26 Contracts
BDT 3.71 crore Total value
BDT 7.10 lakh Median contract
19 Firms with a win

Contracts by month

Month Contracts Total value
Jan11BDT 1.09 crore
Feb8BDT 1.04 crore
Mar5BDT 38.50 lakh
Jul1BDT 63.00 lakh
Oct1BDT 56.98 lakh

Firms with the most contracts

Winner Wins Total value
Progati Traders 3 BDT 22.00 lakh
M/S Khan Enterprise 2 BDT 15.20 lakh
M. Jahangir 2 BDT 14.00 lakh
Md. Mubarak Hossain 2 BDT 9.90 lakh
HILSHA BUILDERS 2 BDT 9.50 lakh
Survey & Data Consultants (SDC) 2 BDT 9.40 lakh
M R R ENGINEERING & CONSTRUCTION 1 BDT 63.00 lakh
ADVANCE TECHNOLOGY CONSORTIUM LIMITED 1 BDT 56.98 lakh
M/S AL MAMUN ENTER PRISE 1 BDT 33.50 lakh
M/S. Mostafa & Sons 1 BDT 30.90 lakh

How the contracts were awarded

Largest contracts

Package Winner Office (PE) Amount Contract date
Emergency Supply Filling and Dumping of Geo-bags (100% Polyester 10500 nos 250KG and 5500 nos 175KG total 16000 nos Geo Bags) to meetup emergency situation along the left bank of the Meghna River Dakatia River and others River areas in order to prevent erosion of embankments and river banks during the upcoming monsoon season under Chandpur WD Division BWDB Chandpur during the FY 2026-27.

Chandpur

M R R ENGINEERING & CONSTRUCTION Chandpur WD Division, BWDB BDT 63.00 lakh 1 Jul 2026
Supply of Single Frequency Echo Sounder, DGPS/RTK GPS, Related Software and Laptop for Data Collection i/c "Rehabilitation of Chandpur Town Protection Project" under Chandpur WD Division, BWDB, Chandpur during the year 2025-2026.

Chandpur

ADVANCE TECHNOLOGY CONSORTIUM LIMITED Chandpur WD Division, BWDB BDT 56.98 lakh 26 Oct 2026
Repair of damaged slope of existing protective work of CIP Protectio Project (1st Phase) at Haimchar along left bank of Meghna river from km 72.643 to km 72.717 = 74m & km 73.196 to km 73.236 = 40 m Total Length = 114 m under Chandpur WD Division BWDB Chandpur during the year 2025-2026.

Chandpur

M/S AL MAMUN ENTER PRISE Chandpur WD Division, BWDB BDT 33.50 lakh 19 Jan 2026
Repair of damaged slope of existing protective work of CIP Protection Project (1st Phase) at Haimchar along left bank of Meghna river from km 72.183 to km 72.203 = 20 m km 72.290 to km 72.315 = 25 mkm 72.385 to km 72.405 =20 m km & km 72.605 to km 72.643 =38 m Total Length = 103 M under Chandpur WD Division BWDB Chandpur during the year 2025-2026.

Chandpur

M/S. Mostafa & Sons Chandpur WD Division, BWDB BDT 30.90 lakh 19 Jan 2026
Precautionary Bank Protection Works along the Left bank of Dakatia River from KM 6.715 to KM 6.735= 20 m adjacent to Ichuli stack yard at Ichuli of Chandpur Sadar Upazila and repair works of Chandpur town protection area under Chandpur WD Division BWDB Chandpur during the year 2025-26.

Chandpur

KHAN BROTHERS Chandpur WD Division, BWDB BDT 26.90 lakh 10 Feb 2026

Cite this data

ProcureIndex, “BWDB contracts in Chandpur, 2026”, https://procureindex.com/stats/chandpur/bwdb/2026?lang=en (last updated 30 Oct 2026)

Figures are counted from e-GP award (NOA) data. The year is the contract signing date, or the NOA date when there is none. This is not official data; check eprocure.gov.bd before using it in a report.

Get new tenders for Chandpur every morning and afternoon, free

Enter your mobile number, or start it on Telegram in one tap. No login.

Free · no login · stop any time

Other years