|
Construction of Additional Class Room Prosadpur GPS under Gomostapur Upazila, Dist: Chapai Nawabganj.
e-Tender/NBIDGPS/C./GOM/2023-24/W1.07944/e-GP/20241222/901612/00238006
|
Office of the Upazila Engineer, LGED, Gomostapur, Chapai Nawbaganj |
৳৬৭.৫৫ লাখ |
২৬ নভে ২০২৩ |
Ongoing |
|
Construction of additional class room Alhaz Kholilur Rahman GPS under NBIDGPS
e-Tender/NBIDGPS/DHA/DHA/2023-24/W1.07537/e-GP/20241017/882219/00197637
|
Office of the Upazila Engineer, LGED, Chirirbandar, Dinajpur |
৳৭১.৪৪ লাখ |
৪ অক্টো ২০২৩ |
Ongoing |
|
Precautionary Bank Protective work from km 75.343 to km. 75.393 = 50.00 m & from km. 75.455 to km. 75.529 = 74.00 m, Total = 124.00 m along the Right Bank of Mohananda River at Kasiabari in Gomostapur Upazila of Chapainawabganj District in C/W "Jhanjhani-Holdigachi Sub-Project" under Nawabganj O&M Division, BWDB, Chapainawabganj during the year 2022-23.
OM/W-04/2022-2023/e-GP/20241209/774060/00231641
|
Nawabganj O&M Division |
৳২.২২ কোটি |
১৭ জানু ২০২৩ |
Ongoing |
|
Widening of Mondalar bazar- RHD Pirgonj Brac office via Kutubpur bazar Madrasha Road from Ch. 00m-3023m & 5522m - 6500m [Pirganj] [Road ID-185762014]
e-Tender/LGED/Rang/GOBM/22-23/W-18/e-GP/20240829/746129/00170322
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.৭৬ কোটি |
২৭ অক্টো ২০২২ |
Completed |
|
Bank Protective work along the right bank of Little Jamuna River from Km. 17.120 to Km. 17.187 = 67.00m at Simultoli Upazilla Panchbibi, District Joypurhat in C/W Protection of Chechra Village Erosion from Little Jamuna River (Border River) and Tulshiganga Sub-project under Joypurhat WD Division, BWDB, Joypurhat during the FY: 2021-2022.
JOY/NDR/W-03/2021-2022/e-GP/20241116/648370/00223877
|
Joypurhat WD Division |
৳৭১.৯৯ লাখ |
১৩ জানু ২০২২ |
Completed |
|
Rehabilitation of 1no. single vent 3mx2m RCC Box Culvert of Mohendranagar GC- Shaptibari ZR Road at Ch. 3510m under Sadar Upazilla, District: Lalmonirhat. [Road ID: 152552005]
e-Tender/LGED/Lal/GOBM/21-22/W-29/e-GP/20240929/609825/00186521
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳৯.৮৩ লাখ |
২০ সেপ ২০২১ |
Completed |
|
Periodic Maintenance of Shanerhat UP Office-Jahangirabad Bazar Road from Ch. 00m-2000m, Road ID.185763003 [Pirganj]
e-Tender/LGED/Rang/GOBM/21-22/W-39/e-GP/20240901/609944/00170430
|
Office of the Executive Engineer, LGED, Rangpur |
৳৫০.৯৮ লাখ |
১৯ সেপ ২০২১ |
Completed |
|
Construction of additional class room of Fulbari Upon Couki under PEDP4.
e-Tender/PEDP4/KUR/RAJ/2020-21/W1.01422/e-GP/20241021/589872/00200806
|
Office of the Upazila Engineer, LGED, Rajarhat, Kurigram |
৳৮৫.০০ লাখ |
২৯ জুন ২০২১ |
Completed |
|
Bank Protection work by sand cement bag along the right bank of Tirnoi river from Km 20.100 to Km 20.250 equal 150 m at Rupgonj in Union Borobari Upazila Baliadangi Dist. Thakurgaon under Thakurgaon O & M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-15/2020-21/e-GP/20220618/558780/008175
|
Thakurgaon O&M Division |
৳৩০.১৮ লাখ |
১৫ মার্চ ২০২১ |
Completed |
|
Construction of 05 Five Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Need Based Infrastructure Development od Newly Nationalized Government PrimarySchools 1st PhaseNBIDNNGPS-1 at differents primary School in DPEH Kurigram district. FY 2020-21.
000/e-GP/DPHE/2023-07-11/00535425
|
Office of the Executive Engineer DPHE, Kurigram |
৳৬৮.৭০ লাখ |
৭ জানু ২০২১ |
Completed |
|
Construction of 05 Five Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Need Based Infrastructure Development od Newly Nationalized Government PrimarySchools 1st PhaseNBIDNNGPS-1 at differents primary School in DPEH Kurigram district. FY 2020-21.
000/e-GP/DPHE/2023-07-11/00535419
|
Office of the Executive Engineer DPHE, Kurigram |
৳৬৮.৬৮ লাখ |
৭ জানু ২০২১ |
Completed |
|
Construction of 05 Five Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Need Based Infrastructure Development od Newly Nationalized Government PrimarySchools 1st PhaseNBIDNNGPS-1 at differents primary School in DPEH Kurigram district. FY 2020-21.
000/e-GP/DPHE/2023-07-11/00535406
|
Office of the Executive Engineer DPHE, Kurigram |
৳৬৮.৬৯ লাখ |
৭ জানু ২০২১ |
Completed |
|
a Improvement of Jahaggirabad Mouza to Pachkouni GPS road Ch. 00-1000m. R.ID. 185765253 b Construction of 06nos 0.625mx0.600m U Drain culvert at ch. 100m 524m 585m 703m 788m & 902m on the same road Pirganj
IRIDP-3/RNG/DW-18/e-GP/20221215/530871/0057093
|
Office of the Executive Engineer, LGED, Rangpur |
৳৮৪.৯৮ লাখ |
২৮ ডিসে ২০২০ |
Ongoing |
|
Protective work on the Left Bank of the River Ghagot from Km. 0.000 to Km. 0.250250m at KaikuriMonglakuti Union in Upazila Mithapukur Dist. Rangpur Under Rangpur O&M DivisionBWDBRangpur
Pirgacha/ Protective-42/e-GP/20220618/489430/008104
|
Rangpur O&M Division |
৳২.৬৬ কোটি |
১০ সেপ ২০২০ |
Completed |
|
Construction of Boundary Wall & Main Gate at 1. BAPARIPARA PRIMARY SCHOOL 2. DHAKIN RADHABOLLAB PRIMARY SCHOOL 3. UTTAR MACHABANDA PRIMARY SCHOOL .
e-Tender/PEDP4/KRG/CHI/2019-20/W14.1038/e-GP/20241212/483700/00234575
|
Office of the Upazila Engineer, LGED, Chilmari, Kurigram |
৳৩৩.৫০ লাখ |
৯ সেপ ২০২০ |
Completed |
|
Construction of Additional class room at Bakakura Adarsha GPS under PEDP4 in Kurigram Sadar Upazila.
eTender/PEDP4/KRG/SAD/2019-20/W2. 01360/e-GP/20241110/492489/00216114
|
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram |
৳৭৩.০২ লাখ |
৯ সেপ ২০২০ |
Completed |
|
Protective work on the Left Bank of the River Ghagot from Km. 0.000 to Km. 0.400400m at Monmontho Kutirpara in Upazila Mithapukur Dist. Rangpur Under Rangpur O&M DivisionBWDBRangpur .
Mitha/ Protective-45/e-GP/20220618/489433/008180
|
Rangpur O&M Division |
৳৩.৯৮ কোটি |
২ সেপ ২০২০ |
Completed |
|
A Improvement of Purbo Bodnapara Mosque -Ajghor Master House Road Ch. 00-1200m ID No-185765212 B Improvement of Khoyerbari Shampur High School - Khoyerbari GPS via Khaprikhal Mosque RoadCh. 00-1000m ID No-185765188 Pirganj
RDRIIP-2/W-VRB-237/e-GP/20240820/480259/00168382
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৬০ কোটি |
২৯ জুলাই ২০২০ |
Completed |
|
A Improvement of Babonpur - Fothapur via Babonpur Jama Mosque Road Ch. 00-1900m ID No-185765128 B Improvement of Khalaspir Pacca -Babonpur Pondit para via Mr. Do. Sahidul Road Ch. 00-655m ID No-185765126 C Improvement of Fothapur Jama mosque - Shailpara Road Ch. 00-557m ID No-185765129 Pirganj
RDRIIP-2/W-VRB-236/e-GP/20240818/480260/00168052
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.২৩ কোটি |
২৯ জুলাই ২০২০ |
Completed |
|
Improvement of Jame Mosque at Palashbari Moddhyo Para Under Belgacha Union Latitude 25.48496 Longitude 89.374407 at Kurigram Sadar Upazila District Kurigram.
GSIDP/KURI/SDW-272/e-GP/20220622/476691/0011784
|
Office of the Executive Engineer, LGED, Kurigram |
৳৩.৮৯ লাখ |
৬ জুলাই ২০২০ |
Completed |
|
Renovation of Irrigation Canal M-1 from KM. 0.00 to KM. 0.800 800 m Irrigation Canal S-1 from Km. 0.000 to Km. 0.200 200 m & Irrigation Canal S-2 from Km. 0.000 to Km. 0.550 550 m in Upazilla-Bagatipara District- Natore in C/W Bashbaria Irrigation Project under Natore O&M Division BWDB Natore during the year 2019-20.
NDR/Bashbaria-1/2019-20/e-GP/20220618/456399/008119
|
Natore O&M Division |
৳১.১৬ কোটি |
২৯ এপ্রিল ২০২০ |
Completed |
|
Major Maintenance of 1 KHALIVITA GPS 2 TITMA GPS & 3 RAMDHAN JUMMA BARI GPS.
eTender/PEDP4/KRG/ULI/2019-2020/W17.01084/e-GP/20241121/447477/00221633
|
Office of the Upazila Engineer, LGED, Ulipur, Kurigram |
৳১৩.৯৯ লাখ |
১২ এপ্রিল ২০২০ |
Completed |
|
Protective Work on the right bank of the River Mohananda at Durgapur to Kasiabari babupur from km 75.900 to Km 75.870 equal 30m & Km 75.455 to Km 75.425 equal 30m Total equal 60m At Boalia Union of Gomostapur Upazila in C/W Jhanjhani-Holdigachi Sub-Project of Chapai Nawabganj District Under Nawabganj O&M Division BWDB Chapai Nawabganj during the F/Y 2019-2020.
NDR/2019-20/12/e-GP/20241215/447210/00235935
|
Nawabganj O&M Division |
৳১.৩১ কোটি |
১৮ মার্চ ২০২০ |
Completed |
|
Rehabilitation of Gangachara-Garagram RHD near Horirthan to Saroaderpara Etim Khana Road from Ch. 00m-1595m ID No-185274046Union-AlombiditorNohali Gangachara
LGED/Rang/VRRP/OL/19-20/W-661/e-GP/20220623/436848/0011823
|
Office of the Executive Engineer, LGED, Rangpur |
৳৫৯.৭৮ লাখ |
৫ মার্চ ২০২০ |
Completed |
|
a Rehabilitation of Dahgram UP Haripara via Noyarhat Road from Ch.00m-3112m Road ID No.152703013 Under Patgram Upazila District Lalmonirhat.b Rehabilitation of of Patgram Zila Road at Koborsthan Loliterhat Kuchibari UP Road from Ch.00m-1400m & Ch.4344m-4920m Road ID No.152703019 Under Patgram Upazila District Lalmonirhat
FDR/Lal/18-19/UNR/W-22 & W-23/e-GP/20220622/433657/0011772
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳১.৬৮ কোটি |
২৬ ফেব ২০২০ |
Completed |
|
Improvement ofDhaldanga bazar-Shilkhuri Kheya ghat Road HBB at Ch.1200m-2250m under Upazila Bhurungamari District Kurigram. Road ID 149064029
PRO/KUR/BUR/VR/19-20/-98/e-GP/20220622/427445/0011789
|
Office of the Executive Engineer, LGED, Kurigram |
৳৫১.৭৩ লাখ |
১৬ ফেব ২০২০ |
Completed |
|
Repair/Re-Sectioning of BRE Embankment with Ditch filling from KM. 124.250 to KM. 124.800 is equal to 550.00m in Sariakandi Upazilla of Bogura District under Bogura O&M Division BWDB Bogura during the year 2019-20.
Bogura/OTM/FCE/03/e-GP/20220618/416003/008084
|
Bogra O&M Division |
৳৮২.৫৮ লাখ |
২৩ জানু ২০২০ |
Completed |
|
Re-sectioning of both dyke in between km. 0.000 to km. 2.128 equal 1000.00m of S1M1 irrigation canal & in between km. 1.000 to km. 3.500 equal 1000.00m of S2M1 irrigation canal & in between km. 4.000 to km. 8.000 equal 1500.00m of S1M2 irrigation canal & in between km. 0.000 to km. 2.000 equal 500.00m of S2M2 irrigation canal of Tangon Barrage Irrigation Project in Upazila-Thakurgoan Sadar Dist-Thakurgoan under Thakurgoan O&M Division BWDB Thakurgoan during the year 2019-2020.
NDR-03/2019-2020/e-GP/20220617/413043/007882
|
Thakurgaon O&M Division |
৳৪১.৮৫ লাখ |
১৪ জানু ২০২০ |
Completed |
|
A Improvement of Digdari Govt. Primary School Connecting Road. Ch. 00-800m School Code-105040302 B Improvement of Bashpukuria Govt. Primary School Connecting Road. Ch. 00-750m School Code-105040611 C Improvement of Jolaidanga Govt. Primary School Connecting Road. Ch. 00-500m School Code-705049059 Pirganj
RDRIIP-2/W-SCH-44/e-GP/20221215/406106/0057080
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৪৮ কোটি |
১২ জানু ২০২০ |
Ongoing |
|
A Improvement of Khastaluk Pucca Road - Khastaluk Eidgha Math Road Ch.00-1500m Road ID No-185765138 B Improvement of Thirarpara House of Mr. Shahidul -Chatra road via Thirarpara Road Ch. 00-400mRoad ID No-185765115 C Improvement of Babonpur H/O Mr. Malak - H/O Mr. Raza Muktar via H/O Mr. Miah Road Ch. 00-485mRoad ID No-185765123 Pirganj
RDRIIP-2/W-VRB-228/e-GP/20221215/406101/0057111
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৭৭ কোটি |
১২ জানু ২০২০ |
Ongoing |
|
Breach Closing works of flood control embankment near Hatia bazar from Km. 32.600 to Km.32.650 50 m in c/w Pigna-Joker Char Flood Control Project at upazaila Kalihati district Tangail during the year 2019-20.
NDR-05/Pigna/2019-20/e-GP/20220617/409459/007873
|
Tangail O&M Division |
৳৩.৬০ লাখ |
৭ জানু ২০২০ |
Completed |
|
Breach Closing with temporary protective works to protect of flood control embankment at Bagil south para from Km. 29.200 to Km. 29.280 80m in c/w Bathuli beel sub-Project at upazaila Basail district Tangail during the year 2019-20.
NDR-07/Bathuli/2019-20/e-GP/20220617/409583/007780
|
Tangail O&M Division |
৳৪.৪৯ লাখ |
৭ জানু ২০২০ |
Completed |
|
A Construction of additional Class room Guchogram Shaheber Alga J.N GPS under PEDP4. B Construction of additional Class room Katlamari Non GPS under PEDP4. C Construction of additional Class room Rotideb GPS under PEDP4. at Ulipur UpazilaDistrictKurigram.
e-Tender/PEDP4/KRG/ULI/2019-2020/W2.00217/e-GP/20241121/402885/00221648
|
Office of the Upazila Engineer, LGED, Ulipur, Kurigram |
৳৮২.২৪ লাখ |
১ জানু ২০২০ |
Completed |
|
A Improvement of Shetulpur-Rusulpur Bazar via Morar Para Road Ch. 1000-1500m.ID No-185765025 B Improvement of PirgonjMadergonj road - Vazakaly Bridge via Hossainpur GPS Road Ch. 00-1025m.ID No-185765085 C Improvement of SanerhatAmtola - Masta Village Road Ch. 00-1650m.ID No-185765167 Pirganj
RDRIIP-2/W-VRB-226/e-GP/20221215/397978/0057096
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.২৭ কোটি |
৩০ ডিসে ২০১৯ |
Ongoing |
|
A Improvement of Dubrazpur to Eidgah field road at Kashipur via Kalitola GPS Road Ch. 00-850m. ID No-185765084 B Improvement of Thakurdas LaxmipurPucca road-UllaghariPacca Road Connccting Road Ch. 00-545m.. ID No-185765118 C Improvement of Shoyekpur village-house of Shunil Chairman via Mondoler Bazar Road Ch. 00-1000m.ID No-185765045 Pirganj
RDRIIP-2/W-VRB-223/e-GP/20221215/397975/0057116
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৭৭ কোটি |
৩০ ডিসে ২০১৯ |
Ongoing |
|
A Improvement of NachimonpurBottola at Bhandabari to KhalaspirFalia Road Ch. 00-760m.ID No-185765114 B Improvement of Hazalgari - Uzirpur Road Ch. 00-1000m..ID No-185765001 C Improvement of Kadirabad-Chowrasta at Bhandabari to Khalaspir road-KadirabadRaierbari Via KarimLaxmipur Road Ch. 00-1890m.ID No-185765113 Pirganj
RDRIIP-2/W-VRB-225/e-GP/20221215/397977/0057119
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.৭০ কোটি |
৩০ ডিসে ২০১৯ |
Ongoing |
|
A Improvement of Pachgachimouza H/O Muhammad Khalek to sadullapurPucca road via Md. Khasar house Road Ch. 600-1200m.ID No-185765251 B Improvement of PirgonjShanerhatPucca road - KhamarShadullapur Road Ch. 1000-1520m.ID No-185765165 C Improvement of Kashimpur - Kutubpur Road Ch. 900-2000m.ID No-185765004 Pirganj
RDRIIP-2/W-VRB-224/e-GP/20221215/397976/0057118
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৮৪ কোটি |
৩০ ডিসে ২০১৯ |
Ongoing |
|
A Improvement of Hasarpara - Mr. Tafil Shop - ModonkhaliTopoti Road Ch. 00-1205m.ID No-185765112 B Improvement of Baluahat-Keshobpur via Milonpur Road Ch. 1000-1550m.ID No-185765046 C Improvement of Raypur bazar Amertol-ChorerGhat via Kashobpur Road Ch. 00-1000m.ID No-185765081 Pirganj
RDRIIP-2/W-VRB-218/e-GP/20221215/397980/0057099
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৮৯ কোটি |
৩০ ডিসে ২০১৯ |
Ongoing |
|
REHABILITATION OF EXISTING DAMAGED PROTECTIVE WORK ALONG THE LEFT BANK OF THE RIVER PADMA AT SHARENGPUR AREA FROM KM. 34.228 TO KM. 34.280 52.00M IN C/W RAJABARI TO BALIAGHATA CONSTRUCTION OF EMBANKMENT PROJECT UNDER RAJSHAHI O&M DIVISION BWDB RAJSHAHI DURING THE FY 2019-20.
NDR/RBP-1/2019-20/e-GP/20220618/405283/008051
|
Rajshahi O&M Division |
৳১.৮০ কোটি |
২৯ ডিসে ২০১৯ |
Completed |
|
Temporary Protective work of 400 M PaKka road from Dharla river left bank erosion in Kawamari bazar UP. Patgram UZ. Patgram Dist. Lalmonirhat During 2019-20.
NDR/Lal/W-20/2019-20/e-GP/20220617/399348/007885
|
Lalmonirhat O&M Division |
৳৪৪.৫৫ লাখ |
২৬ ডিসে ২০১৯ |
Completed |
|
Improvement of Kolone bazar-Daneshnagar Road Ch.1300-5000m Road ID No-185764058Pirganj
RDRIIP-2/W-VRA-270/e-GP/20221215/391484/0057110
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.৭৪ কোটি |
১ ডিসে ২০১৯ |
Ongoing |
|
Construction of 03 Storied Functional Building for Ground Water Treatment Plant at Kurigram Pourashava. under 37 District Towns Water Supply Project 37DTWSP of DPHE.FY2019-20
000/e-GP/DPHE/2023-07-11/00390313
|
Office of the Executive Engineer DPHE, Kurigram |
৳৭২.০০ লাখ |
২৮ নভে ২০১৯ |
Completed |
|
A Improvement of Telypara more-D-50 Rd via Bamoner hat Road from Ch. 2100-3855m Road ID149944070 B Improvement of Hatia UP office-New Anantapur hat Road from Ch.1480-2000m Road ID 149944133 Ulipur
RDRIIP-2/W-VRA-266/e-GP/20240925/386121/00182747
|
Office of the Executive Engineer, LGED, Kurigram |
৳২.০২ কোটি |
২৬ নভে ২০১৯ |
Completed |
|
Construction of 05Five Nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Primary Education Development Program-4 PEDP-4 at different primary School in Kurigram. FY 2019-20
000/e-GP/DPHE/2023-07-11/00390306
|
Office of the Executive Engineer DPHE, Kurigram |
৳৭৬.৫৯ লাখ |
২৬ নভে ২০১৯ |
Completed |
|
Construction of 05Five Nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Primary Education Development Program-4 PEDP-4 at different primary School in Kurigram. FY 2019-20
WB-0053/e-GP/20220621/390307/0010742
|
Office of the Executive Engineer DPHE, Kurigram |
৳৭৫.৭১ লাখ |
২৬ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Rajpur UP at Paglarhat-Habib Bazar Road from Ch. 00m-1800m Lalmonirhat Sadar Road ID152554123
e-Tender/LGED/Lal/GOBM/19-20/W-34/e-GP/20241023/381400/00202840
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳৩৪.৯১ লাখ |
১৩ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Burirhat Mosque-Rail Way Line Road from Ch. 00m-283m Aditmari Road ID 152024011
e-Tender/LGED/Lal/GOBM/19-20/W-24/e-GP/20240924/381390/00181905
|
Office of the Executive Engineer, LGED, Lalmonirhat |
৳৬.৫১ লাখ |
১৩ নভে ২০১৯ |
Completed |
|
A Improvement of road from Muktijoddha Market- Majhipara More via Shahidul Islam Salus house Ch.00-386m & Ch.1400-2324m Road ID 149795040 B Improvement of Isakur Chowrasta mosque - house side Isahak Mistry house road from Ch.00-1030m Road ID 149795067 Rowmari
RDRIIP-2/W-VRB-214/e-GP/20240926/376595/00184695
|
Office of the Executive Engineer, LGED, Kurigram |
৳২.৪০ কোটি |
১১ নভে ২০১৯ |
Completed |
|
A Improvement of Taluarchar R&H - Boraikandi Bazar road from Ch.2000-3458m Road ID 149793006 B Improvement of Horindara gram FRB-Boraikandi via Takanigram road from Ch. 3150-4150m Road ID 149793001 Rowmari
RDRIIP-2/W-UNR-190/e-GP/20240925/376593/00183006
|
Office of the Executive Engineer, LGED, Kurigram |
৳২.০৭ কোটি |
১১ নভে ২০১৯ |
Completed |
|
Improvement of Hazir Hat - Char Shoulmari road from Ch.00-30000m Road ID 149795148 Rowmari
RDRIIP-2/W-VRB-215/e-GP/20240926/376596/00184473
|
Office of the Executive Engineer, LGED, Kurigram |
৳২.৪৫ কোটি |
১১ নভে ২০১৯ |
Completed |