Plastering, Painting, Changing of Door & Window and Sanitary repair works of H-type building Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/Colony-1/23-24/e-GP/20241120/913655/00220827
|
Joypurhat WD Division |
৳৭.২০ লাখ |
৫ ডিসে ২০২৩ |
Completed |
|
Construction of Embankment Name Plate at different location of Joypurhat district Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-07/23-24/e-GP/20241124/902188/00222183
|
Joypurhat WD Division |
৳২.৬৫ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Construction of Regulators Name Plate at different location of Joypurhat district Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-08/23-24/e-GP/20241124/902189/00222169
|
Joypurhat WD Division |
৳৬.৮৮ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Construction of 2 nos Female Teacher's & Girls Wash Block at i) Dostompur Girls High School & ii) S.N. Adarsha Girls High School under Pirganj Upazila.
INF-2021-22-559482-01/e-GP/20241023/875769/00202934
|
Office of the Upazila Engineer, Pirganj, Thakurgaon |
৳১৪.১২ লাখ |
২১ সেপ ২০২৩ |
Completed |
|
(A) Construction of CC Road and Pipe Drain Infront of Nizam house (ch: 00.00m-131.00m) at Karigorpara, Ward 07 under Bheramara Paurashava, Bheramara, Kushtia.(B) Construction of CC Road and Pipe Drain Eidgah road to Hazi Asadul house (ch: 00.00m-37.00m) at Kundupara, Ward 07 under Bheramara Paurashava, Bheramara, Kushtia.(C) Construction of CC Road and Pipe Drain Beside Mothpara Jame Moszid (ch: 00.00m-75.00m) at Mothpara, Ward 08 under Bheramara Paurashava, Bheramara, Kushtia.(D) Construction of CC Road and Pipe Drain Late Soto Shona house to Bamonpara road (ch: 00.00m-47.00m) at Bamonpara, Ward 08 under Bheramara Paurashava, Bheramara, Kushtia.
BHE/ADP/2022-23/W-08/e-GP/20241208/842307/00230893
|
Office of the Bheramara Pourashava, Kushtia |
৳১৬.২২ লাখ |
৮ জুন ২০২৩ |
Completed |
|
Survey Work for Design Preparation under various proposed development project under Sylhet O&M Division, BWDB, Sylhet during the FY: 2022-23.
OM/W-28/EMBK/2022-23/e-GP/20230817/839308/0077971
|
Sylhet O&M Division, BWDB |
৳৪.৯৯ লাখ |
২৯ মে ২০২৩ |
Completed |
|
Rest House repair of Shologhor colony in sunamganj sadar, Sunamganj district under Sunamganj o&m Division-1, BWDB, Sunamganj during the FY 2022-23.
Sunam-1/2022-23/NDR/OTM/W-10/e-GP/20231115/834519/00127772
|
Sunamganj O&M Division |
৳৩৬.০০ লাখ |
২১ মে ২০২৩ |
Completed |
|
Repair and Maintenance work of Rest house (Partly) in c/w colony maintenance Budget under Sunamganj O&M Division-1, BWDB, Sunamganj during the FY 2022-23.
Sunam-1/2022-23/NDR/OTM/W-08/e-GP/20231115/834515/00127769
|
Sunamganj O&M Division |
৳৫.১৭ লাখ |
২১ মে ২০২৩ |
Completed |
|
Placement of name plate on the River bank/canal/embankment in Dharmapasha, Madhanagar, Tahirpur, Bishwampur, Sunamganj Sadar and Jamalganj upazilla under Sunamganj O&M Division-1, BWDB, Sunamganj during the FY 2022-23.
Sunam-1/2022-23/NDR/OTM/W-07/e-GP/20231115/797347/00127800
|
Sunamganj O&M Division |
৳১.৮০ লাখ |
৭ মে ২০২৩ |
Completed |
|
Construction of 2 nos Guard Shed (Colony & Office campus) and Repair work for staff Barrak of Colony in c/w NDR Budget in Upazila:Sunamganj Sadar, District:Sunamganj under Sunamganj O&M Division-1, BWDB,Sunamganj during the FY 2022-23.
Sunam-1/2022-23/NDR/OTM/W-02/e-GP/20231115/797343/00127770
|
Sunamganj O&M Division |
৳৩.১৫ লাখ |
৭ মে ২০২৩ |
Completed |
|
Construction of Sign Board and Name Plate for different Haors and other structure in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2022-2023.
Sunam-2/ NDR/ 2022-23/ OTM/ W-11/e-GP/20231123/827221/00135901
|
Sunamganj O&M Division-2 |
৳১৩.৪৯ লাখ |
৭ মে ২০২৩ |
Completed |
|
Decoration and miscellaneous repair works of Sunamganj O&M Division-2, BWDB office building in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2022-2023.
Sunam-2/ NDR/ 2022-23/ OTM/ W-09/e-GP/20231123/819397/00135903
|
Sunamganj O&M Division-2 |
৳৮.৯৯ লাখ |
১৮ এপ্রিল ২০২৩ |
Completed |
|
Temporary Protective work in Rignt Bank of Khowai River in between km. 40.000 to km. 40.100 total 100 m at Ranigaon area of Chunarughat Upazila in Habiganj District in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the financial year 2022-23.
08/OB/Habi/OTM/22-23/e-GP/20231118/790778/00130079
|
Habiganj O&M Division |
৳২২.২৭ লাখ |
৯ এপ্রিল ২০২৩ |
Completed |
|
Construction of Ghatla/Stair in left bank of Khowai River in Murarband Mazar area of Chunarughat Upazila in Habiganj District in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the financial year 2022-23.
11/OB/Habi/OTM/22-23/e-GP/20231114/790781/00126931
|
Habiganj O&M Division |
৳৩.৬৯ লাখ |
৯ এপ্রিল ২০২৩ |
Completed |
|
Tree Plantation at different location of BWDB Moulvibazar Jurisdiction Embankment under NDR Budget of Moulvibazar O&M Division, BWDB Moulvibazar during the year 2022-23
MOULV/NDR/2022-23/W-03/e-GP/20231220/799625/00156335
|
Moulvibazar O&M Division |
৳৩.৫৬ লাখ |
২৩ মার্চ ২০২৩ |
Completed |
|
Survey works of Shakha Borak Canal along with establishment of BM values along the length and necessary mapping and processing of survey data in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the financial year 2022-23.
23/OB/Habi/OTM/22-23/e-GP/20231115/790787/00127379
|
Habiganj O&M Division |
৳৫.৩৪ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Maintenance dredging of Intake channel in Bibiyana South 400 MW combined cycle power plant in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the financial year 2022-23.
09/OB/Habi/OTM/22-23/e-GP/20231115/790779/00127456
|
Habiganj O&M Division |
৳৮.৯০ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Installation of collapsible gate, construction of Ansar Post, coloring and other repair-maintenance work of BWDB Shayestanagar Office Building in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the year 2022-2023.
01/OB/Habi/OTM/22-23/e-GP/20231118/790791/00130076
|
Habiganj O&M Division |
৳৫.৩৫ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Repair and maintenance of Anandapur Residential Colony Buildings and Jame Mosque of Anandapur Colony in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the year 2022-2023.
02/OB/Habi/OTM/22-23/e-GP/20231118/790792/00130078
|
Habiganj O&M Division |
৳৪.৪৫ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Removal of silt from different locations of Khowai River at sadar upazilla in Habiganj District in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the financial year 2022-23.
14/OB/Habi/OTM/22-23/e-GP/20231118/790784/00130052
|
Habiganj O&M Division |
৳৮.৯০ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Precautionary Protective work in Left Bank of Kushiyara River from km. 55.660 to km. 55.710 total 50 meter adjacent to DC Road at Bodolpur Union of Ajmiriganj Upazila in Habiganj District in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj in the financial year 2022-23.
07/OB/Habi/OTM/22-23/e-GP/20231118/790794/00130080
|
Habiganj O&M Division |
৳২৫.৩৯ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Construction of 1 no. outlet in left embankment of Khowai River in Ballah Border area of Chunarughat Upazila in Habiganj District in connection with Operating Budget under Habiganj O&M Division, BWDB, Habiganj during the financial year 2022-23.
12/OB/Habi/OTM/22-23/e-GP/20231115/790782/00127359
|
Habiganj O&M Division |
৳৪.৪৬ লাখ |
১৯ মার্চ ২০২৩ |
Completed |
|
Repair of Superintending Engineer's office at Shahi Eidgah, BWDB, Sylhet during the FY: 2022-23
OM/W-16/Colony/2022-23/e-GP/20230817/795852/0077972
|
Sylhet O&M Division, BWDB |
৳৬.৩০ লাখ |
৬ মার্চ ২০২৩ |
Completed |
|
Repair & Rehabilitation of Office Building at Shahi Eidgah, BWDB, Sylhet during the FY: 2022-23
OM/W-17/Colony/2022-23/e-GP/20230817/795853/0077974
|
Sylhet O&M Division, BWDB |
৳৮.৫০ লাখ |
৬ মার্চ ২০২৩ |
Completed |
|
Installation of Solar light & other essential work for security purpose of Varies Infrastructure at Sadar Upazila of Joypurhat Disctrict under Joypurhat WD Division, BWDB, Joypurhat during the FY 2022-2023.
JOY/NDR/OTM/W-12/2022-23./e-GP/20241116/797356/00223018
|
Joypurhat WD Division |
৳১৪.৩৬ লাখ |
৫ মার্চ ২০২৩ |
Completed |
|
Plantation of Karach/Hijol plant along the submersible embankment of Guramr and Tanguar haor in Tahirpur upazilla under Sunamganj O&M Division-1, BWDB, Sunamganj during the FY 2022-23.
Sunam-1/2022-23/NDR/OTM/W-06/e-GP/20231115/797346/00127771
|
Sunamganj O&M Division |
৳২.৭০ লাখ |
৫ মার্চ ২০২৩ |
Completed |
|
Repair and Maintenance work at BWDB Moulvibazar Jame Mosque in Moulvibazar Colony under NDR Budget (Economic Code 3258106) of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23
MOULV/NDR/2022-23/W-04/e-GP/20231220/791808/00156333
|
Moulvibazar O&M Division |
৳১৩.৯২ লাখ |
২২ ফেব ২০২৩ |
Completed |
|
Supply of Geo Bags (175 kg) for the protection of Boro Crops of different Haors of upazila- Shantiganj, Jagannathpur, Derai, Shalla, Dowarabazar and Chhatak of Sunamganj District from early flash flood in c/w NDR Budget under Sunamganj O&M Division-2, BWDB, Sunamganj During the FY 2022-23.
Sunam-2/ NDR/ 2022-23/ OTM/ W-02/e-GP/20231123/789286/00135895
|
Sunamganj O&M Division-2 |
৳৩৬.০০ লাখ |
১৪ ফেব ২০২৩ |
Completed |
|
Supplying, filling & placing of synthetic bags for protection of vulnerable submersible embankment in c/w NDR Budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the year 2022-23.
Sunam-2/ NDR/ 2022-23/ OTM/ W-01/e-GP/20231123/789249/00135898
|
Sunamganj O&M Division-2 |
৳১৩.৫০ লাখ |
১৪ ফেব ২০২৩ |
Completed |
|
Repair & Maintenence with Coloring of Executive Engineer's Earmarked Residence under Sylhet O&M Division, BWDB, Sylhet during the FY: 2022-23
OM/W-15/Colony/2022-23/e-GP/20230817/788580/0077973
|
Sylhet O&M Division, BWDB |
৳৪.১৮ লাখ |
৯ ফেব ২০২৩ |
Completed |
|
TBM placement with painting gauges according to SOB reference in new and old structures (Sluice gate, Regulators, Bridge, Culvert etc.) of haors in Upazilla- Dharmapasha, Moddhanagar, Tahirpur, Jamalganj, Bishwambarpur & Sadar Dist-Sunamganj under Sunamgonj O & M Division-1, BWDB, Sunamgonj during the FY: 2022-2023.
Sunam-1/2022-23/NDR/OTM/W-01/e-GP/20231115/780110/00127768
|
Sunamganj O&M Division |
৳৮.৯৯ লাখ |
১৮ জানু ২০২৩ |
Completed |
|
Periodic Maintenance of Nimtala RHD-Bharamara-Chithulia GC Road from Ch. 00m-3000m [Road ID No.250942006] [Upazila-Mirpur, District-Kushtia]
e-Tender/LGED/Kush/GOBM/22-23/W-09./e-GP/20240828/731820/00169742
|
Office of the Executive Engineer, LGED, Kushtia |
৳১.৭৮ কোটি |
২৫ সেপ ২০২২ |
Completed |
|
Repair & Maintenance of XEN Residence, SDE Residence ,Colony Residences and Boundary wall under Rajbari O&M Division during the year 2021-2022.
NDR/Rajbari/W-03/e-GP/20221024/690484/0051931
|
Rajbari O&M Division |
৳১৮.৯০ লাখ |
২৬ এপ্রিল ২০২২ |
Completed |
|
Repair & Maintenance of Joynagar PGCB Technical School Building under HVDC Circle, Ishwardi.
e-TENDER: WR-17/e-GP/20220912/674301/0036261
|
HVDC Circle |
৳১১.১২ লাখ |
১৫ মার্চ ২০২২ |
Completed |
|
Repair and maintenance work of Ilisher bari and camp at Natun Bazar Molehead at right bank of Dakatia river under Chandpur O&M Division, BWDB, Chandpur during the year 2021-2022.
CHAND/OM/W-24/2021-22/e-GP/20220911/636260/0035798
|
Chandpur O&M Division |
৳২.৬৭ লাখ |
৬ ফেব ২০২২ |
Completed |
|
Installation work of 2.5 feet Y-shaped barbed wire fence upon the security fencing of Kashimpur Pump House according to the KPI safety policy in c/w Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2021-22.
OTM-04/MMOMD/2021-22/e-GP/20220911/647441/0035592
|
Moulvibazar Mech. O&M Division |
৳৬.১১ লাখ |
১ ফেব ২০২২ |
Completed |
|
Repair Work of approach Embankment from K.M. 0.500 to K.M. 0.800 of Kashipur Water Control Structure under Thakurgaon O&M Division during the FY 2021-2022.
Tha-RB-07/2021-2022/e-GP/20220919/649644/0038603
|
Thakurgaon O&M Division |
৳২.৬৭ লাখ |
২০ জানু ২০২২ |
Completed |
|
Establishment of Digital Signboard with frame & all accessories and Banner in BWDB Joypurhat office under Joypurhat WD Division, BWDB, Joypurhat during the FY-2021-22.
JOY/NDR/W-05/2021-2022/e-GP/20220911/648372/0035786
|
Joypurhat WD Division |
৳৩.৬০ লাখ |
১৩ জানু ২০২২ |
Completed |
|
Repair of Little Jamuna River Left Embankment from km. 5.400 to km. 5.700 = 300.00 m in C/W Protection of Chechra Village Erosion from Little Jamuna River Border River and Tulshiganga Sub-Project in Upazilla Joypurhat Sadar, District Joypurhat under Joypurhat WD Division, BWDB, Joypurhat during the FY: 2021-2022.
JOY/NDR/W-02/2021-2022/e-GP/20220911/642010/0035788
|
Joypurhat WD Division |
৳৭.২০ লাখ |
২৮ ডিসে ২০২১ |
Completed |
|
Construction of signboard at different structure of BWDB during the year 2021-22 under Rangpur O & M Division BWDB Rangpur.
NDR-01/2021-2022/OTM/e-GP/20220914/640703/0036984
|
Rangpur O&M Division |
৳৮.৯০ লাখ |
২৩ ডিসে ২০২১ |
Completed |
|
Necessary Repair & Maintenance works for 103 houses for officers & employees to live inside the teesta project colony
NDR-09/2021-2022/ OTM/e-GP/20220914/640711/0036983
|
Rangpur O&M Division |
৳৮.৮৯ লাখ |
২৩ ডিসে ২০২১ |
Completed |
|
Painting & Repair works of the main building of Bangladesh Water Devolopement Board, Northern Zone, Rangpur
NDR-06/2021-2022/ OTM/e-GP/20220914/640709/0036982
|
Rangpur O&M Division |
৳৮.৯১ লাখ |
২৩ ডিসে ২০২১ |
Completed |
|
Repair of embankment from km 18.200 to km 18.400 = 0.200 km in Mirzagonj-Rampur Sub-Project of Patuakhali O&M Division, BWDB, Patuakhali during FY 2021-22.
NDR/PTK/21-22/W-15/e-GP/20220912/635008/0036081
|
Patuakhali O&M Division |
৳৩.৯২ লাখ |
৯ ডিসে ২০২১ |
Completed |
|
Repair of embankment in between km 7.500 to km 9.500, 0.400 km in Polder no-55/2E of Patuakhali O&M Division, BWDB, Patuakhali during FY 2021-22.
NDR/PTK/21-22/W-08/e-GP/20220912/635001/0036085
|
Patuakhali O&M Division |
৳৭.১৩ লাখ |
৯ ডিসে ২০২১ |
Completed |
|
Supply of Video Projector System (VPS) UHP Lamp at Bangladesh India Power Transmission Center, Bheramara under HVDC Circle, PGCB.
e-TENDER: HVDC GD-12/e-GP/20220912/634545/0036258
|
HVDC Circle |
৳৩.৯৬ লাখ |
৭ ডিসে ২০২১ |
Completed |
|
Repair of embankment from km 47.800 to km 48.000 = 0.200 km in Polder no-55/2D of Patuakhali O&M Division, BWDB, Patuakhali during FY 2021-22.
NDR/PTK/21-22/W-02/e-GP/20220912/631810/0036077
|
Patuakhali O&M Division |
৳৩.৫৬ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Installation of solar light at Rest House and colony of Patuakhali O&M Division, BWDB, Patuakhali during FY 2021-22.
NDR/PTK/21-22/W-06/e-GP/20220912/631815/0036079
|
Patuakhali O&M Division |
৳২.৭০ লাখ |
৩০ নভে ২০২১ |
Completed |
|
Construction of Pump House-03 Nos/Lot-04
EGPT/GFIADP/2021-22/WD-05/Lot-04/e-GP/20220914/600738/0036972
|
PD Office of Greater Faridpur Irrigation Area Development Project(4th Phase) |
৳৭.৪৩ লাখ |
২৩ সেপ ২০২১ |
Completed |
|
Construction of Pump House-03 Nos/Lot-02
EGPT/GFIADP/2021-22/WD-05/Lot-02/e-GP/20220914/600736/0036970
|
PD Office of Greater Faridpur Irrigation Area Development Project(4th Phase) |
৳৭.৪৩ লাখ |
২৩ সেপ ২০২১ |
Completed |
|
Re-excavation of khal/nala at different upazila under project area..
PD/PANASI/EGP/2021-22/WD-01/Lot-45/e-GP/20220913/602505/0036292
|
PD office of Pabna Natore Sirajgonj Districts Irrigation Development through surface water Project. |
৳৭.২০ লাখ |
১৬ সেপ ২০২১ |
Completed |