|
Precautionary Bank Protection Work of at Right Bank of Bishkhali River from Km. 0.050 to Km.0.090 = 40 m Near Manki Sunder Primary School & Adjacent Area in Rajapur upazilla under Jhalakathi WD Division, BWDB, Jhalakathi from NDR Budget during the FY 2022-23.
Jhal/NDR/PBPW/22-23/W-24/e-GP/20231212/826824/00153086
|
Jhalokathi WD Division |
৳২৬.৪৭ লাখ |
৩ মে ২০২৩ |
Completed |
|
Infilling of Holes, Top filling & Turfing of Slopes of Embankment at Different Location from km. 21.100 to km. 23.500 & km. 24.500 to km. 26.850, Total= 4.750 km of Bishkhali Polder-5 at Kathalia Upazilla in Jhalakathi under Jhalakathi WD Division, BWDB, Jhalakathi from NDR Budget during the FY 2022-23.
Jhal/NDR/BIP/22-23/W-30/e-GP/20231212/821609/00153078
|
Jhalokathi WD Division |
৳৩.৯৬ লাখ |
১৮ এপ্রিল ২০২৩ |
Completed |
|
Infilling of Holes & Top filling of Embankment at Different Location from km. 21.000 to km. 28.000 Total = 7.00 Km of BIP Polder-2 at Nalcity Upazilla in jhalakathi district under Jhalakathi WD Division, BWDB, Jhalakathi from NDR Budget during the FY 2022-23.
Jhal/NDR/BIP/22-23/W-28/e-GP/20231212/821608/00153083
|
Jhalokathi WD Division |
৳৩.৯৭ লাখ |
১৮ এপ্রিল ২০২৩ |
Completed |
|
Precautionary Bank Protection Work at Left Bank of Talgasia Khal from km 0.000 to km 0.136 = 136 m at Sonar Bangla School Showlojalia Union at Kathalia Upazilla in Jhalakathi District Under Jhalakathi WD Division, BWDB, Jhalakathi during the FY 2022-2023.
Jhal/NDR/BIP/22-23/W-31/e-GP/20231212/820291/00153080
|
Jhalokathi WD Division |
৳২৪.০৭ লাখ |
১৭ এপ্রিল ২০২৩ |
Completed |
|
Calibration Work of CTM (Compression Testing Machine), Supplying & Installation Work of CC Block Core Cutting Machine with Core Bit, Gypsum, Sulphur, Lubricant & CCTV System and all other necessary Material & Items for Zonal Testing Laboratory, BWDB, Barisal under Barisal Mechanical O&M Division during the Year 2022-2023.
BMOD/OTM-W-21/2022-2023/e-GP/20231212/814264/00153076
|
Barisal Mech. O&M Division |
৳১০.৬৮ লাখ |
৬ এপ্রিল ২০২৩ |
Completed |
|
Survey Work for Re-Excavation of River/khal/Irrigation Channel; Resectioning of embankment and Design Data Preparation at Different Location under Jhalakathi WD Division, BWDB, Jhalakathi from NDR budget during the FY 2022-2023.
Jhal/NDR/Survey/22-23/W-25/e-GP/20231212/799844/00153082
|
Jhalokathi WD Division |
৳৭.১০ লাখ |
১৩ মার্চ ২০২৩ |
Completed |
|
Precautionary Bank Protection Work from Chainage Km. 0.165 to Km. 0.234 = 69.00 m at Left Bank of Gabkhan River to Protect the Road and adjecent Area of Ramnagor at Jhalakathi Sadar upazilla in Jhalakathi District under Jhalakathi WD Division, BWDB, Jhalakathi from NDR Budget during the FY 2022-23.
Jhal/NDR/PBPW/22-23/W-14/e-GP/20231212/792231/00153085
|
Jhalokathi WD Division |
৳১৯.১১ লাখ |
১৩ মার্চ ২০২৩ |
Completed |
|
Re-Sectioning of Embankment from k.m. 32.915 to k.m. 33.057 = 142 m & k.m. 33.133 to k.m. 33.157 = 24 m Total 166 m at West Badurtola under Mothbari Union in Rajapur Upizilla of Jhalakathi District under Jhalakathi WD Division,BWDB, Jhalakathi during the FY 2022-2023
Jhal/NDR/Emb/22-23/W-22/e-GP/20231212/796068/00153084
|
Jhalokathi WD Division |
৳৪.৭৭ লাখ |
১৩ মার্চ ২০২৩ |
Completed |
|
Precautionary Bank Protection Work at the Right Bank of Tarabunia River from km 0.000 to km 0.120 = 120 meter to Protect Tarabunia Police Camp of upazilla Kathalia in Jhalakathi District under Jhalakathi WD Division, BWDB, Jhalakathi during the Year 2022-2023.
Jhal/NDR/PBPW/22-23/W-20/e-GP/20231212/793009/00153081
|
Jhalokathi WD Division |
৳২৭.৪৫ লাখ |
১৩ মার্চ ২০২৩ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 02 Nos 1.65mx1.95m M.S Flap Gate at Bebazia Sluice, 04 Nos 1.65mx1.95m M.S Flap Gate at Gaimara Sluice & 04 Nos 1.65mx1.95m M.S Flap Gate & 01 Nos Pedestal type lifting device at Madraz Sluice of Polder No. 56/57 of Bhola O&M Division-02 with all necessary accessories under Barisal Mechanical O&M Division, BWDB, Barisal during the year 2022-23.
BMOD/OTM-W-13/2022-2023/e-GP/20231212/792454/00153070
|
Barisal Mech. O&M Division |
৳১৪.৭২ লাখ |
২০ ফেব ২০২৩ |
Completed |
|
Pump House Repair & Maintenance work and Fitting Fixing M.S Door Shutter,Window Grill of Primary Pump No. Bkp-07, Kp-07, Kp-15 & Bp-06 Barishal Irrigation Project under Barishal Mechanical O&M Division, BWDB, Barisal during the year 2022-2023.
BMOD/OTM-W-18/2022-2023/e-GP/20231212/792460/00153073
|
Barisal Mech. O&M Division |
৳৫.৩২ লাখ |
২০ ফেব ২০২৩ |
Completed |
|
Manufacturing, Painting, Supplying & Installation of 02 Nos 1.65mx1.95m M.S Flap Gate, 02 Nos 1.65mx1.875m M.S Lift Gate & 02 Nos Hand Wheel type lifting device at Sangrail sluice & 03 Nos 1.65mx1.95m M.S Flap of Gate Mithakhaly Sluice of Polder No. 39/1C of Pirojpur O&M Division and 01 No 1.98mx2.43m Lift gate at Boro Koibortokhaly Sluice of Jhalokathi Water Development Division with all accessories under Barisal Mechanical O&M Division, BWDB, Barisal during the year 2022-23.
BMOD/OTM-W-17/2022-2023/e-GP/20231212/792459/00153069
|
Barisal Mech. O&M Division |
৳১৩.২৭ লাখ |
২০ ফেব ২০২৩ |
Completed |
|
Construction of Two (2) Nos Cross Bundh to Repair Sluice Gate of NP-01 Pump House at Nalcity upazilla of Jhalakathi District under Jhalakathi WD Division, BWDB, Jhalakathi from NDR budget during the FY 2022-2023
Jhal/NDR/BIP/22-23/W-02/e-GP/20231213/761949/00153091
|
Jhalokathi WD Division |
৳৮.৭২ লাখ |
৫ ডিসে ২০২২ |
Completed |
|
Repair of Pump House Building for RJP-3 & RJP-4 Pump & Extension of Sluice Gate for RJP-4 Pump at Rajapur Upazilla in Jhalakathi District under Jhalakathi WD Division, BWDB, Jhalakathi under NDR Budget during the FY 2022-23
Jhal/NDR/BIP/22-23/W-06/e-GP/20231213/761988/00153088
|
Jhalokathi WD Division |
৳৫.৫৪ লাখ |
৫ ডিসে ২০২২ |
Completed |
|
Repair of Pump House Building and Height Extension of Sluice Gate at NP-08 Pump in Nalcity Upazilla of Jhalakathi District under Jhalakathi WD Division, BWDB, Jhalakathi from NDR Budget during the FY 2022-23
Jhal/NDR/BIP/22-23/W-04/e-GP/20231213/761961/00153089
|
Jhalokathi WD Division |
৳১১.২৩ লাখ |
৫ ডিসে ২০২২ |
Completed |
|
Electrical Control Panel Board and Related Electrical work with necessary accessories at Primary Pump Houses No. BP-13, BKP-07, NP-08, RJP-03 & RJP-04 under Barisal Mechanical O&M Division, BWDB, Barisal during the Year 2022-2023.
BMOD/OTM/W-02/2022-23/e-GP/20231212/757176/00153074
|
Barisal Mech. O&M Division |
৳৭.১৮ লাখ |
২৭ নভে ২০২২ |
Completed |
|
Improvement of Digpaith Bus Stand RHD-Sontia Bazar Road Ch. 100.00 m-1100.00 m Road ID-339365092.
IRIDP-3/ JML/DW-01/e-GP/20230923/528830/0087072
|
Office of the Executive Engineer, LGED, Jamalpur |
৳৮২.৩৮ লাখ |
২৩ ডিসে ২০২০ |
Completed |
|
Rehabilitation of 3 Nos 2.00mx2.00m Single Vent RCC Box culvert on Kahaloo UP office-Eruil Bazar via Aghorshal Road at Ch. 4127m 4264m & 4610m Road ID 110543001 Under Kahaloo Upazila District Bogura.
e-Tender/LGED/Bogu/GOBM/20-21/W-44/e-GP/20240914/494812/00175542
|
Office of the Executive Engineer, LGED, Bogra |
৳১৯.৫৩ লাখ |
২৯ সেপ ২০২০ |
Completed |
|
Improvement of J-5 Polisha Mour-Bera Bazar via Betaga Mosque Road with BC ch 00-700 m
MRRIDP/19/JAM/MADA/VR/68/e-GP/20231005/357659/0098007
|
Office of the Executive Engineer, LGED, Jamalpur |
৳৫৪.৩৬ লাখ |
২২ সেপ ২০১৯ |
Completed |