Vertical Extension of 4th floor at Aditmari Upazila Complex Administrative Extension Building under EDC, Upazila: Aditmari, District: Lalmonirhat
EDC/LALM/ADIT/W1.024./e-GP/20241103/854282/00210611
|
Office of the Upazila Engineer, LGED, Aditmari, Lalmonirhat |
৳১.৫২ কোটি |
২৬ জুলাই ২০২৩ |
Ongoing |
|
(a) lmprovement of Khodalkhata GPS - Durakuti Via 2 no. Fulgach GPS Road. (Ch.00- 2150m) R.ID.152554118] (b) Construction of 01no (0.600mx0.600m) Culvert at ch.669m on the same road. under Upazila : Lalmonirhat Sadar, Lalmonirhat.
IRIDP-3/LAL/DW-38/e-GP/20240925/847517/00183090
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳১.৯৫ কোটি |
১৬ জুলাই ২০২৩ |
Completed |
|
Construction of Additional Class room of Gorol GPS under PEDP-4 Kaliganj Lalmoirhat.
e-tender/PEDP4/LAL/KAL/2020-21/W2.02539/e-GP/20241106/508267/00213366
|
Office of the Upazila Engineer, LGED, Kaliganj, Lalmonirhat |
৳৬৩.৪৪ লাখ |
১ নভে ২০২০ |
Completed |
|
Construction of Additional Class room of Pondit Para GPS under PEDP-4 Kaliganj Lalmoirhat.
e-tender/PEDP4/LAL/KAL/2020-21/W2.02538/e-GP/20241106/508243/00213402
|
Office of the Upazila Engineer, LGED, Kaliganj, Lalmonirhat |
৳৫৯.৮১ লাখ |
১ নভে ২০২০ |
Completed |
|
Periodic Maintenance of Patgram G.C-Burimari GC Road from Ch. 00m-6700m Patgram Road ID 152702004
e-Tender/LGED/Lal/GOBM/20-21/W-47/e-GP/20240929/493075/00187344
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.৭৪ কোটি |
১৩ সেপ ২০২০ |
Completed |
|
Construction of additional class room of Dewdoba under PEDP4
eTender/PEDP4/LMN/ADI/2019-20/W2.02043/e-GP/20241031/488182/00209546
|
Office of the Upazila Engineer, LGED, Aditmari, Lalmonirhat |
৳৫৫.৫৪ লাখ |
৭ সেপ ২০২০ |
Completed |
|
Construction of additional class room of Velabari under PEDP4
eTender/PEDP4/LMN/ADI/2019-20/W2.02052/e-GP/20241031/488188/00209577
|
Office of the Upazila Engineer, LGED, Aditmari, Lalmonirhat |
৳৯১.১৬ লাখ |
৭ সেপ ২০২০ |
Completed |
|
Construction of additional class room of Goalpara under PEDP4
eTender/PEDP4/LMN/ADI/2019-20/W2.02038/e-GP/20241030/487888/00208616
|
Office of the Upazila Engineer, LGED, Aditmari, Lalmonirhat |
৳৭৮.২৮ লাখ |
৭ সেপ ২০২০ |
Completed |
|
Construction of additional class room of Biver under PEDP4
eTender/PEDP4/LMN/ADI/2019-20/W2.02040/e-GP/20241030/488186/00208541
|
Office of the Upazila Engineer, LGED, Aditmari, Lalmonirhat |
৳৭৮.৫২ লাখ |
৭ সেপ ২০২০ |
Completed |
|
1 Minor Maintenance of 15.0m long RCC Box Culvert on Durakuti GC-ZR at Baninagar GC Road at Chainage 6735m Road ID No.1520220022 Minor Maintenance of 10.0m long RCC Box Culvert on Durakuti GC-ZR at Baninagar GC Road at Chainage 11590mRoad ID No.1520220023 Minor Maintenance of 7.90m long RCC Box Culvert on Durakuti GC-ZR at Baninagar GC Road at Chainage 2000m Road ID No.152022002 4 Minor Maintenance of 9.0m long RCC Box Culvert on Durakuti GC-ZR at Baninagar GC Road at Chainage 10600m Road ID No.152022002 5 Minor Maintenance of 15.0m long RCC Box Culvert on Burirhat GC-Bhelabari GC Road at Chainage 989m Road ID No.152022003 Under Aditmari Upazila District Lalmonirhat.
SupRB/Lal/Maint/19-20W-82/e-GP/20240928/459848/00185411
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২২.০৯ লাখ |
৩ জুন ২০২০ |
Completed |
|
Rehabilitation of Durgapur GC - Durakuti GC Via Mogolhat Road Ch.00-6290m Road ID No.152022005 Salvaged Amount 998779.00Under Aditmari UpazilaLalmonirhat.
WNOBI-LalAdit-UZRR-GoB-27/e-GP/20241024/315272/00203114
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳৬.৪৯ কোটি |
১৬ মে ২০১৯ |
Completed |
|
1 a. Improvement of BC Road from R&H near Monowar Principal house - Hospital-Chamterhat GC road at ch. at Ch.00m-595m Road ID 152395089 b Improvement of Road from R&H near Hospital-Kaligonj Open University at Ch. 00m-600m Road ID 152395090 c Improvement of Road from R&H at Chowdhuryhat More-Karim Uddin Degree College via Tushbhandar Station at ch. 00m-515m under Kaligonj Upazila District.Lalmonirhat Road ID 152395091
UTMIDP-KALI/LALM/WR-43/e-GP/20240922/315307/00180133
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳১.০৫ কোটি |
১৬ মে ২০১৯ |
Completed |
|
1. Improvement of BC Road from Aditmari railway station-Chandimari Bazar via H/O Mozibar master at ch. 00m-1500m under Aditmari Upazila District.Lalmonirhat Road ID 152024027
UTMIDP-ADIT/LALM/WR-44/e-GP/20240922/315308/00180158
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳১.০৮ কোটি |
১৬ মে ২০১৯ |
Completed |
|
1 Periodic Maintenance of Kurigram Horikesh more RHD - Kanthalbari GC via Holokhana UPC Road from Ch. 00m-5000m Road ID 149522007 2 Periodic Maintenance of Kurigram Horikesh more RHD - Kanthalbari GC via Holokhana UPC Road from Ch. 5000m -9810m Road ID 149522007 3 Periodic Maintenance of Kurigram Sadar Upazilla HQ Trimohoni - Jotinerhat RHD Road from Ch. 00m-3250m Road ID 149522008 4 Periodic Maintenance of Boat tola - Jatrapur hat Road from Ch. 00m-1780m Road ID 149523005 & 5 Periodic Maintenance of Boat tola - Jatrapur hat Road from Ch. 2400m-5261m Road ID 149523005 Kurigram-S
e-Tender/LGED/Kuri/ GOBM/18-19/W-59/e-GP/20241002/272978/00189347
|
Office of the Executive Engineer, LGED, Kurigram |
৳৩.৮৫ কোটি |
২০ জানু ২০১৯ |
Completed |
|
A Improvement of Mohendranaga UP-Mustafirhat UZR Via Burir Bazer Rice Mill RoadCh.2236-4100m.ID No-152553003B Improvement of Haragach Pourashava BorderSadar Ghat-Rajpur UP at Thikanar Hat Via Harinchra Bazer RoadCh.4440-6440m.ID No-152553018
RDRIIP-2/W-UNR -161/e-GP/20241023/268896/00202567
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.৬৭ কোটি |
১৩ জানু ২০১৯ |
Completed |
|
Improvement of Khoniagach GC- Mohendranagar GC Via Ockrabari Hat RoadCh.00-2470m.ID No-152552012
RDRIIP-2/W-UZR -045/e-GP/20241016/269022/00197099
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.২৫ কোটি |
১৩ জানু ২০১৯ |
Completed |
|
Rehabilitation of 36m long RCC Girder Bridge on Hatibandha Primary School - Dakhin Sindurna Road at Ch. 1460m under Hatibandha UpazilaDistrictLalmonirhat.Road ID152335025
FDR/Lal/18-19/BW18/e-GP/20241001/245330/00188533
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.৫০ কোটি |
১১ নভে ২০১৮ |
Completed |
|
a Rehabilitation of Burirhat GC - Mohiskhocha GC Road Ch. 00m-5083m under Aditmari Upazila District-Lalmonirhat.Road ID152022001b Rehabilitation of 2x4.50x4.00m RCC Box Culvert on Durgapur GC - Durakuti GC via Moghalhat Road at ch. 1740m under Aditmari Upazila District-Lalmonirhat.Road ID152022005
FDR/Lal/17-18/UZR W11 & CW12/e-GP/20240929/237368/00185422
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.৯৭ কোটি |
২৮ অক্টো ২০১৮ |
Completed |
|
Improvement of Kamlabari UP Pander Kura - Chandibari Bazar Road Ch.00-2900m Road ID.152023030 Under Aditmari UpazilaDistrictLalmonirhat.
RDRIIP-2/W-UNR-014/e-GP/20240929/188268/00186930
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.১৬ কোটি |
২২ এপ্রিল ২০১৮ |
Completed |
|
Periodic Maintenance of Nageswari GC- Kachakata bazar Road from Ch. 00m - 3670m Road ID 149613004 Nageswari
e-Tender/LGED/Kuri/GOBM/17-18/W-73/e-GP/20241003/159305/00190105
|
Office of the Executive Engineer, LGED, Kurigram |
৳৫৯.১৭ লাখ |
৩১ জানু ২০১৮ |
Completed |
|
Widening of Pawtanahat GC-Tapamadhupur GC Road Pirgacha portion from Ch. 000m - 5220m Road ID 185732008 Pirgacha
e-Tender/LGED/Rang/GOBM/17-18/W-80/e-GP/20240904/134554/00171804
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৮৮ কোটি |
১৫ নভে ২০১৭ |
Completed |
|
Maintenance of Chineepara More to Nuruzzaman Member via Chinir dighi road ch.00 - 1405m under Lalmonirhat Sadar UpazilaDistrictLalmonirhat.Road ID152554045
IRIDP-2/LAL/MW-84/e-GP/20240929/107699/00187091
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳১০.৮২ লাখ |
১৫ জুন ২০১৭ |
Completed |
|
Construction of 51.00m Long RCC Girder Bridge on Rowmari H/Q-Faluarchar gat via Modabaparir ghat at Ch. 1456m Salvage Cost Tk. 124860.00 Road ID 149793009 Rowmari
RDRIIP/KUR/BR-034/e-GP/20240925/96868/00182693
|
Office of the Executive Engineer, LGED, Kurigram |
৳২.২৩ কোটি |
১৬ এপ্রিল ২০১৭ |
Completed |
|
Implementation of Remaining Works of 85m long Rubber Dam over Jinjiram River [Rowmari]
CRD/KURI/2016-17/W-01/e-GP/20241008/64061/00192974
|
Office of the Executive Engineer, LGED, Kurigram |
৳১.৬২ কোটি |
২১ আগ ২০১৬ |
Completed |
|
(i) Improvement of Patgram-Boura GCCR at Goshpara-Jongra UP office via Doalertary road (Ch. 00-4790m), (ii) Construction of 1x1.5x1.00m RCC box culvert on same road at Ch. 2780m, (iii) Construction of 2 nos. 1x3.00x2.00m RCC box culvert on same road at Ch. 3090m & 4446m, (iv) Construction of 2 nos. U-drain 1x0.90x6.00m on same road at Ch.2900m & 3000m (ID No. 152703009) under Patgram Upazila.
Lal-Pat-Cit-UNR-02/15-16/e-GP/20240925/58056/00182673
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳২.৮৮ কোটি |
৩০ মে ২০১৬ |
Completed |
|
Construction of 57.00m long RCC Girder Bridge on Janater hat - Buraburi hat road at ch. 1500m [Ulipur] [Road ID- 149944134]
RDRIIP/KUR/BR-018/e-GP/20241017/56624/00197897
|
Office of the Executive Engineer, LGED, Kurigram |
৳২.৫৭ কোটি |
৯ মে ২০১৬ |
Completed |
|
Improvement of the Road from R&H Manarat Kinter Garden-Rail Line via H/O Ibrahim (ch. 00-980m) under Aditmari Upazila [Road ID : 152025055 ].
IRIDP-2/LAL/DW-33/e-GP/20241003/47191/00190078
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳৪৭.০৮ লাখ |
৯ ফেব ২০১৬ |
Completed |
|
Improvement of Barakhata BOP- Singimari BOP (Barakhata Bazar- Dolapara BOP camp khabibor Army House) (ch.1000-2000m). under Hatibandha upazila, District: Lalmonirhat. [Road ID: 152334020]
RDRIIP/LAL/VR-100/e-GP/20241006/13907/00191438
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳৪৯.৯৭ লাখ |
৯ নভে ২০১৪ |
Completed |