M/S Khairul Enterprise
Top offices
Top districts
Get new tenders for Kurigram every morning and afternoon, free
Enter your mobile number, or start it on Telegram in one tap. No login.
Biggest competitors
| Companies | Shared offices | Total wins |
|---|---|---|
| M/S K M Abu Bakar | 19 | 168 |
| M/S Zahurul Haque Dulal | 16 | 258 |
| Md. Khairul Kabir Rana | 16 | 110 |
| Shaikat Enterprise | 15 | 99 |
| Md. Ismail Hossain | 15 | 64 |
| Barendra Construction Ltd. | 14 | 165 |
| M/S. BELAL CONSTRUCTION | 14 | 85 |
| Md. Nuruzzaman | 14 | 85 |
| M/S FATEMA TRADERS | 14 | 57 |
| M/S Murad Traders | 14 | 39 |
Awards
178 resultsContract progress
65 results| Description | Office (PE) | Value | Contract date | Status |
|---|---|---|---|---|
|
Repair and renovation works at Gotamari High School, Hatibandha, Lalmonirhat
XEN/EED/LAL/Repair/5974/SHED/2022-23/02/e-GP/20241210/919359/00232727 |
Office of the Executive Engineer, EED, Lalmonirhat District. | BDT 18.97 lakh | 12 Dec 2023 | Ongoing |
|
Package No-27(A)Sl-N0-275 (2022-23) Construction of R.c.c ghatla in the Pond of Bashbaria Nizam Member Bari Jame Mosque Connected , Under Bauphal Upazia, District : Patuakhali (B)Sl-N0-276 (2022-23) Construction of R.c.c ghatla in the Pond of Betagi Sikdaria High-School Connected , Under Dashmina Upazia, District : Patuakhali (C)Sl-N0-278 (2022-23) Construction of R.c.c ghatla in the Pond of Betagi Fazor Ali mathuber Bari Connected , Under Dashmina Upazia, District : Patuakhali (D)Sl-N0-279 (2022-23) Construction of R.c.c ghatla in the Pond of Idris Pahlan Bari Connected , Under Dashmina Upazia, District : Patuakhali (OTM)
2022-2023 Revenue Packge-27/e-GP/20241223/868614/00238473 |
Zila Parishad, Patuakhali | BDT 5.42 lakh | 13 Sep 2023 | Completed |
|
Package No-34(A)Sl-N0-302-ADP(2022-23) Supplying & instrallation of Deep Tube wall in South Side of Md.SaifulKhan Bariar , Jame Mosque, Rangabali Up, Word No-01,Under Rangabali Upazila, District : Patuakhali.(B) Sl-N0-303-ADP(2022-23) Supplying & instrallation of Deep Tube wall in Back Side of Road, Mannan Mardha Bari , 01No- Rangabali Up, Word No-01, Under Rangabali Upazila, District : Patuakhali.(C)Sl-N0-307-ADP(2022-23) Supplying & instrallation of Deep Tube wall Adjacent Kabir Howlader Bari , Mudubi Up, Word No-03, Under Rangabali Upazila, District : Patuakhali (D) Sl-N0-311-ADP(2022-23) Supplying & instrallation of Deep Tube wall Adjacent Hossain Farzi Bari , CharMontaz Up, Word No-06, Under Rangabali Upazila, District : Patuakhali (E)Sl-N0-313-ADP(2022-23) Supplying & instrallation of Deep Tube wall Adjacent Obaidul Howlader Bari , Barobyzda Up, Word No-03, Under Rangabali Upazila, District : Patuakhali (F) Sl-N0-315-ADP(2022-23) Supplying & instrallation of Deep Tube wall in Side of Road Adjacent Jafar Mollah Bari , Moudubi Up, Word No-03, Under Rangabali Upazila, District : Patuakhali (OTM)
2022-2023 Revenue Packge-34/e-GP/20241223/869031/00238417 |
Zila Parishad, Patuakhali | BDT 5.41 lakh | 13 Sep 2023 | Completed |
|
Package No-16(A) Sl-N0-139-ADP(2022-23) Construction of R.c.c ghatla, in the Pond of Uttar Calta Jame Mosque Connected, Village of Konakdia Up , Word No-04,Under Bauphal Upazila Dist: Patuakhali. (B) Sl-N0-257-ADP(2022-23) Construction of R.c.c ghatla in Pond of Parchim Bilbilash Alimuddin Munshi Bari , under Bauphal Upazila, District : Patuakhali (C) (Sl-N0-258-ADP(2022-23) Construction of R.c.c ghatla in Pond of Dakhin Bilbilash Rada-Govando Mondar , Bauphal Up Word No-09, Under Upazila, District : Patuakhali (D)Sl-N0-260-,ADP(2022-23) Construction of R.c.c ghatla in Pond of Sarbo Jannan Durga Mondar , Village of Kappurkathi, Kaliya Up, Word No-06, Under Bauphal Upazila, District : Patuakhali (E) Sl-N0-261-ADP(2022-23) Construction of R.c.c ghatla in Canal of Char Miyazan Bazar, Fakurl Gazi Shop Connected , Chandrodip Up, Under Bauphal Upazia, District : Patuakhali (OTM)
2022-2023 Revenue Packge-16/e-GP/20241224/868607/00239021 |
Zila Parishad, Patuakhali | BDT 5.86 lakh | 13 Sep 2023 | Completed |
|
Construction of 2 storied RCC WASH Block having 2 storied foundation for MT & Boys and FT & Girls including all associated construction, sanitary, plumbing & electrical works at different primary schools at Hatibanda and Others Upazila in Lalmonirhat District under PEDP-4 Project.During The FY-2022-2023.
000/e-GP/DPHE/2023-07-11/00793425 |
Office of the Executive Engineer ,DPHE, Lalmonirhat | BDT 1.05 crore | 26 Feb 2023 | Completed |
|
Periodic Maintenance of Hatibandha hospital-Gendukurihat Road from Ch. 00m-1000m under Upazila Hatibandha, Dist. Lalmonirhat. [Road ID:152333026].
e-Tender/LGED/Lal/GOBM/22-23/W-10/e-GP/20240926/725499/00184714 |
Office of the Executive Engineer, LGED, Lalmonirhat | BDT 13.16 lakh | 24 Aug 2022 | Completed |
|
Construction of Boundary Wall at Bhurungamari Upazila Office in DPHE Kurigram District. (FY:2021-2022)
000/e-GP/DPHE/2023-07-11/00676818 |
Office of the Executive Engineer DPHE, Kurigram | BDT 6.50 lakh | 23 Mar 2022 | Completed |
|
Construction of Inspection Banglou (IB) Building by vertical extension of Existing Roumari Upazila Office Building at Roumari Upazila in DPHE Kurigram district,Kurigram.FY: 2021-22
000/e-GP/DPHE/2023-07-11/00676914 |
Office of the Executive Engineer DPHE, Kurigram | BDT 21.86 lakh | 23 Mar 2022 | Completed |
|
Construction of Residence of Executive Engineer in Department of Public Health Engineering (DPHE) Kurigram District,Kurigram. Fy: 2021-22
000/e-GP/DPHE/2023-07-11/00676813 |
Office of the Executive Engineer DPHE, Kurigram | BDT 66.33 lakh | 23 Mar 2022 | Completed |
|
Construction of Inspection Banglou (IB) Building by vertical extension of Existing Storehouse Building at Rajibpur Upazila in DPHE Kurigram district,Kurigram.FY: 2021-22
000/e-GP/DPHE/2023-07-11/00676822 |
Office of the Executive Engineer DPHE, Kurigram | BDT 21.86 lakh | 23 Mar 2022 | Completed |
|
Construction of Internal RCC Road at Saptibari Degree College, Aditmari, Lalmonirhat
APP/ict/Adit2/e-GP/20241210/667838/00232641 |
Office of the Executive Engineer, EED, Lalmonirhat District. | BDT 4.52 lakh | 1 Mar 2022 | Completed |
|
Construction of Internal RCC Road at Aditmari Degree College, Aditmari, Lalmonirhat
APP/ict/Adit/e-GP/20241210/667837/00232660 |
Office of the Executive Engineer, EED, Lalmonirhat District. | BDT 4.52 lakh | 1 Mar 2022 | Completed |
|
UTMIDP-DUM/PATU/WR-281 1. Improvement of BC Road from Jamla Govt. Primary School-Talukder Hat Via Latif Mohshena High School Via Talukder Hat At Ch. 0-1000m Under Sreerampur UPC, Dumki Upazila, Dist:Patuakhali. (Road ID: 578963008) [Salvage Cost- 705796.00] 2. Improvement of BC Road from Dumki Union Connecting Road (Khurnarmatala Bridge)-Jhatra Jahanara Member Bari. At Ch. 0-1000m Under Angaria UPC, Dumki Upazila, Dist: Patuakhali. (Road ID: 578964098) [Salvage Cost- 912939.00]
UTMIDP-DUM/PATU/WR-281./e-GP/20241212/651928/00234621 |
Office of the Executive Engineer, LGED, Patuakhali | BDT 1.63 crore | 1 Feb 2022 | Completed |
|
Supply of office 01 Nos Almirah for different Upazilla Offices in Lalmonirhat District under revenue budget during FY: 2021-2022
000/e-GP/DPHE/2023-07-11/00645577 |
Office of the Executive Engineer ,DPHE, Lalmonirhat | BDT 34,999 | 6 Jan 2022 | Completed |
|
Supply of office 02nos Almirah for different Upazilla Offices in Lalmonirhat District under revenue budget during FY: 2021-2022
000/e-GP/DPHE/2023-07-11/00645576 |
Office of the Executive Engineer ,DPHE, Lalmonirhat | BDT 68,998 | 6 Jan 2022 | Completed |
|
Construction of Barrack for Ansar Members at Fulbari Upazila Campus.
e-Tender/UZP/REV/KUR/FUL/W1.01/e-GP/20241105/640517/00213069 |
Office Of The Upazila Engineer, Fulbari, Kurigram | BDT 5.34 crore | 27 Dec 2021 | Completed |
|
Periodic Maintenance of Kakina -Mahishamuri Road from Ch. 00m-2880m under Kaliganj Upazilla, District: Lalmonirhat. [Road ID: 152394016]
e-Tender/LGED/Lal/GOBM/21-22/W-08/e-GP/20240929/609767/00185472 |
Office of the Executive Engineer, LGED, Lalmonirhat | BDT 40.81 lakh | 20 Sep 2021 | Completed |
|
Construction of Boundary wall at 1 JOGIPARA and 2 PANCHGACHI GPS under PEDP4 in Kurigram Sadar Upazila.
e-Tender/PEDP4/KRG/SAD/2019-20/W14. 0765/e-GP/20241110/539724/00216169 |
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram | BDT 30.15 lakh | 15 Mar 2021 | Completed |
|
Construction of additional class room of Char Borai Bari GPS under PEDP4 in Kurigram Sadar Upazila.
e-Tender/PEDP4/KUR/SAD/2020-2021/W2-02771/e-GP/20241110/539703/00216128 |
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram | BDT 79.22 lakh | 3 Mar 2021 | Completed |
|
Construction of additional class room of Dakuayapara Adorsho GPS under PEDP4 in Kurigram Sadar Upazila.
e-Tender/PEDP4/KUR/SAD/2020-2021/W2-02772/e-GP/20241110/539708/00216120 |
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram | BDT 79.58 lakh | 3 Mar 2021 | Completed |
|
Construction of additional class room of West Char Kagjipara GPS under PEDP4 in Kurigram Sadar Upazila.
e-Tender/PEDP4/KUR/SAD/2020-2021/W2-02918/e-GP/20241110/539715/00216067 |
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram | BDT 93.76 lakh | 3 Mar 2021 | Completed |
|
Construction of Primary Drain at Nageshwari Pourashava in Kurigram District under Water Supply & Environmental Sanitation including Fecal Sludge Management Project in 32 Pourashava of DPHE.FY 2020-21.
000/e-GP/DPHE/2023-07-11/00546112 |
Office of the Executive Engineer DPHE, Kurigram | BDT 5.00 crore | 11 Feb 2021 | Completed |
|
Construction of 05 Five Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Need Based Infrastructure Development od Newly Nationalized Government PrimarySchools 1st PhaseNBIDNNGPS-1 at differents primary School in DPEH Kurigram district. FY 2020-21.
000/e-GP/DPHE/2023-07-11/00535416 |
Office of the Executive Engineer DPHE, Kurigram | BDT 68.69 lakh | 7 Jan 2021 | Completed |
|
Construction of 05 Five Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1 at differents primary School in DPHE Kurigram district. FY 2020-21.
000/e-GP/DPHE/2023-07-11/00535412 |
Office of the Executive Engineer DPHE, Kurigram | BDT 68.69 lakh | 7 Jan 2021 | Completed |
|
Periodic Maintenance of Patuakhali-Barisal RHD Moukaran Bridge - Dumki UZHQ via Moukaran GC. Sadar Part Road from Ch.3450m-5050m Patuakhali-S ID 578952007
e-Tender/LGED/PTK/GOBM/20-21/W-11/e-GP/20241219/491835/00237388 |
Office of the Executive Engineer, LGED, Patuakhali | BDT 53.17 lakh | 16 Sep 2020 | Completed |
|
Construction of additional class room in Kashiabari Moddha Para GPS under Kurigram Sadar Upazila.
e-Tender/PEDP4/KRG/SAD/2019-20/W2.02047/e-GP/20241110/489462/00216123 |
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram | BDT 38.13 lakh | 9 Sep 2020 | Completed |
|
Construction of Additional Class room of RAMDASH DHANIRAM SARDER PARA GPS.
eTender/PEDP4/KRG/ULI/2019-2020/W2.00933/e-GP/20241105/447473/00213088 |
Office of the Upazila Engineer, LGED, Ulipur, Kurigram | BDT 76.18 lakh | 13 May 2020 | Completed |
|
Construction of Storehouse Cum IB Building For use of Roumari and char Rajibpur Upazila Office Under Reveneu Budget of DPHE at Char Rajibpur Upazila in Kurigram District. FY2019-2020
000/e-GP/DPHE/2023-07-11/00455784 |
Office of the Executive Engineer DPHE, Kurigram | BDT 24.53 lakh | 27 Apr 2020 | Completed |
|
Construction of additional Class room of 1.Monnear par & 2. Samaj Kollan GPS under PEDP-4
e-Tender/PEDP4/KUR/NAG/2019-2020/W2.00470/e-GP/20241113/413501/00217922 |
Office of the Upazila Engineer, LGED, Nageswari, Kurigram | BDT 1.02 crore | 21 Jan 2020 | Completed |
|
Construction of additional Class room of 1 Bhangamore & 2. Damal Gram GPS under PEDP-4
e-Tender/PEDP4/KUR/NAG/2019-2020/W2.00472/e-GP/20241113/413583/00217971 |
Office of the Upazila Engineer, LGED, Nageswari, Kurigram | BDT 94.97 lakh | 21 Jan 2020 | Completed |
|
1 Construction of Additional Class Room of Char Dhaurar Kuti2 GPS under PEDP4 & 2 Construction of Additional Class Room of Dakkhin Char Bhurungamari GPS under PEDP4.
e-Tender/PEDP4/KRG/BHU/2019-2020/W2.00438/e-GP/20241121/401951/00221604 |
Office of the Upazila Engineer, LGED, Bhurungamari, Kurigram | BDT 52.09 lakh | 24 Dec 2019 | Completed |
|
Construction of Department of Public Health Engineering DPHE Upazilla Office Building in Chilmari Upazilla office Compound Under Revenue Budget at DPHE Kurigram District Kurigram during FY 2019-2020.
000/e-GP/DPHE/2023-07-11/00370898 |
Office of the Executive Engineer DPHE, Kurigram | BDT 27.48 lakh | 28 Oct 2019 | Completed |
|
Improvement of Zame Mosque at Dewaner Khamer near Farha Steel Shop Under Bhurungamari Union Latitude 26.110308 Longitude 89.669598 at Bhurungamari UpazilaDistrictKurigram.
GSIDP/KURI/DW-162/e-GP/20241003/358102/00190513 |
Office of the Executive Engineer, LGED, Kurigram | BDT 2.85 lakh | 23 Sep 2019 | Completed |
|
1 Construction of class room of Janata Primary School and2 Construction of class room of Laxmir Khamar Primary School.
e-Tender/NBIDNNGPS/KUR/KUR/2018-2019/W1.03357/e-GP/20241110/302024/00216148 |
Office of the Upazila Engineer, LGED, Kurigram Sadar, Kurigram | BDT 1.58 crore | 7 Apr 2019 | Completed |
|
Construction of Inspection Banglou at suitable places of DPHE Kurigram district office Compound Under The Safe Water Supply and Sanitation Project in Lalmonirhat Kurigram Panchagarh and Nilphamari District giving special emphasize on the former Enclave areas at Kurigram District DPHE Kurigram during FY 2018-2019.
000/e-GP/DPHE/2023-07-11/00274339 |
Office of the Executive Engineer DPHE, Kurigram | BDT 81.88 lakh | 4 Feb 2019 | Completed |
|
a Improvement of Rajmallihat hat-Nazimkhan UP Jorsarar hat via Battalarhat Road Ch. 1483-4000m Road ID 149774029 b Improvement of Omarmajid UP office-Kurigram Chilmari R&H at Panchpir Road Ch. 1200-2970m Road ID 149774024 Rajarhat
RDRIIP-2/W-VRA-210/e-GP/20240925/272974/00182850 |
Office of the Executive Engineer, LGED, Kurigram | BDT 2.73 crore | 20 Jan 2019 | Completed |
|
a Improvement of Omar Majid UP Farkerhat GC - Belgacha UP office Road Ch. 1000-2660m Road ID 149773011 & b Improvement of Chakirpashar UP office - Nakkatihat Road Ch. 1250-2800m Road ID 149773005 Rajarhat
RDRIIP-2/W-UNR-155/e-GP/20240926/272963/00184618 |
Office of the Executive Engineer, LGED, Kurigram | BDT 2.17 crore | 20 Jan 2019 | Completed |
|
a Improvement of Khanjonmara Ansarer more - south side of Sukur shop Road Ch. 00-561m Road ID 149795051 & b Improvement of Saidabad Bazar- west side Pakhiura hat via Komorvangi GPS Road Ch. 00-1950m Road ID 149795077 ROWMARI
RDRIIP-2/W-VRB-026/e-GP/20240925/189932/00184580 |
Office of the Executive Engineer, LGED, Kurigram | BDT 1.55 crore | 6 May 2018 | Completed |
|
Construction of 05 Nos. RCC Wash Block MTBoys and FTGirls at FulbariBhurungamari 0401 Upazila including 2 Nos.Inspection Pit 1 Nos. Soak Well & 1 Nos. Septic tank with all Sanitary & Electrical works etc.
000/e-GP/DPHE/2023-07-11/00190949 |
Office of the Executive Engineer DPHE, Kurigram | BDT 68.17 lakh | 26 Apr 2018 | Completed |
|
Construction of class room of Berubari 2 Government Primary School under NBIDGPS Project-1
e-Tender/NBIDGPS/KRG/NAG/2017-18/W1.00267/e-GP/20241113/169890/00217970 |
Office of the Upazila Engineer, LGED, Nageswari, Kurigram | BDT 22.16 lakh | 22 Mar 2018 | Completed |
|
Periodic Maintenance of Dhasherhat GPS - Horikesh more Road from Ch. 00m-2300m. Road ID 149524034 KURIGRAM-S
e-Tender/LGED/Kuri/ GOBM/17-18/W-82/e-GP/20241002/172130/00189561 |
Office of the Executive Engineer, LGED, Kurigram | BDT 44.94 lakh | 19 Mar 2018 | Completed |
|
Periodic Maintenance of Nageswari GC - Hashnabad UP office Road from Ch. 00m-6700m. Road ID 149613010 NAGESWARI
e-Tender/LGED/Kuri/ GOBM/17-18/W-87/e-GP/20241002/172135/00189128 |
Office of the Executive Engineer, LGED, Kurigram | BDT 94.66 lakh | 19 Mar 2018 | Completed |
|
Construction of improved Sanitary latrine at kurigram district under The Safe Water Supply and Sanitation Project in Lalmonirhat Kurigram Panchagarh and Nilphamari District giving emphasize on the former Enclave areas of DPHE Rangpur Circle Rangpur. FY 2017-2018. former Enclave area.
000/e-GP/DPHE/2023-07-11/00139688 |
Office of the Executive Engineer DPHE, Kurigram | BDT 60.74 lakh | 10 Dec 2017 | Completed |
|
a Improvement of Kabir Mahmud Khanka Sharif - Zakuatari Sona Bura Mosque via South tari Jame Mosque Road Ch 00-880m & b Construction of 04 Nos. 0.625m x 0.600m U-drain at ch. 113m 196m 460m & 758m on the same road Road ID 149185056 Fulbari
IRIDP-2/KURI/DW-92/e-GP/20241008/141569/00192678 |
Office of the Executive Engineer, LGED, Kurigram | BDT 51.44 lakh | 29 Nov 2017 | Completed |
|
Periodic Maintenance of H/o Solaiman Khalilganj Bazar-Halabot via Belgacha UP Road from Ch. 00m - 4160m Road ID 149523004 Kurigram-S
e-Tender/LGED/Kuri/ GOBM/17-18/W-61/e-GP/20241002/132266/00189950 |
Office of the Executive Engineer, LGED, Kurigram | BDT 53.24 lakh | 29 Oct 2017 | Completed |
|
Periodic Maintenance of Raigonj GC-Ramkhana UP office Road from Ch. 00m - 2260m Road ID 149613002 Nageswari
e-Tender/LGED/Kuri/ GOBM/17-18/W-49/e-GP/20241003/132254/00190135 |
Office of the Executive Engineer, LGED, Kurigram | BDT 29.04 lakh | 29 Oct 2017 | Completed |
|
Periodic Maintenance of Dakhin Beparirhat R&H-Bhitarbond Jamtola Road from Ch. 00m - 1780m Road ID 149614026 Nageswari
e-Tender/LGED/Kuri/ GOBM/17-18/W-68/e-GP/20241001/132273/00188847 |
Office of the Executive Engineer, LGED, Kurigram | BDT 48.42 lakh | 29 Oct 2017 | Completed |
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Protap Vice-Chairman at Dashirchara Chitmahal Fulbari
Kuri-Ful-Cit-Shasan-02/16-17/e-GP/20241017/111576/00197498 |
Office of the Executive Engineer, LGED, Kurigram | BDT 8.80 lakh | 25 Jul 2017 | Completed |
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Mohanando in Soto Kamat at Dashirchara Chitmahal Fulbari
Kuri-Ful-Cit-Shasan-01/16-17/e-GP/20241017/111575/00197836 |
Office of the Executive Engineer, LGED, Kurigram | BDT 8.80 lakh | 25 Jul 2017 | Completed |
|
Improvement of Basrah Madrasha - Jarijar-Tutapaikar Bazar Basrah-Jarijar via Unus Ali house road Ch. 00 - 1000m Road ID 149774059 Rajarhat
RDRIIP/KUR/VR-461/e-GP/20241009/96880/00193895 |
Office of the Executive Engineer, LGED, Kurigram | BDT 57.13 lakh | 16 Apr 2017 | Completed |