|
Repair with Carpeting and Seal Coat work from Ch. 134+885 to 135+180 of Daulatdia-Faridpur (Golachamot) - Magura-Jhenaidah-Jashore-Khulna-Mongla (Digraj) Road (N-7) under Road Division Jashore during the year 2020-2021.
e-GP/EE/JRD-Minor/2020-21/13/e-GP/20220730/576031/0027873
|
Road Division, Jessore |
৳২৭.০৯ লাখ |
৩ মে ২০২১ |
Completed |
|
Necessary Repairing work of Damage Bridge and Culvert Railling, Rail Post & Foot path slab and painting Work in railling post and Rail of (i) Curnilla-Lalmai-Chandpur-Laxmipur-Begumganj Road (R- 140), (ii) Baburhat-Matlab-Pennai Road (Z-1402), (iii) BakilaÂTekerhat-Janatabazar-Matlab Dakhin (Narayanpur) Road (Z-1482), (iv)Vhangerpar-Anayatnogor Road (Z-1418) under Road division Chandpur during the year 2020 -2021.
egp/CRD/EE/40/2020-2021/e-GP/20230227/568044/0062186
|
Road Division, Chandpur |
৳২৪.৪৮ লাখ |
২১ এপ্রিল ২০২১ |
Completed |
|
Protective work with RCC Palisiding & Earth work at 2nd Km (p) & 3rd Km (p) of Rahamatpur- Babuganj-Muladi-Hizla Road (Z-8034) Under Barishal Road Division during the Year 2020-2021.
44/e-GP/BRD/2020-2021/e-GP/20220529/569079/003387
|
Barisal Road Division |
৳২২.২৮ লাখ |
১৩ এপ্রিল ২০২১ |
Completed |
|
Providing and Installation of Road Directional Signboard, Traffic Sign, Sign Post, Road Marking at 137th to 165th km. of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali (N-8) Road & at 15th to 22nd km. of Gariarpar-Banaripara-Sawrupkati-Kawkhali-Naikati Road (Z-8033) under Barishal Road Division during the year 2020-2021.
33/e-GP/BRD/2020-2021/e-GP/20220529/569076/003324
|
Barisal Road Division |
৳১৪.৯২ লাখ |
১৩ এপ্রিল ২০২১ |
Completed |
|
Repairing of depression, undulation & damaged pavement by Aggregate Base Type-II with carpeting & Single Bituminous Surface Treatment (SBST) at 3rd, 4th, 5th & 6th (P) Km. of Cumilla-Fakirbazar-Salda-Kosba (Saiadabad) Road (N-114) under Road Division, Cumilla during the year 2020-2021.
e-GP/52/CRD/2020-2021/e-GP/20220605/568148/004415
|
Road Division, Comilla |
৳৬০.৮৬ লাখ |
১১ এপ্রিল ২০২১ |
Completed |
|
Construction of HBB Pavement work at 9th P & 10th p km of Hizla-Mehendigonj-Barishal Road Z-8043 under Barishal Road Division during the year 2020-2021
36/e-GP/BRD/2020-2021/e-GP/20220601/551654/003690
|
Barisal Road Division |
৳৪৪.৮৭ লাখ |
১১ এপ্রিল ২০২১ |
Completed |
|
Emergency Repair with Carpeting & Seal Coat work at Ch. 7+120 to 7+160, Ch. 7+405 to 7+575 & Ch. 8+000 to 9+000 of Mirdpur-Shehala-Pragpur BDR Camp Road (Z-7461) under Road Road Division Kushtia during the year 2020-2021.
e-GP/R/W-40/KURD/2020-2021/e-GP/20220601/565464/003716
|
Kushtia Road Division |
৳৩৬.৮৬ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Emergency Repair of Potholes, Depration and undulation by Carpeting & Seal coat work at Ch. 4+300 to 5+100 = 800m, Ch. 7+000 to 7+900 = 900m Total = 1700m of Bheramara (GK Bandh 3 No Bridge)-Mirpur Thana Road (Z-7463) under Road Division Kushtia during the year 2020-2021.
e-GP/R/W-39/KURD/2020-2021/e-GP/20220529/565463/003391
|
Kushtia Road Division |
৳২২.৫০ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Emergency Repair of Potholes Rutting, Depration and undulation by Aggregate Base Type-II, Carpeting & Seal coat work for damaged pavement at Ch. 5+100 to Ch. 6+500 = 1400m & Ch. 10+000 to Ch. 10+100 = 100m Total = 1500m of Bhermara (GK Bandh 3 No Bridge)-Mirpur Thana Road (Z-7463) under Road Division, Kushtia during the year 2020-2021.
e-GP/R/W-37/KURD/2020-2021/e-GP/20220601/565460/003695
|
Kushtia Road Division |
৳২৮.১৮ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Earth filling and palisiding work (Toe wall) at 2nd (P) & 3rd (P) Km at Ch. 1+800 to 1+900 & Ch. 2+700 to 2+800 of Bheramara (GK Bandh 3 No Bridge)-Mirpur Thana Road (Z-7463) under Road Division Kushtia during the year 2020-2021.
e-GP/R/W-42/KURD/2020-2021/e-GP/20220529/565466/003340
|
Kushtia Road Division |
৳১৭.০৩ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Emergency Repair by Aggregate Base Type-2 and Carpeting with seal coat work at Ch. 1570 to Ch. 2100 Ch. 3400 to Ch. 3700 Ch. 13100 to Ch. 13650 Ch. 13750 to Ch. 13852 Ch. 14053 to Ch. 14400 & Ch. 14600 to Ch. 15000 Total 2229.00m Damaged Portion Ishwardi-Paikpara-Mirzapur-Fultola-Singra-Vabanigonj Road Z-7105 under Road Division Kushtia during the year 2020-2021.
e-GP/R/W-36/KURD/2020-2021/e-GP/20220601/544213/003719
|
Kushtia Road Division |
৳৮৯.৯৯ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Emergency Repair with Carpeting & Seal Coat work at Ch. 29+500 to 29+900, Ch. 30+370 to 30+650, Ch. 31+000 to 31+300, Ch. 31+660 to 31+850 & Ch. 31+900 to 31+930 of Mirdpur-Shehala-Pragpur BDR Camp Road (Z-7461) under Road Road Division Kushtia during the year 2020-2021.
e-GP/R/W-38/KURD/2020-2021/e-GP/20220601/565462/003710
|
Kushtia Road Division |
৳৩৫.৯৮ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Emergency Repair with Carpeting & Seal Coat work at Ch. 17+100 to 17+300, Ch. 17+500 to 17+580, Ch. 17+900 to 18+000, Ch. 18+050 to 18+080, Ch. 19+150 to 19+250 & Ch. 20+320 to 20+340 of Mirdpur-Shehala-Pragpur BDR Camp Road (Z-7461) under Road Road Division Kushtia during the year 2020-2021.
e-GP/R/W-41/KURD/2020-2021/e-GP/20220601/565465/003713
|
Kushtia Road Division |
৳৪২.৩৬ লাখ |
৬ এপ্রিল ২০২১ |
Completed |
|
Emergency Supplying & fitting Fixing of different Size & Shape Overhead directional sign board Sign Signal & Sign Post at different important location from i Baburhat-Matlab-Pennai Road Z-1402 ii KachuaGulbahar-Kashimpur Matlab Dakkin road Z-1445 iii BhangarparEnayetnagar Road Z-1418 under Road Division Chandpur during the year 2020-2021.
egp/CRD/EE/37/2020-2021/e-GP/20230227/561385/0062190
|
Road Division, Chandpur |
৳১৫.৪৩ লাখ |
৫ এপ্রিল ২০২১ |
Completed |
|
Emergency Necessary Repairing on the Existing Damaged Pavement Carpeting on Repair Portion, Seal Coat Work, Protective Work by Providing Brick Toe Wall & Earth Work Inside of Toe Wall Portion at 3rd km (p) & 4th Km (p) Ch: 2940m to 3097m (R/S) of Bakila - Takerhat-Janatabazar -Narayanpur (Matlab Dakkin) Road (Z-1482) under road Division Chandpur during the year 2020-2021.
egp/CRD/EE/38/2020-2021/e-GP/20230227/563619/0062191
|
Road Division, Chandpur |
৳৩৯.৩০ লাখ |
৫ এপ্রিল ২০২১ |
Completed |
|
Existing Pavement repairing by Seal Coat Work at 33th(P) km, 34th(P) km, 35th(P) km, 36th(P) km & 37th(P) km of Sunamganj-Netrokona-Mymensingh-Sherpur-Jamalpur(Dhanuakamalpur) Road (Z-2834) under Sherpur Road Division during the year 2020-2021.
31/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220528/564730/003116
|
Sherpur Road Division |
৳১৮.১৯ লাখ |
৫ এপ্রিল ২০২১ |
Completed |
|
Necessary repairing on the existing damaged pavement Carpeting on repair portion Seal Coat Work & Earth Work at 8th km p 9th Km & 10th Km of Bakila - Takerhat-Janatabazar -Narayonpur Matlab Dakkin Road Z-1482 Under Road Division Chandpur during the year 2020-2021.
egp/CRD/EE/35/2020-2021/e-GP/20230227/561383/0062188
|
Road Division, Chandpur |
৳২৩.৭৮ লাখ |
৫ এপ্রিল ২০২১ |
Completed |
|
Construction of Boundary Wall & Renovation Work of matlab Toll Plaza at Ch 02 100 of Bhangarpar-Enayetnagar Road Z-1418 Under Road Division Chandpur during the year 2020-2021.
egp/CRD/EE/36/2020-2021/e-GP/20230227/561384/0062187
|
Road Division, Chandpur |
৳২৪.২৫ লাখ |
২৪ মার্চ ২০২১ |
Completed |
|
Construction of RCC U-Drain around the Inspection Banglo Generator room & making Thai sliding door at 1st floor of Mongla RHD Inspection Banglo under Bagerhat Road Division during the year 2020-2021.
e-GP-32/EE/BRD/2020-21/e-GP/20220307/556806/0042
|
Bagerhat Road Division |
৳২৭.৩৭ লাখ |
১১ মার্চ ২০২১ |
Completed |
|
Construction of R.C.C Cross drain at 9th P & 43th P Km of Sunamgonj-Netrakona-Mymensingh-Sherpur-Jamalpur Dhanuakamalpur Sherpur Part Road Z-2834 Under Sherpur Road Division During the Year 2020-2021.
27/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220529/552085/003351
|
Sherpur Road Division |
৳১৭.৯২ লাখ |
২৫ ফেব ২০২১ |
Completed |
|
Necessary repairing on the existing damaged road pavement by providing Aggregate Base Type-II potholes repair Premix Bituminous Carpeting on the repair portion seal coat work & earth work at 8th Km P 9th Km & 10th Km of Kachua-GulbaharKashimpur Matlab Dakkin Road Z-1445 under Road Division Chandpur during the year 2020- 2021.
egp/CRD/EE/19/2020-2021/e-GP/20220601/536789/003738
|
Road Division, Chandpur |
৳২৯.৮৭ লাখ |
২৪ জানু ২০২১ |
Completed |
|
Maintenance Work of Madargonj-Koyra-Monsurnagar Kazipur Abdullahmore Sharishabari Dhanbari Road Z-4029 at 28th p 29th p 30th p & 31st p km by providing Earthwork Brick Flat soling HBB & Protective work under Jamalpur Road Division during the year 2020-2021.
e-Gp 13/JRD/2020-2021/e-GP/20220605/530712/004366
|
Jamalpur Road Division |
৳৩৯.৩৪ লাখ |
২৮ ডিসে ২০২০ |
Completed |
|
Repair of pavement by Seal Coat work & Construction of Saucer drain Cross drain & Guide Wall at Ch. 5200 to 5530 6100 to 6600 & 7500 to 7900 km of Sunamganj-Netrokona-Mymensingh-Sherpur-Jamalpur Dhanua Kamalpur Road Z-2834 under Sherpur Road Division during the year 2020-2021.
15/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220601/525997/003721
|
Sherpur Road Division |
৳৪৪.০৯ লাখ |
১৪ ডিসে ২০২০ |
Completed |
|
Pothole repair with Seal Coat work at 17th P 18th P 19th P 20th P 21st P & 23rd P Km of Sunamganj-Netrokona-Mymensingh-Sherpur-JamalpurDhanua Kamalpur Border Road Z-2834 under Sherpur Road Division during the year 2020-2021.
17/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220602/524830/003948
|
Sherpur Road Division |
৳৪০.৩৫ লাখ |
১৪ ডিসে ২০২০ |
Completed |
|
Repair of pavement by Seal Coat work & Construction of Saucer drain & Cross drain at Ch. 0000 to 0500 1200 to 1900 2200 to 2600 4100 to 4900 5300 to 5850 & 6200 to 6800 km of Nalitabari- Pabiyajuri-Haluaghat Road Z-4619 under Sherpur Road Division during the year 2020-2021.
16/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220601/527022/003714
|
Sherpur Road Division |
৳৪৪.৫০ লাখ |
১৪ ডিসে ২০২০ |
Completed |
|
Construction of Saucer drain Cross drain & Concrete slope protection at Ch. 9500 to 9900 12500 to 12800 & 13100 to 13500 km of Sunamganj-Netrokona-Mymensingh-Sherpur-Jamalpur Dhanua Kamalpur Road Z-2834 under Sherpur Road Division during the year 2020-2021.
14/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220601/525993/003709
|
Sherpur Road Division |
৳৪৪.৫৮ লাখ |
১৪ ডিসে ২০২০ |
Completed |
|
Protective work & Earth work at 1st P 2nd P 3rd P 4th P 5th P 6th P & 7th P Km of Jhulgaon-Jhenaigati-Sandahkura Road Z-4605 under Sherpur Road Division during the year 2020-2021.
18/OTM/egp/Rev/SheRD/2020-2021/e-GP/20220605/524582/004447
|
Sherpur Road Division |
৳৩৪.১৮ লাখ |
১৪ ডিসে ২০২০ |
Completed |
|
Construction of 2x6.00mClear Length and 6.00m Clear Height 2 nos. RCC Box Culvert with U-Type wing wall at 8th km. of Barishal Beltala-Shaistabad-Fakirbari Sarikol Road Z-8040 under Barishal Road Division during the year 2020-2021.
e-GP/30/BRD/PMP/B&C/2020-2021/e-GP/20220806/513903/0028785
|
Barisal Road Division |
৳৩.২৪ কোটি |
১৭ নভে ২০২০ |
Completed |
|
Maintenance Work by providing Aggregate Base Type II with Carpeting & Seal Coat from Ch. 0100 to 0610 Km of Togra-Indurkani-Balipara-Kalaron-Saynnashi Road Z-7711 under Pirojpur Road Division during the year 2020-2021.
e-GP/16/PRD/2020-2021/e-GP/20220601/513976/003687
|
Pirojpur Road Division |
৳৪৪.৮৫ লাখ |
১৬ নভে ২০২০ |
Completed |
|
Maintenance Work by providing Aggregate Base Type II with Carpeting & Seal Coat from Ch. 23550 to 24300 Km of Barguna Dhakin Ramna Kheyaghat-Dawatala-Mathabaria-Baromasua Road Z-8814 Pirojpur Part under Pirojpur Road Division during the year 2020-2021.
e-GP/15/PRD/2020-2021/e-GP/20220531/513974/003612
|
Pirojpur Road Division |
৳৪৪.৯৬ লাখ |
১৬ নভে ২০২০ |
Completed |
|
Maintenance work by providing Aggregate Base Type-II Carpeting & Seal Coat work at 43thP & 44thP Km of Goriarpar-Banaripara-Sarshina-Sawrupkathi-Kawkhali-Naikathi Road Z-8033 under Pirojpur Road Division during the year 2020-2021.
e-GP/10/PRD/2020-2021/e-GP/20220604/509750/004208
|
Pirojpur Road Division |
৳৮৯.৫৬ লাখ |
৪ নভে ২০২০ |
Completed |
|
Construction of Hard Shoulder by B.F.S & H.B.B at Ch.18680 KM to 19800 KM of Laldhighi-Taxerhat-Taragonj-Kishorgonj Nilphamari part. Z-5015 Road under Road Division Nilphamari during the Year 2020-2021.
e-GP-11/EE/RHD/Nil/2020-2021./e-GP/20220602/510677/003956
|
Nilphamari Road Division |
৳৩৯.৯৬ লাখ |
৪ নভে ২০২০ |
Completed |
|
Maintenance work by providing Aggregate Base Type-II Carpeting & Seal Coat work at 12thP Km of Naikathi-Bhandaria Road Z-8717 under Pirojpur Road Division during the year 2020-2021.
e-GP/14/PRD/2020-2021/e-GP/20220601/509754/003700
|
Pirojpur Road Division |
৳৪৪.৭৮ লাখ |
৪ নভে ২০২০ |
Completed |
|
Maintenance of Flexible Pavement with Agreegate Base Type-II Carpeting & Seal Coat including necessary repair of pavment distress at 18th km p & 19th km p of GoalandaJamtala-Godarbazar-Pangsha-Habaspur Road Z-7106 under Rajbari Road Division Rajbari during the FY 2020-2021.
10/e-GP/RRD/2020-2021/e-GP/20220526/502686/002935
|
Rajbari Road Division |
৳৪৫.৩৪ লাখ |
২১ অক্টো ২০২০ |
Completed |
|
Maintenance by Base Type-II Carpeting & Seal Coat at Ch.26700 to 28000m of Goalando Jamtala-Goderbazar-Pangsha-Habashpur Road Z-7106 under Rajbari Road Division During the FY-2020-2021.
04/e-GP/RRD/2020-2021/e-GP/20220601/500250/003761
|
Rajbari Road Division |
৳৩০.৫২ লাখ |
২১ অক্টো ২০২০ |
Completed |
|
Improvement of Zilla Highway as per proper standard and width from Ch 23000 to 31500 of Chatmohor - Parshadangha - Edilpur- Dangergaon - Pabna Zilla Highway Z - 6031 Under Pabna Road Division during the year 2020-2021. WP-08.
e-GP/RJZ/ADP/03/2020-2021/e-GP/20221217/504015/0057382
|
Rajshahi Zone |
৳২০.৫৯ কোটি |
১১ অক্টো ২০২০ |
Completed |
|
Maintenance of existing pavement with seal coat including necessary repair works at Ch.0000 to 3000 km of Barisal Dinarerpool - Laxmipasha- Dumki road Z-8044 under Barisal road division during the year 2020-2021.
16/e-GP/BRD/2020-2021/e-GP/20220601/500808/003676
|
Barisal Road Division |
৳৪৪.৯৪ লাখ |
৮ অক্টো ২০২০ |
Completed |
|
Maintenance of existing pavement with seal coat including necessary repair works at Ch.10250 to 12000 km of Barisal Dinarerpool - Laxmipasha- Dumki road Z-8044 under Barisal road division during the year 2020-2021.
19/e-GP/BRD/2020-2021/e-GP/20220602/500814/003858
|
Barisal Road Division |
৳৪০.৭১ লাখ |
৮ অক্টো ২০২০ |
Completed |
|
Maintenance of existing pavement with seal coat including necessary repair works at Ch.3000 to 4000 km and Ch.5000 to 6800 km of Barisal Dinarerpool - Laxmipasha- Dumki road Z-8044 under Barisal road division during the year 2020-2021.
17/e-GP/BRD/2020-2021/e-GP/20220601/500809/003717
|
Barisal Road Division |
৳৪৪.৫২ লাখ |
৮ অক্টো ২০২০ |
Completed |
|
Maintenance of existing pavement with seal coat including necessary repair works at Ch.6800 to 8000 km and Ch.9000 to 10250km of Barisal Dinarerpool - Laxmipasha- Dumki road Z-8044 under Barisal road division during the year 2020-2021.
18/e-GP/BRD/2020-2021/e-GP/20220601/500812/003703
|
Barisal Road Division |
৳৪৪.৯৭ লাখ |
৮ অক্টো ২০২০ |
Completed |
|
Repair and Seal Coat at 4thp 5thp 8thp & 9thp km. of Barishal-Karapur-Nabagram-Swarupkathi Road Z-8037 under Barishal Road Division during the year 2020-2021.
13/e-GP/BRD/2020-2021/e-GP/20220531/500802/003601
|
Barisal Road Division |
৳২৬.৯৮ লাখ |
৬ অক্টো ২০২০ |
Completed |
|
Periodic Maintenance Programme for Widening of Existing Pavement at N-7 from Ch. 3330 Bangladesh Hatchery to Ch. 16100 Bashontapur Rail Crossing & at N-701 from Ch. 0000 Daulatdia Ferry Ghat to Ch. 1000 Nou Police Farri under Rajbari Road Division during the year 2020-2021.
e-GP-07/GZ/2020-21PMP Road/e-GP/20220528/496453/003079
|
Gopalgonj Zone |
৳১৯.৭৫ কোটি |
১৭ সেপ ২০২০ |
Completed |
|
Periodic Maintenance Programme for Re-surfacing of Existing Pavement at Ch. 1000m Natun Bazar to Ch. 27400m Jamalpur of Rajbari- Baliakandi- Jamalpur- Madhukhali Road Z-7102 under Rajbari Road Division during the year 2020-2021.
e-GP-06/GZ/2020-21PMP Road /e-GP/20220528/494904/003086
|
Gopalgonj Zone |
৳১৫.১৩ কোটি |
১৭ সেপ ২০২০ |
Completed |
|
Construction of SD Residence ROADS & HIGHWAY DEPARTMENTMADARIPUR Two Storied Building With Three Storied Foundation including internal sanitary & water supply arrangement Boundary wall Internal R.C.C Road & Internal electrification works.
e-GP-04/GZ/2020-21 WP-15/Kha /e-GP/20221218/491268/0057460
|
Gopalgonj Zone |
৳২.১০ কোটি |
১৪ সেপ ২০২০ |
Completed |
|
Repair Carpeting and Premix Bituminous seal coat work from Ch. 23779 to Ch.27279 Total 3500.00m Road section-03 of KushtiaTrimohoni-Meherpur-Chuadanga-Jhenaidah Road R-745 under Road Division. Meherpur during the year 2020-2021.
e-GP/MERD/03/2020-2021/e-GP/20220528/494410/003121
|
Meherpur Road Division |
৳৭৯.৩১ লাখ |
১৩ সেপ ২০২০ |
Completed |
|
Periodic Maintenance works providing by DBS Wearing Course Base Type-I and Cement Concrete Pavement at 216thP to 226th Km of Dhaka Mirpur - Utholi - Paturia - Notakhola - Kashinathpur - Bogra - Rangpur - Beldanga - Banglabandha Road N-5 under Road Division Bogura during the year 2020-2021.
eGP-02/RHD/ACE/RZ/2020-2021/e-GP/20220606/492297/004517
|
Rangpur Zone |
৳১৪.৯১ কোটি |
৭ সেপ ২০২০ |
Completed |
|
Construction of Hard Shoulder under Periodic Maintenance Program PMP at Ch. 460thp Km to 471thp Km of Dhaka Mirpur-Utholi-Paturia-Notakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha N5 Road under Road Division Panchagarh during the year 2020-2021
eGP-06/RHD/ACE/RZ/2020-2021/e-GP/20220606/492377/004564
|
Rangpur Zone |
৳২৪.৮৫ কোটি |
৭ সেপ ২০২০ |
Completed |
|
Strengthening & Overlay works DBSW under Periodic Maintenance Programme PMP of Shariatpur-Gonganagar-Mongalmazirghat Road Z-8065 at Ch. 0000 to 3000 18500 to 20200 & 20200 to 25052 under Road Division Shariatpur during the year 2020-2021.
e-GP-01/GZ/2020-21PMP Road/e-GP/20220528/490392/003123
|
Gopalgonj Zone |
৳১৭.৪৮ কোটি |
৩ সেপ ২০২০ |
Completed |
|
Periodic Maintenance Program PMP Providing DBS wearing course including strengthening partial widening construction of concrete drain protective work earthwork etc. at 1st km to 16thp km Ch.0000 to 15184 km of Shaheed M Monsur Ali Pipulbaria-Sonamukhi-Dhunot Road Z-5404 under Road Division Sirajganj during the year 2020-2021.
e-GP/RJZ/PMPRoad/02/2020-2021/e-GP/20220528/490326/003093
|
Rajshahi Zone |
৳৩০.০৯ কোটি |
৩ সেপ ২০২০ |
Completed |
|
Periodic Maintenance Work of Strenthening DBS Base Course DBS Wearing Course at Ch. 30000 Palashi Bazar Koborsthan to Ch. 32400 Kakina Bazar Ch. 32900 Kakina Bazar to Ch. 39200 Tushvandar Bazar Ch. 39800 Tushvandar Bazar to Ch. 41550 Kaliganj Bazar Ch. 41850 Kaliganj Bazar to Ch. 44000 Purbo-Srutidhor Km of Barabari-Lalmonirhat-Burimari National Highway N509 under Road Division Lalmonirhat during the Year 2020-2021
eGP-03/RHD/ACE/RZ/2020-2021/e-GP/20220606/489779/004576
|
Rangpur Zone |
৳৩৫.২৯ কোটি |
২ সেপ ২০২০ |
Completed |