a) Improvement of Nehalpur- Srikole Road Ch.00m- 1120m ,Salvage Cost Tk. 3,36,335.00 (ID: 218235023) b) Construction of 2 Nos 0.625m x 0.60m U- Type Drain Culvert at Ch. 366m & 1014m on the same Road, Under Upazila: Sadar, District : Chuadanga.
IRIDP-3/CHU/DW-57/e-GP/20241015/857144/00195613
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 1.00 crore |
30 Jul 2023 |
Completed |
|
Improvement of Lokhnathpur R&H - Darsona Dingadah road by BC Ch.00m-882m & 1810m-3620m, Salvage Cost Tk. 42,89,238.00, Road ID NO: 218314015, Under Upazila: Damurhuda, District : Chuadanga
KDRIDP/Chua/W-69/2022-23/e-GP/20241016/764563/00195880
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 2.09 crore |
13 Dec 2022 |
Completed |
|
Periodic Maintenance of Junary-Bonagati Road from Ch.3000m-5656m under Salikha Upaziala Dist. Magura Road. ID.No.255852002. (Overlay)
e-Tender/LGED/Mag/GOBM/22-23/RW-32/e-GP/20240930/747289/00187824
|
Office of the Executive Engineer, LGED, Magura |
BDT 2.75 crore |
3 Nov 2022 |
Completed |
|
Construction of additional class room 3H/F4+WB at Gangni Model GPS Under PEDP4.
e-Tender/PEDP4/MEH/GAN/2021-2022/W1-01225/e-GP/20241210/651481/00232423
|
Office of the Upazila Engineer, LGED, Gangni, Meherpur |
BDT 88.36 lakh |
31 Jan 2022 |
Completed |
|
A) Improvement of Karamdi - Hinda P/School Road by BC at Ch. 1793 - 4730 m Under Gangni Upazila, District : Meherpur, ID No : 257475006 B) Construction of 3 Nos U-Type Drain (625mm X 600mm) at Ch. 1916m, 3658m & 4556m on of Karamdi - Hinda P/School Road Under Gangni Upazila, District : Meherpur, ID No : 257475006
GKRIDP/04/MW - 51/e-GP/20241104/643306/00211476
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 2.20 crore |
6 Jan 2022 |
Completed |
|
Part-A Improvement of Bhomordah Hat-Koromdi road at Ch.200-1097m & 194500-4858.50 by 25mm BC & 7mm Seal Coat under Gangni UpazilaDistrict MeherpurRoad ID-257474051Part-B Construction of 13 Nos U-Drain 625mm x600mm on Bhomordha Hat-Koromdi road at Ch.559m590m761m2067m2920m3104m3470m3780m3894m4102m4505m.4650m4744m under Gangni UpazilaDistrict MeherpurRoad ID-257474051 Salvaged Cost 1275283.00
GKRIDP/03/MW-46/e-GP/20220520/564427/002403
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 2.93 crore |
6 Apr 2021 |
Completed |
|
Rehabilitation of Meherpur -Shoilmari GC Road from Ch000-3100m under Meherpur Sadar Upazila Meherpur Road ID No 257872004
CAFDRIRP/Meher/UZR/W-02/2020-21/e-GP/20241112/559775/00217257
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 3.02 crore |
22 Mar 2021 |
Completed |
|
Rehabilitation of Meherpur- Atkabor RHD via Mohajanpur GC Jagonathjpur GC Road Mujibnagar Part from Ch 5600-9142m under Mujibnagar Upazila Meherpur Road ID No 257882001
CAFDRIRP/Meher/UZR/W-05/2020-21/e-GP/20241112/559776/00217173
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 2.83 crore |
22 Mar 2021 |
Completed |
|
Improvement of Garadob Kachari-Vatpara via Shymnagor road by BC Ch. 1000-3715m under Gangni Upazila District MeherpurRoad Code 257474010 Salvaged Cost Tk.4520046.00
KDRIDP/Meher/W-35/2020-21/e-GP/20241111/553235/00216800
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 2.13 crore |
9 Mar 2021 |
Completed |
|
Construction of Additional Class Room 3H3VWB/F4 at Chang Gara Purbo Para GPS under PEDP4.
e-Tender/PEDP4/MHR/GAN/2019-20/W1.00731/e-GP/20220521/509677/002507
|
Office of the Upazila Engineer, LGED, Gangni, Meherpur |
BDT 1.21 crore |
29 Nov 2020 |
Completed |
|
1 . Development of Joradah Bazar Under Harinakunda Upazila Jhenaidah.Salvage Tk. 68264.00 .2. Development of Charpara Bazar Under Harinakunda Upazila Jhenaidah.Salvage Tk. 232048.00 .
JRRIDP/20/JND/W-57/e-GP/20241031/504574/00209932
|
Office of the Executive Engineer, LGED, Jhenaidah |
BDT 55.62 lakh |
29 Oct 2020 |
Completed |
|
1.Improvement of Gazipur Agardanga BC road from H/o-Mr Humaun Sarder to Mr Zaharul Islam Rtd Secretary via H/o Mr Samsul Haque by Bituminuos Dense Carpeting DC PART-A at Ch 00m-520m & PART-B Ch 00m-180m under Nowapara Pourashava Dist. Jashore. 2. Construction of 2Two nos RCC Cross Drain size-6.00x1.00x 1.00 at Ch. 75m & Ch. 1055m at the same road ward no-08 under Nowapra Pourashava Dist. Jashore.
IUIDP-2/NOW/ P-7/e-GP/20220521/505873/002503
|
PIU Office of Nowapara Pourashava, Jessore |
BDT 57.03 lakh |
20 Oct 2020 |
Completed |
|
1. Improvement of Gazipur Savar Para road and 3 Three nos Link road from H/O Mr Shawkat to Gazipur Govt Primary School via Mr Nayeem Chairman and Savarpara Police Fari by Bituminous Dense CarpetingDC Ch. 0m-1060m Link-1 Ch 0m-400m Link-2 Ch 0m-125m and Link-3 Ch 0m-600m under Nowapra Pourashava Dist. Jashore.
IUIDP-2/NOW/ P-8/e-GP/20220521/505875/002502
|
PIU Office of Nowapara Pourashava, Jessore |
BDT 1.61 crore |
20 Oct 2020 |
Completed |
|
Construction of additional class room Gopalpur Dakshinpara GPS under PEDP4 .under Mujibnagar Meherpur.
e-Tender/PEDP4/MHR/MUJ/2019-20/W1.00684/e-GP/20241113/447359/00217937
|
Office of the Upazila Engineer, LGED, Mujibnagar, Meherpur |
BDT 91.46 lakh |
25 Mar 2020 |
Completed |
|
Construction of Shubolpur GPS under PEDP4 Upazila-Damurhuda Dist-Chuadanga
e-Tender/PEDP4/CHD/DAM/2019-20/W2.00997/e-GP/20220521/428054/002493
|
Office of the Upazila Engineer, LGED, Damurhuda, Chuadanga |
BDT 66.99 lakh |
20 Feb 2020 |
Completed |
|
Const. of Additional class room GPS under PEDP4
e-Tender/PEDP4/KST/KHO/2019-20/W1.00206/e-GP/20220521/420975/002491
|
Office of the Upazila Engineer, LGED, Khoksa, Kushtia |
BDT 1.08 crore |
12 Feb 2020 |
Ongoing |
|
Construction of additional class room Paschim Bahir Char GPS under PEDP4
e-Tender/PEDP4/KST/BHE/2019-20/W1.00128/e-GP/20241202/419655/00226170
|
Office of the Upazila Engineer, LGED, Bheramara, Kushtia |
BDT 82.70 lakh |
3 Feb 2020 |
Completed |
|
Construction of additional class room Kaligangni GPS under PEDP4 3HWBStair Meherpur Sadar Upazila District Meherpur.
e-Tender/PEDP4/MHR/SAD/2019-20/W1.00041/e-GP/20241113/416862/00218203
|
Office of the Upazila Engineer, LGED, Meherpur Sadar, Meherpur |
BDT 86.16 lakh |
2 Feb 2020 |
Completed |
|
Widening of Bamundi RHD-Pragpur GC via Modhugari Ghat RoadGangni Part Road from Ch. 00m-1900m under Gangni Upazila District Meherpur. Road ID 257472006
e-Tender/LGED/Meher/GOBM/19-20/W-18/e-GP/20241023/375487/00202750
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 1.61 crore |
30 Oct 2019 |
Completed |
|
Widening of Dingadah G.C-Darsona Sadar Portion Road from Ch. 5000m -7490m in Sadar Upazila Under Chuadanga District Road Widening Road Code 218232004
e-Tender/LGED/Chua/GOBM/19-20/W-10/e-GP/20241210/373447/00232825
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 1.77 crore |
27 Oct 2019 |
Completed |
|
Periodic Maintenance of Badorganj R&H-Andulbaria G.C Sadar Portion Road from Ch.-8250m-11970m in Sadar Upazila Under Chuadanga District Overlay Road Code 218232005
e-Tender/LGED/Chua/GOBM/19-20/W-05/e-GP/20241210/373445/00232824
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 2.19 crore |
27 Oct 2019 |
Completed |
|
1 Construction of RCC Drain from Nowapara Sadar Hospital to Jogo Babur More via Dhopa Para Under Nowapara Paurashava at Ch 0000-13501350m.2 Construction of RCC Box Culvert to Road Cross 2 Nos of X-drain Length 10.00m size 0.800x1.600x0.200m at Ch 0120m & 0180m2 nos at ward no 05 under Nowapara Pourashava Dist. Jashore.
IUIDP-2/NOW/P-3/e-GP/20220520/333128/002421
|
PIU Office of Nowapara Pourashava, Jessore |
BDT 1.73 crore |
17 Jul 2019 |
Ongoing |
|
1. Improvement of Road from Vanga Gate to Laxmipur Road via Al-Karim Mosque by Bituminus Carpeting BC at Ch 00m-750m at ward no 02 under Nowapara Pourashava Dist. Jashore. 2. a Improvement of A R Trading Road From JK Road to A R cemet Mills by Bituminus Carpeting BC at Ch 00m-375m b Construction Of 1 One Nos RCC Cross Culvert size-6.000x1.000x1.000 at Ch 0370m. at ward no 01 under Nowapara Pourashava Dist. Jashore.3. a Improvement of Road from Jashore- Khulna Road to Hospital Road by Bituminus Carpeting BC at Ch 00m-780m and 1 One Link Road From WAPDA More to H/o. Dr. Ali Ahmed at Ch 00m-550m1330m at ward no 06 under Nowapara Pourashava Dist. Jashore.
IUIDP-2/NOW/P-5/e-GP/20220520/333129/002419
|
PIU Office of Nowapara Pourashava, Jessore |
BDT 1.25 crore |
17 Jul 2019 |
Ongoing |
|
1. a Improvement of Road From Upozilla Gate to Hospital Road Via Nowapara College by Bituminus Carpeting BC at Ch. 00m-1570m b Construction Of RCC Cross Drain size-6.000x1.000x1.000 at Ch 0800m at ward no 06 under Nowapara Pourashava Dist. Jashore. 2. a Improvement of Road from Sarkhola Club to H/o. Mr. Malek Maste to H/o. Mr. Harun Shaheb Via H/o. Mr.Anayet fakir at Sarkhola by Bituminus Carpeting BC at Ch 00m-6500650m b Construction Of 2 Two nos RCC Cross Drain size-6.000x1.000x1.000 at Ch 0 050m & 0645m at ward no 05 under Nowapara Pourashava Dist. Jashore. 3. a Construction of RCC Road from H/o. Mr. Arman to H/o. Mr. Mahadeb at Ch 00m-270mb Construction of Brick Drain by the side of Palpara Road from H/o. Mr. Arman to H/o. Mr. Mahadeb at Ch 00m-270m at ward no 05 under Nowapara Pourashava Dist. Jashore.4. a Improvement of Road from Taltala LGED Road to H/o. Br. General Mr. Masud by Bituminus Carpeting BC at Ch 00m-750m at ward no 07 under Nowapara Pourashava Dist. Jashore.
IUIDP-2/NOW/P-4/e-GP/20220521/333092/002431
|
PIU Office of Nowapara Pourashava, Jessore |
BDT 1.63 crore |
17 Jul 2019 |
Ongoing |
|
Construction of Two 2 Storied Rural Market Building With 04 Storied Foundation in Bhatpara Hat Under Gangni UpazilaDistrict Meherpur.
CRMIDP/MHPR/W-174/e-GP/20241023/329362/00202789
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 2.13 crore |
17 Jun 2019 |
Completed |
|
A. Improvement of Dhapa pakurtala-Pangasia Gabtola Road by BC at Ch. 700-2194m Road ID 257475199 Salvage Cost. Tk. 424003.00 B. Improvement of Nittanandanpur MoreUNR-KhorampurSawtia River Road by BC at Ch. 1100-2415m under Gangni Upazila District Meherpur. Road ID 257475200 Salvage Cost. Tk. 67980.00
GKRIDP/01/MW-20/e-GP/20241024/308551/00203315
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 1.80 crore |
23 Apr 2019 |
Completed |
|
A. Improvement of Ramkrishnapur Kabuls House-Tetulbaria Road by BC at Ch. 00-1500m Road ID 257475082 Salvage Cost. Tk. 3570407.00 B. Improvement of Nobinpur Regulator- Dholar Bridge Tentulbari Road by BC at Ch. 550-2260m under Gangni Upazila District Meherpur Road ID 257475174
GKRIDP/01/MW-18/e-GP/20241024/308548/00203377
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 2.47 crore |
23 Apr 2019 |
Completed |
|
Improvement of Pirtola hat-Natnapara Ghat Road at Ch. 00-345m 1803-2153m 2156-2653m & 2656-3774m under Gangni Upazila District Meherpur. Road ID 257474044 Salvage Cost. Tk. 509959.00
GKRIDP/01/MW-13/e-GP/20241024/308541/00203352
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 1.57 crore |
23 Apr 2019 |
Completed |
|
Improvement of Raymuntola-Mahabbatpur Road by BC at Ch. 00-1620m & Ch. 1691-1865m & & Construction of 3 nos U-Type Drain 625mmx600mm at Ch. 422m 627m & 1274m on same road under Gangni Upazila District Meherpur. Road ID 257475002 Salvage Cost. Tk. 143604.00
GKRIDP/01/MW-15/e-GP/20241103/308544/00210677
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 1.28 crore |
23 Apr 2019 |
Completed |
|
Part-a Improvement of Mukterpur-Madhabpur Hat. road at Ch 00-1665m Road ID No 218554032 Salvage Amount TK.341620.00 Part-B Improvement of Rakhal Shah Mazar-Piaratala Road Sattar Chairman house at Ch 00-980m & Construction of 01 No U-Drain 625mm x 600mm at Ch 187m on same road Road ID No 218555047 Salvage Amount TK.1075907.00 in Jibonnagar Upazila Under Chuadanga District
GKRIDP/01/CW-13/e-GP/20241210/303935/00232829
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 1.89 crore |
9 Apr 2019 |
Completed |
|
Improvement of UzalpurSiraj Battala-Monohopur Road by BC at Ch. 500-905m under Sadar Upazila District Meherpur. Road ID 257875127 Salvage Cost. Tk. 673286.00
GKRIDP/01/MW-05/e-GP/20241024/300639/00203499
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 27.31 lakh |
7 Apr 2019 |
Completed |
|
Improvement of 4-Mile R&H- Basubhanderdah-Jugirhudda road at Ch 00-2650m & Construction of 05 Nos U-Drain 625mm x 600mm at Ch 176m 237m 880m 1165m & 1723m on same road Road ID No 218234046 Salvage Amount TK.5297820.00 in Sadar Upazila Under Chuadanga District
GKRIDP/01/CW-05/e-GP/20241210/298454/00232830
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 1.90 crore |
21 Mar 2019 |
Completed |
|
Maintenance of Alamdanga Rail Station-Asmankhali road Ch 00-1000m Under Alamdanga Upazila Chuadanga District Road ID No 218075222
IRIDP-2/CHU/MW-78/e-GP/20241210/209879/00232804
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 31.95 lakh |
2 Jul 2018 |
Completed |
|
Part-A a Improvement of Pragpur-Malittad road by BC Ch 1000-1350m Road ID No 218075159 b Construction of 1 No U-type drain at Ch 1280m on same road Part-B Improvement of Laxmipur-Pragpur-Malihat -Mohammadpur- Kuatola Road by BC Ch 1007-1800m Road ID No 218075158 Part-C Improvement of Bhangbaria UP Office-Udaypur hat via Bashbaria Road by BC Ch 2170-3170m Road ID No 218073033 Salvage Amount TK 251419.00 Part-D a Improvement of Jadabpur-More Bhanga via Hardi Kuatola Road by BC Ch 250-1120m Road ID No 218075211 Salvage Amount TK 24715.00 b Construction of 3 Nos U-type drain at Ch 340 485 & 750m on same road Part-E Improvement of Hardi Thainapara R&H-Moavanga Via Kuatala road by BC Ch 00-1033m Road ID No 218075236 Salvage Amount TK 642776.00 Part-F a Improvement of Osmain pur Bazar - Mirpur Road by BC Ch 00-1000m Road ID No 218075237 Salvage Amount TK 2259300.00 Part-G a Improvement of Pragpur Madrasha Laxmipur Bottola via Morebhanga road by BC Ch 1110-2250m Road ID No 218075156 b Construction of 3 Nos U-type drain at Ch 1130 1550 & 1850m on same road Under Alamdanga Upazila District Chuadanga
GKP/06/CH-202/e-GP/20241210/207931/00232810
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 3.63 crore |
14 Jun 2018 |
Completed |
|
Periodic Maintenance of Goyespur BGB Camp-Chengkhali Road from Ch. 00m -1648m and 1895m-3180m in Jibannagar Upazila under Chuadanga District Overlay Road Code 218554031
e-Tender/LGED/Chua/GOBM/17-18/W-60/e-GP/20241210/170264/00232812
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 60.13 lakh |
27 Feb 2018 |
Completed |
|
CONSTRUCTION OF BOUNDARU WALL INCLUDING GATE 1 SUBDIA 2 TALTALA GPS UNDER CHUADANGA SADAR UPAZILA DIST. CHUADANGA
e-Tender/PEDP-III/CHD/SAD/2017-18/W17.803/e-GP/20220516/155170/001956
|
Office of the Upazila Engineer, LGED, Chuadanga Sadar, Chuadanga |
BDT 43.90 lakh |
30 Jan 2018 |
Completed |
|
Improvemen of Holidani up office -Labutola hat via Natabaria Road Ch.600m - 2340m Jhenaidah -S Road ID 244193025
IRIDP-2/JHN/DW-172/e-GP/20220516/115284/001961
|
Office of the Executive Engineer, LGED, Jhenaidah |
BDT 81.81 lakh |
21 Aug 2017 |
Completed |
|
A Improvement of Dingadah Shankarchandra UP Makaldanga-Doster Hat road by BC Ch 6820-7735m B Construction of 1 no U-Drain Culvert 625x600mm at Ch 7165m on same road under Sadar Upazila in Chuadanga District Road ID No 218123002 Salvage Amount TK 53178.00
KDRIDP/Chua/W-05/2016-17/e-GP/20241210/100829/00232813
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 47.92 lakh |
3 May 2017 |
Completed |
|
A Improvement of Jehala UP-Kumari UP road by BC Ch 2250-2484m 2934-3540m 3650-4675m5208-7383m 7583-7977m and 8727-9111m B Construction of 12 nos 625x600mm U-Type Drian Culvert at Ch 3268 3379 3418 3828 3888 3936 6025 6170 6230 6375 6705 and 8834m on same road under Alamdanga Upazila in Chuadanga District. Road ID No 218073025 Salvage Amount TK 904869.00
KDRIDP/Chua/W-04/2016-17/e-GP/20241210/98101/00232821
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 2.95 crore |
20 Apr 2017 |
Completed |
|
A Improvement of Goldari GC-Nilmonigonj Alamdanga Portion road by BC Ch 00-2740m B Construction of 6 nos 625x600mm U-Type Drian Culvert at Ch 8 360 720 1510 1820 and 2578m on same road under Alamdanga Upazila in Chuadanga District. Road ID No 218072014 Salvage Amount TK 510471.00
KDRIDP/Chua/W-03/2016-17/e-GP/20241210/98100/00232815
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 2.02 crore |
20 Apr 2017 |
Completed |
|
A Improvement of Jalsuka-Chhaygharia School road by BC Ch 00-2000m B Construction of 3 nos 625x600mm U-Type Drian Culvert at Ch 28 750 and 1782m on same road under Chuadanga Sadar Upazila in Chuadanga District. Road ID No 218234021 Salvage Amount TK 3746786.00
KDRIDP/Chua/W-01/2016-17/e-GP/20241210/98097/00232814
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 1.18 crore |
20 Apr 2017 |
Completed |
|
Construction of 3.60x3.00m RCC Box Culvert on Gangni Upazila H/Q Malshadah-Bamondi GC-Harabanga Road at Ch. 392m under Gangni Upazila District Meherpur. Road ID 257472007
e-Tender/LGED/Meher/GKP/05/ME-126/e-GP/20220516/95167/001968
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 18.52 lakh |
6 Apr 2017 |
Completed |
|
Maintenance of Begum Rokeya Hostel Academic Bhaban Super Quarter New and Construction of Mosque at Kamlapur RTI Alamdanga Chuadanga.
e-Tender/PEDP-III/CHD/2016-17/W10.109/e-GP/20241210/82949/00232828
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 51.88 lakh |
25 Jan 2017 |
Completed |
|
Improvement of Shimanta UP to Goalpara Hat (Dhopakhali Hat Via Goeshpur BOP) road (CH:4835-5532m) in Jibonnagar Upazila under Chuadanga District. (Road ID No: 218553004) (Salvage Materials Cost: TK.4,74,059.00).
GKP/04/CH-146/e-GP/20241210/47231/00232822
|
Office of the Executive Engineer, LGED, Chuadanga |
BDT 30.88 lakh |
7 Feb 2016 |
Completed |
|
Profile correction, carpeting & seal coat on the existing road pavement at 1st km (Ch-0+000 to 1+000) of Arpara-Shalikha Road (Z-7201) under road division, Magura during the year 2015-16.
egp-01/MRD/WR/ 2015-2016 /e-GP/20220516/31765/002012
|
Magura Road Division |
BDT 37.14 lakh |
5 Oct 2015 |
Completed |
|
1) Improvement of Malshadah-Hijolbaria-Hinda-Palashipara-Tentulbaria-Ramdebpur-Goribpur-Shewratola-Harabanga road at Ch. 12800-14300m & 2 nos U-Type Drain at Ch. 13100, 14210m under Gangni Upazila, District- Meherpur. Road ID: 257472007 (Part-A) 2) Improvement of Malshadah-Hijolbaria-Hinda-Palashipara-Tentulbaria-Ramdebpur-Goribpur-Shewratola-Harabanga road at Ch. 14300-15300m & 1 no 3.60m x 2.60m RCC Box Culvert at Ch. 15100m & 1 no U-Type Drain at Ch. 14690m under Gangni Upazila, District- Meherpur. Road ID: 257472007 (Part-B)
e-TENDER/RBCTRHD/MEH/R-07/e-GP/20220516/31306/002013
|
Office of the Executive Engineer, LGED, Meherpur |
BDT 1.65 crore |
4 Oct 2015 |
Completed |