|
Package No-32(A)Sl-N0-289 (2022-23) Reparing of Dakhin Nizampur,Kaumi Nurani Madrasa, Mahipur Up. Word N0-02, Under Kalapara Upazila, Dist: Patuakhali. (B)Sl-N0-290 (2022-23) Reparing of Maddo Purn Mahipur Baitun Noor Jame Mosque, Mahipur Up. Word N0-02, Under Kalapara Upazila, Dist: Patuakhali. (OTM)
2022-2023 Revenue Packge-32/e-GP/20241224/868994/00239014
|
Zila Parishad, Patuakhali |
৳৩.৬০ লাখ |
১৩ সেপ ২০২৩ |
Completed |
|
Package No-31 (A) Sl-N0-204-ADP(2022-23) Construction of Eid-Gah in front of Hanif Mardha Bari, Galachipa Up. Word N0-09, Under Galachipa Upazila Dist: Patuakhali.(B)Sl-N0-326 (2022-23) Re-Construction: of road in Front of Babri Mosque, Word N0-06, Under Galachipa Paurasaba, Under Galachipa Upazila, Dist: Patuakhali (C)Sl-N0-333(2022-23) Re-Construction: of road From Hatum Gazi Bari to end of the Melak Chowkader Bari, Ratandi-Taltali Up. Under Galachipa Upazila, Dist: Patuakhali .(D) Sl-N0-334(2022-23) Re-Construction: of road From Maddo-Amkhala, 03 No-Word,Pacca Road to end of the Manohar Dash Bari, Under Galachipa Upazila, Dist: Patuakhali (E))Sl-N0-335(2022-23) Re-Construction: of C.C road From Galachipa Pauroshaba, 02 No-Word, Pashu Hospital Road to end of the Howlader Bari, Under Galachipa Upazila, Dist: Patuakhali.(OTM)
2022-2023 Revenue Packge-31/e-GP/20241224/868991/00239010
|
Zila Parishad, Patuakhali |
৳৭.২১ লাখ |
১৩ সেপ ২০২৩ |
Completed |
|
Package No-19(A)Sl-N0-128-ADP(2022-23) Construction of R.c.c ghatla, at Farazi Bari Jame Mosque Connected Village of Mazgram Madanpur Up, Word No-03,Under Bauphal Upazila Dist: Patuakhali.(B)Sl-N0-130-ADP(2022-23) Construction of R.c.c ghatla, Pond of Chokidar BariBitun-Nur Jame Mosque Connected Village of Madanpur Up, Word No-07,Under Bauphal Upazila Dist: Patuakhali.(C)Sl-N0-131-ADP(2022-23) Construction of R.c.c ghatla, Pond of Razzak Howlader Bari Jame Mosque Connected Village of Uttar Chandropara Madanpur Up, Word No-09,Under Bauphal Upazila Dist: Patuakhali.(D)Sl-N0-133-ADP(2022-23) Construction of R.c.c ghatla, at RamLakhan Bari Mondir Connected, Village of Madanpur Up, Word No-04,Under Bauphal Upazila Dist: Patuakhali.(E)Sl-N0-135-ADP(2022-23) Construction of R.c.c ghatla, at Pachu Mira Bari Connected Village of Shi-pur Kali-shuri Up, Word No-06,Under Bauphal Upazila Dist: Patuakhali.(F)Sl-N0-136-ADP(2022-23) Construction of R.c.c ghatla, at Nazu Howlader Bari Al-Amin Jame Mosque Connected Village of JoyGhora KonakdiaUp ,Word No-01,Under BauphalUpazila Dist: Patuakhali.(G)Sl-N0-138-ADP(2022-23) Construction of R.c.c ghatla, in Pond of Altaf Gazi Bari Jame Mosque Connected, Village of Konakdia Up ,Word No-08,Under Bauphal Upazila Dist: Patuakhali.(H)Sl-N0-142-ADP(2022-23) Construction of R.c.c ghatla,Pond of Rari Bari Madrasa Connected, Village of Nazurpur, Nazirpur Up ,Word No-04,Under Bauphal Upazila Dist: Patuakhali.(I)Sl-N0-145-ADP(2022-23) Construction of R.c.c ghatla in Pond of Gazi Bari Connected, Village of Joygora, Kanikdhia Up ,Word No-01,Under Bauphal Upazila Dist: Patuakhali.(OTM)
2022-2023 Revenue Packge-19/e-GP/20241224/868613/00238981
|
Zila Parishad, Patuakhali |
৳৮.১২ লাখ |
১৩ সেপ ২০২৩ |
Completed |
|
Package No-30(A)Sl-N0-196-ADP(2022-23) Construction of Soling road From Dash-kania Govt: primary School to end of Manir-gutia Mosque, at Lalua Up. Word N0-02, Under Kalapara Upazila Dist: Patuakhali. (B)Sl-N0-199-ADP(2022-23) Construction of Soling road From Milon Howlader Bari Berry Badh to end of Yusuf Howlader Bari, at Lata-chapli Up. Word N0-03, Under Kalapara Upazila Dist: Patuakhali. (C)Sl-N0-287 (2022-23) Construction of Soling road From Monir Sikder Bari to end of the Mahabub Ghazi Bari Nilgong Up. Word N0-03, Under Kalapara Upazila, Dist: Patuakhali. (D)Sl-N0-292 (2022-23) Construction of Soling road From Char Dhuleshwar Sattar Howladar Bari to end Side of the River, Dhuleshwar Up,. Word N0-01, Under Kalapara Upazila, Dist: Patuakhali. (E)Sl-N0-322 (2022-23) Re-Construction: of Soling road From Howlader Bari to end of the Rafiq Member Bari, Galachipa Up. Word N0-08, Under Galachipa Upazila, Dist: Patuakhali..(F)Sl-N0-323 (2022-23) Re-Construction: of Soling road From Phul khali Sluice Gate to end of the Prempole, Dakua Up,. Under Galachipa Upazila, Dist: Patuakhali(OTM)
2022-2023 Revenue Packge-30/e-GP/20241223/868987/00238842
|
Zila Parishad, Patuakhali |
৳১৪.৮০ লাখ |
১৩ সেপ ২০২৩ |
Completed |
|
Package No-14(F) Sl-N0-318-ADP(2022-23) Construction of Boundary Wall at Thanar Pukur Par , Galachipa Paurashava Under Galachipa Upazia, District : Patuakhali(G) Sl-N0-324-ADP(2022-23) Construction of Boundary Wall at Jahangir Moulana Barir Kaborsthan at Haridebpur, Gajalia Up. Word No-08, Under Galachipa Upazila Dist: Patuakhali (OTM)
2022-2023 Revenue Package-14/e-GP/20241223/868521/00238499
|
Zila Parishad, Patuakhali |
৳২.৪৭ লাখ |
১৩ সেপ ২০২৩ |
Completed |
|
Package No-09(A) Sl-N0-24-ADP(2022-23) Construction of Soling road from Late Muktijatto Shahjhan Farqui Road to end of the Md Rafiqul Islam Bari,Village of Indrakpur, Lohalia Up, Under Sadar Upazila, Dist: Patuakhali. (B) Sl-N0-27-ADP(2022-23) Construction of Soling road from Maha Sarak Rabind Nath Pal Bari to end of the Zila Parishad Phalak ,Badarpur UP, Word No-5, Under Sadar Upazila Dist: Patuakhali. (C)Sl-N0-29-ADP(2022-23) Construction of Soling road from Vaila Sabuj Howlader Barir Parcim paser Rasta to end of the Via Nur Mohammed Howlader Bari Jama Mosque to Sattar Howlader Bari, Buria U.P Under Sadar Upazila Dist: Patuakhali.(D) Sl-N0-43-ADP(2022-23) Construction of Soling road from Kuralia gram Pascim Paser bheribadh to end of the (Purba Diker) Abdul Jalil Sikdar Bari, Village of Kurila, Madarbunia Up,. Word N0-03, Under Sadar Upazila Dist: Patuakhali. (E)Sl-N0-55-ADP(2022-23)Improvement of Eid-gha, at late Kanchion Ali Mardha BariConnectedVillage of Est Awliapur, Awliapur Up.Word N0-04,Under Sadar Upazila Dist: Patuakhali Sl-N0-71-ADP(2022-23) Construction of Soling road at Pirtala Howlader Bari Connected, Village of Pirtala, Jainkathi Up. Word N0-01, Under Sadar Upazila Dist: Patuakhali. (F) Sl-N0-179-ADP(2022-23) Construction of Soling road From South Side of Garur Badh Kashpukar to Bahalgachia Howlader Bari, to end of the Talukder Bari, Kalikapur Up,. Under Patuakhali Sadar Upazila Dist: Patuakhali. (G) Sl-N0-223-ADP(2022-23) Construction of Soling road Adjacent Sujan Mardha Bari, Kamlapur Up,. Word N0-04, Under Patuakhali Sadar Upazila Dist: Patuakhali.(H) Sl-N0-346 (2022-23) Construction: of Soling road From Dakhin Pangashia Community Clinic to end of the Hajji Afaz-Uddin Mollah Bari, Pangashia Up. Under Dumki Upazila, Dist: Patuakhali.(OTM)
2022-2023 Revenue Package-09/e-GP/20241223/868502/00238452
|
Zila Parishad, Patuakhali |
৳৮.৫৬ লাখ |
১৩ সেপ ২০২৩ |
Completed |
|
Survey works of River/Canal and Embankment of Rupgonj O&M Sub-Division under Narsingdi O&M Division, BWDB, Narsingdi during the year 2021-2022.
NDR-NR-9/2021-22/e-GP/20220901/655633/0033017
|
Narsingdi O&M Division |
৳৪.৪৫ লাখ |
৯ ফেব ২০২২ |
Completed |
|
Repair & Maintanance of Office Building, Rest House and Cleaning Septic Tank, Colonies Jungle at Narsingdi O&M Division Office Cuampus of Narsingdi O&M Division, BWDB Narsingdi under Colony Budget (Code-3258106) during the year 2021-2022.
NDR-NR/Col-1/2021-22/e-GP/20220901/655643/0033018
|
Narsingdi O&M Division |
৳১১.৮১ লাখ |
৯ ফেব ২০২২ |
Completed |
|
Repair & Maintenance, Cleaning with silt Removal of Baniar Khal Sluice 1Vent 02 nos (1v-1.50 x1.80), 2 Vent 01 no(2v-1.50 x1.80) & 3 Vent 01 no (3v-1.50 x1.80) total 04 nos Sluice i/c with Balushair Flood Embankment Project in Upazila: Narsingdi Sadar, Dist: Narsingdi at Narsingdi O&M Division, BWDB, Narsingdi under NDR Budget during the year 2021-22.
NDR-NR-8/2021-22/e-GP/20220901/655632/0033016
|
Narsingdi O&M Division |
৳৬.২৪ লাখ |
৯ ফেব ২০২২ |
Completed |
|
Repair & Maintenance, Cleaning with silt Removal of Batuadi Sluice (3v-1.50 x1.80) i/c with Balushair Flood Embankment Project in Upazila: Narsingdi Sadar, Dist: Narsingdi at Narsingdi O&M Division, BWDB, Narsingdi under NDR Budget during the year 2021-22.
NDR-NR-6/2021-22/e-GP/20220901/655147/0033013
|
Narsingdi O&M Division |
৳৭.১৩ লাখ |
৯ ফেব ২০২২ |
Completed |
|
Repair and maintenance of Ghogs or Holes in between from km 8.500 to km 10.000 in c/w Balushair Embankment under Balushair Flood Embankment FCDI Project in Upazilla: Narsingdi Sadar, Dist: Narsingdi at Narsingdi O & M Division, BWDB, Narsingdi under NDR Budget during the year 2021-22
NDR-NR-5/2021-22/e-GP/20220901/655145/0033009
|
Narsingdi O&M Division |
৳৪.৪৫ লাখ |
৯ ফেব ২০২২ |
Completed |
|
Instant/Emergency Repair and Maintenance Works of Lateral Irrigation Canals of Main Irrigation Canal No-1 and Main Irrigation Canal No-2 under North Rupgonj Water Conservancy Project in c/w Non-Development Revenue Budget under Narsingdi O&M Division, BWDB, Narsingdi during the year 2021-2022.
NDR-NR-Irr-7/2021-22/e-GP/20220901/655128/0033008
|
Narsingdi O&M Division |
৳৪.৯৭ লাখ |
৯ ফেব ২০২২ |
Completed |
|
Maintenance dredging of Bibiana South 400 MW combined cycle power plan Km 0.000 to Km 0.070 total 70m (2 Times) for maintaining the intake channel under Habiganj O&M Division, BWDB, Habiganj during the year 2021-2022.
Habi/NDR/W-07/2021-2022/e-GP/20231118/648784/00129927
|
Habiganj O&M Division |
৳৭.৩৮ লাখ |
১৭ জানু ২০২২ |
Completed |
|
Repairing and Maintenance Works of General Irrigation Canal Dyke, Main Irrigation Canal Dyke No-1 & Lateral Irrigation Canal Dyke No. 1,2,&3 of Main Irrigation Canal No-1; Main Irrigation Canal Dyke No-2 & Lateral Irrigation Canal Dyke No. 1,2,3&4 of Main Irrigation Canal No-2, North Irrigation Canal Dyke, South Irrigation Canal Dyke and Lateral Irrigation Canal no-1&2 of South Irrigation Canal during Irrigation Period under North Rupgonj Water Conservancy Project in C/W Non-Development Revenue Budget under Narsingdi O&M Division, BWDB, Narsingdi during the year 2021-2022.
NDR-NR-Irr-4/2021-22/e-GP/20220901/622953/0033004
|
Narsingdi O&M Division |
৳৮.০২ লাখ |
২৬ অক্টো ২০২১ |
Completed |
|
Repairing and Maintenance Works of Canal and Lining Work of North Irrigation Canal from km 0.000 to km 5.500, damaged North Irrigation Canal dyke in between Km 1.000 to Km 5.000, Main Irrigation Canal No-1 from Km. 0.000 to Km. 2.170 & Lateral Irrigation Canal No-1 from km 0.000 to km 0.670, Lateral Irrigation Canal No-2 from km 0.000 to km 2.110, Lateral Irrigation Canal No-3 from km 0.000 to km 2.750 of Main Irrigation Canal No-1 and removal of water hyacinth including debris/garbage from drainage canal adjacent to Main Irrigation Canal No-1 and Lateral Irrigation canals under North Rupgonj Water Conservancy Project in c/w NDR Budget under Narsingdi O&M Division, BWDB, Narsingdi during the year 2021-2022.
NDR-NR-Irr-1/2021-22/e-GP/20220901/622956/0033007
|
Narsingdi O&M Division |
৳১৬.৪৮ লাখ |
২৬ অক্টো ২০২১ |
Completed |
|
Repairing & Maintenance works of canal and lining of South Irrigation Canal in between km 0.000 to km 8.000, damaged South Irrigation canal dyke in between Km 0.000 to km 4.000, repairing of canal & damaged Pucca drain of Sub-lateral irrigation canal no.-1in-between km 0.000 to km 1.000 and Sub-Lateral irrigation canal no.-2 from km 0.000 to km 0.500 of South Irrigation Canal, Re-excavation of Intake canal from Km 0.000 to Km 0.100, Painting, greasing & Miscellaneous works of gates of water structures and Removal of water hyacinth including debris/garbage respectively from Drainage canal adjacent to Pump House & General irrigation canal and drainage canal adjacent to Main Irrigation canal no-2 & lateral Irrigation canal No- 3&4 of Main Irrigation canal no-2 under North Rupgonj Water Conservancy Project (NRWCP) in c/w Non-Development Revenue Budget under Narsingdi O&M Division, BWDB, Narsingdi during the year 2021-2022.
NDR-NR-Irr-2/2021-22/e-GP/20220901/622955/0033006
|
Narsingdi O&M Division |
৳১২.৪৬ লাখ |
২৬ অক্টো ২০২১ |
Completed |
|
Clearing Jungles & Repairing damaged dyke of General irrigation canal form km 0.00 to km 1.200 and Repairing & Maintenance works of Main irrigation canal no.-2 form km 0.000 to km 2.850, Lateral irrigation canal no. -1 form km 0.000 to km 0.470, Lateral irrigation canal no.-2 from km 0.00 to km 0.850, Re-construction of pucca drain in-between km 0.000 to km 0.110 adjacent of Lateral irrigation canal no.-2, repairing of Lateral irrigation canal no.-3 from km 0.000 to km 2.000 and Lateral irrigation canal no.-4 from km 0.000 to km 1.000 of Main Irrigation canal No-2 under North Rupgonj Water Conservancy Project (NRWCP) in C/W Non-Development Revenue Budget under Narsingdi O&M Division, BWDB, Narsingdi during the year 2021-2022.
NDR-NR-Irr-3/2021-22/e-GP/20220901/622954/0033005
|
Narsingdi O&M Division |
৳১২.৯১ লাখ |
২৬ অক্টো ২০২১ |
Completed |
|
Supply, Fitting & Fixing of Eclectic Goods, Stationary & Pluming and Colour washing and Painting of Building and Cleaning of Septic Tank in Dhanshiri Inspection Banglo, Kuakata under Kalapara WD. Division, BWDB, Kalapara, during the Year 2020-2021.
kuakata/Colony/W-02/2020-21/e-GP/20220628/572410/0018412
|
Patuakhali WD Division |
৳৪.৮০ লাখ |
২০ মে ২০২১ |
Completed |
|
Supply, fitting & fixing of electric goods, stationary, furniture & plumbing, repair & maintenance of Kalapara Inspection Banglo under Patuakhali WD Division, BWDB, Patuakhali during the year 2020-2021.
kalapara/Colony/W-01/2020-21/e-GP/20220628/572409/0018364
|
Patuakhali WD Division |
৳৪.৫০ লাখ |
২০ মে ২০২১ |
Completed |
|
Repair of embankment from km 21.100 to km 21.330 0.230 km with temporary R/S slope protection work from km 21.100 to km 21.200 0.100 km in polder no. 54/A under Patuakhali WD. Division BWDB Kalapara Patuakhali under operational budget during the year 2020-2021.
NDR-KP-REP-54/A-2020-21-1 /e-GP/20220701/548806/0025069
|
Patuakhali WD Division |
৳২১.৬৭ লাখ |
১৬ ফেব ২০২১ |
Completed |
|
Re-excavation of Connecting khal between Dhulai Beel and Old Brahmaputra River at Diakandi-Narandi-Harordia Mouza and construction of drainage box sluice/outlet 0.90m x 0.90m at Offtake under Narsingdi O&M Division BWDB Narsingdi during the year 2020-2021 .
e-TD/Nr/Regulator-1/e-GP/20220608/547788/004945
|
Narsingdi O&M Division |
৳৩৬.৫৬ লাখ |
১৪ ফেব ২০২১ |
Completed |
|
Resectioning of embankment from km.36.734 to km 36.814 equal to 0.080 km. & km. 37.630 to km 38.170 equal to 0.540 km total 0.620 km in polder no. 43/2A of Patuakhali O&M division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-43/2A-2020-21-W1/e-GP/20220628/546158/0018178
|
Patuakhali O&M Division |
৳৯.৪৩ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Resectioning of embankment from km. 9.560 to km 9.760 equal to 0.200 km from km. 12.230 to km 12.430 equal to 0.200 km & km. 13.100 to km 13.250 equal to 0.150 km total 0.550 km in polder no. 41/7 of Patuakhali O&M division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-41/7-2020-21-W3/e-GP/20220628/546843/0018232
|
Patuakhali O&M Division |
৳১৫.২০ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Resectioning of embankment from km. 18.540 to km 18.900 equal to 0.360 km. & km. 28.590 to km 29.435 equal to 0.845 km total 1.205 km in polder no. 41/7 of Patuakhali O&M division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-41/7-2020-21-W1/e-GP/20220628/546155/0018164
|
Patuakhali O&M Division |
৳১৬.৬২ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Construction of retired embankment from km. 20.800 to km 21.100 equal to 0.300 km in Itbaria-Lebukhali Sub-Project of Patuakhali O&M Division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-ILSP-2020-21-W2/e-GP/20220628/547305/0018277
|
Patuakhali O&M Division |
৳৮.৪৯ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Construction of retired from km. 19.615 to 19.740 equal to 0.125 km. & km. 19.835 to 19.990 equal to 0.155 km. total 0.280 km in polder no. 43/2A of Patuakhali O&M division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-43/2A-2020-21-W2/e-GP/20220628/547111/0018263
|
Patuakhali O&M Division |
৳৮.০৭ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Re-sectioning of embankment from km. 37.490 to km 39.076 equal to 1.586 km in Mirzagonj-Rampur Sub-Project of Patuakhali O&M Division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-MRSP-2020-21-W2/e-GP/20220628/547099/0018249
|
Patuakhali O&M Division |
৳১৯.৭৪ লাখ |
১১ ফেব ২০২১ |
Completed |
|
Resectioning of embankment from km. 73.990 to 74.977 equal to 0.987 km. in polder no. 55/2E of Patuakhali O&M division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-55/2E-2020-21-W2/e-GP/20220628/546132/0018144
|
Patuakhali O&M Division |
৳২১.১০ লাখ |
১০ ফেব ২০২১ |
Completed |
|
Resectioning of embankment from km. 29.400 to km 29.705 equal to 0.305 km from km. 30.990 to km 31.180 equal to 0.190 km from km. 31.390 to km 31.430 equal to 0.040 km from km. 32.500 to km 32.650 equal to 0.150 km & Retired of embankment from km. 16.500 to km 16.722 equal to 0.222 km total 0.907 km in polder no. 55/2E of Patuakhali O&M division BWDB Patuakhali under operational budget during the year 2020-21.
EGP-PAT-NDR-55/2E-2020-21-W1/e-GP/20220628/546362/0018191
|
Patuakhali O&M Division |
৳১৫.১৭ লাখ |
১০ ফেব ২০২১ |
Completed |
|
Repair and Maintenance work of Sylhet Water Development Board Shahid Altaf Hossain Jame Mosque at BWDB Colony Dist.- Sylhet under Non-Development Revenue Budget during the year 2020-21
NDR-W-01/20-21/e-GP/20220608/534194/004943
|
Sylhet O&M Division, BWDB |
৳৯.২৩ লাখ |
৭ জানু ২০২১ |
Completed |
|
Instant/Emergency Repair and Maintenance Works of Lateral Irrigation Canals of Main Irrigation Canal No-1 and Main Irrigation Canal No-2 under North Rupgonj Water Conservancy Project in c/w Non-Development Revenue Budget under Narsingdi O&M Division BWDB Narsingdi during the year 2020-2021.
e-TENDER/Nr/Irr-5/e-GP/20220608/531846/004823
|
Narsingdi O&M Division |
৳৫.৩৪ লাখ |
৩১ ডিসে ২০২০ |
Completed |
|
Survey work for re-sectioning of embankment & re-excavation of khals of Narsingdi District under Narsingdi O&M Division BWDB Narsingdi during the year 2020-21.
e-TD/Nr/Srvy-1/e-GP/20220608/531850/004939
|
Narsingdi O&M Division |
৳৪.৪৫ লাখ |
৩১ ডিসে ২০২০ |
Completed |
|
River/Canal and Embankment Survey works under Project of Rupgonj O&M Sub-Division under Narsingdi O&M Division BWDB Narsingdi during the year 2020-2021.
e-TD/Nr/Srvy-2/e-GP/20220608/531855/004940
|
Narsingdi O&M Division |
৳২.৬৭ লাখ |
৩১ ডিসে ২০২০ |
Completed |
|
Repair & Maintenance and others accessories Supplying of Narsingdi O & M Office and Colony for Narsingdi O&M Division in c/w Non-Development Revenue budget under Narsingdi O&M Division BWDB Narsingdi during the Year- 2020-2021.
e-TD/Nr/Colony-1/e-GP/20220608/531865/004941
|
Narsingdi O&M Division |
৳২.৬৭ লাখ |
৩১ ডিসে ২০২০ |
Completed |
|
Repairing and Maintenance Works of Rupgonj BWDB Office/ Colony Buildings under Narsingdi O&M Division BWDB Narsingdi during the year 2020-21.
e-TD/Nr/Colony-2/e-GP/20220608/531867/004942
|
Narsingdi O&M Division |
৳১.৭৮ লাখ |
৩১ ডিসে ২০২০ |
Completed |
|
Re-Sectioning of Flood Embankment from km 9.400 to km 9.660 km 9.860 to km 10.040 total 440 m along the right bank of the Meghna river under Balushir embankment Project at Bongerchar Paikerchar union Upazila-Narsingdi sadar in c/w NDR budget under Narsingdi O&M Division BWDB Narsingdi during the Fy 2020-21.
e-TD/Nr/Rpr-2/e-GP/20220608/531839/004820
|
Narsingdi O&M Division |
৳৪.৪৫ লাখ |
৩১ ডিসে ২০২০ |
Completed |
|
Re-Excavation/Renovation of Small Width Khal/Chara including levelling dressing & turfing at any upazila in Project Area...
WD2/SACP-BADC/20-21/Patuakhali-S-Khal-6/e-GP/20220601/503379/003829
|
Office of Component Director, Smallholder Agricultural Competitiveness Project (SACP)-BADC Part |
৳২৩.২৮ লাখ |
১৫ নভে ২০২০ |
Completed |
|
Re-Excavation/Renovation of Medium Width Khal/Chara including levelling dressing & turfing at any upazila in Project Area...
WD3/SACP-BADC/20-21/M-Khal-6/e-GP/20220602/503448/003834
|
Office of Component Director, Smallholder Agricultural Competitiveness Project (SACP)-BADC Part |
৳২৭.২৬ লাখ |
১৫ নভে ২০২০ |
Completed |
|
Repairing and Maintenance Works of Canal and Lining Work of North Irrigation Canal from km 0.000 to km 5.500 Re-construction of Pucca Drain from Km 0.100 to Km 0.200 adjacent to North Irrigation Canal Repairing of Damaged North Irrigation Canal Dyke in between km 1.000 to Km 5.000 Repairing and Maintenance Works of Main Irrigation Canal No-1 from Km. 0.000 to Km. 2.170 Lateral Irrigation Canal No-1 from km 0.000 to km 0.670 Lateral Irrigation Canal No-2 from km 0.000 to km 2.110 Lateral Irrigation Canal No-3 from km 0.000 to km 2.750 of Main Irrigation Canal No-1 under North Rupgonj Water Conservancy Project in c/w NDR Budget under Narsingdi O&M Division BWDB Narsingdi during the year 2020-2021.
Irr-1/2020-21/e-GP/20220607/512075/004815
|
Narsingdi O&M Division |
৳১৭.৮১ লাখ |
৯ নভে ২০২০ |
Completed |
|
Repairing & Maintenance works of irrigation canal damaged canal dyke and lining in between km 0.000 to km 8.000 of South Irrigation Canal and Repairing & Maintenance works of irrigation canal & re-construction of pucca drain respectively in Sub-lateral canal no. -1 in-between km 0.000 to km 0.900 and Sub-Lateral canal no.-2 in-between km 0.000 to km 0.500 of South Irrigation Canal under North Rupgonj Water Conservancy Project NRWCP in c/w Non-Development Revenue Budget under Narsingdi O&M Division BWDB Narsingdi during the year 2020-2021.
Irr-2/2020-21/e-GP/20220607/512099/004816
|
Narsingdi O&M Division |
৳১৬.০৪ লাখ |
৯ নভে ২০২০ |
Completed |
|
Repairing & Maintenance works of damaged canal dyke of General irrigation canal form km 0.00 to km 1.100 including Jungle clearing repairing of Irrigation canal respectively Main irrigation canal no.-2 form km 0.000 to km 2.850 Lateral irrigation canal no. -1 form km 0.000 to km 0.470 Lateral irrigation canal no.-2 from km 0.00 to km 0.850 & Re-construction of pucca drain from Km 0.000 to Km 0.100 adjacent of Lateral irrigation canal no.-2 repairing of Lateral irrigation canal no.-3 from km 0.000 to km 3.000 and Lateral irrigation canal no.-4 from km 0.000 to km 2.000 of Main Irrigation canal No-2 re-excavation of Intake canal from km 0.000 to km 0.100 and clearing debris/ garbage including water hyacinth from canal infront of Rupgonj Pump House under North Rupgonj Water Conservancy Project NRWCP in C/W Non-Development Revenue Budget under Narsingdi O&M Division BWDB Narsingdi during the year 2020-2021.
Irr-3/2020-21/e-GP/20220607/512104/004817
|
Narsingdi O&M Division |
৳১৫.৫৯ লাখ |
৯ নভে ২০২০ |
Completed |
|
Retired Backing Re-sectioning & Repairing work along the Right embankment of Kushiyara river from km 26.500 to km 26.550 km 26.700 to km 26.790 km 26.900 to km 26.950 km 27.200 to km 27.290 km 27.400 to km 27.485 km 39.000 to km 39.090 & km 39.290 to km 39.350 km 39.430 to km 39.500 & km 41.800 to km 41.900 total 685m & along the Left embankment of Surma River from km 53.000 to km 53.090 & km 54.300 to km 54.500 total 290m grand total 975m Under Non Development Revenue budget in Upazilla Zakiganj Dist- Sylhet Under sylhet O&M Division BWDB Sylhet During the year 2019-20.
NDR-W-08/19-20/e-GP/20220607/461612/004814
|
Sylhet O&M Division, BWDB |
৳১৫.৬১ লাখ |
১৮ মে ২০২০ |
Completed |
|
Re-Excavation of Baliatoli Sluice-2 Khal from km. 1.750 to km. 3.200 1.450 km. in Polder No 47/4 under Patuakhali WD. Division BWDB Kalapara Patuakhali in C/W Blue Gold Program during the year 2019-2020.
BGP-KP-REX-47/4-2019-20/14/e-GP/20220628/430677/0017143
|
Patuakhali WD Division |
৳২৩.১১ লাখ |
২৩ ফেব ২০২০ |
Completed |
|
Re-Excavation of Char Nazir Sluice Khal from km. 0.150 to km. 1.210 1.060 km. in Polder No 47/4 under Patuakhali WD. Division BWDB Kalapara Patuakhali in C/W Blue Gold Program during the year 2019-2020.
BGP-KP-REX-47/4-2019-20/7/e-GP/20220628/430239/0017137
|
Patuakhali WD Division |
৳২৭.২৬ লাখ |
২৩ ফেব ২০২০ |
Completed |
|
Repair & Maintenance of Office Building Colony & Re-construction of Boundary Wall of Daulatkhan O&M Colony under Bhola O & M Division-I BWDB Bhola during the year 2019-2020.
NDR-Dau-Colony-W17/2019-2020/e-GP/20220628/416511/0017130
|
Bhola O&M Division-1 |
৳১.৮০ লাখ |
২৬ জানু ২০২০ |
Completed |
|
Re-Excavation of Mouzar khal from km 0.00 to km 1.300 equal to 1.300 km in polder no.- 43/2B under Blue Gold Program of Patuakhali O&M Divison BWDB Patuakhali during the year 2019-20.
BGP/PTK/19-20/ W-31/e-GP/20220628/412560/0017113
|
Patuakhali O&M Division |
৳১৯.৫২ লাখ |
১৬ জানু ২০২০ |
Completed |
|
Re-sectioning of embankment from km 37.000 to km 39.300 2.300 km at the left bank of Arial Kha in c/w Binnbaid FCDI Project in Upazilla-Belabo Dist. Narsingdi under Narsingdi O & M division BWDB Narsingdi during the year 2019-20.
NAR/TD-8/e-GP/20220607/409468/004810
|
Narsingdi O&M Division |
৳৪৪.৫৫ লাখ |
৯ জানু ২০২০ |
Completed |
|
Re-sectioning of embankment from km 5.300 to km 5.915 equal to 0.615 km & from km 45.895 to km 46.997 equal to 1.102 km total 1.717 km in polder no. 55/3 of Patuakhali O&M Division BWDB Patuakhali under Operational budget during the year 2019-20.
NDR/PTK/19-20/W-10/e-GP/20220628/397036/0017073
|
Patuakhali O&M Division |
৳২৮.১৬ লাখ |
১০ ডিসে ২০১৯ |
Completed |
|
Re-sectioning of embankment from km 37.100 to km 38.910 equal to 1.810 km in Polder No. 55/2A under Blue Gold Program of Patuakhali O&M Divison BWDB Patuakhali during the year 2019-20.
BGP/PTK/19-20/ W-15/e-GP/20220628/397053/0017084
|
Patuakhali O&M Division |
৳২৯.৬৩ লাখ |
৯ ডিসে ২০১৯ |
Completed |
|
Construction of ring dyke at Gucchogram area from km 0.00 to 0.410 Total 410m at Dubag union in Upazilla-Beanibazar Dist-Sylhet under Sylhet O&M Division BWDB Sylhet during the year 2019-20.
NDR-W-02/19-20/e-GP/20220607/396764/004761
|
Sylhet O&M Division, BWDB |
৳১৩.৫০ লাখ |
৮ ডিসে ২০১৯ |
Completed |