River bank protection work on the right bank of Jamuna river from BRE km. 198.700 to km. 199.100 = 400.00 meter at Brahmangram to Hatpachil Area in Shahjadpur Upazila, District- Sirajganj under Sirajganj O&M Division, BWDB, Sirajganj during the year 2021-2022 & 2022-2023.
BHP-08/e-GP/20241219/603016/00237319
|
Sirajganj O&M Division |
৳২৫.৮১ কোটি |
২ সেপ ২০২১ |
Ongoing |
|
Bank Revetment work on the left bank of the Padma River at Charbagdanga from Km.9.972 to Km. 10.192 220m in connection with Protection of Charbandanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River under Nawabganj O&M Division BWDB Chapainawabganj during FY 2020-2021 & 2021-2022.
CWP -10/e-GP/20241203/488578/00227233
|
Nawabganj O&M Division |
৳১৪.৮৮ কোটি |
২ সেপ ২০২০ |
Completed |
|
Construction of 02 storied Water Super Office cum Residence building at Ishwargonj Pourashava under Expansion and Development of Water Supply and Sanitation System in Ishwargonj Pourashava Project DPHE Mymensingh.
000/e-GP/DPHE/2023-07-11/00446640
|
Office of the Executive Engineer, DPHE,Mymensingh |
৳৬১.০৪ লাখ |
১৫ মার্চ ২০২০ |
Completed |
|
Construction of 500 meter RCC Primary Drain 3500x3000x275mm at Ishwargonj Pourashava under Expansion and Development of Water Supply and Sanitation System in Ishwargonj Pourashava Project Mymensingh.
000/e-GP/DPHE/2023-07-11/00405810
|
Office of the Executive Engineer, DPHE,Mymensingh |
৳২.২৬ কোটি |
৩০ ডিসে ২০১৯ |
Completed |
|
Earthwork Widening of Pavement Strengthening Surfacing RCC Drain Construction & Widenig of Culvert Palisading work Sign/Signal KM post & Road Marking from Ch. 0000 km to 7274 km of Joypurhat-Bypassi Road Hichmi to Puran Ipol Z-5504 under Road Division Joypurhat during the year 2018-2019.Package No.W-03
eGp-01/SE/BRC/2018-2019 /e-GP/20220927/233997/0044205
|
Bogra Road Circle |
৳৩২.৬৫ কোটি |
১৫ অক্টো ২০১৮ |
Completed |
|
Re-exacavation of 5 nos ponds at Sadar upazila of Shariatpur District under Water Preservcation and safe water supply project through Reexcavation/ Maintenence of ponds/ Dighi/ Ditches of zila parishd during FY 2017-18.
000/e-GP/DPHE/2023-07-11/00180300
|
Office of the Executive Engineer , DPHE, Sariatpur |
৳১.৪৫ কোটি |
১১ এপ্রিল ২০১৮ |
Completed |
|
Re-excavation including embankmentwalkway and other civil works for surface water source of drinking purpose of 6 Nos pond at different upazila of Kishoreganj District under Re-excavation Scheme During the year 2017-2018 under Water preservation and Safe Water Supply Project Through Re-excavation/Maintenance of Ponds/Dighi/Ditches Owned by Zilla Parishads implemented by DPHE.
000/e-GP/DPHE/2023-07-11/00179394
|
Office of the Executive Engineer DPHE, Kishoreganj |
৳৯৮.৬৮ লাখ |
২২ মার্চ ২০১৮ |
Completed |
|
Construction of Internal Road under the project The Construction of 7 RAB Complex One at Rajshahi
RAB/IR/2017-18 /e-GP/20241212/172606/00234328
|
Rajshahi PWD Division-2 |
৳১.০৭ কোটি |
৭ মার্চ ২০১৮ |
Completed |
|
Construction of Enayet Nagar Adarsha Primary School Under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/MDR/KAL/2017-18/W1.00092/e-GP/20231218/170096/00155433
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৫.০৫ লাখ |
৭ মার্চ ২০১৮ |
Completed |
|
Construction of Dakkhin Sashikar RPS Primary School Under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/MDR/KAL/2017-18/W1.00280/e-GP/20231218/170100/00155142
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৩.০১ লাখ |
৭ মার্চ ২০১৮ |
Completed |
|
Construction of West Comlapur Primary School Under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/MDR/KAL/2017-18/W1.00091/e-GP/20231218/170099/00155306
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৫৯.৭৩ লাখ |
৭ মার্চ ২০১৮ |
Completed |
|
Construction of South-Dhuashar Primary School Under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/MDR/KAL/2017-18/W1.00088/e-GP/20231219/170098/00155629
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৮.৮৬ লাখ |
৭ মার্চ ২০১৮ |
Completed |
|
Construction of class room of DAKKHIN JONAR DONDI Government Primary School Under NBIDGPS Project-1
e-Tender/NBIDGPS/MDR/KAL/2017-18/W1.00444/e-GP/20231219/169597/00155869
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৫.১২ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Construction of PURBO MAIZPARA NO-2 Primary School under NBDIGPS Project-1
e-Tender/NBIDGPS/MDR/KAL/2017-2018/W1.00180/e-GP/20231219/158668/00155747
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬২.৬৯ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Construction of UTTOR ROMJANPUR M.E Primary School under NBIDGPS Project-1
e-Tender/NBIDGPS/MDR/KAL/2017-2018/W1.00182/e-GP/20231219/158665/00155584
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৫.৮৫ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Construction of PURBO CHAR AIR KANDI Primary School under NBIDGPS Project-1.
e-Tender/NBIDGPS/MDR/KAL/2017-2018/W1.00181/e-GP/20231219/158664/00155597
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৭০.৫৬ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Consruction of POSHCHIM ROMJAN PUR Primary School under NBIDGPS Project-1
e-Tender/NBIDGPS/MDR/KAL/2017-2018/W1.00179/e-GP/20231219/158663/00155575
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৫.৮৫ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Construction of CHAR LAXMI Primary School under NBDIGPS Project-1
e-Tender/NBIDGPS/MDR/KAL/2017-2018/W1.00184/e-GP/20231218/158666/00155394
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬০.৩৫ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Construction of class room of DOKKIN SHAHEBRAMPUR Government Primary School Under NBIDGPS Project-1
e-Tender/NBIDGPS/MDR/KAL/2017-18/W1.00445/e-GP/20231219/169599/00155862
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
৳৬৬.১৬ লাখ |
৪ মার্চ ২০১৮ |
Completed |
|
Periodic Maintenance of Baro Ragunathpur BazarChaita to United High School via Molla Faruk Regd. Pry. School Road from Ch. 00m-2965m Bakerganj Road Code 506074115
e-Tender/LGED/Bari/GOBM/17-18/W-55/e-GP/20241215/168753/00235555
|
Office of the Executive Engineer, LGED, Barisal |
৳৫৪.৭৬ লাখ |
২২ ফেব ২০১৮ |
Completed |
|
Construction of Class Room of SONKANDA POURO Government Primary School Under NBIDNNGPS Project-1 Jamalpur Sadar Jamalpur.
e-Tender/NBIDNNGPS/JML/SAD/2017-18/W1.00338/e-GP/20231029/165465/00118619
|
Office of the Upazila Engineer, LGED, Jamalpur Sadar, Jamalpur |
৳৭০.৫৭ লাখ |
১৯ ফেব ২০১৮ |
Completed |
|
Rehabilitation of Jamadarpukur GCM-garidaha NHW Shajahanpur portion Road from ch.00m-1000m Rehab road id-110962008
e-Tender/LGED/BOG/GOBM/17-18/W-121/e-GP/20240925/165525/00182988
|
Office of the Executive Engineer, LGED, Bogra |
৳৫২.৫৭ লাখ |
১৮ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Zianagor Union Banaich Fuldighi hat road From Ch .00m-2470m & 3080m-3570m.Dupchanchia Overlay Road ID-110333014
e-Tender/LGED/BOG/GOBM/17-18/W-114/e-GP/20240925/165518/00182344
|
Office of the Executive Engineer, LGED, Bogra |
৳৫০.৪৯ লাখ |
১৮ ফেব ২০১৮ |
Completed |
|
Construction of class room of Joypur Government Primary school. under Kalia Upazila Narail.
e-Tender/NBIDNNGPS/NRL/KAL/2017-2018/W1.00365/e-GP/20241106/157711/00213609
|
Office of the Upazila Engineer, LGED, Kalia, Narail |
৳৫১.১২ লাখ |
৭ ফেব ২০১৮ |
Completed |
|
Construction of class room of Sarash Pur Government Primary School under Sadar upazila District Narail.
e-Tender/NBIDGPS/NRL/SAD/2017-2018/W1.00096/e-GP/20241110/148805/00216284
|
Office of the Upazila Engineer, LGED, Narail Sadar, Narail |
৳৫৯.১৪ লাখ |
৪ ফেব ২০১৮ |
Completed |
|
Improvement of Kahaloo Aghorshal road - Muroil Erulia road via Dhawapara road from ch.00-1516m Rd ID-110544055 Including salvage TK 157636
GPBRIDP/Rd-519/e-GP/20240923/152716/00180310
|
Office of the Executive Engineer, LGED, Bogra |
৳১.০৫ কোটি |
২৫ জানু ২০১৮ |
Completed |
|
Maintenance of Sherpur GC-Khanpur UP Road from Ch.500-1500m & 4270-5670m. Rd ID-110403002
GPBRIDP/MW-84/e-GP/20241007/152712/00192806
|
Office of the Executive Engineer, LGED, Bogra |
৳৬০.০৫ লাখ |
২৫ জানু ২০১৮ |
Completed |
|
Widening of Adamdighi-Abadpukur Road frrom Ch.00-4830m Rd ID- 110062002
GPBRIDP/WR-10/e-GP/20241001/152710/00188882
|
Office of the Executive Engineer, LGED, Bogra |
৳১.৮২ কোটি |
২৫ জানু ২০১৮ |
Completed |
|
Improvement of College Station-Karamjahat via NowdabogaBoritola Road from Ch.985-2680m Rd ID-110954080
GPBRIDP/Rd-525/e-GP/20240926/152711/00184712
|
Office of the Executive Engineer, LGED, Bogra |
৳১.০২ কোটি |
২৫ জানু ২০১৮ |
Completed |
|
Maintenance Majihata UP- Bilhamlahat road from ch.00-3200m Rd ID-110943022
GPBRIDP/MW-107/e-GP/20240923/152749/00180406
|
Office of the Executive Engineer, LGED, Bogra |
৳৬৯.৯০ লাখ |
২৫ জানু ২০১৮ |
Completed |
|
Improvement of Dhap Sultangong Hat-Gunahar via Paikpara Vhathanda Road from Ch3120-4650m Rd ID-110333005
GPBRIDP/Rd-362/e-GP/20240922/152726/00180057
|
Office of the Executive Engineer, LGED, Bogra |
৳৮১.৬০ লাখ |
২৫ জানু ২০১৮ |
Completed |
|
Construction of Upazila Muktijuddha Complex Bhaban at Sadar Upazila under Habiganj District.
CUMCP/HAB/SAD/17/C-373/e-GP/20230910/150187/0081386
|
Office of the Executive Engineer, LGED, Habiganj |
৳২.১৭ কোটি |
২ জানু ২০১৮ |
Completed |
|
Construction of 30.06m Long RCC Girder Bridge on Harinber GC-Fundauk GC Road via Gouniauk Up office & Chinta Bazar Road at Ch.6300Km Under Nasirnagar Upazila Dist Brahmanbaria Road ID 412902004
RIDPCBC/B-BW40/e-GP/20231003/147055/0095627
|
Office of the Executive Engineer, LGED, Brahmanbaria |
৳২.২২ কোটি |
১৯ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Lakutia-Bazar to Babugonj Hat. GC. Road from Ch. 3748m-5810m Babuganj Road ID 506042006
e-Tender/LGED/Bari/GOBM/17-18/W-36/e-GP/20241215/141530/00235538
|
Office of the Executive Engineer, LGED, Barisal |
৳৫৪.৫৮ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Agorpur UP - Islampur -Telerchar- Sarikaol UPGournadi Road from Ch. 880m-3500m Babuganj ID No. 506103013
e-Tender/LGED/Bari/GOBM/17-18/W-25/e-GP/20241209/141519/00231221
|
Office of the Executive Engineer, LGED, Barisal |
৳২৯.০১ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Dehergoti UP Office to Kalir bazar via Natunhat Road from Ch. 000m-1960m Babuganj ID No. 506053006
e-Tender/LGED/Bari/GOBM/17-18/W-24/e-GP/20241210/141518/00232535
|
Office of the Executive Engineer, LGED, Barisal |
৳৩৬.৯০ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Construction of 12.00m Long RCC Girder Bridge over Chowdhuri Hat - Hasti Shundi via Daberkul road infront of A. Latif MasterDaberkul Chowmohani - Chowmohini Sere Bangla road at ch. 00.0m under Uzirpur UpazilaBarisal District ID No. 506943004
BDRIDP/BAR/UZP/UN-St/01/e-GP/20241207/136688/00229597
|
Office of the Executive Engineer, LGED, Barisal |
৳৭৫.৩৫ লাখ |
১৬ নভে ২০১৭ |
Completed |
|
Construction of 15.00m RCC Girder Bridge on Boga Bauphal RHD Shaplakhali to Kalisuri GC via Kanakdia Hat Road at Ch. 14990km Road ID No. 578382004
BDRIDP/PAT/BAF/UZ-St/03/e-GP/20241212/131267/00233940
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১.১২ কোটি |
২ নভে ২০১৭ |
Completed |
|
Construction of 20.00m RCC Girder Bridge on Boga Bauphal RHD Shaplakhali to Kalisuri GC via Kanakdia Hat Road at Ch. 12290km Road ID No. 578382004
BDRIDP/PAT/BAF/UZ-St/01/e-GP/20241212/131265/00234586
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১.৩৫ কোটি |
২ নভে ২০১৭ |
Completed |
|
a Improvement of Goria Setla khola - Mugakathi Govt. Primary School road..Ch.00m - 1020m ID NO 506945261b Construction of 04no 0.625mx0.90m culvert at ch.103m376m580m &720m on the same road.c Construction of 01no 2.0mx2.0m culvert at ch.870m on the same road under Uzirpur Upazila Dist Barisal. Salvage Cost Tk. 206757.60
IRIDP-2/BRS/ DW-174/e-GP/20241208/123327/00229966
|
Office of the Executive Engineer, LGED, Barisal |
৳৭১.৪৮ লাখ |
৪ অক্টো ২০১৭ |
Completed |
|
a Improvement of Bamrail-Boharkati road Ch.00m - 1000m ID NO 506944026b Construction of 04no 0.625mx0.90m culvert at ch.205m305m870m &920m on the same road.c Construction of 01no 4.0mx4.0m culvert at ch.12m on the same road under Uzirpur Upazila Dist Barisal. Salvage Cost Tk. 809607.88
IRIDP-2/BRS/ DW-173/e-GP/20241209/123326/00231680
|
Office of the Executive Engineer, LGED, Barisal |
৳৭৪.২৮ লাখ |
৪ অক্টো ২০১৭ |
Completed |
|
a Improvement of UZRNanduhar Bridge-Udoykati UPC road Ch.00m - 1400m ID NO 506105084b Construction of 01no 3.0mx3.0m culvert at ch.188m on the same road.c Construction of 02no 2.0mx2.0m culvert at ch.366m 520 on the same road.d Construction of 04no 0.625mx0.60m culvert at ch.586m740m825m886m on the same road under Banaripara Upazila Dist Barisal. Salvage Cost Tk. 1219434.10
IRIDP-2/BRS/ DW-178/e-GP/20241208/123331/00230035
|
Office of the Executive Engineer, LGED, Barisal |
৳৯৩.১০ লাখ |
৪ অক্টো ২০১৭ |
Completed |
|
Construction of Upazila Muktojoddah Complex Bhaban Under Narail-S Narail
CUMCP/NAR/SAD/17/C-335/e-GP/20241028/113497/00205368
|
Office of the Executive Engineer, LGED, Narail |
৳২.২২ কোটি |
২৩ আগ ২০১৭ |
Completed |
|
Re-excavation of 7 nos pond at different upozila of patuakhali district
000/e-GP/DPHE/2023-07-11/00110649
|
Office of the Executive Engineer, DPHE,Patuakhali |
৳২.০৪ কোটি |
৯ জুলাই ২০১৭ |
Completed |