.37 lakh | 21 Apr 2020 | Completed |
|
1.Sinking of Deep Tube Well In front of Tabber Bhaper Bari -Ward N0-9 under Lawrence UP2.Construction of Public Toilet At Mollah Market -Ward N0-9 under Lawrence UP3.Sinking of Deep Tube Well In front of Mostafa Mazi house -Ward N0-8 under Lawrence UP4.Sinking of Deep Tube Well In front of Darushalam Zam-E-Mosque-Ward N0-8 under Lawrence UP5.Construction of U-Drain on near Alamgir Master Bari Road Side -Ward N0-4 under Lawrence UP
ADP/UZP/KOMO/2019-20/03/A/e-GP/20230920/430242/0085459 |
Office of the Upazila Engineer, LGED, Komolnagar, Laxmipur | BDT 6.98 lakh | 27 Feb 2020 | Completed |
|
1 Construction of Kunia Chinguri Bazar Primary School.2 Construction of Goribpur Charbaneary Model Primary School.
e-Tender/ NBIDGPS/BAG/ CHI/2018-19/ W1.01600/e-GP/20241115/418493/00219003 |
Office of the Upazila Engineer, LGED, Chitalmari, Bagerhat | BDT 1.94 crore | 6 Feb 2020 | Completed |
|
Improvement of Benky Lunchghat-Basund Mosque Road Road by BC from Ch. 00-2200m under Mirjagonj upazila District Patuakhali. Road ID No-578765003
IRIDPPB/PAT/MIRZ/VR-10/e-GP/20241208/374118/00230104 |
Office of the Executive Engineer, LGED, Patuakhali | BDT 2.36 crore | 18 Nov 2019 | Completed |
|
Improvement of Road at Chitalmari Hasina Begum High School-Badsha Market Road Both Side by RCC Drain under Chitalmari Upazila Bagerhat.
UTMIDP-CHIT/BAGE/WD-38/e-GP/20241010/383229/00194102 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 1.55 crore | 13 Nov 2019 | Completed |
|
Widening of Ratoil UP-Kalna R&H Road from Ch.800m-5940m Kasiani Road ID No 335433002
e-Tender/LGED/Gopa/GOBM/19-20/W-25/e-GP/20231007/376716/0098458 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 2.68 crore | 4 Nov 2019 | Completed |
|
Maintenance of Kasiani GC-Takerhat RHD via Rahuthor Hat Kasiani Part Road at Ch. 1800m-7300m Road ID No 335432007 under Kasiani Upazila District Gopalganj.
GDIRIIP/Kasiani/UZR/Maint/18-19/16/e-GP/20230921/313729/0086426 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 4.91 crore | 13 May 2019 | Completed |
|
Part-1A Improvement of Tetulia-Rauthkhamar road at Ch. 00-1740m by BC Salvage Materials Cost. 2518000.00 Part-1B Const. of 1No 600x600mm U-drain at Ch. 990mon the same road Road ID No 335324012 Part-2A Improvement of Kajulia Madrasha Dhorail road at Ch. 00-920m by BC Salvage Materials Cost. 1361000.00 Part-2B Const. of 2Nos 600x600mm U-drain at Ch. 510m & 780m on the same road under Sadar Upazila District Gopalganj Road ID No 335324068.
GDIRIIP/VR/BC/Sadar/18-19/90/e-GP/20231109/298909/00125141 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 2.91 crore | 31 Mar 2019 | Completed |
|
Improvement of Road by BC from Ch. 1920m-5290m Urfi UPC-Manikhar Hat via Gopalpur and Construction of 04 Nos 600mmx600mm size U Drain at Ch. 2690m H/O Miraj Khan Ch. 3855m H/O Nur Alom Ch. 4590m Adorshorgram & Ch. 5190m on the same road Road ID No 335323010 under Sadar Upazila District Gopalganj Salvage Materials Cost Tk. 3801008.00.
GDIRIIP/Sadar/UZR/BC/18-19/118/e-GP/20231107/298903/00123721 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 3.12 crore | 31 Mar 2019 | Completed |
|
Improvement of Kathi RHD-Betangi Bazar road at Ch. 00-3220m by BC Road ID No 335324017 under Sadar Upazila District Gopalganj Salvage Materials Cost Tk. 5219030.00.
GDIRIIP/VR/BC/Sadar/18-19/94/e-GP/20231107/292286/00123759 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 3.07 crore | 7 Mar 2019 | Completed |
|
a Improvement of Char Astail Tin Raster Mor-Astail Wapda Road By BC from Ch. 00m-1000m. Road ID No. 201564095.b Improvement of Joydehe-Gosgati Road By BC from Ch. 500m-1510m. Road ID No. 201564033.c Improvement of Udaypur-Baro Madrasa-Sarderpara Jame Mosque Road By BC from Ch. 00m-700m with 01no Drain Culvert at Ch. 493m. Salvage Cost 477199.00 Road ID No. 201565101 under Mollahat Upazila Bagerhat.
KBS-RIDP/BAG/VR-50.1/18/e-GP/20241010/290612/00194274 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 1.74 crore | 6 Mar 2019 | Completed |
|
Maintenence of Ramdia-Ulpur R&H via Taltola road by BC at Ch. 00-6800m Road ID No 335432004 under Kasiani Upazila District Gopalganj.
GDIRIIP/Kasiani/UZR/18-19/Maint/08/e-GP/20231026/284619/00117161 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 4.59 crore | 14 Feb 2019 | Completed |
|
Construction of 4-Storied Academic Building with 4-Storied Foundation inc. Sanitary Water Supply & Electrification Works at Chardakatia Secondary School Chitalmari Bagerhat. Category-01
e-GP/W-37/EED/BAZ/New NGS/2018-19/e-GP/20241223/243926/00238380 |
Office of the Executive Engineer, Bagerhat Zone. | BDT 2.88 crore | 9 Dec 2018 | Ongoing |
|
Construction of 30.00m Long RCC Girder Bridge at Gawla-Kodalia Bazar Road at Ch 3050m Road ID 201562009 under Mollahat Upazila Bagerhat
KDRIDP/Bager/B-12/2017-18/e-GP/20241012/184513/00194562 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 2.27 crore | 12 Apr 2018 | Completed |
|
Construction of 17.00m Long RCC Girder Bridge on Chinguri hat-Kalatala UP-Banglabazar Road at Ch 8090m Road ID 201143006 under Chitalmari Upazila Bagerhat
KDRIDP/Bager/B-10/2017-18/e-GP/20241104/180745/00211639 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 1.41 crore | 10 Apr 2018 | Completed |
|
Const. of 37.00m Long PC Girder Bridge on Shanpukuria-Chakkurlia road at Ch. 160m under Sadar Upazila District Gopalganj Road ID No 335324071.
PD/CLBUURP/W-298/e-GP/20231127/182784/00140609 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 4.87 crore | 5 Apr 2018 | Completed |
|
Construction of Nagarkandi Growth Center Under Mollahat Upazila Bagerhat.
KDRIDP/Bager/GC-05/2017-18/e-GP/20241104/150796/00211635 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 18.47 lakh | 23 Jan 2018 | Completed |
|
Improvement of Nimtala RHD-Arpara Kheaghat road at Ch. 1250m-1700m under Sadar Upazila District Gopalganj Road ID No 335324135 Salvage Materials Cost Tk. 1003079.00.
IRIDP-2/GPJ/DW-99/e-GP/20231112/152949/00125845 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 25.05 lakh | 17 Jan 2018 | Completed |
|
Construction of Udaypur Gholarchak Madrasa Ghat Under Mollahat Upazila Bagerhat.
KDRIDP/Bager/G-10/2017-18/e-GP/20241011/144293/00194442 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 11.32 lakh | 6 Dec 2017 | Completed |
|
Construction of 12.00m RCC Girder Bridge on Pinjuri School-Gopalpur Sluice gate road at Ch. 1160m under Kotwalipara Upazila District Gopalganj Road ID No 335514053.
IRIDP-2/GPJ/DW-98/e-GP/20231112/135068/00125991 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 69.67 lakh | 15 Nov 2017 | Completed |
|
Construction of 15.00m RCC Girder Bridge on Gachapara Sumshu Shek house-Utterpara Hatkhola-Nagra road at Ch. 00m under Kotwalipara Upazila District Gopalganj Road ID No 335515483.
IRIDP-2/GPJ/DW-94/e-GP/20231112/135064/00126007 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 73.63 lakh | 15 Nov 2017 | Completed |
|
Construction of 18.00m RCC Girder Bridge on Gopalganj-Posharhat R&H-Shikirbazar road at Ch. 165m under Kotwalipara Upazila District Gopalganj Road ID No 335515482.
IRIDP-2/GPJ/DW-95/e-GP/20231112/135065/00126010 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 99.10 lakh | 15 Nov 2017 | Completed |
|
Periodic Maintenance of Ramchandra Bottola RHD-South Kushli via Ramchandrapur Kheyaghat Road from Ch. 00m-2803m Tungipara Road ID No 335914007
e-Tender/LGED/Gopa/GOBM/17-18/W-49/e-GP/20231015/131106/00107937 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 42.11 lakh | 1 Nov 2017 | Completed |
|
Periodic Maintenance of Dumuria UP Office Tungipara Upazila H/Q Road from Ch. 1990m-5230m Tungipara Road ID No 335913005
e-Tender/LGED/Gopa/GOBM/17-18/W-56/e-GP/20231015/131113/00107676 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 60.33 lakh | 1 Nov 2017 | Completed |
|
Improvement of Hizla Sheikpara- Agakhal RPS Road. Ch 00 -1275 m Under Chitalmari Upazila Bagerhat. Road ID No.-201145027. Salvage Cost TK. 618000.00
KDRIDP/Bager/W-64/2017-18/e-GP/20241011/131454/00194425 |
Office of the Executive Engineer, LGED, Bagerhat | BDT 92.82 lakh | 26 Oct 2017 | Completed |
|
Improvement of Sreeramkandi Baily Bridge-Uttarpara H/O Kabir Sk. Via Beltola more road by BC at Ch. 00-925m under Tungipara Upazila District Gopalganj Road ID No 335915062
GDIRIIP/VR/BC/Tungi/17-18/20/e-GP/20231111/119160/00125484 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 64.07 lakh | 10 Sep 2017 | Completed |
|
Periodic Maintenance of Patgati RHD Bus Stand-Banshbaria Bazar GC via Patgati GC Road from Ch. 00m-1000m Tungipara Road ID No 335912002
e-Tender/LGED/Gopa/GOBM/17-18/W-05/e-GP/20231202/119157/00146510 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 14.78 lakh | 10 Sep 2017 | Completed |
|
Construction of Paikerdanga & Boultoli Union land office under Sadar Upazila District Gopalganj.
TULO/GOP/W-01/e-GP/20231127/112860/00140632 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 68.66 lakh | 1 Aug 2017 | Completed |
|
Maintenance of Manikhar-Gopalganj road Ch. 00-1000m under Sadar Road ID No 335324096.
IRIDP-2/GPJ/MW-84/e-GP/20231112/110489/00125997 |
Office of the Executive Engineer, LGED, Gopalganj | BDT 16.40 lakh | 12 Jul 2017 | Completed |