|
Running repair and maintenance (Rudder Shaft, Hydraulic Crane, Gear Box, Paint etc.) of Work boat-11 under Khulna Dredger Operation Division, BWDB, Labanchora, Khulna during FY 2022-23.
ONM-Maintenance-OTM-12/e-GP/20231003/836093/0095429
|
Khulna Dredger Division |
৳১.৮০ লাখ |
২২ মে ২০২৩ |
Completed |
|
Repair and maintenance of Bhatshala 1V boatpass in Nazirpur Sub-project & Bornali 2V sluice in Bemorta Sub-project & Petnimari 1V sluice in Polder 34/3 under Bagerhat O&M Division, BWDB, Bagerhat under Operational Expenditure Budget during the FY 2022-23.
Bag/Rev/OTM/HS/W-19/2022-23/e-GP/20231005/829530/0097598
|
Bagerhat O&M Division |
৳৬.৪৭ লাখ |
১০ মে ২০২৩ |
Completed |
|
Manufacturing, Supplying & Installation of 02 Nos 1.05m X 1.05m M.S Flap gate at Bashukhali Pipe Sluice of Polder: 4 and 04 Nos 1.65mX1.875m M.S Lift gate & 04 Nos Pasestal type lifting device at S-4 (Krishna Nagor), DS-Bamnali Sluice of Kolaroua Drainage Project with all accessories for Satkhira O&M Division-2 under Khulna Mechanical Division, BWDB, Khulna During the year 2022-23.
KMD/OTM-08/W-21/2022-2023/e-GP/20230930/826748/0092892
|
Khulna Mechanical Division |
৳১০.৭৫ লাখ |
৩ মে ২০২৩ |
Completed |
|
Supply, replace and fitting of cutter teeth & anchor of 20" dredgers and 18" dredgers under Khulna Dredger Operation Division, BWDB, Labanchora, Khulna during FY 2022-23.
ONM-Maintenance-OTM-11/e-GP/20231003/794261/0095409
|
Khulna Dredger Division |
৳১৮.০০ লাখ |
২৩ ফেব ২০২৩ |
Completed |
|
Repair & Maintenance work of Divisional office, Workshop Sub-division office and 04 Nos. colony Pump House at BIP colony under Barisal Mechanical O&M Division, BWDB, Barisal during the year 2022-2023.
BMOD/OTM-W-19/2022-2023/e-GP/20230930/792461/0092948
|
Barisal Mech. O&M Division |
৳৭.১৩ লাখ |
২০ ফেব ২০২৩ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 03 Nos 1.00mX1.00m M.S Flap gate at Purbobil, Dokkhin Puijhala Sluice of Polder No. 04 , 08 Nos 1.65mX1.95m M.S Flap gate at Kakrabunia Sluice of Polder No. 04, Gorkumarpur, Suvodrokathi, Kalkir, Volanathpur Sluice of Polder No. 7/1 with all accessories for Satkhira O&M Division-2 under Khulna Mechanical Division, BWDB, Khulna during the year 2022-23.
KMD/OTM-02/W-09/2022-2023/e-GP/20230930/787723/0092810
|
Khulna Mechanical Division |
৳১৪.৪৭ লাখ |
১৩ ফেব ২০২৩ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 02 Nos 1.65mX1.95m M.S Flap Gate at Sonakhali Sluice of Doiboggohati Upo Prokolpo & 02 Nos 1.65mX1.95m M.S Lift Gate, 03 Nos Pedestal type lifting device, 01 Nos Foot Over Bridge at Kumarijhola Sluice of Doiboggohati Upo Prokolpo with all accessories for Bagerhat O&M Division under Khulna Mechanical Division, BWDB, Khulna during the year 2022-23.
KMD/OTM-05/W-13/2022-2023/e-GP/20230930/787726/0092854
|
Khulna Mechanical Division |
৳১৮.০০ লাখ |
১৩ ফেব ২০২৩ |
Completed |
|
Repair of Executive Engineer's office main gate & staff residence in Daratana & Modoner Math BWDB Colony in Bagerhat under Bagerhat O&M Division, BWDB, Bagerhat under Operational Expenditure Budget during the FY 2022-23.
Bag/Rev/OTM/Colony/W-12/2022-23/e-GP/20231005/785776/0097607
|
Bagerhat O&M Division |
৳৫.৩৯ লাখ |
৮ ফেব ২০২৩ |
Completed |
|
Repair and maintenance of Gopalkathi 1V sluice, Khalishpur-2 1V sluice, Singra 1V sluice in Nazirpur Sub-project & Tengramari 1V sluice, Bollober 1V sluice, Joygasi 2V sluice in Bemorta Sub-project & Jeeptola 1V sluice, Shashikhali 3V sluice in Polder 34/3 & Rahimabad 1V sluice in Polder 34/1 under Bagerhat O&M Division, BWDB, Bagerhat under Operational Expenditure Budget during the FY 2022-23.
Bag/Rev/OTM/HS/W-5/2022-23/e-GP/20231005/783947/0097504
|
Bagerhat O&M Division |
৳২০.২০ লাখ |
৩১ জানু ২০২৩ |
Completed |
|
Repair and Maintenance Work of Bishkhali 7-Vent and Srenikhali 2-Vent Regulator at Morrelgonj Upazilla under Bagerhat O&M Division, BWDB, Bagerhat under Operational Expenditure during the FY 2022-2023.
Bag/Rev/OTM/HS/W-17/2022-23/e-GP/20231005/784461/0097561
|
Bagerhat O&M Division |
৳১১.৫৮ লাখ |
৩০ জানু ২০২৩ |
Completed |
|
Repair and Maintenance work of the office of chief engineer, Superintendent Engineer and Executive Engineer at Khulna Dredger Operation Base during FY 2022-23
NDR-Maintenance-OTM-06/e-GP/20231003/780617/0095411
|
Khulna Dredger Division |
৳৯.০০ লাখ |
২৩ জানু ২০২৩ |
Completed |
|
(a) Improvement of Kalar Danga near Haren house to Nilphamari masjid & Amul house Road. (ch.00-1000)m [R.ID.173645066] (b) Construction of 01 no.(Size 0.625x0.600m) Culvert at ch. 742m on the same road (c) Construction of 02 no.(Size 2.500x1.500m) Culvert at ch. 270m, 506m on the same road. Upazila: Nilphamari-S, District: Nilphamari.
IRIDP-3/NIL/DW-50/e-GP/20241112/777952/00217274
|
Office of the Executive Engineer, LGED, Nilphamari |
৳৮৯.৮৭ লাখ |
১৬ জানু ২০২৩ |
Completed |
|
Dyke Construction for Dredging work of Modhumoti river (Chainage Km. 0.30 to KM 1.30) near Salamatpur, Modhukhali, Faridpur during FY 2022-23 as per direction of engineer in charge.
NDR-Modhukhali-OTM-01/e-GP/20231003/769514/0095418
|
Khulna Dredger Division |
৳৪৪.৯৯ লাখ |
২১ ডিসে ২০২২ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 07 Nos 1.65mX1.95m M.S Flap Gate at Kumirdanga Sluice (Vutiar Bill Dranage Prokolpo) with all accessories for Khulna O&M Division-1 under Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-14/W-26/2021-22/e-GP/20221009/704046/0050594
|
Khulna Mechanical Division |
৳৯.৫৮ লাখ |
২৬ মে ২০২২ |
Completed |
|
Construction of Internal RCC Road at Shimulbari Bongobondhu Degree College under Jaldhaka Upazila, Nilphamari
EXEN/EED/NIL/ICT COLLEGE/INTERNAL ROAD/2021-22/12/e-GP/20241212/699220/00234415
|
Office of the Executive Engineer, EED, Nilphamari District. |
৳৪.৫২ লাখ |
১৮ মে ২০২২ |
Completed |
|
Construction of Internal RCC Road at Polashbari College under Sadar Upazila, Nilphamari
EXEN/EED/NIL/ICT COLLEGE/INTERNAL ROAD/2021-22/10/e-GP/20241212/699218/00234418
|
Office of the Executive Engineer, EED, Nilphamari District. |
৳৪.৫২ লাখ |
১৮ মে ২০২২ |
Completed |
|
Repair and Maintenance of Khuzra 10-Vent Regulator, Arzakhali 5-Vent Regulator, Doayni 3-Vent Sluice, Vodropara 2-Vent Sluice, Joygasi 2-Vent Sluice, Roghunathpur 2-Vent Sluice, Shoshikhali 3-Vent Sluice & Mobhuck Sluice under gabkhali and Bemorta Sub-project in polder 34/3 and 36/1 under Bagerhat O&M Division,BWDB, Bagerhat during the year 2021-22
Bag/NDR/OTM/SLUICE/W-01/2021-22/e-GP/20221011/685097/0050716
|
Bagerhat O&M Division |
৳৩৪.১৫ লাখ |
২৪ এপ্রিল ২০২২ |
Completed |
|
Suppling, Fitting-Fixing and Installation of Flap Gate in Polder 3, 5 & satkhira-kaloroa drainage project at Satkhira O&M Division-1, BWDB, Satkhira under Operating Budget, during the year 2021-22
Sat 1/W 7/21-22/e-GP/20221211/653060/0056355
|
Satkhira O&M Division-1 |
৳২৫.২০ লাখ |
১৮ এপ্রিল ২০২২ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 04 Nos 2.08mX1.95m M.S Lift Gate at FS-1, FS-2 & FS-6 Sluice of Polder No. 20 & 04 Nos Pedestal type lifting device at FS-1, FS-4 & FS-6 Sluice of Polder No. 20 with all accessories for Khulna O&M Division-2 under Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-13/W-22/2021-22/e-GP/20221009/681015/0050593
|
Khulna Mechanical Division |
৳১০.৭০ লাখ |
৬ এপ্রিল ২০২২ |
Completed |
|
Earth work (14400 Cum) by Mechanical Excavator (Long Boom ) in constructing/ resectioning of embankment/ canal bank/road etc. with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and all lifts including throwing the spoils to profiles in layers not exceeding 150mm in thickness, clod breaking upto a maximum size of 100mm, benching the side slopes, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth, with uprooting stumps, clearing jungles, rough dressing and 150mm cambering at the centre of the crest etc. complete as per specification and direction of Engineer in charge & Construction and dismanteling of outlet (2 each) for dumping and disposal of water from disposal area by shore pipe by using necessary gunny bags, rope, wire, polytheen, rubber gasket, nut-bolt etc. complete as per direction of engineering in charge for Dredging work of Salamatpur at Faridpur Modukhali, Kamarkhali,from Km. 0.00 to 1.30 Km Under Khulna Dredger Operation Division ,BWDB, Lobonchora, Khulna During Year 2021-22.
KDD/OTM-20/2021-22/e-GP/20221009/668502/0050566
|
Khulna Dredger Division |
৳১৮.৬৬ লাখ |
১৪ মার্চ ২০২২ |
Completed |
|
Improvement by BC of Charkashi-Haulbhanga Road from Ch.1000-1600m (Road ID No. 393385025) Under Gopalpur Upazila, District : Tangail.
IRIDP/TAN/Gopalpur/VR/69/e-GP/2023920/660461/0085150
|
Office of the Executive Engineer, LGED, Tangail |
৳৫২.১৩ লাখ |
১৪ ফেব ২০২২ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 03 Nos 1.65mX1.95m M.S Flap Gate at Nandonprotab Sluice (Barakpur Digholia Prokolpo) & 06 Nos Lifting Device at Shoilmari Sluice (Polder No. 27/2) with all accessories for Khulna O&M Division-1 under Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-05/W-13/2021-22/e-GP/20221009/652507/0050585
|
Khulna Mechanical Division |
৳৯.৮৩ লাখ |
১ ফেব ২০২২ |
Completed |
|
Manufacturing, Painting and Supplying of 10 Nos1.65mX1.95m M.S Flap Gate at Khulna Mechanical Workshop Sub Division under Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-02/W-10/2021-22/e-GP/20221009/652504/0050578
|
Khulna Mechanical Division |
৳১৩.০৬ লাখ |
১ ফেব ২০২২ |
Completed |
|
Repair and Maintenance works of the Executive Engineer and Sub-Divisional Engineer's Office by Installing new Floor Tiles, Replastering wall & Ceiling, Painting work of the Rooms of Executive Engineer's Office and Installation of Y Shaped Fencing at the Boundary wall of Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-12/W-20/2021-22/e-GP/20221009/652514/0050591
|
Khulna Mechanical Division |
৳১২.২৩ লাখ |
১ ফেব ২০২২ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 04 Nos 1.65mX1.95m M.S Flap Gate at Hanirabad Sluice (Polder No. 20), DS-4 (4-Vent) Sluice, DS-9 (1-Vent) Sluice (Polder No. 31) & Repairing of 1 Nos 1.65mX1.95m at DS-4 (4-Vent) Sluice (Polder No. 31) with all accessories for Khulna O&M Division-2 under Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-06/W-14/2021-22/e-GP/20221009/652508/0050587
|
Khulna Mechanical Division |
৳৬.০১ লাখ |
১ ফেব ২০২২ |
Completed |
|
Manufacturing, Painting and Supplying of 6 Nos 1.65mX1.95m M.S Flap Gate at Jashore Mechanical Water Development Sub Division under Khulna Mechanical Division, BWDB, Khulna During the year 2021-22.
KMD/OTM-04/W-12/2021-22/e-GP/20221009/652506/0050583
|
Khulna Mechanical Division |
৳৭.১৭ লাখ |
১ ফেব ২০২২ |
Completed |
|
Construction and dismantling of temporary/ permanent Shore pipe line at ground level laying on the ground or on 50 kg gunny bag where necessary,lifting manually/by tripod stand with chain pulley, fitting/fixing shore pipe with nut-bolt & rubber gasket,leveling & dressing uneven ground where necessary, including cost of necessary jute string, GI wire etc complete for Dredging/Filling work At Shamnagar, Ashsuni, Kaira Upazila, Dist:- Satkhira Under Khulna Dredger Operation Division, BWDB, Khulna During Year 2021-22 (Total=3150m)
KDD/OTM-10/2021-22/e-GP/20221009/648571/0050563
|
Khulna Dredger Division |
৳১৪.০৬ লাখ |
১৭ জানু ২০২২ |
Completed |
|
Vertical Extension of 1st, 2nd and 3rd Floor of Existing Academic Building of four storied foundation in/c Sanitary, Electrification works at Kokoi Borogacha High School under Sadar Upazilla Dist. Nilphamari. (Category-C4)
EXEN/EED/NIL/Vertical/2021-22/e-GP/20241211/623449/00233149
|
Office of the Executive Engineer, EED, Nilphamari District. |
৳১.৫২ কোটি |
১৪ নভে ২০২১ |
Completed |
|
Improvement of Bolihar RHD (H/O samsul road at Ch. 00m-500m. Road ID No: 181105028 under Bagha Upazila, Dist. Rajshahi.
RDRIDP/ Raj/Bagha-54/21-22/e-GP/20240912/606614/00175135
|
Office of the Executive Engineer, LGED, Rajshahi |
৳৩২.৪২ লাখ |
৮ সেপ ২০২১ |
Completed |
|
Running Repair & Maintenance work of CSD Jaldhaka-01,26" such as Replace of Thrust ball bearing,Topper Roller bearing, Throttle Linner, Rubber oil seal,Dismantelling & Fitting Fixing With Carring Work for Tentulia River Char Dredging Work at Sreepur, Mehendigong, Barisal Under Khulna Dredger Division, BWDB, Labonchara, Khulna During The Year 2020-21.
XEN/KDD/OTM-22/2020-21/e-GP/20220528/585522/003031
|
Khulna Dredger Division |
৳৩.০৪ লাখ |
৬ জুন ২০২১ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 3 nos vertical lift gate, 3 nos flap gate & 3 nos Hand wheel lifting device with all necessary materials of proper grade for different sluices At Kakmari Sluice of Blue Gold program at Polder # 26 under Khulna O&M Division-1 during the year 2020-21.
KMD/BGP/KHU-1/OTM/W-13/2020-2021/e-GP/20220614/576595/006855
|
Khulna Mechanical Division |
৳১৬.১১ লাখ |
৫ মে ২০২১ |
Completed |
|
Supply & repair of lift gate Flap gate lifting device of Kagura 3v-1.50mx1.80m sluice Purbo Balibunia Box inlet 1v-1.20m x 1.20m Kalagachia 1v-0.600m dia inlet Old Bamna 2v-1.50m x 1.80m sluice & Kumirmara 2v-1.50m x 1.80m sluice in Polder no-39/1D & 39/2A under NDR Budget at Barguna O&M Division BWDB Barguna during the year 2020-2021
BR-NDR-30/2020-21/e-GP/20220525/554988/002870
|
Barguna O&M Division |
৳১৬.৯৫ লাখ |
৭ মার্চ ২০২১ |
Completed |
|
Manufacturing Painting Supplying & Installation of 2 nos vertical lift gate 2 nos flap gate & 2 nos Hand wheel lifiting device with all necessary materials of proper grade for different sluices At Badnakhali Sluice of Blue Gold program at Polder 28/2 under Khulna O&M Division-1 during the year 2020-2021.
KMD/BGP/KHU-1/OTM/W-06/2020-2021/e-GP/20220616/548034/007312
|
Khulna Mechanical Division |
৳১১.৩৬ লাখ |
১৭ ফেব ২০২১ |
Completed |
|
Manufacturing Painting Supplying & Installation of 4 nos vertical lift gate 4 nos flap gate & 4 nos Hand wheel lifiting device with all necessary materials of proper grade for Kewratola Sluice of Blue Gold program at Polder 25 under Khulna O&M Division-1 during the year 2020-2021.
KMD/BGP/KHU-1/OTM/W-05/2020-2021/e-GP/20220614/548033/006852
|
Khulna Mechanical Division |
৳২২.৫৫ লাখ |
১৭ ফেব ২০২১ |
Completed |
|
Supply of Security Labour for Guarding The Dredger Along With Related All Equipments For Dredging works Of Tentulia River Char Dredging at Sreepur Mehendigong Barisal From Km 0.950 To Km 2.200 1.250 km 2nd Stage Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2020-21.
XEN/KDD/OTM-04/2020-21/e-GP/20220527/544505/003004
|
Khulna Dredger Division |
৳১০.০৫ লাখ |
৭ ফেব ২০২১ |
Completed |
|
Removal of Slushy earth Sediment and waste from primary pump house chamber and intake side of 25 cusec different primany pump of Barishal Irrigation Project Under Barishal Mechanical O&M Division BWDB Barishal during the year 2020-2021.
BMOD/OTM/W-2/2020-21/e-GP/20220704/518066/0025595
|
Barisal Mech. O&M Division |
৳৪.৯৯ লাখ |
৭ ডিসে ২০২০ |
Completed |
|
Maintenance of Andharkotha R&H-Kholabona Madrasha Road from Ch 00m-700m Road ID No. 181724025 Under Paba Upazila Rajshahi District.
LGED/Raj/VRRP/Re-hab/20-21/W-1362/e-GP/20240921/514503/00179012
|
Office of the Executive Engineer, LGED, Rajshahi |
৳২৫.০৮ লাখ |
১৯ নভে ২০২০ |
Completed |
|
Construction of single storied Academic Building with 4- storied foundation to including sanitary water supply & electrification works at Dadpur Gargari High School Bagha Rajshahi. FY-2017-18
7016/New Cons-17-18/2020-21/01/e-GP/20241121/506142/00221666
|
Office of the Executive Engineer, EED, Rajshahi, District. |
৳৭৬.৭৪ লাখ |
২৫ অক্টো ২০২০ |
Completed |
|
Construction of class room of Ghotoil Govt. Primary school under NBIDGPS Project-1
e-Tender/NBIDGPS/C/NAC/2019-20/W1.05421/e-GP/20241029/504749/00206969
|
Office of the Upazila Engineer, LGED, Nachole, Chapai Nawbaganj |
৳৮৬.৫৮ লাখ |
২২ অক্টো ২০২০ |
Completed |
|
Construction and Dismantelling Of Temporary/Permenent MS Shore Pipe Line On Ground & Staging for Dredging works Of Borni BaorTungipara Gopalgong From Km 2.200 To Km 4.700 2.500 k m Left Dyke Group No -P/01 on ground 1656 m & on staging 180 m Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20 & 2020-21
XEN/KDD/OTM-26/2019-20/e-GP/20220529/476775/003347
|
Khulna Dredger Division |
৳১০.৭৭ লাখ |
২ জুলাই ২০২০ |
Completed |
|
Manufacturing Painting Supplying & Installation of 2 nos vertical lift gate 2 nos flap gate 2 nos slanting frame & 2 nos Hand wheel lifting device with all necessary materials of proper grade for Hajikhali & Budhata Sluice of Blue Gold program at Polder 2 under Satkhira O&M Division-2 during the year 2019-20.
KMD/SAT-02/BG/OTM/W-14/2019-2020 /e-GP/20220616/454716/007310
|
Khulna Mechanical Division |
৳১১.৮৯ লাখ |
১৯ এপ্রিল ২০২০ |
Completed |
|
Supply fitting & fixing of 07 Nos 1.65X1.95m M.S Flap Gate at Kulbaria Sluice Polder No.17/2 with all accessories Manufacturing works in KMDs Workshop for Khulna O&M Division-1 under Khulna Mechanical Division BWDB Khulna During the year 2019-20.
KMD/KHU-1/OTM/W-06/2019-2020/e-GP/20220704/444187/0025611
|
Khulna Mechanical Division |
৳৮.৯১ লাখ |
১২ এপ্রিল ২০২০ |
Completed |
|
Supply fitting & fixing of 04 Nos 1.65X1.95m M.S Flap Gate at Boiltoli Khalia Sluice Polder No. 04 & 01 Nos Padestal type Lifting device at Boiltoli Sluice Polder No. 04 with all accessories Manufacturing works in KMDs Workshop for Gopalganj O&M Division under Khulna Mechanical Division BWDB Khulna During the year 2019-20.
KMD/GOP/OTM/W-13/2019-2020/e-GP/20220704/444196/0025614
|
Khulna Mechanical Division |
৳৬.০১ লাখ |
১২ এপ্রিল ২০২০ |
Completed |
|
Supply fitting & fixing of 04 Nos 1.65X1.95m M.S Flap Gate at Nagorkandi Sluice Polder No.36/1 & 01 Nos Padestal type Lifting device at Nagorkandi Sluice Polder No.36/1 with all accessories Manufacturing works in KMDs Workshop for Bagerhat O&M Division under Khulna Mechanical Division BWDB Khulna During the year 2019-20.
KMD/BAG/OTM/W-12/2019-2020/e-GP/20220704/444195/0025613
|
Khulna Mechanical Division |
৳৬.৬৮ লাখ |
১২ এপ্রিল ২০২০ |
Completed |
|
Supply fitting & fixing of 09 Nos 1.65X1.95m M.S Flap Gate at Naranpur Khanjia Kholiskhali Sluice Polder No.03 Kashimari Sora Manikpur Sluice Polder No.05 & Cokbara Dumuria Sluice Polder No.15 with all accessories Manufacturing works in KMDs Workshop for Satkhira O&M Division-1 under Khulna Mechanical Division BWDB Khulna During the year 2019-20.
KMD/SAT-1/OTM/W-08/2019-2020/e-GP/20220704/444190/0025612
|
Khulna Mechanical Division |
৳১১.৬৪ লাখ |
১২ এপ্রিল ২০২০ |
Completed |
|
Supply of Shifting Labour For Connection & Disconnection Of Shore Pipe & Floating Pipe for Dredging works Of Shanda River Char Dredging Work At Hatkholar Char Uzirpur Barisal From Km 0.00 To Km 2.10 2.10 k m Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20.
XEN/KDD/OTM-20/2019-20/e-GP/20220527/450126/003011
|
Khulna Dredger Division |
৳১১.৩৯ লাখ |
২৫ মার্চ ২০২০ |
Completed |
|
Moblization & De-moblization with Loading Un-loading the M.S Shore pipe 500 mm Dia 6m Long Quantity 250 nos by enging boat 40 Ton Capacity from Austogram Kishargong to UzirpurBarisal & De-moblization from Uzirpur Barisal To Narayangong Dredger Base for Dredging works Of Shanda River Char Dredging Work Hatkholar Char At Uzirpur Barisal From Km 0.00 To Km 2.10 2.10 k m Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20.
XEN/KDD/OTM-14/2019-20/e-GP/20220527/450120/003009
|
Khulna Dredger Division |
৳১৮.৭৯ লাখ |
২৫ মার্চ ২০২০ |
Completed |
|
Manufacturing Painting Supplying & Installation of 7 nos vertical lift gate 7 nos flap gate 7 nos slanting frame & 7 nos Hand wheel lifiting device with all necessary materials of proper grade for Solua Sluice of Blue Gold program at Polder 25 under Khulna O&M Division-1 during the year 2019-20.
KMD/KHU-01/BG/OTM/W-2/2019-2020/e-GP/20220614/444197/006845
|
Khulna Mechanical Division |
৳৪২.৫৩ লাখ |
১৯ মার্চ ২০২০ |
Completed |
|
Manufacturing Painting Supplying & Installation of 1 no vertical lift gate 1 no flap gate 1 no slanting frame & 1 no Hand wheel lifiting device with all necessary materials of proper grade for Kallansree Sluice of Blue Gold program at Polder 31Part under Khulna O&M Division-2 during the year 2019-20.
KMD/KHU-02/BG/OTM/W-5/2019-2020/e-GP/20220704/444201/0025617
|
Khulna Mechanical Division |
৳৬.৫৯ লাখ |
১৯ মার্চ ২০২০ |
Completed |
|
Manufacturing Painting Supplying & Installation of 1 no vertical lift gate 1 no flap gate 1 no slanting frame & 1 no Hand wheel lifiting device with all necessary materials of proper grade for Kismot Fulltola Sluice of Blue Gold program at Polder 30 under Khulna O&M Division-2 during the year 2019-20.
KMD/KHU-02/BG/OTM/W-4/2019-2020/e-GP/20220704/444200/0025615
|
Khulna Mechanical Division |
৳৬.৫০ লাখ |
১৯ মার্চ ২০২০ |
Completed |