Improvement of Paltapur UP H/Q-Nizpara UP H/Q. road. (Ch.00.00-2500.00m). [Road ID: 127123021] Under Birganj Upazila, Dist: Dinajpur.
GDDRIDP/DIN/BIR/UNR/51/e-GP/20241003/929880/00190495
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 2.37 crore |
31 Dec 2023 |
Ongoing |
|
Improvement of Shibrampur UP Office to Shibrampur hat road at (Ch.1500.00-3200.00m). [Road ID: 127123018] Under Birganj Upazila, Dist: Dinajpur.
GDDRIDP/DIN/BIR/UNR/50/e-GP/20241003/929879/00190477
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 1.83 crore |
31 Dec 2023 |
Ongoing |
|
Repairing works on sound system and installation of projector system at the conference hall of Rajshahi PWD office.
e-Tender/raj1/APP/non-68/em pwd conf/2023-24/e-GP/20241219/924132/00237590
|
Rajshahi PWD Division-1 |
BDT 12.46 lakh |
28 Dec 2023 |
Completed |
|
Periodic Maintenance of Kulia UP - Nagarkandi G.C Road from Ch: 00m - 3975m [Road ID: 201563007] [Mollahat] [Bagerhat]
KDRIDP/Bager/M-28/2023-24/e-GP/20241019/915063/00198431
|
Office of the Executive Engineer, LGED, Bagerhat |
BDT 1.65 crore |
30 Nov 2023 |
Ongoing |
|
Construction of additional classroom of Sonatala GPS under NBIDGPS
e-Tender/NBIDGPS/PAB/SAN/2023-24/W1. 07780/e-GP/20240904/899663/00171692
|
Office of the Upazila Engineer, LGED, Santhia, Pabna |
BDT 75.49 lakh |
19 Nov 2023 |
Ongoing |
|
Construction of additional class room under Ratidhar Sheba Samiti GPS NBIDGPS-1st Phase at Lalmonirhat Sadar Upazila, District. Lalmonirhat.
e-Tender/NBIDGPS/LAL/SAD/2023-2024/W1.07924/e-GP/20241028/896731/00205555
|
Office of the Upazila Engineer, LGED, Lalmonirhat Sadar, Lalmonirhat |
BDT 98.79 lakh |
13 Nov 2023 |
Ongoing |
|
Rehabilitation of R&H (Esken More) - Tubia hat - Baligram UP Road (Sadar Portion) from Ch.00-6500m under Sadar Upazila, District: Madaripur (Road ID No: 354543034)
CAFDRIRP/Madaripur/UNR/ER/W-11/2023-24/e-GP/20250616/884996/00246129
|
Office of the Executive Engineer, LGED, Madaripur |
BDT 2.66 crore |
25 Oct 2023 |
Completed |
|
(a) Construction Of 10.00 m Long RCC Bridge On Kaminebashia N/H/O Jagubandu to Neshinkhali N/H/O Dinobadu via Arakhail Primary School Road at Ch 825m,Road ID No 247175103, under Upazila:Dacope, Dist Khulna. (b) Construction Of 12.00 m Long RCC Bridge On Kaminebashia N/H/O Jagubandu to Neshinkhali N/H/O Dinobadu via Arakhail Primary School Road at Ch 2450m, Road ID No 247175103 under Upazila:Dacope, Dist: Khulna.
KBS-RIDP/KHUL/VR/ST-06/23-24/e-GP/20241106/886875/00213294
|
Office of the Executive Engineer, LGED, Khulna |
BDT 2.66 crore |
18 Oct 2023 |
Completed |
|
Rehabilitation of Chandisha Road-Kishoreganj Nilgonj from Ch. 00-5000m [Kishoreganj-S, Kishoreganj] (Road ID: 348494042)
e-Tender/LGED/KISH/GOBM/23-24/RW-34/e-GP/20250807/879549/00248565
|
Office of the Executive Engineer, LGED, Kishoreganj |
BDT 1.94 crore |
27 Sep 2023 |
Completed |
|
Periodic Maintenance of Tarail HQ - Chowganga GC via Damiha UP (Tarail Part) Road from Ch.3000-5840m (Part 02) [Tarial, Kishoreganj] (Road ID: 348922008)
e-Tender/LGED/KISH/GOBM/23-24/RW-33/e-GP/20250807/879547/00248566
|
Office of the Executive Engineer, LGED, Kishoreganj |
BDT 2.55 crore |
27 Sep 2023 |
Completed |
|
Rehabilitation (Widening) of Domar G.C-Chilahati GC via Muktirhat road from Ch.14000-16000m. [RD. ID. 173152002] Under Domar Dist. Nilphamari.
e-Tender/LGED/Nil/GOBM/23-24/RW.-24/e-GP/20241204/877524/00227482
|
Office of the Executive Engineer, LGED, Nilphamari |
BDT 2.55 crore |
20 Sep 2023 |
Ongoing |
|
Periodic Maintenance of Jhalakati HQ - Gagonhat via Manpasha GC RoadRoad (Up to Chalitabari) from Ch. 2000m-10150m [Road ID 542402002] [JHALOKATHI-S]
e-Tender/LGED/Jha/GOBM/23-24/RW-13/e-GP/20241210/874257/00232346
|
Office of the Executive Engineer, LGED, Jhalokati |
BDT 2.54 crore |
17 Sep 2023 |
Ongoing |
|
Construction of Single Storied Academic Building with 04- Storied Foundation in/c Sanitary, Water Supply & Electrification Works at Boro Baishdia A. Hakim Secondary School, Rangabali, Patuakhali.
e-GP/W-10/7016/SHED/2022-23/e-GP/20250101/855260/00241451
|
Office of the Executive Engineer, EED, Patuakhali, District. |
BDT 1.07 crore |
13 Sep 2023 |
Completed |
|
Rehabilitation of Tarash GC- Chanchkoir GC Via Kundoil Road from Ch. 3432m- 7325m [Road ID:188892016] under Tarash Upazila, Distrct: Sirajganj.
e-Tender/LGED/Siraj/GOBM/23-24/W-01/e-GP/20240929/865412/00186998
|
Office of the Executive Engineer, LGED, Sirajganj |
BDT 2.51 crore |
12 Sep 2023 |
Completed |
|
Rehabilitation (Widening) of Bakultola R&H to Khotchabari hat GC Road (Bochaganj portion) from Ch.2600m-5300m [Bochaganj].[Road Code: 127212006]
e-Tender/LGED/Dina/GOBM/23-24/RW-36/e-GP/20241007/870076/00192314
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 2.56 crore |
7 Sep 2023 |
Ongoing |
|
1. Construction of Bangla Bazar Slaughter Shed (Size:5.00m x 3.00m) under Upazila: Khanshama, Dist:Dinajpur. 2. Construction of Chahel Gazi Kacha Bazar under Upazila: Khanshama, Dist.: Dinajpur.
UTMIDP-DINA/KHAN/WSS-21 WKM-24/e-GP/20241003/868519/00190638
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 98.46 lakh |
31 Aug 2023 |
Ongoing |
|
Construction of 1x4.0x3.50m RCC Box Culvert at R&H Road (Tangua Bridge) Gobindhapur Govt. primary School at Ch.985m.Under Upazila: Khanshama, Dist.: Dinajpur. (Road ID: 127604003)
UTMIDP-DINA/KHAN/WB-108/e-GP/20241003/868517/00190558
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 26.89 lakh |
31 Aug 2023 |
Completed |
|
Part-A: Construction of Public Toilet at Chahel Gazi Bazar Part-B: Construction of Public Toilet Pakar hat Part-C: Construction of Public Toilet Near Upazila Porishad Coffie House Chottor under Upazila: Khanshama, Dist. Dinajpur
UTMIDP-DINA/KHAN/WT-123/e-GP/20241003/868518/00190628
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 54.00 lakh |
31 Aug 2023 |
Ongoing |
|
Improvement of Nanahar-Mohisaboy road ch.00-2700m. Road ID-164795013, Porsha, Naogaon.
IRIDP-3/NAO/DW-133/e-GP/20240910/863240/00174376
|
Office of the Executive Engineer, LGED, Naogaon |
BDT 2.00 crore |
22 Aug 2023 |
Ongoing |
|
Rehabilitation of Urshiura Jail Khana Bazar - Machihata UP Office Road. Ch: 00m - 2911m [Road ID: 412134044] [Brahmanbaria-S] [Brahmanbaria]
e-Tender/LGED/BBR/GOBM/23-24/W-08/e-GP/20250213/854459/00242508
|
Office of the Executive Engineer, LGED, Brahmanbaria |
BDT 1.80 crore |
6 Aug 2023 |
Completed |
|
Periodic Maintenance of Bagmara RHD- Sharif khair hat Road from Ch. 00m-5830m. Road ID - 509182011, under Bhola Sadar Upazila, District-Bhola.
e-tender/LGED/Bhola/GOBM/23-24/W-04/e-GP/20241226/851971/00240162
|
Office of the Executive Engineer, LGED, Bhola |
BDT 2.56 crore |
18 Jul 2023 |
Completed |
|
Construction of Single Vent 2.6m x 4.0m size RCC Box Culvert on Shikari B.O.P - Bholahat Special Camp via Chamusha B.O.P Road at Ch. 5748m under Bholahat Upazila, Dist: Chapianawabganj, road ID No: 170185012
UTMIDP-CHAP/BHOL/WB-88/e-GP/20241001/840547/00188109
|
Office of the Executive Engineer, LGED, Chapainawabganj |
BDT 18.34 lakh |
26 Jun 2023 |
Completed |
|
Construction of Public Toilet at Chowdala GC under Chowdala Union Gomostapur Upazila, Dist: Chapianawabganj.
UTMIDP-CHAP/GOMO/WT-96/e-GP/20241001/840541/00188074
|
Office of the Executive Engineer, LGED, Chapainawabganj |
BDT 17.96 lakh |
26 Jun 2023 |
Completed |
|
Construction of 2 Vent 2.30mx3.00m size RCC Box Culvert Chowdala GC to Ranibari Chandpur hat via Diapara road Ch. 480m under Gomostapur Upazila, Dist: Chapianawabganj (Salvage Cost Tk 79338.00)
UTMIDP-CHAP/GOMO/WB-87/e-GP/20240930/840539/00187443
|
Office of the Executive Engineer, LGED, Chapainawabganj |
BDT 20.49 lakh |
26 Jun 2023 |
Completed |
|
(1) Development of Kawkhali GPS -Kawkhali HQ to Sugarmil Road Ch. 00.00-165 m (2) Development of Kawkhali RHD Road - Muslimpara Road Ch. 00.00-168 m (3) Development of Kawkhali RHD Road Monir Member Bari Road Ch. 00.00-243 m (4) Development of Kawkhali RHD Road Model Mosjid Road via Kawkhali Thana Ch. 00.00-270 m (5) Development of Kawkhali HQ - Laxmichari Road via Barmachari Road to Rangipara Road Ch. 00.00-800 m (6) Development of Maigamachara-Baro Dolu Road to Hatimara Juloto Bridge Road Ch. 00.00-645m (Total Effective Length=2291 m) under Kawkhali Upazila Dist: Rangamati Hill Tracts.
UTMIDP/RANG/KAWK/WR-327/e-GP/20250826/847975/00248980
|
Office of the Executive Engineer, LGED, Rangamati |
BDT 1.79 crore |
25 Jun 2023 |
Completed |
|
Improvement of RCC Road at Birgaon-Asia Road (Vendari Bazar-Pukur Par) Road (Ch.00-1069m) [348025012] under Austagram,District-Kishoreganj.
IRIDP-3/KISH/DW-104/e-GP/20231122/842926/00134671
|
Office of the Executive Engineer, LGED, Kishoreganj |
BDT 2.19 crore |
5 Jun 2023 |
Ongoing |
|
Construction of RCC Box Culvert (1.0x4.0x3.0 m )on Barkal H/Q to Choto Horina Road at Ch. 0+210 m under Barkal Upazila, Dist: Rangamati Hill Tracts
UTMIDP/RANG/BARK/WB-90/Manual/20240910/00173843
|
Office of the Executive Engineer, LGED, Rangamati |
BDT 17.77 lakh |
1 Jun 2023 |
Completed |
|
Construction of Slaughter Shed (5.0x3.0m) Bhushenchara union Bazar u8nder Barkal Upazila, Dist: Rangamati Hill Tracts
UTMIDP/RANG/BARK/WSS-11/e-GP/20240903/837727/00171467
|
Office of the Executive Engineer, LGED, Rangamati |
BDT 8.74 lakh |
1 Jun 2023 |
Completed |
|
Construction of RCC Drain with Cover Slab at (a) Borkol Bazar Drain Ch. 0.00-290.00m (b) Bhushenchara Bazar Drain at 0.00-110.00m (c) choto Horina Bazar Drain Ch. 00.00-300.00m (d) Kalabunia Bazar Drain Ch. 00.00-200.00m under Barkal Upazila, Dist: Rangamati Hill Tracts ( salvage: TK. 45621.00)
UTMIDP/RANG/BARK/WDD-160/e-GP/20250529/837725/00245719
|
Office of the Executive Engineer, LGED, Rangamati |
BDT 1.16 crore |
1 Jun 2023 |
Completed |
|
Providing fitting fixing and commissioning of solar street light at Ch: 01+400m (Kalarpool Bridge) of Moizzertek-Boalkhali-Kanungopara-Uderbanna Road (Z-1065) under Chattogram South Road Division during the year 2022-2023.
e-GP/EE/CSRD/56/2022-2023/e-GP/20250807/835817/00248492
|
Dohazari Road Division |
BDT 10.22 lakh |
28 May 2023 |
Completed |
|
Rehabilitation of Baishari UPC-Dochari UPC via Longgudhu Mukh Bakkhali Road from Ch.3293-7000m Under Naikhongchari Upazila, District: Bandarban. (Road ID No. 403733002)
CAFDRIRP/Bandarban/UZR/FD/W-07/2022-23/e-GP/20241119/832097/00219958
|
Office of the Executive Engineer, LGED, Bandarban |
BDT 2.06 crore |
21 May 2023 |
Completed |
|
Rehabilitation of Borhanuddin (East Side of Diversion)-Kachia UP via Miabari (C.O Road Borhanuddin Kheyaghat - Miabari - Kachiahat - Dalal bazar) Road from Ch.00m-4000m Road ID- 509212009, under Borhanuddin Upazila, District- Bhola.
e-Tender/LGED/Bhola/GOBM/22-23/W-43/e-GP/20241225/827844/00240048
|
Office of the Executive Engineer, LGED, Bhola |
BDT 2.70 crore |
15 May 2023 |
Completed |
|
Emergency Repair of Damaged Road Pavement by Scarify, Base type-I, Carpeting, Sealcoat & HBB work at Ch.0+000 to 4+500(P) of Chatori (Chowmohoni)-CUFL-Karnaphuli Dry Dock(Marine Academy)-Fakirnirhat(Chatori Chowmohoni to CUFL Portion) National Highway (N-121) under Chattogram South Road Division during the year 2022
e-GP/EE/CSRD/55/2022-2023/e-GP/20250807/831889/00248513
|
Dohazari Road Division |
BDT 89.97 lakh |
15 May 2023 |
Completed |
|
Construction of WMCA office (12m x 6m) of Shampur-Kandakpur Subproject (SP ID: 62047) under Bhola Sadar Upazila, District- Bhola.
SSSWRDP/Bho/WD-46/2022-23/e-GP/20241226/816549/00240181
|
Office of the Executive Engineer, LGED, Bhola |
BDT 20.92 lakh |
17 Apr 2023 |
Completed |
|
Improvement of RCC Road Dhami Para-Choto Pancharo Govt. Primary School Road Ch.00.00-790 m under Jurachari Upazila, Dist: Rangamati
UTMIDP/RANG/JURA/WR-300/e-GP/20240328/802503/00160479
|
Office of the Executive Engineer, LGED, Rangamati |
BDT 1.16 crore |
19 Mar 2023 |
Completed |
|
Construction of WMCA office of Nayar Char Subproject (SP ID: 62041) under Bhola Sadar Upazila, District- Bhola.
SSSWRDP/Bho/WD-39/2022-23/e-GP/20241226/797058/00240180
|
Office of the Executive Engineer, LGED, Bhola |
BDT 19.87 lakh |
6 Mar 2023 |
Completed |
|
Shurb and Jungles cutting including removing and clearing at different Chainage of 11th (p) km, 12th (p) km, 13th (p) km, 14th (p) km, 15th (p) km, 16th (p) km, 17th (p) km, 18th (p) km and 19th (p) km of Keranihat-Satkania-Gunagori Zilla Road (Z-1019) under Dohazari Road Division during the year 2022-2023.
e-GP/EE/DRD/21/2022-2023/e-GP/20250807/786404/00248489
|
Dohazari Road Division |
BDT 2.69 lakh |
13 Feb 2023 |
Completed |
|
Jungles and Shrub cutting including removing and clearing at different Km (p) of Dhaka (Jatrabari)-Cumilla (Moinamoti)- Chattogram-Coxs Bazar-Teknaf National Highways (N-1) under Dohazari Road Division during the year 2022-2023.
e-GP/EE/DRD/28/2022-2023/e-GP/20250807/785942/00248493
|
Dohazari Road Division |
BDT 2.67 lakh |
2 Feb 2023 |
Completed |
|
Shrub and Jungles cutting including removing and clearing at different Km (p) of Patiya- Anowara- Banshkhali- Toitong Regional Highway (R-170) under Dohazari Road Division during the year 2022-2023.
e-GP/EE/DRD/27/2022-2023/e-GP/20250807/785941/00248494
|
Dohazari Road Division |
BDT 2.68 lakh |
2 Feb 2023 |
Completed |
|
Rehabilitation of Kalaiya UP (Launch Ghat)-Bogi Hat Road from Ch. 5000m-9982m under Bauphal, Patuakhali. (Road ID: 578383014)
e-Tender/LGED/PTK/GOBM/22-23/W-41/e-GP/20241212/780693/00234612
|
Office of the Executive Engineer, LGED, Patuakhali |
BDT 2.11 crore |
25 Jan 2023 |
Completed |
|
Precautionary Bank Protection Work on the Right bank of the Mohanonda River from Km 20.400 to Km 20.800 = 400 m at Dewantola Upazila : Chapainawabgonj Sadar, Dist : Chapainawabganj in Connection With "Morichardara Sub-Project'' under Nawabganj O&M Division, BWDB, Chapai Nawabganj during the FY 2022-2023.
OM/W-5/2022-23/e-GP/20241215/779958/00235812
|
Nawabganj O&M Division |
BDT 2.19 crore |
17 Jan 2023 |
Completed |
|
Repair & maintenance of Rahmatkhali 14 vent regulator (New & Old) Radial gates, Flap Gates & Gear box with internal metal parts of hoisting under Lakshmipur O&M Sub-Division in c/w O&M budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2022-23 (Package No.-LAK/OM/OTM/W-01/2022-2023).
LAK/OM/OTM/W-01/2022-2023/e-GP/20250807/771858/00248505
|
Laksmipur O&M Division |
BDT 9.00 lakh |
3 Jan 2023 |
Completed |
|
Rehabilitation of Chottosiba UZR-Baro Siba Launch Ghat Road from Ch. 1750-6970m under Upazila: Galachipa, District: Patuakhali Road ID No: 578574209
FDR/Pat/22-23/VR/W-32/e-GP/20241217/756475/00236630
|
Office of the Executive Engineer, LGED, Patuakhali |
BDT 1.90 crore |
1 Dec 2022 |
Completed |
|
(a) Improvement of North Kazir Howla-Jabbor Howlader House Road Ch. 00m-853m & 2329m-4026m (ID No. 578584064) & (b) Construction of 04 No 0.625mx0.900m Culvert at Ch. 2930m, 3080m, 3398m & 3722m on the same road under Rangabali, Patuakhali.
IRIDP-3/PTK/DW-57/e-GP/20241219/757548/00237403
|
Office of the Executive Engineer, LGED, Patuakhali |
BDT 1.98 crore |
1 Dec 2022 |
Ongoing |
|
Construction of the Bamboo Bandalling Structures to protect the (A branch of Jamuna) erosion theghoria and Shirighat at MelandahUpazila in Jamalpur district
RRI-I-06/e-GP/20250807/744477/00248557
|
PD, Protection of Islampur & Melandaha Upazila from erosion of the Old Brahmaputra Alaikhal and branch of Jamuna using Bamboo Bandalling Structure |
BDT 50.78 lakh |
23 Oct 2022 |
Completed |
|
Construction of the Bamboo Bandalling Structures to protect the Old Brahmaputra River Bank from erosion of Goyalar char, North SirajabadIslampurUpazila in Jamalpur district
RRI-I-01/e-GP/20250807/743384/00248558
|
PD, Protection of Islampur & Melandaha Upazila from erosion of the Old Brahmaputra Alaikhal and branch of Jamuna using Bamboo Bandalling Structure |
BDT 36.91 lakh |
23 Oct 2022 |
Completed |
|
Construction of the Bamboo Bandalling Structures to protect the Old Brahmaputra River Bank from erosion of MohanmadpurIslampurUpazila in Jamalpur district
RRI-I-03/e-GP/20250807/744471/00248531
|
PD, Protection of Islampur & Melandaha Upazila from erosion of the Old Brahmaputra Alaikhal and branch of Jamuna using Bamboo Bandalling Structure |
BDT 87.54 lakh |
23 Oct 2022 |
Completed |
|
Supplying Desktop Computer of Yufatunessa Govt. High School and Repair Digital Lab Room Under Bakshiganj Sadar, Bakshiganj District-Jamalpur.
INF-2020-21-453907-03/e-GP/20231012/734137/00106761
|
Office Of The Upazila Engineer, Bakshiganj, Jamalpur |
BDT 10.95 lakh |
16 Oct 2022 |
Completed |
|
Construction of Wash Block at Bogarchar Adarsho Girls High School under Bakshiganj Upazila District-Jamalpur.
INF-2020-21-453907-01/e-GP/20231011/734136/00105745
|
Office Of The Upazila Engineer, Bakshiganj, Jamalpur |
BDT 10.51 lakh |
16 Oct 2022 |
Completed |
|
Installation of vertical drop, louvers and construction work of a new iron staircase on the outside of the multipurpose hall room, installation of imported acoustic false ceiling in the multipurpose hall room including installation of platform inside the under construction multipurpose hall on the administrative block of the permanent Hajj camp in Ashkona, Dhaka.
Mhkli/Uttara/22-23/Hajj-03/e-GP/20240108/741797/00158641
|
Mohakhali PWD Division, Mohakhali, Dhaka |
BDT 1.69 crore |
13 Oct 2022 |
Completed |