|
1) Minor Maintenance of 37.00m long RCC Girder Bridge on Harinal (RHD) - Pubail GC via Baria UP Office Road (St. from Titarkul Bridge) Road at Chainage: 7055m [333302012] under Gazipur Sadar Upazila, 2) Minor Maintenance of 61.00m long RCC Girder Bridge on Talchala Bazar - Fulbaria U.P Road at Chainage: 150m [333323004] under Kaliakoir Upazila, District: Gazipur
SupRB/Gazi/Maint/21-22/W-261/e-GP/20231028/656443/00117743
|
Office of the Executive Engineer, LGED, Gazipur |
৳৩৮.৪৬ লাখ |
১৬ ফেব ২০২২ |
Completed |
|
1. (Part-1) Improvement of RCC road on Labukhali Boga RHD (Pagla Baily Bridge) - Labukhali Old Bazar Road from Ch. oom -1010m Under Dumki Upazila Dist. Patuakhali [Road ID 578964058] (Part-2) Construction of 01 nos RCC 2.00m x 2.00m Box Culvert on Labukhali Boga RHD (Pagla Baily Bridge)- Labukhali Old Bazar Road from Ch. 393m Under Dumki Upazila Dist. Patuakhali [Road ID 578964058] 2. Construction of Public Toilet Adjancent at Pangashia Neseria Kamil Madrasha Under Dumki Upazila Dist. Patuakhali. 3. Construction of Public Toilet Adjancent at Angaria Bazar Jame Mosque Under Dumki Upazila Dist. Patuakhali. 4. Construction of Public Toilet Adjancent at Talukder Hat Sreerampur Union Under Dumki Upazila Dist. Patuakhali.
UTMIDP-DUMK/PATU/WR-282//WT-66/e-GP/20241212/637289/00234716
|
Office of the Executive Engineer, LGED, Patuakhali |
৳২.০৩ কোটি |
২ জানু ২০২২ |
Completed |
|
Construction of 24.00m RCC Bridge on Gilabaria Bazar to Bashbaria Bazar via Abid Kha Road at Ch. 1.450 km under Galachipa Upazila, Dist: Patuakhali [Road ID: 578574086]
DIRIP-2/VR-Str-11/Patuakhali/2019-2020/e-GP/20241218/641476/00237036
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১.৬১ কোটি |
২৬ ডিসে ২০২১ |
Completed |
|
Construction of Rain Water Harvesting (RWH)Total 80 nos at Mollahat (55 nos) and Mongla (25 nos) Upazila For Landless and Houseless Family Through Mujib Barsho (2nd phase) In Bagerhat District Under Revenue Budget FY-2021-2022
000/e-GP/DPHE/2023-07-11/00626873
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৩৪.১৯ লাখ |
৯ নভে ২০২১ |
Completed |
|
Construction of Additional Class Room MODDHO MURADIYA GPS under PEDP4
e-Tender/PEDP4/PAT/DUM/2020-2021/W1.01455../e-GP/20241121/598015/00221662
|
Office of the Upazila Engineer, LGED, Dumki, Patuakhali |
৳১.২০ কোটি |
১৬ আগ ২০২১ |
Ongoing |
|
Installation of 06#(nos) Deep Tubewell 182 nos at Rampal Upazila in Bagerhat District Under Project for Safe Water Supply Throughout the Country(PSWSC) FY:2021-22
000/e-GP/DPHE/2023-07-11/00598213
|
Office of the Executive Engineer,DPHE Bagerhat |
৳১.২৫ কোটি |
১৬ আগ ২০২১ |
Completed |
|
Installation of 06#(nos) Deep Tubewell 130 nos at Bagerhat Sadar Upazila in Bagerhat District Under Project for Safe Water Supply Throughout the Country(PSWSC) FY:2021-22
000/e-GP/DPHE/2023-07-11/00598215
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৯২.৪৩ লাখ |
১৬ আগ ২০২১ |
Completed |
|
Installation of 06#(nos) Deep Tubewell 104 nos at Fakirhat Upazila in Bagerhat District Under Project for Safe Water Supply Throughout the Country(PSWSC) FY:2021-22
000/e-GP/DPHE/2023-07-11/00598208
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৭৪.১৫ লাখ |
১৬ আগ ২০২১ |
Completed |
|
Construction of Rain Water Harvesting (RWH) 143 nos at Chitalmary Upazila in Bagerhat District Under Project for Safe Water Supply Throughout the Country(PSWSC) FY:2021-22.
000/e-GP/DPHE/2023-07-11/00598220
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৫৯.৬১ লাখ |
১৬ আগ ২০২১ |
Completed |
|
Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021
000/e-GP/DPHE/2023-07-11/00590225
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৩০.০২ লাখ |
২৩ জুন ২০২১ |
Completed |
|
Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 7.062 to Km. 7.612 = 550.00 M in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River" Project under Nawabganj O&M Division BWDB, Chapainawabganj during the FY 2021-2022 & 2022-2023.
RHWP-03/e-GP/20241209/585144/00231558
|
Nawabganj O&M Division |
৳১৪.১৪ কোটি |
২২ জুন ২০২১ |
Ongoing |
|
Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 7.612 to Km. 8.162 = 550.00 M in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River" Project under Nawabganj O&M Division BWDB, Chapainawabganj during the FY 2021-2022 & 2022-2023.
RHWP-04/e-GP/20241209/585142/00231583
|
Nawabganj O&M Division |
৳১৪.১৪ কোটি |
২২ জুন ২০২১ |
Ongoing |
|
Re-sectioning of embankment Inbetween km 5.000 to km. 23.000 = 9000.00 m. along the Left bank of Atrai river in C/W Patnitola Sub Project in Union/Pourashova Nazipur, Anayetpur & Mohadevpur in Upazila Patnitola & Mohadevpur, District Naogaon under Naogaon O & M Division BWDB, Naogaon During The FY 2020-21.
Nao-W-9/e-GP/20241022/588314/00201788
|
Naogaon O&M Division |
৳৯.২১ কোটি |
১৫ জুন ২০২১ |
Completed |
|
An estimate for installation of 100 x 50 mm dia.35 nos tubewell with submersible pump capacity 1.5 HP with RO filter at different primary schools at Mongla Upazila in Bagerhat District under PEDP-4
000/e-GP/DPHE/2023-07-11/00576241
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৪১.২১ লাখ |
৫ মে ২০২১ |
Completed |
|
1. Supplying & fitting Fixing Submarsable Pump with Tube well at Sunura Bazar Koilati Union. Kalmakanda Upazila Dist Netrakona. 2. Construction of Pablic Toilet 1.52x1.37 at Sunura BazarKoilaty Union Kolmakanda Upazila. Dist Netrakona.
ADP/Kalma/2020-21/W-07/e-GP/20231125/552386/00136275
|
Office of the Upazila Engineer, Kalmakanda, Netrokona |
৳১.৯০ লাখ |
৭ মার্চ ২০২১ |
Completed |
|
Extension of executive engineers office Building DPHE Bagerhat under Revenue Budget FY-2020-2021
000/e-GP/DPHE/2023-07-11/00553505
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৩৬.০২ লাখ |
২৮ ফেব ২০২১ |
Completed |
|
Precautionary River bank Protection Work to Protect Salimpur Bandar and adjacent area in Batamar Union from km 0.470 to km 0.500 equal 30.00m & km 0.580 to km 0.615 equal 35.00m Total 65.00m from the erosion of Arialkhan river in Muladi Upazila District Barisal under Barishal O&M Division BWDB Barishal during the year 2020-21.
Barishal/NDR/2020-21/W-04/e-GP/20220812/545443/0029638
|
Barisal O&M Division |
৳৫৪.৪২ লাখ |
১৮ ফেব ২০২১ |
Completed |
|
Construction of One storied Bagerhat Sadar Upazila DPHE office Building with four storied foundation In Bagerhat District under Revenue Budget FY-2020-2021
000/e-GP/DPHE/2023-07-11/00526190
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৩৩.৪৫ লাখ |
২২ ডিসে ২০২০ |
Completed |
|
Construction of Rain Water Harvesting RWH Total 234 nos at Rampal 78 nos & Mongla 156 nos Upazila in Bagerhat District under Project for Safe Water Supply Throughout the Country PSWSC Fy-2020-2021
000/e-GP/DPHE/2023-07-11/00518943
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৯৮.৫৭ লাখ |
১ ডিসে ২০২০ |
Completed |
|
Re-excavation of Jujnal Khal from Km 10.000 to Km 15.000 total 5.000 Km in C/W Re-excavation of Small Rivers Khal and Water Bodiesin 64 District 1st Phasein Upazilla Bahubal District Habiganj under Habiganj O&M Division BWDB Habiganj.
Habiganj/W-10/2020-21/e-GP/20231115/513975/00127422
|
Habiganj O&M Division |
৳২.৩৭ কোটি |
১৮ নভে ২০২০ |
Completed |
|
Rehabilitation of Joy bangla bazar- Jagurani Bazar Road from Ch.00m-890m. Under Muktagacha Upazila District Mymensingh Road ID. 361654108
LGED/MYM/VRRP/Re-hab/20-21/W-1267/e-GP/20231014/507271/00107437
|
Office of the Executive Engineer, LGED, Mymensingh |
৳৩৫.৪৬ লাখ |
২ নভে ২০২০ |
Completed |
|
Bank Revetment work on the left bank of the Padma River at Shajahanpur from km 9.950 to km 10.225 275.00 m in connection with Protection of Charbandanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River under Nawabganj O&M Division BWDB Chapainawabganj during FY 2020-2021 & 2021-2022.
SWP-11/e-GP/20241208/501334/00230640
|
Nawabganj O&M Division |
৳১৭.৪৫ কোটি |
৮ অক্টো ২০২০ |
Ongoing |
|
Improvement of Babuganj GC-Patharghata GC Road Babuganj Bazar-Gora Padma Sagor to Kumirmara Forest office Sonatala Pucca Road including structure at Ch. 00m to 2200m Road ID-504282012 under Barguna Sadar Upazila District Barguna
IRIDPPB/BAR/SADAR/UZR-03/e-GP/20241203/496690/00227036
|
Office of the Executive Engineer, LGED, Barguna |
৳১.৮২ কোটি |
২৭ সেপ ২০২০ |
Completed |
|
Periodic Maintenance of Belgachi UP-Jehala UP Road from Ch. 5250m-6180m in Alamdanga Upazila Under Chuadanga District Overlay Road Code 218073015
e-Tender/LGED/Chua/GOBM/20-21/W-12/e-GP/20241009/490404/00193679
|
Office of the Executive Engineer, LGED, Chuadanga |
৳২১.৮৩ লাখ |
১০ সেপ ২০২০ |
Completed |
|
An estimate for safe water supply in climate change affected Rampal & Mongla upazila under Bagerhat district Fy-2020-2021.Technology Rain Water Harvesting RWH with PVC tank-192 nos
000/e-GP/DPHE/2023-07-11/00493299
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৯৫.০১ লাখ |
১০ সেপ ২০২০ |
Completed |
|
An estimate for safe water supply in climate change affected Rampal & Mongla upazila under Bagerhat district Fy-2020-2021.Technology Rain Water Harvesting RWH with PVC tank-200 nos
000/e-GP/DPHE/2023-07-11/00492991
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৯৮.৯৭ লাখ |
১০ সেপ ২০২০ |
Completed |
|
Periodic Maintenance of Kalam Khan Shop Gabtali GPS via Rofiqul Islam GPS Road from Ch. 00m-1915m Road ID504874110Taltali
e-Tender/LGED/Barg/GOBM/20-21/W-20/e-GP/20241211/489930/00233116
|
Office of the Executive Engineer, LGED, Barguna |
৳৩৯.৯৪ লাখ |
৬ সেপ ২০২০ |
Completed |
|
Construction of 45.00m Long RCC Girder Bridge RHDPairakunja Bazar to RHD Bus stand Badher hat Adjacent to the end of the paka road infront of the setara clinic at Ch.5060m Road ID 578954060
IBRP/Patu/Sadar/Brg-24/e-GP/20241202/447195/00226581
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৭.৪৩ কোটি |
২৭ এপ্রিল ২০২০ |
Completed |
|
Estimate For Construction Of Rain Water Harvesting Sharankhola-104 & Morrelganj-150 Total-254 Nos Upazila Bagerhat District Under Project Safe Water Supply Through Out The Country PSWSC FY-2019-20
000/e-GP/DPHE/2023-07-11/00452507
|
Office of the Executive Engineer,DPHE Bagerhat |
৳১.১৯ কোটি |
২০ এপ্রিল ২০২০ |
Completed |
|
Installation of 500 five hundred nos. Rain Water Harvesting under Safe Water Supply and Sanitation Project at Mathbaria Upazila in Pirojpur District of Department of Public Health Engineering.during the FY 2019-2020.
000/e-GP/DPHE/2023-07-11/00451896
|
Office of the Executive Engineer DPHE, Perojpur |
৳২.৩৩ কোটি |
৫ এপ্রিল ২০২০ |
Completed |
|
Installation of 500 five hundred nos. Rain Water Harvesting under Safe Water Supply and Sanitation Project at Mathbaria Upazila in Pirojpur District of Department of Public Health Engineering.during the FY 2019-2020.
000/e-GP/DPHE/2023-07-11/00451815
|
Office of the Executive Engineer DPHE, Perojpur |
৳২.৩৪ কোটি |
৫ এপ্রিল ২০২০ |
Completed |
|
Installation of 200 Nos. Rain Water Harvesting RWH With PVC Tank at Morrelgonj-100 Nos. Shrankhola-50 Nos & Rampal-50 Nos. in Bagerhat District under Safe Water Supply in Rural areas of Khulna Bagerhat & Satkhira District Project. FY 2019-2020.
000/e-GP/DPHE/2023-07-11/00447250
|
Office of the Executive Engineer,DPHE Bagerhat |
৳৯২.২১ লাখ |
১৮ মার্চ ২০২০ |
Completed |
|
Improvement of Goualgaon Purbapara Jame Mosque Union Battajure Latitude 25.193057 Longitude89.886068
GSIDP/JML/DW-133/e-GP/20231004/410403/0096988
|
Office of the Executive Engineer, LGED, Jamalpur |
৳৬.৮০ লাখ |
১২ জানু ২০২০ |
Completed |
|
Periodic Maintenance of Pandapara-Miridhapara Road from Ch. 00m-850m Under Mymensingh-S Upazila District Mymensingh. Road ID No 361524043
e-Tender/LGED/MYM/GOBM/19-20/W-70/e-GP/20230927/378093/0090959
|
Office of the Executive Engineer, LGED, Mymensingh |
৳২৭.৪০ লাখ |
২৭ নভে ২০১৯ |
Completed |
|
a Improvement of BC road from Rahmatpur Khanpura-Nomorhat road at Ch. 750-2200m under Babuganj Upazila District-Barishal. ID No 506034054. Salvage Materials Tk. 3462758.00 b Improvement of BC road from Degrirchar Jolabari - Dc Janab Delower Hossains house - Ghatkerchar Junior High School road at Ch. 0.00-970m including 01 No. 3.00mx3.00m RCC Box Culvert at ch. 910m and 02 Nos. 1.50mx1.50m RCC Box Culvert at ch. 405m & 750m under Babuganj Upazila District-Barishal. ID No 506035085. Salvage Materials Tk. 1957918.00 Total Salvaged Tk. 5420676.00
BJP/BAR/ BAB/ DW-90/e-GP/20241209/367847/00231708
|
Office of the Executive Engineer, LGED, Barisal |
৳১.৮২ কোটি |
৩০ অক্টো ২০১৯ |
Completed |
|
Construction of Class Room of Char Atjuri Primary School Under NBIDNNGPS Project Upazila Mollahat District Bagerhat 3H2V/F3WB
e-Tender/NBIDNNGPS/BAG/MOL/2019-2020/W1.04575/e-GP/20241102/354504/00210337
|
Office of the Upazila Engineer, LGED, Mollahat, Bagerhat |
৳৯৪.৭৫ লাখ |
১৮ সেপ ২০১৯ |
Completed |
|
Construction of 10nos. Public Toilet Sanitary Electrical works and water supply at Kuakata Pouroshava in Patuakhali District under Safe Water Supply and Sanitation Project FY 2019-2020
000/e-GP/DPHE/2023-07-11/00354543
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳১.৯১ কোটি |
১১ সেপ ২০১৯ |
Completed |
|
Construction of 96m long PSC Girder Bridge at Ch. 1500m over Srimonto river on Kathaltali GC-Patuakhali-Betagi RHD Thana Bridge road and Kathaltoli road under Mirzaganj Upazila District Patuakhali Road ID 578762004
CIB-Pat-W- 86 /e-GP/20241209/335575/00231602
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১২.৩০ কোটি |
১৯ জুন ২০১৯ |
Completed |
|
a Improvement of road from Daspara Khajurbaria High school west side of Khajurbaria Bazar GPS Road at including structure from Ch. 00m-3050m. Bauphal Road ID-578384239b Improvement of road by BC from Daspara Choerasta Bazar-Kaliya Road via Sona Boru hat including structure from Ch. 00m-2330. Bauphal Road ID-578384181
IRIDPPB/PAT/BAU/VR-1430/e-GP/20241219/289695/00237351
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৪.০৭ কোটি |
৩০ মে ২০১৯ |
Completed |
|
Improvement of Bolshapur Pacca Road-Nimtola J.K Canil road Nimtola Puraton Mosque-Boleshorpur sharderpara at Ch 00-1734m & Construction of 02 Nos U-Drain 625mm x 600mm at Ch 780m & 900m on same road Road ID No 218075238 Salvage Amount TK.425055.00 in Alamdanga Upazila Under Chuadanga District
GKRIDP/01/CW-28/e-GP/20241020/324093/00198841
|
Office of the Executive Engineer, LGED, Chuadanga |
৳১.২২ কোটি |
২৯ মে ২০১৯ |
Completed |
|
Part-A Improvement of Rehabilitation Kalapara BC- Chapli Bazar GC Via Baliatoli Ghat Bablatola Bazar Road from Ch. 6000m-10000m including structure Kalapara. Road ID- 578662002Part-B Improvement of Rehabilitation Kalapara BC- Chapli Bazar GC Via Baliatoli Ghat Bablatola Bazar Road from Ch.10000m-14000m including structure Kalapara. Road ID- 578662002 Salvage cost Tk. 2149467.00
IRIDPPB/PAT/KALA/MAIN/UZR-02 /e-GP/20220605/314703/004377
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৩.৮৮ কোটি |
২৩ মে ২০১৯ |
Completed |
|
Construction of 50.06 RCC Girder Bridge on Kathaltoli GC Trimukhi- Sailabunia Sluice RHD Road via Shishurhat at Ch.4300m. ID No. 578762003
BDRIDP/PAT/MIR/UZ-St/02/e-GP/20241218/306434/00236642
|
Office of the Executive Engineer, LGED, Patuakhali |
৳৩.১৮ কোটি |
১১ এপ্রিল ২০১৯ |
Completed |
|
Rehabilitation of Sreerampur Bazar Sreerampur School-UZR Kalikapur GPS via Maddya Sreerampur GPS road from Ch 00-2770m under Upazila Sadar District Patuakhali. Road ID No 578954196
FDR/Pat/18-19/VR/W-21/e-GP/20241212/288885/00233991
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১.৬০ কোটি |
২৮ ফেব ২০১৯ |
Completed |
|
Re-excavation of Dulal Dali Bari to Sholghar khal from km 0.00 to km 5.00 5.00 km in Charkhalakha Union of Upazilla Muladi District Barisal under Barisal O&M Division BWDB Barisal During the Year 2018-19
BARISAL-W-01/2018-19/e-GP/20220812/287756/0029637
|
Barisal O&M Division |
৳১.০২ কোটি |
২৬ ফেব ২০১৯ |
Completed |
|
Re-excavation of Baharchar Goshkati Shajhan Master Bari Via Goharur Bari to Honarable Minister Rashed Khan Manon MP Sir Bari khal from km 0.00 to km 5.00 5.00 km in Upazilla Babugonj District Barisal under Barisal O&M Division BWDB Barisal During the Year 2018-19
BARISAL-W-03/2018-19/e-GP/20220812/289829/0029636
|
Barisal O&M Division |
৳৯৯.৬০ লাখ |
২৬ ফেব ২০১৯ |
Completed |
|
Re-excavation of Patarchar 1 No Word Khaya Ghat to Muladi Union 1 No Word Gusso Gram khal from km 0.00 to km 3.50 3.50 km in Upazilla Muladi District Barisal under Barisal O&M Division BWDB Barisal During the Year 2018-19
BARISAL-W-02/2018-19/e-GP/20220813/287725/0029816
|
Barisal O&M Division |
৳৬৭.২২ লাখ |
২৬ ফেব ২০১৯ |
Completed |
|
Rehabilitation of Barguna - Betagi RHD - Tulatala mor - Fuljuri GC Road Ch. 00 - 6500m Upazila Betagi District Barguna. ID 504472004
FDR/Barg/18-19/W 06/e-GP/20241208/274463/00230036
|
Office of the Executive Engineer, LGED, Barguna |
৳২.৯৬ কোটি |
২৪ জানু ২০১৯ |
Completed |
|
a Improvement of BC road of Gobindo Sarkari Prathomic Biddaloy Connecting road Ch.00- 700m. School Code.303020102 b Improvement of HBB road of Bahadurpur Sarkari Prathomic Biddaloy Connecting road Ch.00- 527m. School Code.303110702 c Improvement of HBB road of Purabari Sarkari Prathomic Biddaloy Connecting road Ch.00- 391m. School Code303020901 d Improvement of HBB road of Golaia Sarkari Prathomic Biddaloy Connecting road Ch.00- 88m. School Code.303029204 Under Muktagacha Upazilla District Mymensingh.
MRRIDP/18/MYM/MUKT/SCR/122/e-GP/20231014/262996/00107255
|
Office of the Executive Engineer, LGED, Mymensingh |
৳১.০৯ কোটি |
২ জানু ২০১৯ |
Completed |
|
Pond Re-excavation Scheme During the year 2018-2019 under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads DPHE
000/e-GP/DPHE/2023-07-11/00259018
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳৯৬.৭৯ লাখ |
৯ ডিসে ২০১৮ |
Completed |
|
Construction of 5Five Storied Academic Building with 5Five Storied Foundation Ground Floor Open including Sanitary Water Supply & Internal Electrification Works at Mariam Memorial Girls High School under Dasmina upazilla Patuakhali District. Category-4
SNHS 27/e-GP/20250101/256131/00241450
|
Office of the Executive Engineer, Patuakhali Zone. |
৳৩.৯৬ কোটি |
২৮ নভে ২০১৮ |
Completed |