Construction of Regulator Name Plate in c/w Chilimpur-Chaligram Sub- project under Naogaon O&M Division BWDB, Naogaon during the FY 2023-2024.
OTM-5/2023-2024/e-GP/20241017/911416/00198067
|
Naogaon O&M Division |
৳১.৬৯ লাখ |
৩০ নভে ২০২৩ |
Completed |
|
Repair of Existing Damaged Bank Protection Work & Ancillary Work in various places in C/W "Raktadaha-Lohachura Beel Drainage Scheme" under Naogaon O&M Division, BWDB, Naogaon during the FY 2023-2024.
OTM-6/2023-2024/e-GP/20241022/911417/00202035
|
Naogaon O&M Division |
৳৫.৮০ লাখ |
৩০ নভে ২০২৩ |
Completed |
|
Construction of Regulator Name Plate in c/w Construction of Embankment on Right Bank of Atrai River Project under Naogaon O&M Division BWDB, Naogaon during the FY 2023-2024.
OTM-3/2023-2024/e-GP/20241028/911406/00205393
|
Naogaon O&M Division |
৳২.৫৪ লাখ |
৩০ নভে ২০২৩ |
Completed |
|
Dumping of CC Block to Protect the Foundation of Kashiabari Regulator in upazila- Atrai, District-Naogaon in C/W "Raktadaha-Lohachura Beel Drainage Scheme" under Naogaon O&M Division, BWDB, Naogaon during the FY 2023-2024.
OTM-1/2023-2024/e-GP/20241017/910399/00197967
|
Naogaon O&M Division |
৳৪.৩৭ লাখ |
৩০ নভে ২০২৩ |
Completed |
|
Tree Plantation works at right bank of flood control embankment of Tulshiganga River from km. 3.900 to km. 4.400 = 500 m and from km. 6.400 to km. 6.800 = 400 m Total 900 m in Khetlal upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-05/23-24/e-GP/20241120/902186/00220848
|
Joypurhat WD Division |
৳১৯.৮০ লাখ |
১৯ নভে ২০২৩ |
Completed |
|
Tree Plantation works at right bank of flood control embankment of Tulshiganga River from km. 3.000 to km. 3.900 = 900 m in Sadar & Khetlal upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-04/23-24/e-GP/20241120/902185/00220834
|
Joypurhat WD Division |
৳১৭.৮২ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Tree Plantation works in C/W different Completed projects Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-02/23-24/e-GP/20241124/902181/00222180
|
Joypurhat WD Division |
৳১৭.৮২ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Tree Plantation works at Little Jamuna left bank flood control embankment from km. 6.200 to km. 6.800 = 600 m in Sadar upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-03/23-24/e-GP/20241120/902184/00220807
|
Joypurhat WD Division |
৳৮.৯১ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Afforestation on the different Embankment in Rehabilitation of 3 Nos Project in Upazila-Dhamurhat, Patnitala & Mohadevpur, District-Naogaon and Bank Protection Project including Dredging of Atrai River under Naogaon O&M Division, BWDB, Naogaon during the Year 2023-2024.
Nao-W-16/e-GP/20241022/862546/00202036
|
Naogaon O&M Division |
৳৯.০০ লাখ |
১৬ আগ ২০২৩ |
Completed |
|
River bank rehabilitation work from km 6.500 to km 7.500= total 1.000 km in c/w Rajshahi Town Protection Project under Rajshahi O & M Division, BWDB, Rajshahi in FY 2022-23.
NDR/RTPP/OTM/04/e-GP/20241203/838309/00227151
|
Rajshahi O&M Division |
৳২২.৮০ লাখ |
২৫ মে ২০২৩ |
Completed |
|
Coloring, Greasing and Ancillary work of Borodhor 12-vent & Katadhar 2 vent regulator and Obstacle in c/w Naogaon Polder-1 Sub Project in upazila-Raninagar,District-Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.
OTM-04/2022-23/e-GP/20230818/819946/0078041
|
Naogaon O&M Division |
৳৩.৭৪ লাখ |
১৮ এপ্রিল ২০২৩ |
Completed |
|
Construction of Inlet/Outlet at Hapania Bazar in C/W Jobaibeel FCDI project in Upazila: Sapahar, District: Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY 2022-2023.
OTM-06/2022-23/e-GP/20241019/819948/00198497
|
Naogaon O&M Division |
৳৩.৮৫ লাখ |
১৮ এপ্রিল ২০২৩ |
Completed |
|
Civil Repair, Painting & Greasing of 1 Vent Shimultole, 1 Vent Nolpokra, 2 Vent Udoyshree Regulator in c/w Right Embankment of Atrai River Sub-Project in Upazila:-Dhamoirhat under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.
OTM-09/2022-23/e-GP/20241019/819951/00198455
|
Naogaon O&M Division |
৳৩.৬০ লাখ |
১৮ এপ্রিল ২০২৩ |
Completed |
|
Painting works of Boundary Wall of Rangpur Teesta Project Colony under Rangpur O&M Division, BWDB, Rangpur during the year 2022-2023.
OMB-OTM-10/e-GP/20230811/814485/0077621
|
Rangpur O&M Division |
৳৪.৫০ লাখ |
৬ এপ্রিল ২০২৩ |
Completed |
|
Repair & Maintenance works for SDE-1 General & office Bathroom, Teesta Building's Ladies' Prayer Room & Bathroom Room under Rangpur O&M Division, BWDB, Rangpur, during the years 2022-2023.
OMB-OTM-08/e-GP/20230811/814482/0077620
|
Rangpur O&M Division |
৳৪.৪৯ লাখ |
৬ এপ্রিল ২০২৩ |
Completed |
|
Repair & Maintenance of Lab & Mosque of the Rangpur O&M Division, BWDB, Rangpur during the years 2022-2023.
OMB-OTM-09/e-GP/20230811/814483/0077619
|
Rangpur O&M Division |
৳৪.৫০ লাখ |
৬ এপ্রিল ২০২৩ |
Completed |
|
Eviction works of Illegal Structure Nearby Structures, Irrigation and Drainage Canal of Various Project from Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2022-23.
Magura/NDR-35/2022-23/e-GP/20230811/790553/0077618
|
Magura O&M Division |
৳২.৭০ লাখ |
২৩ ফেব ২০২৩ |
Completed |
|
Survey and Exploration Works of Different Irrigation and Drainage Canal of Various Project of BWDB, Magura from Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2022-23.
Magura/NDR-34/2022-23/e-GP/20230810/790552/0077617
|
Magura O&M Division |
৳৪.৫০ লাখ |
২৩ ফেব ২০২৩ |
Completed |
|
Re-sectioning or Repair of Dhalai River Right Embankment from km 8.000 to km 8.290 in between 200 m at Bongaon in Kamalganj Upazilla District Moulvibazar under NDR Budget of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23
MOULV/NDR/2022-23/W-08/e-GP/20231220/789308/00156327
|
Moulvibazar O&M Division |
৳১০.২৫ লাখ |
১৫ ফেব ২০২৩ |
Completed |
|
Re-sectioning or Repair of Embankment from km 3.000 to km 7.000 in between 300 m in Vurvurichora at Srimongol Upazilla District Moulvibazar under NDR Budget of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23
MOULV/NDR/2022-23/W-11/e-GP/20231220/789311/00156332
|
Moulvibazar O&M Division |
৳৪.০১ লাখ |
১৫ ফেব ২০২৩ |
Completed |
|
Temporary protection work by Geo-bag on the left bank of Gopaldi river from km 33.400 to km 33.630 = 0.230 km in polder no 55/2D of Patuakhali O&M Division, BWDB, Patuakhali during FY 2022-23.
NDR/PTK/2022-23/W-02/e-GP/20231222/784341/00156555
|
Patuakhali O&M Division |
৳৫৭.৯১ লাখ |
৯ ফেব ২০২৩ |
Completed |
|
Annual repair work of different type of lift gates, flap gates & hoisting devices in c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2022-23.
OTM-06/MMOMD/2022-23/e-GP/20230811/785148/0077622
|
Moulvibazar Mech. O&M Division |
৳৪.৫০ লাখ |
৬ ফেব ২০২৩ |
Completed |
|
Tree Plantation work both bank of Pagla River in Upazila Nawabganj Sadar & Shibganj, Dist. Chapainawabganj in C/W "Re-Excavation of small River, Channel and water bodlies in 64 districts (1st Phase) (2nd Revised)" Project Uuder Nawabganj O&M Division, BWDB, Chapainawabganj during the FY 2022-2023.
OM/Tree-01/2022-2023/e-GP/20230814/774061/0077805
|
Nawabganj O&M Division |
৳২২.৪৯ লাখ |
১১ জানু ২০২৩ |
Completed |
|
Repair/Re-sectioning of flood control embankment in between km 133.307 to km 134.000 = 535.00 meter in c/w Challan Beel Project polder-C under Rajshahi O&M Division, BWDB, Rajshahi during the Fiscal Year 2022-2023.
NDR/Polder-C/01/e-GP/20241203/777671/00227169
|
Rajshahi O&M Division |
৳৩৪.১৯ লাখ |
১০ জানু ২০২৩ |
Ongoing |
|
Dismantling, Repair, & Installation with paint work of 8 (Eight) vent Regulator on Nabaganga River for Magura O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2022-2023.
GK/2022-23/Magura/OTM-03/e-GP/20230818/777941/0078036
|
Bheramara ME Division |
৳৮.১৩ লাখ |
১০ জানু ২০২৩ |
Completed |
|
Repair, Manufacturing & Installation of Satoir 4-Vent Regulator with paint work for Faridpur O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2022-2023.
GK/2022-23/Faridpur/OTM-01/e-GP/20230818/777793/0078035
|
Bheramara ME Division |
৳৯.৭৬ লাখ |
১০ জানু ২০২৩ |
Completed |
|
Repair of Little Jamuna River Left Embankment from km. 6.200 to km. 6.800 = 600.00 m in C/W Protection of Chechra Village Erosion from Little Jamuna River Border River and Tulshiganga Sub-Project in Upazilla Joypurhat Sadar, District Joypurhat under Joypurhat WD Division, BWDB, Joypurhat during the FY: 2022-23.
JOY/NDR/OTM/W-10/2022-23/e-GP/20241125/769446/00222990
|
Joypurhat WD Division |
৳১৩.৪৮ লাখ |
২২ ডিসে ২০২২ |
Ongoing |
|
Completion of incomplete works of " River Bank Protective Work along the left bank of Dhaleswari river in c/w Babupur-Lauhati FCD Project for a length of 400m (from km 11.320 to km 11.720) in UZ: Delduar of Tangail district during the year 2017-18" under NDR budget during the year 2021-22.
NDR/Gaskumulli/21-22/e-GP/20220920/682745/0042920
|
Tangail O&M Division |
৳১৩.৫১ লাখ |
৪ এপ্রিল ২০২২ |
Completed |
|
Repair, Manufacturing & Installation of 02 (two) no's vertical lift gate (Size:1.50m x 1.80m), 04 (four) no's Pedestal Type hoisting device with paint work for Modonkhali and jakersurra Regulator for Faridpur O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2021-2022.
GK/2021-22/Faridpur/OTM-01/e-GP/20221210/672691/0056332
|
Bheramara ME Division |
৳১১.৪৭ লাখ |
১৩ মার্চ ২০২২ |
Completed |
|
Temporary bank protective work at the right bank of Rahmatkhali khal Adjacent to Kalir char from km. 4.500 to km. 4.600 =0.100 K.M at tomchar union in sadar upazilla, district Lakshmipur in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-22 (LAK/OM/OTM/W-03/2021-2022).
LAK/OM/OTM/W-03/2021-2022/e-GP/20220921/657181/0043965
|
Laksmipur O&M Division |
৳৬.২৯ লাখ |
৭ ফেব ২০২২ |
Completed |
|
Tree Plantation Works at Various Dyke of Different Irrigation and Drainage Canal Under Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2021-22.
Magura/NDR-22/2021-22/e-GP/20220817/655168/0030427
|
Magura O&M Division |
৳৩.৬০ লাখ |
৬ ফেব ২০২২ |
Completed |
|
Annual repair and partial rehabilitation work of different type of gates & hoisting devices with accessories c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2021-22.
OTM-02/MMOMD/2021-22/e-GP/20220903/647439/0033390
|
Moulvibazar Mech. O&M Division |
৳৭.৬০ লাখ |
১ ফেব ২০২২ |
Completed |
|
Strengthing and Repairing of Hasnapara Spur-1 by Geo bag at BRE Km. 110.700
Rev/OTM-05/2021-22/e-GP/20220903/648321/0033387
|
Bogura O&M Division |
৳৮.৯৯ লাখ |
২৫ জানু ২০২২ |
Completed |
|
Construction of Main Gate for Derai O&M Sub-Division Office in Upazila-Derai, District-Sunamganj in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.
Sunam-2/NDR/2021-22/OTM-03/e-GP/20231122/646628/00135328
|
Sunamganj O&M Division-2 |
৳৬.৩০ লাখ |
১০ জানু ২০২২ |
Completed |
|
Construction of Boundary wall of Derai O&M Sub-Division Office in Upazila-Derai, District-Sunamganj in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.
Sunam-2/NDR/2021-22/OTM-02/e-GP/20231122/646627/00135326
|
Sunamganj O&M Division-2 |
৳৯.৪৪ লাখ |
১০ জানু ২০২২ |
Completed |
|
Construction of Sign Board for road crossing River/Khal in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.
Sunam-2/NDR/2021-22/OTM-01/e-GP/20231122/646626/00135330
|
Sunamganj O&M Division-2 |
৳৬.৬৬ লাখ |
১০ জানু ২০২২ |
Completed |
|
Breach closing of Baghabari to Nimaichora Flood Control Embankment from Km. 7.975 to Km. 8.000 Total 25.00m (near Ratanpur) and from Km. 24.484 to Km. 24.565 Total 80.00m (near Char Bhangura) Grand total 105.00m under Pabna O&M Division ,BWDB, Pabna during the FY: 2021-22
PAB/W-07/2021-22/e-GP/20220903/641523/0033370
|
Pabna O&M Division |
৳১১.৭৭ লাখ |
২৩ ডিসে ২০২১ |
Completed |
|
Repair & Maintenance of BWDB's Office, Colony & Rest House with Mosque under Pabna O&M Division, BWDB, Pabna during the FY: 2021-22.
PAB/W-06/2021-22/e-GP/20220903/629898/0033368
|
Pabna O&M Division |
৳১১.২৩ লাখ |
২২ নভে ২০২১ |
Completed |
|
Construction of C.C Drain at I3S19T9 irrigation canal From Km. 0.00 to Km. 0.205 Total=205.00 m in C/W PIRDP under Pabna O&M Division, BWDB, Pabna during the FY: 2021-22.
PAB/W-04/2021-22/e-GP/20220903/629887/0033372
|
Pabna O&M Division |
৳১০.৬৯ লাখ |
২২ নভে ২০২১ |
Completed |
|
Emergency repair and maintenance works to protect the slope of Embankment to control the seepage inbetween BRE km-133.280 to BRE km-133.680=400.0 m at Doripara in Upazila Sariakandi of Bogra District during the Flood of the year 2021
OTM-EMG-07-2020-2021/e-GP/20220903/587876/0033383
|
Bogura O&M Division |
৳১৮.০০ লাখ |
১৭ জুন ২০২১ |
Completed |
|
Repair maintenance and supply work for Non-residential building of Teesta Project Colony, Rangpur under Rangpur O & M Division, BWDB , Rangpur during the year 2020-2021.
Colony/OTM/Works-01/2020-21/e-GP/20220603/588066/003991
|
Rangpur O&M Division |
৳১৩.৪৯ লাখ |
১৪ জুন ২০২১ |
Completed |
|
Supply filling and dumping of 250 kg geo Bag for Emergency work, where and when necessary under Nawabganj O & M division BWDB, Chapainawabganj during FY-2020-2021 and 2021-2022.
NDR/Geo Bag/2020-2021/e-GP/20220621/579789/0011028
|
Nawabganj O&M Division |
৳৪০.৬৭ লাখ |
২০ মে ২০২১ |
Completed |
|
Repair & re-installation of 5 (Five) Nos. MS Lift Gate at Kanshat 5-Vent regulator of Nawabganj O&M Division under Bogura Mechanical Division, BWDB, Bogura During the FY 2020-21.
BMD/Gate/Nawabganj/LTM-30/2020-21/e-GP/20220621/579551/0011024
|
Bogura ME Division |
৳৫.৭০ লাখ |
১৭ মে ২০২১ |
Completed |
|
Strengthening of Embankment on emergency basis Work along Left Embankment of Manu River at Khaspremnagar at 7 no. Kamarchak Up in Rajnagar Upazila Chainage from Km 43.290 to 43.400 = 110 m in c/w Tarapasha-Premnagar FC Sub-Project under Moulvibazar O&M Division during the FY 2020-21.
LTM-27/2020-2021/e-GP/20220817/573684/0030433
|
Moulvibazar O&M Division |
৳১৬.৩৭ লাখ |
২ মে ২০২১ |
Completed |
|
Afforestration at different location in Lakshmipur District in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.
LAK/OM/OTM-10/2020-21/e-GP/20220622/572968/0011069
|
Laksmipur O&M Division |
৳১৬.২০ লাখ |
২৭ এপ্রিল ২০২১ |
Completed |
|
Operates of Rahmatkhali 2 Nos 14-Vent regulator, Monpura 1-Vent Regulator, Navigation gate and Jarirdhona 4-Vent Regulator in c/w Operation and Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.
LAK/OM/OTM-07/2020-21/e-GP/20220622/572964/0011059
|
Laksmipur O&M Division |
৳২.৭০ লাখ |
২৭ এপ্রিল ২০২১ |
Completed |
|
Changing Gear oil, Grease and wire rope of 14 Vent Rahmatkhali New Regulator in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.
LAK/OM/OTM-05/2020-21/e-GP/20220622/572962/0011040
|
Laksmipur O&M Division |
৳২.৬৯ লাখ |
২৭ এপ্রিল ২০২১ |
Completed |
|
Repair & maintenance of Rahmatkhali 14 nos. Radial gates internal metal parts of hoisting and supplying, fitting, fixing electric goods for repair of electric line device in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.
LAK/OM/OTM-06/2020-21/e-GP/20220622/572963/0011071
|
Laksmipur O&M Division |
৳২.৭০ লাখ |
২৭ এপ্রিল ২০২১ |
Completed |
|
Conducting Topographic, Bathymetric and Drone survey for preparation of DPP of -Protection work at the left bank of Meghna river at Borokheri, Ludhua bazar and kader ponditer hat areas in Ramgati and Kamalnagar Upazila under Lakshmipur District" in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.
LAK/OM/OTM-11/2020-21/e-GP/20220622/572969/0011046
|
Laksmipur O&M Division |
৳১০.৩৫ লাখ |
২৭ এপ্রিল ২০২১ |
Completed |
|
Removal of Water hyacinth from Rahmatkhali Khal from Km. 13.00 to 14.00 = 1.000 Km., Km. 18.00 to 19.500 = 1.50 Km., Wapda Khal km. 6.000 to km 7.000 = 1.000 Km. in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.
LAK/OM/OTM-04/2020-21/e-GP/20220622/572961/0011041
|
Laksmipur O&M Division |
৳৩.৫৯ লাখ |
২৭ এপ্রিল ২০২১ |
Completed |