|
Vertical Extension of 4th floor at Sadar Gaibandha Complex Administrative Extension Building under EDC, Upazila: Sadar Gaibandha, District: Gaibandha.
EDC/GAIB/SAD/W1.270/e-GP/20241110/897365/00216433
|
Office of the Upazila Engineer, LGED, Gaibandha Sadar, Gaibandha |
৳১.৫২ কোটি |
৭ নভে ২০২৩ |
Ongoing |
|
Part - A: Improvement of Jaria Maitkumra Commonity Cilinic road by BC from Ch. 00 - 888m Under Lakhpur Union under Fakirhat Upazila Dist.: Bagerhat. [Road ID: 201345055] 2 Nos. Box Culvert at ch..397m, & 435m ( 600mm x 600mm Size). Part -B: Improvement of Jaria Baruidanga Mostofa House to Komol Odikaria House road by BC from ch. 00 - 846m under Lakhpur Union Fakirhat Upazila Dist.: Bagerhat [Road ID: 201345161] 2 Nos. Box Culvert at ch.354m & 535m ( 600mm x 600mm Size). Part - C: Improvement of Jara Mait Kumra Hayder Dokan to Moinuddin House road from Ch. 00 - 900m Under Lakhpur Union Under Fakirhat Upazila Dist.: Bagerhat [Road ID: 201345163] 2 Nos. Box Culvert at Ch.38m & 535m ( 600mm x 600mm Size). Part - D: Improvement of Upazila Parishad Internal Road By RCC (Length = 410m) (Parishad Internal Road) (Salvage: 49,032.00TK.) [Fakirhat] [Bagerhat]
UTMIDP-BAGE/FAKI/WR-384/e-GP/20241017/872758/00198166
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২.৫৮ কোটি |
২৭ সেপ ২০২৩ |
Ongoing |
|
Rehabilitation (Widening) of Gaibandha-Sadullahpur GC via Ballamjhar UP Road from Ch. 00m-3000m (Road Id: 132242007) under Gaibandha-S upazila Disrict: Gaibandha.
e-Tender/LGED/Gai/GOBM/23-24/RW-25/e-GP/20241003/870453/00190353
|
Office of the Executive Engineer, LGED, Gaibandha |
৳২.০৫ কোটি |
১০ সেপ ২০২৩ |
Completed |
|
a) Construction of RCC Road Austagram Mithamain (Austagram Govt.Collage-Moulovi Bazar) RD at Ch.5850-6270m & Ch.6527-6670m Under Austagram Upazila,Dist:Kishoreganj.(Road ID;348022002) b) Construction of RCC Road at Austagram Bangalpara UP via Barachar (Austagram Boro Bazar) Mithamain (Govt.Collage-Moulovi Bazar) RD at Ch.00-187m Under Austagram Upazila,Dist:Kishoreganj.(Road ID;348023009)
UTMIDP-KISH/AUST/WR-320/e-GP/20231122/846768/00134727
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳৮৯.০৯ লাখ |
১৫ জুন ২০২৩ |
Ongoing |
|
a) Improvement of Charfaradi UP - Councilor Nazrul house via barsagati Dhakil Madrasha Road at (Ch.00-2180m) [Road ID-348795145] under Pakundia,District-Kishoreganj. b) Construction of 07nos (0.600mx0.600m) Culvert on Same road at Ch.10m,235m,1000m,1200m,1700m,1880m,2040m. c) Construction of 02nos (1.00mx1.00m) Culvert on Same road at Ch.1080m,1398m.
IRIDP-3/KISH/DW-98/e-GP/20231122/840192/00134733
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.২০ কোটি |
৩১ মে ২০২৩ |
Ongoing |
|
Pavement Repair work by Carpeting with Seal Coat at 59th(P) & 60th Km of Barisal-Jhalokathi-Rajapur-Bhandaria-Pirojpur (R-870) Road under Pirojpur Road Division during the year 2022-2023
e-GP/61/PRD/2022-2023/e-GP/20240130/837721/00159390
|
Pirojpur Road Division |
৳৩৫.৯৭ লাখ |
২৩ মে ২০২৩ |
Completed |
|
Installation of Traffic Sign with post at Different Road under Pirojpur Road Division during the year 2022-2023.
e_GP/60/PRD/2022-2023/e-GP/20240130/837022/00159389
|
Pirojpur Road Division |
৳২৫.৮৬ লাখ |
২৩ মে ২০২৩ |
Completed |
|
Pavement Repair work by Carpeting with Seal Coat at 44th Km of Barisal-Jhalokathi-Rajapur-Bhandaria-Pirojpur (R-870) Road under Pirojpur Road Division during the year 2022-2023
e-GP/62/PRD/2022-2023/e-GP/20240130/837731/00159388
|
Pirojpur Road Division |
৳৩৬.১৬ লাখ |
২৩ মে ২০২৩ |
Completed |
|
Repair & Maintenance works of different Staff Quarter at Road Sub-Division-I and Road Sub-Division-II under Road Division Khulna during the year 2022-2023.
44/e-GP/KRD/2022-2023/e-GP/20240507/832140/00161372
|
Khulna Road Division |
৳২১.৫০ লাখ |
১৬ মে ২০২৩ |
Ongoing |
|
Pavement Maintenance by Aggregate Base Type-II with Carpeting Seal Coat work at 11th(P), 12th(p) Km of Naikathi-Bhandaria (Z-8717) Road under Pirojpur Road Division during the year 2022-2023
e-GP/54/PRD/2022-2023/e-GP/20240130/831296/00159391
|
Pirojpur Road Division |
৳৬৯.৪৯ লাখ |
১৪ মে ২০২৩ |
Completed |
|
R.C.C Palisiding & Earth work at 42th (P) km, 43th (P) km & 44th (P) km of Naogaon-Atrai-Natore Road (R-548) under Road Division, Natore during the year 2022-2023.
44/e-GP/OTM/NRD/2022-2023/e-GP/20240203/820390/00159486
|
Natore Road Division |
৳২৬.৯৭ লাখ |
১৭ এপ্রিল ২০২৩ |
Completed |
|
Providing & Installation of Over Head Sing Board, One Side Cantiliver Sing Board, Raise Pedestrain Crossing ,Ramble Stips and Trafic Signal Post at different Km of (N-704, R-710) and (Z-7461,Z-7465,Z-7463,Z-7409,Z-7105,Z-7464,Z-7411,Z-7451,Z-7412) Road under Road Division ,Kushtia during the year 2022-2023.
e-Gp/R/W-12/KURD/2022-2023/e-GP/20240125/810146/00159201
|
Kushtia Road Division |
৳৮৯.৯৬ লাখ |
৩ এপ্রিল ২০২৩ |
Completed |
|
Maintenance work by Carpeting Seal Coat at 2nd(P), 3rd & 4th km(p) of Bhandaria-Paikali-Kathalia (Z-8705) Road under Pirojpur Road Division during the year 2022-2023
e-GP/33/PRD/2022-2023/e-GP/20240129/810055/00159377
|
Pirojpur Road Division |
৳৪৬.৩৭ লাখ |
২ এপ্রিল ২০২৩ |
Completed |
|
Maintenance of existing pavement by Aggregate Base Type-II,Carpeting & Seal Coat including necessary works at Ch. 0+800 to 1+210 = 410.00m & Ch. 1+500 to Ch.1+850 =350.00m of Ishwardi-Paikpara-Mirjapur-Fultala-Singra-Vabanigonj Road (Z-7105) under Road Division Kushtia during the year 2022-2023.
e-Gp/R/W-11/KURD/2022-2023/e-GP/20240125/807968/00159200
|
Kushtia Road Division |
৳৬৫.৫৫ লাখ |
৩০ মার্চ ২০২৩ |
Completed |
|
Repair of Hard Shoulder Providing Wearing Course at 153th(p) to157th(p) km of Kashinathpur-Dashuria-Natore-Rajshahi-Nawabganj-Kansat-Sonamasjid-Baliadighi Border (N-6) Road under RHD Road Division,Rajshahi during the year 2022-2023.
e-GP/raj/35/2022-2023/e-GP/20240125/805685/00159209
|
Rajshahi Road Division |
৳৭১.১৭ লাখ |
২৮ মার্চ ২০২৩ |
Completed |
|
Installation of Directional Board, Road Marking, Road Studs, Guide Post, Traffic Signs and Sign Post at different Location of different Roads under Road Division Jashore during the year 2022-2023.
35/EE/JRD/PMP-Minor-Sign-Signal/OTM/2022-2023/e-GP/20240122/807961/00159131
|
Road Division, Jessore |
৳৫২.০৮ লাখ |
২৭ মার্চ ২০২৩ |
Completed |
|
Kacha Ferryghat Both End Maintenance by Bullah Palisiiding with Geo-Bag Dumping work at 53rd km of Barisal-Jhalokathi-Bhandaria-Pirojpur (R-870) Road under Pirojpur Road Division, during the year 2022-2023
e-GP/27/PRD/2022-2023/e-GP/20240130/806747/00159387
|
Pirojpur Road Division |
৳৪৩.৭৭ লাখ |
২৩ মার্চ ২০২৩ |
Completed |
|
Maintenance Pavement Repair work by Aggregate Base Type-II with Carpeting Seal Coat work at 10th(P) of Naikathi-Bhandaria (Z-8717) Road under Pirojpur Road Division during the year 2022-2023
e-GP/32/PRD/2022-2023/e-GP/20240129/807160/00159379
|
Pirojpur Road Division |
৳৪৪.০৩ লাখ |
২৩ মার্চ ২০২৩ |
Completed |
|
Installation of Single Chevron with post at Charkhali-Tushkhali-Mathbaria-Patharghata Road (Z-8701) under Pirojpur Road Division during the year 2022-2023.
e-GP/30/PRD/2022-2023/e-GP/20240129/807129/00159378
|
Pirojpur Road Division |
৳১৯.৩৬ লাখ |
২৩ মার্চ ২০২৩ |
Completed |
|
Improvement of Baraigram UP Office at RHD - Naga Hat via Borodeha Hat road (Ch.1000 - 2530m) under Upazila: Baraigram, District: Natore. [Road ID No.-169153005]
GRDRIDP-Nat-Barai-UNR--02/22-23/e-GP/20240910/762663/00174170
|
Office of the Executive Engineer, LGED, Natore |
৳৯১.৯৭ লাখ |
১২ ডিসে ২০২২ |
Completed |
|
(1) Improvement of Chandai UP-Shaeb Bazar via Rajendrapur road (Ch.1000 - 3500m) under Upazila: Baraigram, District: Natore. [Road ID No.-169153016] (2) Improvement of Gopalpur UP Office at R&H - Majgram Bazar (Baraigram Part) road (Ch.1000 - 2000m) under Upazila: Baraigram, District: Natore. [Road ID No.-169153003]
GRDRIDP-Nat-Barai-UNR--01/22-23/e-GP/20240910/762661/00174175
|
Office of the Executive Engineer, LGED, Natore |
৳২.২৮ কোটি |
১১ ডিসে ২০২২ |
Completed |
|
Widening of Existing Pavement By Providing HBB 229th(p) of at Kashinathpur -Dashuria-Natore-Rajshahi-Nawabganj-Kansat-Sonamosjid-Baliadighi Border (N-6)Under RHD Road Division Nawabgonj During the year 2022-2023.
egp/Naw/2022-2023/03/e-GP/20240118/746072/00159051
|
Nowabgonj Road Division |
৳৪৪.০০ লাখ |
২ নভে ২০২২ |
Completed |
|
Repair and SBST work at 15th Km (P), 16th Km (P), 18th Km (P), 19th Km (P), 20th Km (P), 21st Km (P) and 22nd Km (P) of Kansat-Gomostapur-Rohonpur (Bangabari) (Z-6802) Road under Nawabganj Road Division, during the year 2022-2023.
egp/Naw/2022-2023/07/e-GP/20240118/747755/00159052
|
Nowabgonj Road Division |
৳৪২.৩০ লাখ |
২ নভে ২০২২ |
Completed |
|
Widening of Barahoishpur UP Office to Tebaria GC Road from Ch. 00m-3545m [Natore-S] Under Natore Sadar Upazila, District: Natore. (Road ID No.:169633007)
e-Tender/LGED/Nat/GOBM/22-23/W-32/e-GP/20240917/744465/00176766
|
Office of the Executive Engineer, LGED, Natore |
৳২.১৪ কোটি |
২৩ অক্টো ২০২২ |
Completed |
|
Periodic Maintenance of Nazirpur GCM - Sonabazu R&H Road from Ch. 00m-6000m [Gurudaspur] Under Gurudaspur Upazila, District: Natore. (Road ID No.:169412006)
e-Tender/LGED/Nat/GOBM/22-23/W-25/e-GP/20240917/744464/00177475
|
Office of the Executive Engineer, LGED, Natore |
৳২.১১ কোটি |
২৩ অক্টো ২০২২ |
Completed |
|
Periodic Maintenance of Simulati RHD-Purura Bazar via Kawligahti Road from Ch. 00m-5620m [Tarail] (Road Id:348924026), Dist:Kishoreganj.
e-tender/KIS/GOBM/2022-23/W-32./e-GP/20231130/744009/00145995
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১.৮১ কোটি |
২০ অক্টো ২০২২ |
Ongoing |
|
Strengthening and Sufacing of Jamalpur-Sherpur-Bongaon Regional Highways (R-460) at Ch.32+400 to Ch 32+550 KM (150 m) under Sherpur Road Division during the year 2022-2023.
04/OTM/egp/Rev/SheRD/2022-2023/e-GP/20240118/733847/00159055
|
Sherpur Road Division |
৳৬২.৪২ লাখ |
১৮ সেপ ২০২২ |
Completed |
|
Single Bituminous Surface Treatment Works with necessary repair at (Ch.7+500 km to 10+000 km) and (Ch 24+500 km to 27+000 km ) =5000 m of Nakla-Nalitabari-Nakugaon landport Road ( N-402 ) under Sherpur Road Division during the year 2022 - 2023.
02/OTM/egp/Rev/SheRD/2022-2023/e-GP/20240118/733812/00159054
|
Sherpur Road Division |
৳৮২.৭৭ লাখ |
১৮ সেপ ২০২২ |
Completed |
|
Peridic Maintenance of Nurundi GC-Jamalpur Ferryghat RHD via Tulshirchar UP Road from Ch. 11750m-16000m [JAMALPUR-S]. [Road ID NO: 339363012]
e-Tender/LGED/JAM/GOBM/22-23/W-36/e-GP/20231012/734039/00106434
|
Office of the Executive Engineer, LGED, Jamalpur |
৳২.১৭ কোটি |
১৮ সেপ ২০২২ |
Completed |
|
Maintenance of Existing Pavement by Single Bituminous Surface Treatment Works and Repair of potholes at Ch.0+000 to 4+000 km of Nakla Bypass Road ( Z-4610 ) under Sherpur Road Division during the year 2022 - 2023.
01/OTM/egp/Rev/SheRD/2022-2023/e-GP/20240118/733761/00159053
|
Sherpur Road Division |
৳৮৬.৬৪ লাখ |
১৮ সেপ ২০২২ |
Completed |
|
Strengthening and Sufacing of Jamalpur-Sherpur-Bongaon Regional Highways (R-460) at Ch.32+200 to Ch 32+400 KM (200m) under Sherpur Road Division during the year 2022-2023.
03/OTM/egp/Rev/SheRD/2022-2023/e-GP/20240118/733827/00159056
|
Sherpur Road Division |
৳৮৫.২১ লাখ |
১৮ সেপ ২০২২ |
Completed |
|
Widening of Katiadi H.Q-Sararchar GC via Boalia bazar Vangnadi Road from Ch. 00m-10630m [Katiadi] (Road ID:348452009),Dist:Kishoreganj
e-Tender/KIS/GOBM/2022-2023/W-27/e-GP/20231130/727905/00146003
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳১.৯৮ কোটি |
২৮ আগ ২০২২ |
Ongoing |
|
Widening of Chintagonj GC to Bakchanda GC Road from Ch. 00m-2270m [Kishoreganj-Sadar] (Road ID:348492008),Dist:Kishoreganj
e-Tender/KIS/GOBM/2022-2023/W-28/e-GP/20231130/726531/00145981
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৩৩ কোটি |
২৮ আগ ২০২২ |
Ongoing |
|
Periodic Maintenance of Thanaghat R&H-Mothkhola GCCR Road from Ch. 00m-3050m [Pakundia](Road ID:348792004), Dist: Kishoreganj
e-Tender/KIS/GOBM/2022-2023/W-22/e-GP/20231130/726436/00145951
|
Office of the Executive Engineer, LGED, Kishoreganj |
৳২.৫৫ কোটি |
২২ আগ ২০২২ |
Ongoing |
|
Repair with Carpeting & Seal Coat work from Ch. 0+620 to 720 and Ch. 4+300 to 4+445 of Palbari-Board Office-Mohihar National Highway (N-708) under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD/Rev Minor /2021-2022/12/e-GP/20220808/700347/0029125
|
Road Division, Jessore |
৳৬.৮০ লাখ |
১৭ মে ২০২২ |
Completed |
|
Supply and Installation of 03 nos Single Side Cantilever sign, 13 Nos Informatory Sign Board and Reflecting Sheet on Guide Post & Railings at different km of Mymensingh (Raghurampur)-Kishoreganj (Battali)-Bhairab (Bazar) Road (R-360) and Trishal- Balipara- Nandail(Kanurampur) (Z-3034) Road under Kishoreganj Road Division during the year 2021-2022
e-GP/73/EE/KRD/2021-2022/e-GP/20220728/693981/0027713
|
Kishoreganj Road Division |
৳১৭.৯৩ লাখ |
২৮ এপ্রিল ২০২২ |
Completed |
|
Repair & Renovation of Site Laboratory Jashore and Other Different Works under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD-Residence/2021-2022/03/e-GP/20220808/688796/0029139
|
Road Division, Jessore |
৳৯.৭৯ লাখ |
২০ এপ্রিল ২০২২ |
Completed |
|
Repairing and Painting work at sub-Divisional Engineers Residence ,SAE Quarter and Repair of RHD Staff Quarter at Parnanduali Old Sub-Division Office Compound and Division Office Compound under Road Division Magura during the year 2021-2022.
e-GP/MRD/07/2021-2022/e-GP/20220808/686741/0029156
|
Magura Road Division |
৳৭.৫৬ লাখ |
১৮ এপ্রিল ২০২২ |
Completed |
|
Emergency Repair of potholes rutting, Depration and Undulation by Base Type-II, Carpeting & Seal Coat Work for damaged pavement at 4th Km(P), 5th Km, 6th Km, 7th Km & 8th Km (P) (Ch. 3+300 to 7+300 = 4000m of Bheramara (GK Bandh 3 No Bridge)-Mirpur Thana Road (Z-7463) under Road Division Kushtia during the year 2021-2022.
e-GP/R/W-23/KURD/2021-2022/e-GP/20220705/686722/0025812
|
Kushtia Road Division |
৳৭৩.০১ লাখ |
১৭ এপ্রিল ২০২২ |
Completed |
|
Manufacture & Installation of Overhead Directional Traffic Sign/Signal at different Location of Jamalpur-Chechua-Muktagasa Road (R-462) under Jamalpur Road Division during the year 2021-2022.
e-Gp:33/JRD/2021-2022/e-GP/20240104/687372/00158584
|
Jamalpur Road Division |
৳৬০.৮৪ লাখ |
১৭ এপ্রিল ২০২২ |
Completed |
|
Strengthening by Base Type-II, Carpeting and Seal Coat work at Ch. 16+485 to Ch.17+012 & Ch.17+240 to Ch. 17+370 (Total Length = 675.00M) of Keshabpur-Betgram (Z-7553) Road under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD/Rev Minor /2021-2022/08 /e-GP/20220808/679187/0029132
|
Road Division, Jessore |
৳৪৪.৫৩ লাখ |
২৮ মার্চ ২০২২ |
Completed |
|
Construction of R.C.C. Drain and Brick Masonary Drain for Superintending Engineer & Executive Engineers Residence under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD/Rev Drainage/2021-2022/01/e-GP/20220808/679191/0029126
|
Road Division, Jessore |
৳৪৯.৪৮ লাখ |
২৮ মার্চ ২০২২ |
Completed |
|
Strengthening by Base Type-II, Carpeting and Seal Coat work at Ch. 17+000 to 17+200, Ch.17+300 to 17+400 & Ch.18+500 to 18+800 (Total Length = 600.00M) of Madanpur (College More)-Trimohoni Bazar (Z-7619) Road under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD/Rev Minor /2021-2022/11/e-GP/20220808/679190/0029141
|
Road Division, Jessore |
৳৪০.৬৭ লাখ |
২৮ মার্চ ২০২২ |
Completed |
|
Strengthening by Base Type-II, Carpeting and Seal Coat work at Ch. 11+200 to 11+400 & Ch.12+250 to 12+725 (Total Length = 675.00M) of Madanpur (College More)-Trimohoni Bazar (Z-7619) Road under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD/Rev Minor /2021-2022/09/e-GP/20220808/679188/0029130
|
Road Division, Jessore |
৳৪০.৪৫ লাখ |
২৮ মার্চ ২০২২ |
Completed |
|
Strengthening by Base Type-II, Carpeting and Seal Coat work at Ch. 4+640 to 5+000, Ch. 5+300 to 5+600, Ch. 6+200 to 6+300,Ch. 6+600 to 6+650, Ch. 7+300 to 7+500,& Ch.7+950 to 8+200 (Total Length = 1260.00M) of Madanpur (College More)-Trimohoni Bazar (Z-7619) Road under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD/Rev Minor /2021-2022/10/e-GP/20220808/679189/0029131
|
Road Division, Jessore |
৳৫৮.৬৬ লাখ |
২৮ মার্চ ২০২২ |
Completed |
|
Repair of Potholes & Surfacing by Overlay Work at 1st Km to 6th Km (P) of Hasnabad Intersection to Pangaon Container Terminal Connecting Road (N-810) Under Munshiganj Road Division, During the Year 2021-2022.
31/e-GP/Mundiv/2021-2022/e-GP/20220802/671066/0028368
|
Munshiganj Road Division |
৳২৩.৫৫ লাখ |
৭ মার্চ ২০২২ |
Completed |
|
Repair and Renovation Work of Executive Engineers Residence under Road Division, Jashore during the year 2021-2022.
e-GP/EE/JRD-Residence/2021-2022/02/e-GP/20220808/669695/0029124
|
Road Division, Jessore |
৳২০.১৮ লাখ |
৩ মার্চ ২০২২ |
Completed |
|
Repairing work of Kishoreganj Road Division Office Building, Kishoreganj Sub-Division & Ist Line Workshop Sub-Division Office Building under Kishoreganj Road Division during the year 2021-2022.
e-GP/50/EE/KRD/2021-2022/e-GP/20220728/669200/0027707
|
Kishoreganj Road Division |
৳১০.৬৩ লাখ |
১ মার্চ ২০২২ |
Completed |
|
Installation of Directional Board, Overhead Sign, Traffic Signs and Sign Post at Different Location of Different Roads under Road Division, Jashore, during the year 2021-2022.
e-GP/EE/JRD/Rev Sign Signal/2021-2022/01 /e-GP/20220808/667710/0029129
|
Road Division, Jessore |
৳৯০.০০ লাখ |
২৪ ফেব ২০২২ |
Completed |
|
Repair and Maintenance work of Inspection Banglow of Rangtia,Jhenaigati and sherpur RHD office Building under Sherpur Road Division during the year 2021-2022.
19/OTM/egp/Dev/SheRD/2021-2022/e-GP/20240104/658178/00158580
|
Sherpur Road Division |
৳৯.৯৬ লাখ |
১৬ ফেব ২০২২ |
Completed |